CRONOGRAMA ADICIONAL N 01 VALORIZADO EN ( S/.

) Y ( % )
PROPIETARIO:
MUNICIPALIDAD DISTRITAL DE HUACHOCOLPA
PROYECTO:
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO "SANTA ROSA" DISTRITO DE HUACHOCOLPA, TAYACAJA
HUANCAVELICA.
ITEM

DESCRIPCION

COSTO
PARCIAL(S/.)

01
ESTRUCTURAS
626,911.37
75,507.87
01.01
MOVIMIENTO DE TIERRAS
01.01.01 EXCAV. MANUAL DE ZANJAS HASTA 1.40 M
1,306.04
01.01.02 EXCAVACION MASIVA C/MAQUINARIA
13,832.24
01.01.03 ELIMIN. DE MATERIAL CON EQUIPO PROM. 1KM
60,369.59
01.02
14,462.62
CONCRETO SIMPLE
12,160.40
01.02.01 CIMIENTO CORRIDO CONCRETO 1:10 + 30% P G
01.02.02 ENCOFRADO Y DESENCOFRADO
2,302.22
01.03
111,268.99
CONCRETO ARMADO
01.03.01 VIGAS DE CIMENTACION
90,401.11
01.03.01.01 VIGAS CONCRETO F'C=210 kg/cm2
29,294.85
01.03.01.02 VIGAS ENCOFRADO Y DESENCOFRADO
16,588.20
01.03.01.03 VIGAS ACERO FY=4200 KG/CM2
44,518.06
01.03.02 COLUMNAS
6,724.88
01.03.02.01 COLUMNAS CONCRETO F'C=210 kg/cm2
1,810.41
01.03.02.02 COLUMNAS ENCOFRADO Y DESENCOFRADO
277.09
01.03.02.03 COLUMNAS ACERO F'C=4200 KG/CM2
4,637.38
01.03.03 COLUMNETAS
14,143.00
01.03.03.01 COLUMNETAS CONCRETO f'c=175 kg/cm2
8,150.54
01.03.03.02 COLUMNETAS ENCOFRADO Y DESENCOFRADO
4,050.51
01.03.03.03 COLUMNETAS ACERO FY=4200 KG/CM2
1,941.95
02
9,625.00
VARIOS
02.01
9,625.00
ADITIVO ACELERANTE
03
416,046.89
FLETE
03.01
416,046.89
FLETE TERRESTRE
04
INSTALACIONES ELECTRICAS - ADICIONALES
38,226.99
04.01
2,485.58
CANALIZACIONES, CONDUCTOS O TUBERIAS
04.01.01
114.55
TUBO PVC - P 50 MM
04.01.02
1,118.22
TUBO PVC - P 35MM
04.01.03
173.60
TUBO PVC - P 25MM
04.01.04
308.85
TUBO PVC - P 35MM TG - TD
04.01.05
770.36
TUBO PVC - P 25MM TG - TD
04.02
16,941.13
CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
04.02.01
16,941.13
RED DE CONEXION A TABLERO GENERAL PRINCIPAL
04.02.01.01 CABLE DE ENERGIA N2XH 3 - 25MM
1,240.14
04.02.01.02 CABLE DE ENERGIA N2XH 3-1-16MM
5,347.25
04.02.01.03 CABLE DE ENERGIA NH 2-1-10MM
989.06
04.02.01.04 CABLE DE ENERGIA N2XH 2-1-16MM
979.88
04.02.01.05 CABLE DE ENERGIA N2XH 2-1- 6MM
1,950.56
04.02.01.06 CABLE DE ENERGIA NH 2-1-16MM
580.58
04.02.01.07 CONDUCTOR Cu 1 x 25MM2 TW
398.95
04.02.01.08 CONDUCTOR Cu 1 x 16MM2 TW
2,846.17
04.02.01.09 CONDUCTOR Cu 1 x 10MM2 TW
1,589.05
04.02.01.10 CONDUCTOR Cu 1 x 6MM2 TW
1,019.49
04.03
411.82
TABLEROS DE DISTRIBUCION
04.03.01 TABLERO GENERAL CAJA METALICA DE 18 POLOS
411.82
04.04
3,006.38
TABLERO GENERAL PRINCIPAL
04.04.01 TABLERO DE DISTRIBUCION 11-21 TD CAJA METALICA 10 POLOS773.64
04.04.02 TABLERO DE DISTRIBUCION 12 TD CAJA METALICA 12 POLOS
351.82
04.04.03 TABLERO DE DISTRIBUCION 13 TD CAJA METALICA 26 POLOS
351.82
04.04.04 TABLERO DE DISTRIBUCION 14 TD CAJA METALICA 04 POLOS
256.82
04.04.05 TABLERO DE DISTRIBUCION 22-32 TD CAJA METALICA 14 POLOS593.64
04.04.06 TABLERO DE DISTRIBUCION 31 TD CAJA METALICA 10 POLOS
311.82
04.04.07 TABLERO DE DISTRIBUCION 41 TD CAJA METALICA 14 POLOS
366.82
04.05
1,165.48
INTERRUPTORES TERMOMAGNETICOS
04.05.01 TG 01 INTERRUPTOR TERMOMAGNETICO 3 x 50
61.82
04.05.02 TG 02 INTERRUPTOR TERMOMAGNETICO 3 x 50
61.82
04.05.03 TG 03 INTERRUPTOR TERMOMAGNETICO 3 x 50
61.82
04.05.04 TD 11 INTERRUPTOR TERMOMAGNETICO 2 x 50A
91.82
04.05.05 TD 13 INTERRUPTOR TERMOMAGNETICO 2 x 50A
91.82
04.05.06 TD 22 INTERRUPTOR TERMOMAGNETICO 2 x 50A
91.82
04.05.07 TD 32 INTERRUPTOR TERMOMAGNETICO 2 x 50A
91.82
04.05.08 TD 21 INTERRUPTOR TERMOMAGNETICO 2 x 40A
86.82
04.05.09 TD 04 INTERRUPTOR TERMOMAGNETICO 2 x 40A
86.82

1ER. MES
MONTO ( S/.)

2DO. MES

AVANCE %

MONTO ( S/.)

AVANCE %

1,306.04
13,832.24
30,184.79

100.00%
100.00%
50.00%

0.00
0.00
30,184.79

12,160.40
2,302.22

100.00%
100.00%

0.00
0.00

14,647.43
8,294.10
22,259.03

50.00%
50.00%
50.00%

14,647.43
8,294.10
22,259.03

50.00%
50.00%
50.00%

0.00
0.00
0.00

1,810.41
277.09
4,637.38

100.00%
100.00%
100.00%

0.00
0.00
0.00

8,150.54
4,050.51
1,941.95

100.00%
100.00%
100.00%

0.00

9,625.00

100.00%

208,023.45

50.00%

0.00
0.00
0.00
0.00
0.00

114.55
1,118.22
173.60
308.85
770.36

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1,240.14
5,347.25
989.06
979.88
1,950.56
580.58
398.95
2,846.17
1,589.05
1,019.49

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00

411.82

100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

773.64
351.82
351.82
256.82
593.64
311.82
366.82

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

61.82
61.82
61.82
91.82
91.82
91.82
91.82
86.82
86.82

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

208,023.45

50.00%

50.00%

CRONOGRAMA ADICIONAL N 01 VALORIZADO EN ( S/.) Y ( % )


PROPIETARIO:
MUNICIPALIDAD DISTRITAL DE HUACHOCOLPA
PROYECTO:
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO "SANTA ROSA" DISTRITO DE HUACHOCOLPA, TAYACAJA
HUANCAVELICA.
ITEM

COSTO

DESCRIPCION

PARCIAL(S/.)

04.05.10 TD 12 INTERRUPTOR TERMOMAGNETICO 2 x 30A


89.82
04.05.11 TD 14 INTERRUPTOR TERMOMAGNETICO 2 x 30A
89.82
04.05.12 TD 31 INTERRUPTOR TERMOMAGNETICO 2 x 30A
89.82
04.05.13 TD 41 INTERRUPTOR TERMOMAGNETICO 2 x 30A
89.82
04.05.14 TD 05 INTERRUPTOR TERMOMAGNETICO 2 x 20A
79.82
04.06
674.64
ARTEFACTOS ELECTRICOS
04.06.01 LUMINARIA C/REFLECTOR 2 x 400W HPI-220V
674.64
04.07
1,670.14
EQUIPOS ELECTRICOS Y MECANICOS
04.07.01 INSTALACION DE SISTEMA A PUESTA A TIERRA
1,670.14
04.08
1,403.77
INSTALACIONES DE COMUNICACIONES
04.08.01 CABLEADO ESTRUCTURADO EN INTERIORES DE EDIFICIOS
1,403.77
04.08.01.01 CABLE DATA INTERNET
239.59
04.08.01.02 CABLE COMUNICACIONES 8 HILOS
448.64
04.08.01.03 CABLE SISTEMA DE ALARMA
239.59
04.08.01.04 CABLE SISTEMA CONTRAINCENDIO
475.95
04.09
1,625.94
CANALETAS, CONDUCTOS Y/O TUBERIAS
04.09.01 TUBERIA PVC SEL 25MM2
1,625.94
04.10
35.73
SISTEMAS DE CONDUCTOS
04.10.01 CAJA DE PASE 150x150x100MM
35.73
04.11
1,167.56
CABLES EN TUBERIAS
04.11.01 CABLE DATA INTERNET
152.06
04.11.02 CABLE SISTEMA CONTRAINCENDIO
1,015.50
04.12
4,896.60
SALIDAS DE COMUNICACIONES
04.12.01 SALIDA PARA SISTEMA CONTRAINCENDIO
1,024.80
04.12.02 SALIDA PARA INTERNET DE COMPUTADORA
1,616.80
04.12.03
2,255.00
EQUIPO DE INTERNET
04.13
1,319.58
BUZONETAS
04.13.01 BUZONETAS DE CONDUCTOS
1,319.58
04.14
1,422.64
EXCAVACIONES DE ZANJA DE CONDUCTOS
04.14.01 EXCAV. DE ZANJAS P/DUCTOS DE COMUNICACIONES
711.32
04.14.02 EXCAV. DE ZANJAS P/DUCTOS DE INSTALACIONES ELECTRICAS711.32

COSTO DIRECTO
% AVANCE
% ACUMULADO

665,138.36
100%

1ER. MES
MONTO ( S/.)

2DO. MES

AVANCE %

MONTO ( S/.)

AVANCE %

0.00
0.00
0.00
0.00
0.00

89.82
89.82
89.82
89.82
79.82

100.00%
100.00%
100.00%
100.00%
100.00%

0.00

674.64

100.00%

0.00

1,670.14

100.00%

0.00
0.00
0.00
0.00

239.59
448.64
239.59
475.95

100.00%
100.00%
100.00%
100.00%

0.00

1,625.94

100.00%

0.00

35.73

100.00%

0.00
0.00

152.06
1,015.50

100.00%
100.00%

0.00
0.00
0.00

1,024.80
1,616.80
2,255.00

100.00%
100.00%
100.00%

1,319.58

100.00%

711.32
711.32

100.00%
100.00%

0.00
0.00

0.00%

313,009.70

352,128.66

47.06%

52.94%

47.06%

100.00%