LICITACION: CONTRATO:

OBRA:
CONTRATISTA:
LUGAR:
134
CLAVE UNIDAD CANTIDAD P.U.
GRAPA8 pza 0.40 $1,770.03
GRAPA4 pza 0.40 $1,170.02
GRAPA6 pza 0.40 $1,460.02
GRAPA3 pza 0.40 $1,050.02
GRAPA12 pza 0.40 $2,250.04
BENTO BULTO 1.00 $149.25
CAL KG 50.00 $1.24
009 jor 1.00 $587.96
008 jor 1.00 $669.95
002 jor 1.00 $505.97
005 jor 4.00 $503.66
006 jor 2.00 $340.84
017 jor 1.00 $1,325.85
018 jor 2.00 $709.04
CAM3 hora 4.00 $481.12
TARRAJA hr 4.00 $36.44
LOWB hora 4.00 $77.41
C990122-1005 hora 4.00 $81.27
TRAC hora 4.00 $452.56
TORRE hr 10.00 $86.68
MANGAS pza 4.00 $1,500.00
GRAV M3 21.00 $289.77
APUAS rollo 1.00 $642.00
GRAPA kg 10.00 $24.00
RADIO SERVICIO 1.00 $12,387.67
SUMA DE MAQUINARIA Y EQUIPO
SUMA DE AUXILIARES
POR P.E.P
MANGAS TERMORETRACTILES PARA PROTECCION DE JUNTAS
GRAVA
ALAMBRE DE PUAS VAQUERO DE 34 KG PRESENTACION DE 360 M
GRAPA GALVANIZADA PARA ALAMBRE DE PUAS VAQUERO DE 1" 1/4". MCA.
DEACERO
AUXILIARES
MAQUINA ROSCADORA RIDGID MOD. 300 COMP. RID 67182 SUPEROIR MODELO
BC810 DE 1/2" A 8"
REMOLQUE PLATAFORMA BAJA LOW BOY
COMPACTADOR TIPO BAILARINA MARCA BECKER 4 HP
TRACTOCAMION KENWORTH QUINTA RUEDA
TORRE DE LUZ WACKER 4X100W DIESEL LOMBA
BULTO DE BENTONITA SODICA READY VISK 100 PRESETACION DE 50 KGS.
CAL HIDRATADA MARCA CALERAS BERTRAN SA DE CV
OPERADOR DE EQUIPO MEDIANO
OPERADOR DE EQUIPO MAYOR
CAMIONETA DE REDILAS 4.50 TON. DE CAPACIDAD CON BRAZO HIDRAULICO
ARTICULADO
SERVICIO DE INSPECCION RADIOGRAFICA.
AUTORIZADO POR
SUBCONTRATOS
POR EL CONTRATISTA
SERVICIO PARA REALIZAR TRABAJOS INMEDIATOS (FUGAS, INTERCONEXIONES , LIBRANZAS ) EN LA INFRAESTRUCTURA DEL APATG.
D E S C R I P C I N
GRAPA DE 8" CED. 80 PARA TUBERIA DE ACERO AL CARBON. INCLUYE NEOPRENO
Y ESPARRAGOS PARA SUJECION.
GRAPA DE 4" CED. 80 PARA TUBERIA DE ACERO AL CARBON. INCLUYE NEOPRENO
Y ESPARRAGOS PARA SUJECION.
GRAPA DE 6" CED. 80 PARA TUBERIA DE ACERO AL CARBON. INCLUYE NEOPRENO
Y ESPARRAGOS PARA SUJECION.
GRAPA DE 3" CED. 80 PARA TUBERIA DE ACERO AL CARBON. INCLUYE NEOPRENO
Y ESPARRAGOS PARA SUJECION.
GRAPA DE 12" CED. 80 PARA TUBERIA DE ACERO AL CARBON. INCLUYE
NEOPRENO Y ESPARRAGOS PARA SUJECION.
SUMA DE MATERIALES
SUMA DE MANO DE OBRA
ANEXO DE-1 ANLISIS DE PRECIOS UNITARIOS
MATERIALES
MANO DE OBRA
MAQUINARIA Y EQUIPO
CABO DE OFICIO
AYUDANTE GENERAL
PEON
OFICIAL TUBERO
OFICIAL SOLDADOR
HOJA: 1/2
$587.96
$669.95
$505.97
$2,014.64
$681.68
$420.01
$900.02
$149.25
$62.00
$3,291.31
jornada
TOTAL
$708.01
$468.01
$584.01
POR P.E.P
$1,325.85
$1,418.08
$7,204.13
$1,924.48
$145.76
$309.64
$325.08
$1,810.24
$866.80
$5,382.00
$6,000.00
AUXILIARES
$6,085.17
$642.00
$240.00
SUBCONTRATOS
$12,967.17
$12,387.67
ANEXO DE-1 ANLISIS DE PRECIOS UNITARIOS
MATERIALES
MANO DE OBRA
MAQUINARIA Y EQUIPO
LICITACION: CONTRATO:
OBRA:
CONTRATISTA:
LUGAR:
RADIO SERVICIO 1.00
10.01 %
0.53 %
4.04 %
0.50 %
$12,387.67
%
SERVICIO DE INSPECCION RADIOGRAFICA.
AUTORIZADO POR
SUMA DE SUBCONTRATOS
COSTO DIRECTO
Indirectos de oficina
Financiamiento
Utilidad
Cargos adicionales
Total sobrecostos
ANEXO DE-1 ANLISIS DE PRECIOS UNITARIOS
P R E C I O U N I T A R I O
** CINCUENTA Y CINCO MIL CUATROCIENTOS OCHENTA Y DOS PESOS 66/100 M.N. **
POR EL CONTRATISTA
PRECIO UNITARIO
POR P.E.P
HOJA: 2/2
$12,387.67 $12,387.67
$47,980.31
$4,802.83
$279.75
$2,143.74
$276.03
$7,502.35
$55,482.66
ANEXO DE-1 ANLISIS DE PRECIOS UNITARIOS
P R E C I O U N I T A R I O
** CINCUENTA Y CINCO MIL CUATROCIENTOS OCHENTA Y DOS PESOS 66/100 M.N. **
POR P.E.P