AL-UQLAH CENTRAL PROCESSING FACILITY

WATER LEVEL & SETTLEMENT TABLE


Doc No:8011-QC-056
Unit Description/Number : 0-T-6701
Unit Location/Area: CPF
System: Diesel Fuel Storage Tank
Ref:DWG/Documents: S2-01-YS207019-DRA-Z051-5009
Measure Pre-Water
25% Filling
50% Filling
Filling
ment
17/09/14
18/09/14
19/09/14
Date
6:00 AM
6:00 AM 4:00 PM 9:30 AM
Time
Level
Level
Level
Level
Position
100.904
1
100.905 100.902 100.908
100.908
2
100.907 100.907 100.910
100.907
3
100.906 100.906 100.907
100.910
4
100.907 100.908 100.909
100.918
5
100.915 100.916 100.916
100.911
6
100.912 100.909 100.909
100.910
7
100.911 100.909 100.909
100.908
8
100.908 100.906 100.906

Doc No : 801-QC-056
Date : Jun 15, 2013

Report No: 01
Inspection Date:
Test Code: API 650
ITP No: YS2-01-C07019-ITP-M-108
75% Filling
21/09/14
6:30 AM 1:30 PM
Level
Level
100.903 100.904
100.908 100.908
100.907 100.908
100.909 100.908
100.915 100.915
100.910 100.910
100.910 100.910
100.908 100.907

100% Filling
22/09/14
7:00 AM 4:30 PM
Level
Level
100.904 100.905
100.909 100.908
100.906 100.906
100.908 100.907
100.914 100.915
100.910 100.911
100.909 100.911
100.907 100.909

Empty

23/09/14
8:00 AM
Level
100.900
100.909
100.910
100.906
100.912
100.904
100.906
100.905

26/09/14
7:00 AM
Level
100.901
100.909
100.908
100.906
100.910
100.904
100.906
100.905

00
8

1
100%

75%
50%

900

2700
6

25%

EMPTY
5

4
1800

SURVEY INSTRUMENT
DETAILS
Make

LEICA GEOSYSTEMS
AG

Type
S.No.

Sprinter50
1101400

Accepted By

ORGANIZATION
ATL
DOME
OMV

DATE

NAME

SIGNATURE

REMARKS

AL-UQLAH CENTRAL PROCESSING FACILITY


HYDROSTATIC / PNEUMATIC TEST CHECKLIST

Doc No : 8011-QC-055
Rev : 00
Date : Jun 15, 2013
Page : 1 of 1

Doc No:8011-QC-055
Report No: 01
Unit Description/Number : 0-T-6701
Inspection Date:
Unit Location / Area: CPF
Test Code No: API 650
System: Diesel Fuel Storage Tank
ITP No: YS2-01-C07019-ITP-M-108
Ref:DWG/Documents: S2-01-YS207019-DRA-Z051-5009
1. FINAL INSPECTION FOR HYDROSTATIC TEST OR PNEUMATIC TEST
DESCRIPTION OF INSPECTION
RESULTS
REMARKS
NO.
1
WELDING INSPECTION COMPLETED
2
ALL NDE COMPLETED
3
ROOF INSTALLATION COMPLETED
4
REMOVAL OF TEMPORARY ATTACHMENT
5
CLOSING OF ALL OPENING
6
OTHERS
NOTE:

ATL

DOME

2. HYDROSTATIC TEST OR PNEUMATIC TEST:


DESCRIPTION OF INSPECTION
NO.
1
TEST WATER LEVEL
2
HYDRO-TEST START DATE/TIME
3
HYDRO-TEST FINISH DATE/TIME
4
WATER FILLING DATE
5
HOLDING TIME AT HYDROTEST LEVEL
6
HOLDING PRESSURE FOR PNEUMENTIC TEST
7
HOLDING TIME FOR PNEUMATIC TEST
8
LEAKAGE INSPECTION
9
INSPECTION RESULT
NOTE:

Accepted By

ORGANIZATION
ATL
DOME
OMV

DATE

OMV

RESULTS
NA
NA
NA
NA
NA
NA
NA
NA
NA

REMARKS

NAME

SIGNATURE

AL-UQLAH CENTRAL PROCESSING FACILITY


MATERIAL TRACEABILITY REPORT
Doc No:8011-QC-014
Unit Description/Number
Unit Location / Area:
System:
Ref:DWG/Documents:
SR.
NO.

ISO Drawing No./item


No/Spool

HEAT NUMBER

Report No:
Inspection Date:
Test Code No:
ITP No:
P & ID No:
DEMENSION
MATERIAL
LENGTH/
DIA/THK
AREA
SPECIFICATION

HEAT NO.
TRANSFERRED AND
CHECKED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED

REMARKS:

ORGANIZATION

Accepted By

ATL
DOME

DATE

NAME

SIGNATURE

Accepted By

DOME
OMV

HEAT NO.
TRANSFERRED AND
CHECKED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED

SIGNATURE

Doc No : 8011-QC-057
Rev : 00
Date : Jun 15, 2013
Page : 1 of 1

AL-UQLAH CENTRAL PROCESSING FACILITY


TANK BOTTOM SETTLEMENT REPORT
Doc No : 8011-QC-057
Unit Description/Number : 0-T-6701
Unit Location / Area : CPF
System: Diesel Fuel Storage Tank
Ref:DWG/Documents: S2-01-YS207019-DRA-Z051-5009
Before Hydrostatic Test
Sr.No.
After Hydrostatic Test
1

103.188

103.186

103.178

103.179

103.139

103.140

103.16

103.161

103.154

103.153

103.159

103.158

103.158

103.156

103.168

103.167

103.168

103.167

Report No: 01
Inspection Date:
Test Code No: API 650
ITP No: YS2-01-C07019-ITP-M-108
Remarks

SURVEY INSTRUMENT DETAILS


MAKE

LEICA GEOSYSTEMS AG

TYPE

SPRINTER 50

S.NO

1101400

00
C = CENTRE

NORTH

2700

9000

1800
ORGANIZATION
ATL
Accepted By
DOME
OMV

DATE

NAME

SIGNATURE

AL-UQLAH CENTRAL PROCESSING FACILITY


TANK HYDROTEST REPORT
Doc No:8011-QC-056
Unit Description/Number: 0-T-6701
Unit Location / Area: CPF
System: Diesel Fuel Storage Tank
Ref:DWG/Documents: S2-01-YS207019-DRA-Z051-5009

Report No: 01
Inspection Date:
Test Code No: API 650
ITP No: YS2-01-C07019-ITP-M-108

POSITION

ACTIVITY

DATE

TIME

EMPTY

START FILLING

17/09/14

9:00 AM

QUARTERS FULL

SETTLEMENT SURVEY

18/09/14

6:00 PM

HALF FULL

SETTLEMENT SURVEY

19/09/14

9:30 AM

THREE QUARTERS FULL

SETTLEMENT SURVEY

21/09/14

6:30 AM

FULL

START HOLD TIME 24 HRS

22/09/14

7:00 AM

FULL

SETTLEMENT SURVEY

23/09/14

8:00 AM

EMPTY

SETTLEMENT SURVEY

26/09/14

7:00 AM

REMARKS

Accepted By

ORGANIZATION
ATL
DOME
OMV

DATE

NAME

SIGNATURE

AL-UQLAH CENTRAL PROCESSING FACILITY


TANK BOTTOM / ROOF VACUUM TEST CHART
Doc No:8011-QC-061
Unit Description/Number
Unit Location / Area:
System:
Ref:DWG/Documents:

Report No:
Inspection Date:
Test Code No:
ITP No:

Defect Location & Vacuum Box Test Record


Defect
Signature
Weld No.
Date
Location ATL
DOME
OMV

Accepted By

ORGANIZATION
ATL
DOME

DATE

Data Rep.
@ Retest

NAME

Signature
ATL

SIGNATURE

Accepted By

DOME
OMV

Signature
DOME
OMV

SIGNATURE