S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra
Subpresupuesto
Fecha
Lugar

0504001
001
22/11/2014

CANAL DE IRRIGACION
CANAL DE IRRIGACION

051007

AYACUCHO - VICTOR FAJARDO - COLCA

Cdigo

Recurso

0147000032
0147010001
0147010002
0147010003
0147010004

TOPOGRAFO
CAPATAZ
OPERARIO
OFICIAL
PEON

Unidad

Cantidad

Precio S/.

Parcial S/.

8.75
8.75
6.95
5.81
5.20

1,634.65
12.18
12,670.40
7,656.58
62,695.01

MANO DE OBRA
hh
hh
hh
hh
hh

186.8166
1.3916
1,823.0786
1,317.8286
12,056.7326

84,668.82

MATERIALES
0202010005
0202040009
0202040010
0202970002
0202980001
0202990001
0202990002
0204000000
0205000004
0205000032
0205000033
0205000034
0205010004
0205010020
0205020020
0205040001
0213520041
0221000000
0227020011
0228000022
0230020002
0230080013
0230990075
0238000000
0239050000
0239130019
0243100004
0243100005
0244000017
0244000018
0244010000
0249060056
0249130015
0254020004
0256220067
0261100003
0271950003
0272810001
0272810002
0272810003
0278010001
0279010001
0281010002
0282010001
0284010002

CLAVOS PARA MADERA C/C 3"


ALAMBRE NEGRO N16
ALAMBRE NEGRO N8
ACERO DE REFUERZO FY=4200 GRADO 60
CLAVOS
ENSAYO DE COMPRESION DEL CONCRETO
REJILLA DE PL 1/2"x1" (0.70x0.70)
ARENA FINA
PIEDRA CHANCADA DE 3/4"
PIEDRA ZARANDEADA DIAM. MAX = 1"
PIEDRA GRANDE
PIEDRA CHANCADA DE 1/2"
ARENA GRUESA
MATERIAL ZARANDEADO
PIEDRA MEDIANA
ARENA GRUESA
ELASTOMETRICOS
CEMENTO PORTLAND TIPO I (42.5KG)
FULMINANTE
DINAMITA
YESO EN BOLSA DE 25 Kg
ACCESORIOS
BOLSAS DE POLIETILENO
HORMIGON
AGUA
IMPERMEABILIZANTE LIQUIDO
ROLLIZO DE 6"x3.50m
REGLA DE MADERA
MADERA TORNILLO
MADERA DE 2"*3"
ESTACA DE MADERA
BARRENO DE 5'x7/8"
TRANSPORTE DE EQUIPOS Y HERRAMIENTAS
PINTURA ESMALTE D.D.
COMPUERTA ARMCO MOD. DE 0.70x0.70
CALAMINA
CODOS PRE-FABRICADOS
TUBERIA PERFILADA PVC D=350 mm NTP 399.162
TUBERIA PERFILADA PVC D=400 mm NTP 399.162
TUBERIA PERFILADA PVC D=450 mm NTP 399.162
LACA PROTECTORA PARA EN COFRADO
TRIPLAY 4x8x19MM
ANFO
CLAVOS PARA CALAMINA
CARTEL DE OBRA DE 4.80x3.60

kg
kg
kg
kg
kg
pza
pza
m3
m3
m3
m3
m3
m3
m3
m3
m3
gln
BOL
und
kg
BOL
GLB
cto
m3
m3
gln
pza
p2
p2
p2
p2
und
GLB
gln
pza
pln
und
m
m
m
gln
pza
kg
kg
und

93.4573
340.4318
1.4300
3,761.9687
0.8250
1.0000
1.0000
7.1148
18.2080
2.4457
26.9863
42.7780
47.7246
370.8250
0.2535
1.7979
0.2100
1,107.3344
7,862.7749
1,965.6858
25.9080
11.0000
6.0760
51.4965
422.3093
11.6952
2.0000
1.0995
1,257.1800
2,750.0000
1,189.0460
32.9855
2.0000
10.5950
1.0000
121.0000
74.0000
378.0000
2,097.3750
3,087.0000
3.2204
95.8474
1,171.2733
27.5000
1.0000

2.52
2.52
2.52
2.25
2.52
25.00
523.28
50.42
45.00
3.50
30.00
45.00
35.00
3.50
30.00
35.00
210.00
18.50
0.59
9.60
6.05
84.03
25.00
35.00
1.00
50.42
20.00
2.30
2.20
2.30
1.25
280.00
2,289.00
25.50
974.17
20.00
84.03
61.20
70.07
90.92
145.00
85.00
3.00
5.00
420.00

235.51
857.89
3.60
8,464.43
2.08
25.00
523.28
358.73
819.36
8.56
809.59
1,925.01
1,670.36
1,297.89
7.61
62.93
44.10
20,485.69
4,639.04
18,870.58
156.74
924.33
151.90
1,802.38
422.31
589.67
40.00
2.53
2,765.80
6,325.00
1,486.31
9,235.94
4,578.00
270.17
974.17
2,420.00
6,218.22
23,133.60
146,963.07
280,670.04
466.96
8,147.03
3,513.82
137.50
420.00
562,926.73

EQUIPOS
0337010001
0348000043
0349020005
0349030026
0349060004
0349060057
0349070003
0349100008
0349190001

HERRAMIENTAS MANUALES
MOTOBOMBA DE 6" x 16 HP
COMPRESORA NEUMATICA 240 HP 700-800 PCM
COMPACTADORA VIBR. TIPO PLANCHA 4 HP
MARTILLO NEUMATICO DE 25 Kg.
BALDE DE PRUEBA + ACCESORIOS
VIBRADOR DE CONCRETO 4 HP 1.50"
MEZCLADORA TROMPO 9P3
TEODOLITO

%MO
hm
hm
hm
hm
hm
hm
hm
hm

0.5003
184.1495
323.7832
184.6514
120.8547
77.8323
81.8753
186.8145
Fecha :

8.40
76.27
7.14
7.00
10.00
6.30
12.61
5.46

2,990.74
4.20
14,045.08
2,311.81
1,292.56
1,208.55
490.34
1,032.45
1,020.01

03/12/2014 01:52:48a.m.

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra
Subpresupuesto
Fecha
Lugar

0504001
001
22/11/2014

CANAL DE IRRIGACION
CANAL DE IRRIGACION

051007

AYACUCHO - VICTOR FAJARDO - COLCA

Cdigo

Recurso

Unidad

Cantidad

0349880002

NIVEL TOPOGRAFICO

hm

186.8157

Precio S/.

4.45

Parcial S/.

831.33
25,227.07

Total

Fecha :

S/.

672,822.62

03/12/2014 01:52:48a.m.