DESCRIPCION
Unidad M3
ITEM: BASICO
UND CANT. DESP.% PRECIO UNIT VALOR TOTAL
MATERIALES
ARENA FINA
AGUA
CEMENTO GRIS PORTLAND SACO DE 50 KILOS
M3
LTS
KLS
1.16
36,667.00
185
50.00
364
5
320.00
SUBTOTAL MATERIALES
42,533.72
9,250.00
122,304.00
174,087.72
MANO DE OBRA
M. O. ALBANILERIA 2 AYUDANTE
HC
1.5
9,357.00
SUBTOTAL MANO DE OBRA
14,035.50
14,035.50
EQUIPO
HERRAMIENTA MENOR
GLB
MORTERO 1:4
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
2,000.00
2,000.00
190,123.22
DESCRIPCION
Unidad M3
ITEM: BASICO
UND CANT. DESP.% PRECIO UNIT VALOR TOTAL
MATERIALES
ARENA MEDIANA
CEMENTO GRIS PORTLAND SACO DE 50 KILOS
CAL HIDRATADA
M3
KLS
KLS
1.1
1
45,000.00
359
1
320.00
78
1
400.00
SUBTOTAL MATERIALES
49,995.00
116,028.80
31,512.00
197,535.80
MANO DE OBRA
M. O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
3.55
18,338.00
SUBTOTAL MANO DE OBRA
65,099.90
65,099.90
EQUIPO
HERRAMIENTA MENOR
GLB
0.195
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
390.00
390.00
263,025.70
DESCRIPCION
Unidad M3
ITEM: BASICO
UND CANT. DESP.% PRECIO UNIT VALOR TOTAL
MATERIALES
AGUA
ARENA MEDIANA
CEMENTO GRIS PORTLAND SACO DE 50 KILOS
LTS
M3
KLS
220
50.00
1.09
45,000.00
454
5
320.00
SUBTOTAL MATERIALES
11,000.00
49,050.00
152,544.00
212,594.00
MANO DE OBRA
M. O. ALBANILERIA 2 AYUDANTE
HC
1.5
9,357.00
SUBTOTAL MANO DE OBRA
14,035.50
14,035.50
EQUIPO
HERRAMIENTA MENOR
GLB
MORTERO 1:3
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
2,000.00
2,000.00
228,629.50
DESCRIPCION
Unidad: KLS
ITEM: BASICO
UND CANT. DESP.% PRECIO UNIT VALOR TOTAL
MATERIALES
ALAMBRE NEGRO # 18
HIERR.DE 60000 PSI 420 MPA
KLS
KLS
0.04
2,700.00
1
10
3,500.00
SUBTOTAL MATERIALES
108.00
3,850.00
3,958.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.056
13,660.00
SUBTOTA MANO DE OBRA
764.96
764.96
EQUIPO
HERRAMIENTA MENOR
GLB
0.1
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
200.00
200.00
4,922.96
DESCRIPCION
Unidad: M3
ITEM: BASICO
UND CANT. DESP.% PRECIO UNIT VALOR TOTAL
MATERIALES
AGUA
ARENA GRUESA
GRAVA TRITURADA 3/4"
GASOLINA CORRIENTE
CEMENTO GRIS PORTLAND SACO DE 50 KILOS
ACEITE MOTOR 4 TIEMPOS
PREMOLDA
LTS
M3
M3
GLN
KLS
GLN
190
50.00
0.56
1
45,000.00
0.84
1
75,000.00
0.1
6,800.00
350
5
320.00
0.006
12,500.00
SUBTOTAL MATERIALES
9,500.00
25,452.00
63,630.00
680.00
117,600.00
75.00
216,937.00
10,292.70
10,292.70
MANO DE OBRA
M. O. ALBANILERIA 2 AYUDANTE
HC
1.1
9,357.00
SUBTOTAL MANO DE OBRA
EQUIPO
MEZCLADORA DE CONCRETO
HERRAMIENTA MENOR
DIA
GLB
0.06
2.7
45,000.00
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
DEMOLICION DE MUROS
DESCRIPCION
2,700.00
5,399.26
8,099.26
235,328.96
Unidad: M2
ITEM: 1.1
UND. CANT. DESP.% PRECIO UNIT. VALOR TOTAL
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
EQUIPO
VOLQUETA 5 M3
HERRAMIENTA MENOR
VJE
GLB
0.35
4679
SUBTOTAL MANO DE OBRA
0.044
0.079
40000
2000
SUBTOTAL EQUIPO
COSTO DIRECTO
1,637.65
1,637.65
1,760.00
158.00
1,918.00
3,555.65
MANO DE OBRA
M.O. CARP.MADERA 1 AYUDANTE-1 OFI
HC
EQUIPO
HERRAMIENTA MENOR
GLB
2.5
13,660.00
SUBTOTAL MANO DE OBRA
1
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
Unidad: UND
ITEM: 1.2
VALOR TOTAL
34,150.00
34,150.00
2,000.00
2,000.00
36,150.00
DESCRIPCION
Unidad: M2
ITEM: 2.1
UND. CANT. DESP.% PRECIO UNIT. VALOR TOTAL
MATERIALES
PUNTILLA 2 CC
BASTIDOR 2"x2"x3M OTOBO
PIOLA GRUESA 50 METROS
LBS
ML
ROL
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
M.O. TOPOGRAFIA 1 CADENERO-1 TOP
HC
HC
EQUIPO
HERRAMIENTA MENOR
GLB
0.02
0.33
0.06
1850
1500
2500
SUBTOTAL MATERIALES
37.00
495.00
150.00
682.00
0.06
18338
0.04
13660
SUBTOTAL MANO DE OBRA
1,100.28
546.40
1,646.68
0.039
2000
SUBTOTAL EQUIPO
COSTO DIRECTO
78.00
78.00
2,406.68
Unidad: M3
ITEM: 2.2
UND. CANT. DESP.% PRECIO UNIT. VALOR TOTAL
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
EQUIPO
HERRAMIENTA MENOR
GLB
1.5
4679
SUBTOTAL MANO DE OBRA
0.168
2000
SUBTOTAL EQUIPO
COSTO DIRECTO
7,018.50
7,018.50
336.00
336.00
7,354.50
Unidad: M3
ITEM: 2.3
UND. CANT. DESP.% PRECIO UNIT. VALOR TOTAL
MATERIALES
MATERIAL DE RELLENO (BALASTO)
M3
1.3
25000
SUBTOTAL MATERIALES
32,500.00
32,500.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.9
4679
SUBTOTAL MANO DE OBRA
4,211.10
4,211.10
EQUIPO
VIBROCOMPACTADOR CA-15
HERRAMIENTA MENOR
HRS
GLB
0.07
0.692
58000
2000
SUBTOTAL EQUIPO
COSTO DIRECTO
4,060.00
1,384.00
5,444.00
42,155.10
KLS
LBS
UND
UND
M3
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
EQUIPO
VIBRADOR ELECTRICO
HERRAMIENTA MENOR
DIA
GLB
5.84
0.8
0.72
0.46
0.13
4,922.96
1850
7500
4500
235,328.96
SUBTOTAL MATERIALES
28,750.08
1,480.00
5,400.00
2,070.00
30,592.76
68,292.84
1.69
18338
SUBTOTAL MANO DE OBRA
30,991.22
30,991.22
0.1
0.5
40000
2000
SUBTOTAL EQUIPO
COSTO DIRECTO
4,000.00
1,000.00
1,000.00
102,284.06
KLS
KLS
LBS
UND
UND
M3
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
EQUIPO
HERRAMIENTA MENOR
VIBRADOR ELECTRICO
GLB
DIA
0.05
3.4
0.5
0.22
0.11
0.042
2700
4,922.96
1850
7500
4500
235,328.96
SUBTOTAL MATERIALES
135.00
17,574.96
925.00
1,650.00
495.00
9,883.81
30,663.77
0.5
18338
SUBTOTAL MANO DE OBRA
9,169.00
9,169.00
0.2
0.05
2000
40000
SUBTOTAL EQUIPO
COSTO DIRECTO
400.00
2,000.00
2,400.00
42,232.77
UNIDAD: ML
ITEM: 3.3
VALOR TOTAL
DESCRIPCION
MATERIALES
MORTERO 1:3
BLOQUE MORTERO 10X19X39
M3
UND
0.015
228,629.50
5
550.00
SUBTOTAL MATERIALES
3,429.44
2,750.00
6,179.44
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.8
13,660.00
SUBTOTAL- MANO DE OBRA
10,928.00
10,928.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.2
2,000.00
SUBTOTAL- EQUIPO
COSTO DIRECTO
400.00
400.00
17,507.44
UNIDAD: ML
ITEM: 3.4
VALOR TOTAL
DESCRIPCION
MATERIALES
MORTERO 1:3
BLOQUE MORTERO 10X19X39
M3
UND
0.015
228,629.50
5
550.00
SUBTOTAL MATERIALES
3,429.44
2,750.00
6,179.44
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.8
13,660.00
SUBTOTAL- MANO DE OBRA
10,928.00
10,928.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.2
2,000.00
SUBTOTAL- EQUIPO
COSTO DIRECTO
400.00
400.00
17,507.44
KLS
KLS
LBS
UND
UND
M3
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
EQUIPO
HERRAMIENTA MENOR
ANDAMIO METALICO TUBULAR
GLB
U/D
0.2
3.16
0.15
0.7
0.5
0.024
2700
4,922.96
1850
7500
4500
235,328.96
SUBTOTAL MATERIALES
540.00
16,334.38
277.50
5,250.00
2,250.00
5,647.89
30,299.77
0.5
13660
SUBTOTAL MANO DE OBRA
6,830.00
6,830.00
0.33
0.1
2000
350
SUBTOTAL EQUIPO
COSTO DIRECTO
660.00
35.00
695.00
37,824.77
Unidad: M2
ITEM: 4.2
UND. CANT. DESP.% PRECIO UNIT. VALOR TOTAL
MATERIALES
CUARTON 2"x4"x3M OTOBO
PUNTILLA 2 CC
TABLA 1x10x3M OTOBO
FORMALETA PARA ENTREPISO PRE
MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA
UND
LBS
UND
M2
M3
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OIF
HC
EQUIPO
VIBRADOR ELECTRICO
HERRAMIENTA MENOR
DIA
GLB
0.5
0.2
0.67
1
0.1
4519
1850
7500
3765
235,328.96
SUBTOTAL MATERIALES
2,259.50
370.00
5,025.00
3,765.00
23,532.89
34,952.39
0.7
23016
SUBTOTAL MANO DE OBRA
16,111.20
16,111.20
0.02
0.33
40000
2000
SUBTOTAL EQUIPO
COSTO DIRECTO
800.00
660.00
1,460.00
52,523.59
DESCRIPCION
Unidad: M2
ITEM: 5.1
UND. CANT. DESP.% PRECIO UNIT. VALOR TOTAL
MATERIALES
BLOQUE MORTERO 10X19X39
MORTERO DE PEGA PARA BLOQUE
UND
M3
12.5
0.015
550
263,025.70
SUBTOTAL MATERIALES
6,875.00
3,945.38
10,820.38
5,464.00
5,464.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.4
13660
SUBTOTAL MANO DE OBRA
EQUIPO
HERRAMIENTA MENOR
ANDAMIO METALICO TUBULAR
GLB
U/D
0.2
0.1
2000
350
SUBTOTAL EQUIPO
COSTO DIRECTO
400.00
35.00
435.00
16,719.38
DESCRIPCION
Unidad: M2
ITEM: 5.2
UND. CANT. DESP.% PRECIO UNIT. VALOR TOTAL
MATERIALES
LADRILLO 15X20X40CM
MORTERO 1:4
UND
M3
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
EQUIPO
HERRAMIENTA MENOR
ANDAMIO METALICO TUBULAR
GLB
U/D
12
0.035
1200
190,123.22
SUBTOTAL MATERIALES
14,400.00
6,654.31
21,054.31
0.62
13660
SUBTOTAL MANO DE OBRA
8,469.20
8,469.20
0.2
0.1
2000
350
SUBTOTAL EQUIPO
COSTO DIRECTO
400.00
35.00
435.00
29,958.51
Unidad: M2
ITEM: 6.1
VALOR TOTAL
MATERIALES
PINTURA PARA CUBIERTA
GLN
80,000.00
0.125
SUBTOTAL MATERIALES
10,000.00
10,000.00
MANO DE OBRA
M.O. PINTURA 1 AYUDANTE-1 OFI
HC
13,660.00
0.12
SUBTOTAL MANO DE OBRA
1,639.20
1,639.20
EQUIPO
HERRAMIENTA MENOR
ANDAMIO METALICO TUBULAR
GLB
U/D
2,000.00
350.00
SUBTOTAL EQUIPO
44.00
105.00
149.00
0.022
0.3
COSTO DIRECTO
11,788.20
GLB
800,000.00
GLB
700,000.00
SUBTOTAL OTROS
COSTO DIRECTO
OTROS
MANO DE OBRA
MATERIALES PARA PUNTOS HIDRAULICOS
GLB
GLB
1
1
300,000.00
500,000.00
SUBTOTAL OTROS
COSTO DIRECTO
800,000.00
700,000.00
1,500,000.00
1,500,000.00
Unidad: GLB
ITEM: 8.1
VALOR TOTAL
300,000.00
500,000.00
800,000.00
800,000.00
UNIDAD: GLB
ITEM: 9.1
UND CANT. DESP.% PRECIO UNIT VALOR TOTAL
GLB
600,000.00
GLB
500,000.00
SUBTOTAL OTROS
COSTO DIRECTO
MATERIALES
AGUA
CEMENTO BLANCO NARE SACO DE 25 KILOS
MANGUERA FLEXIBLE GRIFLEX GRIVAL
REF.38014001
SANITARIO CON CISTERNA Y ACCESORIOS
500,000.00
1,100,000.00
1,100,000.00
600,000.00
Unidad: JGO
ITEM: 9.2
VALOR TOTAL
LTS
KLS
UND
1
1
1
50.00
680.00
50.00
680.00
UND
2,300.00
270,000.00
1
SUBTOTAL MATERIALES
2,300.00
270,000.00
273,030.00
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI
HC
13,660.00
2
SUBTOTAL MANO DE OBRA
27,320.00
27,320.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.01
2,000.00
SUBTOTAL EQUIPO
20.00
20.00
COSTO DIRECTO
300,370.00
DESCRIPCION
Unidad: JGO
ITEM: 9.3
VALOR TOTAL
MATERIALES
AGUA
CEMENTO BLANCO NARE SACO DE 25 KILOS
LAVAMANO CON PEDESTAL + ACCESORIOS
LTS
KLS
UND
50.00
0.5
680.00
0.5
109,000.00
1
SUBTOTAL MATERIALES
25.00
340.00
109,000.00
109,365.00
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI
HC
13,660.00
1.25
SUBTOTAL MANO DE OBRA
17,075.00
17,075.00
EQUIPO
HERRAMIENTA MENOR
GLB
2,000.00
SUBTOTAL EQUIPO
200.00
200.00
0.1
COSTO DIRECTO
126,640.00
Unidad: UND
ITEM: 9.4
VALOR TOTAL
MATERIALES
AGUA
CEMENTO BLANCO NARE SACO DE 25 KILOS
LAVAPLATOS DE A.INOX DOBLE + ACCESORIOS
LTS
KLS
UND
50.00
2
680.00
1.5
210,000.00
1
SUBTOTAL MATERIALES
100.00
1,020.00
210,000.00
211,120.00
MANO DE OBRA
M.O. ALB. ACABADOS 2 AYUDANTE-1 OFI
HC
18,339.00
1.2
SUBTOTAL MANO DE OBRA
22,006.80
22,006.80
EQUIPO
HERRAMIENTA MENOR
GLB
0.25
2,000.00
SUBTOTAL EQUIPO
500.00
500.00
COSTO DIRECTO
233,626.80
Unidad: M2
ITEM: 10.1
VALOR TOTAL
MATERIALES
MORTERO 1:3
M3
0.05
228,629.50
SUBTOTAL MATERIALES
11,431.47
11,431.47
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.42
13,660.00
SUBTOTAL MANO DE OBRA
5,737.20
5,737.20
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
HERRAMIENTA MENOR
M3
GLB
0.075
0.3
4,500.00
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
337.50
600.00
937.50
18,106.17
Unidad: M2
ITEM: 10.2
VALOR TOTAL
DESCRIPCION
MATERIALES
AGUA
WAIPE
PEGANTE CERAMICA PEGACOR-ALFALISTO
CERAMICA PARA PISO 25X25 PRIMERA CALIDAD
EMBOQUILLADOR
LTS
KLS
KLS
M2
KLS
3
50.00
0.1
3,870.00
4
900.00
1
25,000.00
0.45
3,250.00
SUBTOTAL MATERIALES
150.00
387.00
3,600.00
25,000.00
1,462.50
30,599.50
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI
HC
0.7
13,660.00
SUBTOTAL MANO DE OBRA
9,562.00
9,562.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.05
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
100.00
100.00
40,261.50
GUARDAESCOBA TABLON
DESCRIPCION
Unidad: ML
ITEM: 10.3
VALOR TOTAL
MATERIALES
AGUA
TABLON GRESS LISO 20X10 ALFA
MORTERO 1:3
LTS
M2
M3
0.005
50.00
0.1
1
14,488.00
0.001
228,629.50
SUBTOTAL MATERIALES
0.25
1,463.28
228.62
1,692.15
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.3
13,660.00
SUBTOTAL MANO DE OBRA
4,098.00
4,098.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.03
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
60.00
60.00
5,850.15
Unidad: M2
ITEM: 11.1
VALOR TOTAL
MATERIALES
MORTERO 1:4
M3
0.03
190,123.22
SUBTOTAL MATERIALES
5,703.69
5,703.69
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.45
13,660.00
SUBTOTAL MANO DE OBRA
6,147.00
6,147.00
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
HERRAMIENTA MENOR
ANDAMIO METALICO TUBULAR
M3
GLB
U/D
0.032
0.05
0.1
4,500.00
2,000.00
350.00
SUBTOTAL EQUIPO
COSTO DIRECTO
144.00
100.00
35.00
279.00
12,129.69
Unidad: M2
ITEM: 12.1
VALOR TOTAL
DESCRIPCION
MATERIALES
PEGACOR BLANCO CORONA R:30100
WAIPE
CEMENTO BLANCO SACO DE 40 KILOS
CERAMICA CORONA 25 x25 PRIMERA CALIDAD
KLS
KLS
BTO
M2~
3
2
900.00
0.2
3,870.00
0.02
33,000.00
1
1
25,000.00
SUBTOTAL MATERIALES
2,754.00
774.00
660.00
25,250.00
29,438.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.8
13,660.00
SUBTOTAL MANO DE OBRA
10,928.00
10,928.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.05
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
100.00
100.00
40,466.00
UND
M3
MANO DE OBRA
M.O. CARP.MADERA 1 AYUDANTE-1 OFI
HC
EQUIPO
HERRAMIENTA MENOR
GLB
1
550,000.00
0.015
228,629.50
SUBTOTAL MATERIALES
550,000.00
3,429.44
553,429.44
3
13,660.00
SUBTOTAL MANO DE OBRA
40,980.00
40,980.00
2,000.00
SUBTOTAL EQUIPO
COSTO DIRECTO
UND
M3
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
EQUIPO
HERRAMIENTA MENOR
GLB
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI
HC
EQUIPO
HERRAMIENTA MENOR
GLB
Unidad: UND
ITEM: 13.2
VALOR TOTAL
250,000.00
4,572.59
254,572.59
13,660.00
3
SUBTOTAL MANO DE OBRA
40,980.00
40,980.00
2,000.00
SUBTOTAL EQUIPO
2,000.00
2,000.00
M3
596,409.44
250,000.00
228,629.50
0.02
SUBTOTAL MATERIALES
UND
2,000.00
2,000.00
COSTO DIRECTO
MATERIALES
PUERTA EN ALUMINIO Y VIDRIO ESPEJO DE
1.0X2.05MTS
MORTERO 1:3
Unidad: UND
ITEM: 13.1
VALOR TOTAL
297,552.59
Unidad: UND
ITEM: 13.4
VALOR TOTAL
1
550,000.00
228,629.50
0.02
SUBTOTAL MATERIALES
550,000.00
4,572.59
554,572.59
13,660.00
3
SUBTOTAL MANO DE OBRA
40,980.00
40,980.00
2,000.00
SUBTOTAL EQUIPO
18,800.00
18,800.00
9.4
COSTO DIRECTO
614,352.59
M3
UND
Unidad: UND
ITEM: 13.5
VALOR TOTAL
228,629.50
4,572.59
1,100,000.00
SUBTOTAL MATERIALES
1,100,000.00
1,104,572.59
0.02
1
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI
HC
13,660.00
3
SUBTOTAL MANO DE OBRA
40,980.00
40,980.00
EQUIPO
HERRAMIENTA MENOR
GLB
10.5
2,000.00
SUBTOTAL EQUIPO
21,000.00
21,000.00
COSTO DIRECTO
1,166,552.59
Unidad: M2
ITEM: 13.6
VALOR TOTAL
MATERIALES
MORTERO 1:3
VENTANA EN ALUMINIO Y VIDRIO ESPEJO
M3
M2
228,629.50
0.02
181,000.00
1
SUBTOTAL MATERIALES
4,572.59
181,000.00
185,572.59
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI
HC
13,660.00
2
SUBTOTAL MANO DE OBRA
27,320.00
27,320.00
EQUIPO
HERRAMIENTA MENOR
GLB
2,000.00
SUBTOTAL EQUIPO
2,954.00
2,954.00
1.477
COSTO DIRECTO
MATERIALES
CIELO RASO EN YESO (INCLUYE SUMINISTRO,
INSTALACION, ACABADO FINAL Y MANO DE OBRA)
215,846.59
UNIDAD: M2
ITEM: 14.1
VALOR TOTAL
30,000.00
M2
1
30,000.00
SUBTOTAL MATERIALES
COSTO DIRECTO
30,000.00
30,000.00
MATERIALES
MOLDURA EN YESO PARA CIELORASO (INCLUYE
SUMINISTRO, INSTALACION, ACABADO FINAL Y
MANO DE OBRA)
UNIDAD: ML
ITEM: 14.2
VALOR TOTAL
10,800.00
ML
1
10,800.00
SUBTOTAL MATERIALES
COSTO DIRECTO
10,800.00
10,800.00
DESCRIPCION
Unidad: M2
ITEM: 14.3
VALOR TOTAL
MATERIALES
AGUA
VINILO TIPO 1 BASE DE AGUA
LTS
GLN
50.00
0.02
1
44,500.00
0.032
SUBTOTAL MATERIALES
1.00
1,438.24
1,439.24
MANO DE OBRA
M.O. PINTURA 1 AYUDANTE-1 OFI
HC
13,660.00
0.12
SUBTOTAL MANO DE OBRA
1,639.20
1,639.20
EQUIPO
HERRAMIENTA MENOR
ANDAMIO METALICO TUBULAR
GLB
U/D
0.02
0.1
2,000.00
350.00
SUBTOTAL EQUIPO
40.00
35.00
75.00
COSTO DIRECTO
OTROS
LIMPIEZA GENERAL DE PISOS Y RETIRO DE
ESCOMBROS
GLB
450,000.00
SUBTOTAL OTROS
COSTO DIRECTO
UND
M3
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
EQUIPO
HERRAMIENTA MENOR
GLB
3,153.44
Unidad: GLB
ITEM: 15.1
VALOR TOTAL
450,000.00
450,000.00
450,000.00
Unidad: UND
ITEM: 13.3
VALOR TOTAL
1
500,000.00
228,629.50
0.02
SUBTOTAL MATERIALES
500,000.00
4,572.59
504,572.59
13,660.00
3
SUBTOTAL MANO DE OBRA
40,980.00
40,980.00
2,000.00
SUBTOTAL EQUIPO
2,000.00
2,000.00
COSTO DIRECTO
547,552.59