PRESUPUESTO Y MEDICIONES

SISTEMA DESHIDRATACION DE LODOS


CDIGO

RESUMEN

UDS LONGITUD ANCHURA ALTURA

PARCIALES

CANTIDAD

PRECIO

IMPORTE

1,640.14000

12,052.48

19,767,754.55

229.00000

11,710.48

2,681,699.92

34.45000

517,689.83

17,834,414.64

48.00000

784,308.64

37,646,814.72

10.80000

930,862.00

10,053,309.60

96.30000

930,862.00

89,642,010.60

144.14000

870,002.18

125,402,114.23

6.12000

870,002.18

5,324,413.34

105.73000

444,704.53

47,018,609.96

50,866.46000

2,917.19

148,387,128.45

1.00000 23,398,789.44

23,398,789.44

CAPTULO P01 EDIFICIO DESHIDRATACION DE LODOS


A200.013

A100.001

E06

E07

E23

m2 LOCALIZACION Y REPLANTEO CON EQUIPO DE PRECISION

m3 EXCAVACIN A MANO

m3 CONCRETO ZAPATAS f'c=21MPa

m3 CONCRETO VIGAS DE CIMENTACION f'c=21MPa

m3 PEDESTALES EN CONCRETO, f'c= 21MPa

A1.400.007

m3 COLUMNA EN CONCRETO, F'C= 21MPa

E24

m3 CONCRETO VIGAS N+6.80m h=0.80m

E25

m3 CONCRETO VIGAS N+11.90m

E08

A200.002

E10

E11

E2605

E30

E31

7 de enero de 2015

m3 CONCRETO CONTRAPISO e= 20 cm

kg ACERO DE REFUERZO PDR-60 Y A-37

un ESCALERA METALICA

m2 CUBIERTA METALICA
623.04000

135,084.77

84,163,215.10

1.00000

4,500,000.00

4,500,000.00

10.46000

870,002.18

9,100,222.80

76.15000

1,285,613.27

97,899,450.51

gb ASEO Y RETIRO DE ESCOMBROS

m3 CONCRETO VIGAS N+6.80m h=0.30m

m3 CONCRETO RECUBRIMIENTO e=15 cm

TOTAL CAPTULO P01 EDIFICIO DESHIDRATACION DE LODOS....................................................................

722,819,947.86

TOTAL......................................................................................................................................................................

722,819,947.86