Está en la página 1de 8

CRONOGRAMA DE AVANCE DE OBRA VALORIZADO N 1

PROYECTO
COSTO DIRECTO TOTAL

TROCHA CARROZABLE LA CALETA ( CONST ) BID III OCOA CAMANA


150,512.63

EXPEDIENTE
MONTO TOTAL PRESUPUESTADO S/

N 2120050127
170,000.00

PERIODO
N

PARTIDAS

1 MES

*.**.01 TROCHA CARROZABLE


1

TRABAJOS PRELIMINARES

1.01

TRAZO Y REPLANTEO DE EJE

1.02

CASETA Y ALMACEN

MOVIMIENTO DE TIERRAS

2.01

CORTE EN MATERIAL SUELTO C/MAQUINARIA COSTA

2.02

2.03

RELLENO CON MATERIAL PROPIO

CONFORMACION DE TERRAPLEN

CARGUIO Y TRANSPORTE DE LASTRE E=20 CM

3.01

EXTRACCION DE MATERIAL

3.02

3.03

3.05

CARGUIO

TRANSPORTE DE MATERIALES D > 1 KM

PERFILADO Y COMPACTADO DE SUBRASANTE, INC CISTERNA

AVANCE MENSUAL (%)


AVANCE ACUMULADO (%)
INSPECTOR RESIDENTE
Ing. NIVARDO HITO CORDOVA

S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E

316.92

316.92

69.57%

69.57%

69.57%

69.57%

220.47

220.47

220.47

220.47

375.75

375.75

375.75

375.75

100.00%

100.00%

100.00%

100.00%

375.75

375.75

375.75

375.75

1,932.05

1,932.05

1,932.05

1,932.05

1,932.05

1,932.05

1,932.05

1,932.05

1,932.05

229.23%

229.23%

229.23%

229.23%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4,428.90

4,428.90

4,428.90

4,428.90

541.49

541.49

541.49

541.49

541.49

541.49

541.49

541.49

541.49

541.49

217.76%

217.76%

217.76%

217.76%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1,179.14

1,179.14

1,179.14

1,179.14

144.77

144.77

144.77

144.77

144.77

144.77

144.77

144.77

144.77

144.77

225.11%

225.11%

225.11%

225.11%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

325.89

325.89

325.89

325.89

1589.28

1,589.28

1,589.28

1,589.28

1,589.28

1,589.28

1,589.28

1,589.28

1,589.28

1,589.28

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

FECHA
1

3
4

3 MES

1932.05

19,601.05
26,120.59
19,601.05
26,120.59

SUPERVISOR DE PROYECTOS
Ing. ADOLFO FLORES VALDEZ

316.92

PROGRAMADO
EJECUCION
PROGRAMADO
EJECUCION
N

2 MES

316.92

8/28/2006

MONTO
41,935.00

SALDO

2,254.56

2,254.56

2,254.56

2,254.56

2,254.56

2,254.56

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4,964.96

4,964.96

4,964.96

4,964.96

4,964.96

4,964.96

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

3,338.53

3,338.53

3,338.53

3,338.53

3,338.53

3,338.53

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

13.02%
17.35%
13.02%
17.35%
DESEMBOLSOS

59,062.57
78,663.62
26,120.59

FECHA INICIO DE OBRA

128,065.00 PLAZO DE EJECUCIN


FECHA DE TERMINO

39.24%
0.00%
52.26%
17.35%
9/4/2006
2.5 MESES

29,531.29
108,194.91
26,120.59
FECHA

4 MES

N DIAS

19.62%
0.00%
71.88%
108,194.91
17.35%
26,120.59
AMPLIACIONES DE PLAZO
PLAZO VIGENCIA

FIN DE OBRA

0.00%
0.00%
71.88%
17.35%
OBSERVACIONES

CRONOGRAMA DE AVANCE DE OBRA VALORIZADO


PROYECTO
COSTO DIRECTO TOTAL

TROCHA CARROZABLE LA CALETA ( CONST ) BID III OCOA CAMANA


150,512.63

EXPEDIENTE
MONTO TOTAL PRESUPUESTADO S/

N 2120050127
170,000.00

PERIODO
N

PARTIDAS

1 MES

*.**.04 PRUEBAS DE CONTROL DE CALIDAD


1

PRUEBAS DE CONTROL DE CALIDAD

1.01

PROCTOR MODIFICADO, DENSIDAD DE CAMPO

*.**.05 MUROS DE PIEDRA


5.01

MUROS DE PIEDRA

*.**.06 CARTEL DE OBRA/PLACA RECORDATORIA


6.01

1.02

CARTEL DE OBRA

PLACA RECORDATORIA

*.**.06 HERRAMIENTAS PARA CAPACITACION


MATERIALES Y HERRAMIENTAS PARA CAPACITACION
1.01

MATERIALES Y HERRAMIENTAS PARA CAPACITACION

*.**.08 APORTE COMUNAL


2

MOVIMIENTO DE TIERRAS
EXTRACCION DE MATERIAL DE RELLENO

2.10

PERFILADO Y COMPACTADO DE SUBRASANTE, INC CISTERNA

*.**.09 FLETE TERRESTRE


1

FLETE TERRESTRE

1.01

FLETE TERRESTRE

1.02

MOVILIZACION Y DESMOVILIZACION

AVANCE MENSUAL (%)


AVANCE ACUMULADO (%)
INSPECTOR RESIDENTE
Ing. NIVARDO HITO CORDOVA

S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E
S/.
P
E

218

218

218

218

218

218

218

218

150.00%

150.00%

150.00%

150.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

327.00

327.00

327.00

327.00

2971.74

2,971.74

2,971.74

2,971.74

2,971.74

2,971.74

2,971.74

2,971.74

2,971.74

2,971.74

138.81%

138.81%

138.81%

138.81%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4,125.00

4,125.00

4,125.00

4,125.00

300.60

300.60

300.60

300.60

66.67%

66.67%

66.67%

66.67%

200.40

200.40

200.40

200.40

544.37

544.37

544.37

544.37

400.00%

0.00%

0.00%

0.00%

69.33

69.33

0.00%

0.00%

4 MES

2,177.47
16.46

16.46

16.46

16.46

16.46

16.46

16.46

16.46

16.46

16.46

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

13.72

13.72

13.72

13.72

13.72

13.72

13.72

13.72

13.72

13.72

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

250.00

250.00

200.00%

0.00%

500.00
3050.00

3,050.00

100.00%

0.00%

3050

FECHA

SUPERVISOR DE PROYECTOS
Ing. ADOLFO FLORES VALDEZ

218

36,983.12
50,457.65
36,983.12
50,457.65

3 MES

218.00

PROGRAMADO
EJECUCION
PROGRAMADO
EJECUCION
N

2 MES

8/28/2006

MONTO
41,935.00

24.57%
33.52%
24.57%
33.52%
DESEMBOLSOS
SALDO

74,119.73
111,102.85
50,457.65

FECHA INICIO DE OBRA

128,065.00 PLAZO DE EJECUCIN

49.24%
0.00%
73.82%
33.52%
9/4/2006

39,409.78
150,512.63
50,457.65
FECHA

2.5 MESES

FECHA DE TERMINO

3
4

PPPAAA

N DIAS

26.18%
0.00%
100.00%
150,512.63
33.52%
50,457.65
AMPLIACIONES DE PLAZO
PLAZO VIGENCIA

FIN DE OBRA

0.00%
0.00%
100.00%
33.52%
OBSERVACIONES

VALORIZACION DE AVANCE DE OBRA N 1


CONVENIO
PROYECTO

DESCRIPCION

PARTIDA

N2120050127 - FONCODES

CORRESPONDIENTE AL MES DE

TROCHA CARROZABLE LA CALETA ( CONST.) BID III

FECHA DE PRESENTACIN

PRESUPUESTO
Und. Metrado
P. Unit. S/. Presup.

ANTERIOR
Metrado Valorizado

AVANCES
ACTUAL
Metrado Valorizado

ACUMULADO
Metrado Valorizado

TROCHA CARROZABLE
TROCHA CARROZABLE
1.00 TRABAJOS PRELIMINARES
1.01 TRAZO Y REPLANTEO DE EJE
2.01 CASETA Y ALMACEN

KM
M2

2.30
50.00

551.17
30.06

1,267.69
1,503.00

0.00
0.00

0.00
0.00

1.60
50.00

881.87
1,503.00

1.60
50.00

2.00
2.01
2.04
2.05

MOVIMIENTO DE TIERRAS
CORTE EN MATERIAL SUELTO C/MAQUINARIA COSTA
RELLENO CON MATERIAL PROPIO
CONFORMACION DE TERRAPLEN

M3
M3
M3

6,133.50
2,334.00
1,019.50

3.15
2.32
1.42

19,320.53
5,414.88
1,447.69

0.00
0.00
0.00

0.00
0.00
0.00

5,624.00
2,033.00
918.00

17,715.60
4,716.56
1,303.56

5,624.00
2,033.00
918.00

17,715.60
4,716.56
1,303.56

3.00
2.01
2.04
2.05
2.05

CARGUIO Y TRANSPORTE DE LASTRE E=20 CM


EXTRACCION DE MATERIAL
CARGUIO
TRANSPORTE DE MATERIALES D > 1 KM
PERFILADO Y COMPACTADO DE SUBRASANTE, INC CISTERNA

M3
M3
M3
M3

7,392.00
7,392.00
7,392.00
13,720.00

2.15
1.83
4.03
1.46

15,892.80
13,527.36
29,789.76
20,031.20

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

*.**.04
PRUEBAS DE CONTROL DE CALIDAD
1.00 PRUEBAS DE CONTROL DE CALIDAD
1.01 PROCTOR MODIFICADO, DENSIDAD DE CAMPO

M3

1.00

2,180.00

2,180.00

0.00

0.00

0.60

1,308.00

*.**.05
MUROS DE PIEDRA
5.01 MURO DE PIEDRA

M3

990.58

30.00

29,717.38

0.00

0.00

550.00

UND
M2

1.00
1.00

1,202.38
138.65

1,202.38
138.65

0.00
0.00

0.00
0.00

UND

1.00

2,177.47

2,177.47

0.00

M3
M2

2,744.00
13,720.00

0.06
0.01

164.64
137.20

GLB
GLB

1.00
1.00

500.00
6,100.00

500.00
6,100.00

SETIEMBRE

10/3/2006

SALDO
%

Metrado

Valorizado

**.**.01

*.**.06
1.00
1.01
1.02

CARTEL DE OBRA/PLACA RECORDATORIA


CARTEL DE OBRA
CARTEL DE OBRA
PLACA RECORDATORIA

2.00 HERRAMIENTAS PARA CAPACITACION


1.00 MATERIALES Y HERRAMIENTAS PARA CAPACITACION
2.01 MATERIALES Y HERRAMIENTAS PARA CAPACITACION
3.00
1.00
2.01
3.01

APORTE COMUNAL
MOVIMIENTO DE TIERRAS
EXTRACCION DE MATERIAL PARA RELLENO
PERFILADO Y COMPACTADO DE SUBRASANTE, INC CISTERNA

6.00 FLETE TERRESTRE


6.01 FLETE TERRESTRE
6.02 MOVILIZACION Y DESMOVILIZACION

881.87 70%
1,503.00 100%

0.70
0.00

385.82
0.00

30%
0%

92%
87%
90%

509.50
301.00
101.50

1604.93
698.32
144.13

8%
13%
10%

0.00
0.00
0.00
0.00

0%
0%
0%
0%

7392.00
7392.00
7392.00
13720.00

15892.80
13527.36
29789.76
20031.20

100%
100%
100%
100%

0.60

1,308.00

60%

0.40

872.00

40%

16,500.00

550.00

16,500.00

56%

440.58

13217.40

44%

1.00
0.00

1,202.38
0.00

1.00
0.00

1,202.38 100%
0.00
0%

0.00
1.00

0.00

1.00

2,177.47

1.00

2,177.47 100%

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

1.00
0.50

500.00
3,050.00

1.00
0.50

0.00
0.00

0%
0%

2,744.00
13,720.00

500.00 100%
3,050.00 50%

0.00
0.50

0.00
0%
138.65 100%

0.00

0%

164.64 100%
137.20 100%

0.00
3050.00

0%
50%

VALORIZACION DE AVANCE DE OBRA N 1


CONVENIO
PROYECTO

PARTIDA

DESCRIPCION

COSTO DIRECTO TOTAL

N2120050127 - FONCODES

CORRESPONDIENTE AL MES DE

TROCHA CARROZABLE LA CALETA ( CONST.) BID III

FECHA DE PRESENTACIN

PRESUPUESTO
Und. Metrado
P. Unit. S/. Presup.

150,512.63

SECRETARIO
YURI M. VIZCARRA MIRANDA
D.N.I. 45016973

ANTERIOR
Metrado Valorizado

150,512.63
100.00%

AVANCES
ACTUAL
Metrado Valorizado

ACUMULADO
Metrado Valorizado

50,858.44
33.79%

INSPECTOR-RESIDENTE
ING. NIVARDO HITO CORDOVA
D.N.I. 29534791

50,858.44
33.79%

SETIEMBRE

10/3/2006

SALDO
%

Metrado

Valorizado

99,654.20
66.21%

SUPERVISOR
ING. ADOLFO FLORES VALDEZ
D.N.I. 29572002

DIA

PROGRESIVA

17-Oct
18-Oct
19-Oct
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct
27-Oct
28-Oct
29-Oct
30-Oct
31-Oct

MAT SUELTO

ROCA SUELTA

0.80
0.80
0.80
0.80
0.80

291.20
208.16
268.00
676.88
2,048.04

232.96
166.53
214.40
541.50
1,638.43

72.80
52.04
67.00
169.22
107.82

58.24
41.63
53.60
135.38
86.26

161.50
244.20
25.70
0.00
530.80

129.20
195.36
20.56
0.00
424.64

0.60
0.60
0.60
0.60
0.60
0.60

843.15
163.53
115.29
99.33
39.27
90.58

505.89
98.12
69.17
59.60
23.56
54.35

44.40
20.70
49.41
42.57
16.83
38.82

31.08
14.49
34.59
29.80
11.78
27.17

139.30
22.90
53.60
52.40
115.20
42.75

76.62
12.60
29.48
28.82
63.36
23.51

3,604.51
1-Nov
2-Nov
3-Nov

RELLENO

524.02

1,004.14

MUROS
ML

150
60
150

100
100
150

710.00

ALCANTARILLAS
1.28

192
76.8
192
0
0
128
128
192
0
0
0

908.80

MUROS
LOSA

ALCANTARILLAS
VOL
CANT
CONCRETO ENCOFRADO
0.4
1.044
2
2.09
13.92
1
1.7
2
3.40
17
5.49
30.92

17.4
8.5

0.15
0.2

0.1

0.5

1.00

EXCAVACION ALCANT
ALCANTARILLAS 8.5
BADENES
4.5

0.8
0.5

1
1.5

6.8
3.375

4
2

27.20
6.75
33.95

SOLADO

CANT
3/8"
1/2"

ACERO 1/2"
3/8"
LONG
1.02
0.56
4
3.5
14
7
9
63
63
14
64.26
7.84

72.1 KG

DECLARACION JURADA
POR MEDIO DEL PRESENTE DOCUMENTO QUE TIENE CARCTER DE DECLARACION JURADA,
SE HACE CONSTAR QUE EL SR.(A):
HA RECIBIDO DEL NUCLEO EJECUTOR: N.E.TROCHA CARROZABLE LA CALETA ( CONST) BID III
LA CANTIDAD DE S/.
en letras:
NUEVOS SOLES), POR CONCEPTO DE:

CANTIDAD

UNIDAD

PRECIO
UNITARIO

CONCEPTO

TOTAL

PRECIO
TOTAL

S/.

LUGAR Y FECHA:

FIRMA
NOMBRES Y APELLIDOS
D.N.I.

PRESIDENTE
MONTOYA CARNERO FREDDY MARIANO
D.N.I. 30418309

TESORERO
NIETO DE POLAR ROSA HERMELINDA
D.N.I. 30417306

SECRETARIO
YURI VIZCARRA MIRANDA
D.N.I. 45016973

FISCAL
GRANDA CALDERON YANETH MARILU
D.N.I. 30417269

INSPECTOR-RESIDENTE
ING. NIVARDO HITO CORDOVA
D.N.I. 29534791

AUTORIDAD DEL LUGAR


D.N.I.