OBRA
: BUENA VISTA
ITEM
DESCRIPCION
DEPARTAMENTO : ANCASH
UND
METRADO
COSTO AL : 27/01/2005
PRECIO PARCIAL
TOTAL
UNIT
01.01.00 EXCAVACION
M3
52,792.00
32.14
1,696,734.88
01.04.00 ENCOFRADO
M2
02.02.00 CONCRETO
M3
98,985.00
43.48
4,303,867.80
13,198.00
302.87
3,997,278.26
9,997,880.94
COSTO DIRECTO
9,997,880.94
1,499,682.14
Utilidad (5%)
499,894.05
Sub Total
11,997,457.13
IGV
2,159,542.28
Total
MANO DE OBRA
HH
CAP.
HH
OP.
HH
Of.
HH
PE
MATERIALES
CLAVO
MADERA
CEMENTO
PIEDRA
ARENA
AGUA
EQUIPO Y HERRAMIENTAS
HERRAM_MANUALES
MEZCLADORA
VIBRADORA
14,156,999.41
19,904.56
78,390.18
71,991.79
171,859.08
17.5
15.2
13.2
11.9
348,329.87
1,191,530.74
950,291.63
2,045,123.01
19,797.00
494,925.00
121,421.60
9,898.50
7,786.82
2,903.56
4.5
4
18.5
50
35
7
89,086.50
1,979,700.00
2,246,299.60
494,925.00
272,538.70
20,324.92
136,467.32
6,398.39
6,398.39
1
25
10
136,467.32
159,959.76
63,983.90
9,998,560.95
MANO DE OBRA
CAP.
OP.
Of.
12,068.25
7,196.21
640.10
71,991.79
6,398.39
71,991.79
19,904.56
78,390.18
71,991.79
17.5
348,329.87
MATERIALES
PE
CLAVO
MADERA
19,797.00
494,925.00
CEMENTO
PIEDRA
121,421.60
9,898.50
121,421.60
9,898.50
120,666.67
15.2
1,191,530.74
51,192.40
13.2
950,291.63
171,859.08
11.9
2,045,123.01
19,797.00
494,925.00
4.5
18.5
50
89,086.50
1,979,700.00
2,246,299.60
494,925.00
89086.5
0
1979700
0
0
2246299.6
0
494925
##########
###########
125933.675 1094275.2 950291.63
0
11201.8025 97255.534
0
609189.589
10225.5
0.75
1.3333333
2
1.5
0.6666667
680.01
6000
ES
EQUIPO Y HERRAMIENTAS
ARENA
HERRAM_MANU
MEZCLADORA VIBRADORA
ALES
AGUA
7,786.82
2,903.56
49,624.48
65,330.10
21,512.74
7,786.82
2,903.56
136,467.32
35
272,538.70
0
272538.7
20,324.92
136,467.32
0
20324.92
49,624.48
65330.1
21512.74
6,398.39
6,398.39
6,398.39
6,398.39
25
159,959.76
182,359.41
731,231.89
234,550.90
7.88
1,485,557.91
4,304,617.11
3,997,191.55
-211,176.97
749.31
-86.71
10
63,983.90
0
0
159959.76 63983.904
-210,514.37
Partida
: 01.01 EXCAVACION
Unidad
: M3
Rendimiento :
I.U.
P.U.
3.50 M3/DIA
DESCRIPCIN
UND
CUADRILLA
CANTIDAD
PRECIO
32.14
PARCIAL
SUB TOTAL
MANO DE OBRA
CAPATAZ
HH
0.10
0.2286
17.5
4.00
PEON
HH
1.00
2.2857
11.9
27.20
3.0000
31.20
0.94
31.20
EQUIPO
HERRAMIENTAS MANUALES
%MO
Partida
: 01.02 ENCOFRADO
Unidad
I.U.
0.94
: M2
Rendimiento :
11.00 M2/DIA
DESCRIPCIN
UND
P.U.
CUADRILLA
CANTIDAD
PRECIO
43.48
PARCIAL
SUB TOTAL
MANO DE OBRA
CAPATAZ
HH
0.10
0.0727
17.5
1.27
OPERARIO
HH
1.00
0.7273
15.2
11.05
OFICIAL
HH
1.00
0.7273
13.2
9.60
21.92
MATERIALES
CLAVO DE FIERRO
KG
0.2000
4.50
0.90
P2
5.0000
4.00
20.00
20.90
EQUIPO
HERRAMIENTAS MANUALES
%MO
3.0000
21.92
0.66
-
L=
Partida
0.66
32995
Unidad
: M3
Rendimiento :
DESCRIPCIN
P.U.
16.50
UND
15.45595054
30911.9011
CUADRILLA
CANTIDAD
PRECIO
302.87
PARCIAL
SUB TOTAL
MANO DE OBRA
CAPATAZ
HH
0.10
0.0485
17.5
0.85
OPERARIO
HH
1.00
0.4848
15.2
7.37
PEON
HH
8.00
3.8788
11.9
46.16
54.38
MATERIALES
PIEDRA CHANCADA DE 1/2"
M3
0.7500
50.00
37.50
ARENA GRUESA
M3
0.5900
35.00
20.65
BOL
9.2000
18.50
170.20
AGUA
M3
0.2200
7.00
1.54
229.89
EQUIPO
HERRAMIENTAS MANUALES
%MO
VIBRADORA
HM
3.0000
54.38
1.63
1.00
0.4848
10.00
4.85
1.00
0.4848
25.00
12.12
18.60
0.66666667
2.66666667
0.731930
9.66148216
PRESUPUESTO
OBRA
: BUENA VISTA
ITEM
DESCRIPCION
DEPARTAMENTO : ANCASH
UND
METRADO
COSTO AL : 27/01/2005
PRECIO PARCIAL
METRADO
UNIT
01.01.00
EXCAVACION
M3
#REF!
01.04.00
ENCOFRADO
M3
02.02.00
CONCRETO
M3
MES I
TOTAL
32.14
#REF!
#REF!
43.48
#REF!
#REF!
302.87
#REF!
#REF!
COSTO DIRECTO
#REF!
#REF!
Utilidad (5%)
#REF!
Sub Total
#REF!
IGV
#REF!
Total
#REF!
#REF!
MES I
MONTO
#REF!
400,000.00
#REF!
M.O
MATERIALES HERRAM_EQ.
#REF!
#REF!
#REF!
140,000.00 230,000.00
30,000.00 GASTADO
#REF!
#REF!
#REF!