GENERADOR DE OBRA

ESTIMACION No.

PERIODO:

CONCEPTO No. 1

HOJA: 1 DE: 1
AREAS DE CORTE EN EXCAVACION DE DREN PLUVIAL

ESTACION

A1

0+000
0+020
0+040
0+060
0+080
0+100
0+120
0+140
0+160
0+180
0+200
0+220
0+240
0+260
0+280
0+300
0+320
0+340
0+360
0+380
0+400
0+420
0+440
0+460
0+480
0+500

3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19
3.19

A1+A2

D/2

VOL

UNIDAD

VOLUMEN ACUMULADO

M2
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38
6.38

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80
63.80

63.80
127.60
191.40
255.20
319.00
382.80
446.60
510.40
574.20
638.00
701.80
765.60
829.40
893.20
957.00
1,020.80
1,084.60
1,148.40
1,212.20
1,276.00
1,339.80
1,403.60
1,467.40
1,531.20
1,595.00

LA SUMA ESTA HOJA ES:


ABUNDAMIENTO %
TOTAL

1,595.000 M3
319.000
1,914.000