Presupuesto Factibilidad de Servicios Rev 03 - Final
Presupuesto Factibilidad de Servicios Rev 03 - Final
OBRA:
ENTIDAD
ZONA
: "R"
DPTO.
: ICA
PROVINCIA
: NASCA
DISTRITO
: MARCONA
TIEMPO CONTRACTUAL
: 60 Das Calendarios
CONTRATO
: PRECIOS UNITARIOS
Ref.:
Costo Directo
S/.
347,786.19
60
Anticipo solicitado
Gerente de Ingeniera
Julio lvarez
Coordinador de Obras
Injante Lima
OBSERVACIONES:
Das corridos.
Item
Parcial S/.
01.00.00
OBRAS PROVISIONALES
S/.
6,000.00
02.00.00
REDES DE DESAGUE
S/.
304,578.82
03.00.00
S/.
12,948.53
04.00.00
S/.
8,529.09
05.00.00
SISTEMA DE ELECTRIFICACION
S/.
15,729.75
S/.
347,786.19
LISTA DE PARTIDA
PROYECTO
OBRA:
ENTIDAD
ZONA
DPTO.
PROVINCIA
DISTRITO
Item
01.00.00
OBRAS PROVISIONALES
01.03.00
02.00.00
REDES DE DESAGUE
02.01.00
TRABAJOS PRELIMINARES
02.01.01
02.01.02
02.01.03
02.02.00
COLECTORES DE DESAGUE
02.02.01
DEMOLICION
02.02.01.01
Und
Metrado
Precio
CAMINSA
Parcial S/.
vje
2.00
S/.
3,000.00 S/.
3,000.00 S/.
6,000.00
ml
1,086.20
S/.
13.39 S/.
13.39 S/.
14,544.22
m2
362.40
S/.
17.93 S/.
17.93 S/.
6,497.83
und
16.00
S/.
270.98 S/.
270.98 S/.
4,335.68
m2
15.00
S/.
98.68 S/.
98.68 S/.
1,480.20
02.02.01.02
m3
10.44
S/.
323.54 S/.
323.54 S/.
3,377.76
02.02.02
MOVIMIENTO DE TIERRAS
02.02.02.01
944.52
S/.
17.26 S/.
17.26 S/.
16,302.42
02.02.02.02
65.45
S/.
27.62 S/.
27.62 S/.
1,807.73
02.02.02.03
76.23
S/.
51.15 S/.
51.15 S/.
3,899.16
02.02.02.04
m2
1,086.20
S/.
4.79 S/.
4.79 S/.
5,202.90
02.02.02.05
m3
108.62
S/.
80.80 S/.
80.80 S/.
8,776.50
02.02.02.06
m3
1,469.89
S/.
37.14 S/.
37.14 S/.
54,591.71
02.02.02.07
ELIMINACION DE TUBERIAS DE DESAGUE Y MATERIAL EXCEDENTE DIST. PROM. 15KM, CARGUIO C/MAQ
m3
435.67
S/.
27.02 S/.
27.02 S/.
11,771.80
02.02.03
ENTIBADOS
02.02.03.01
ENTIBADO DE ZANJA
148.12
S/.
57.36 S/.
57.36 S/.
8,496.16
02.02.04
1,086.20
S/.
40.99 S/.
40.99 S/.
44,523.34
02.02.04.02
1,086.20
S/.
0.82 S/.
CAM-01
1,086.20
S/.
02.02.05
02.02.05.01
da
30.00
02.02.06
und
02.02.06.02
CAMARAS DE INSPECCION
BUZON DE CONCRETO H=1.50m (Fc=175KG/CM2, Fy=4200 KG/CM2 CEMENTO TIPO V,
IMPERM, ACELER..)
TECHO BUZON CONCRETO F'C=210 KG/CM2, TAPA CONCRETO Y MARCO FF
02.02.06.03
MANTENIMIENTO DE BUZONES
02.02.06.04
02.02.04.01
0.82 S/.
890.68
S/.
2.27 S/.
2,465.67
S/.
712.49 S/.
712.49 S/.
21,374.70
1.00
S/.
2,115.97 S/.
2,115.97 S/.
2,115.97
und
17.00
S/.
787.23 S/.
787.23 S/.
13,382.91
und
4.00
S/.
148.09 S/.
148.09 S/.
592.36
Pto
4.00
S/.
331.71 S/.
331.71 S/.
1,326.84
02.02.06.05
und
17.00
S/.
897.74 S/.
897.74 S/.
15,261.58
02.02.06.06
und
34.00
S/.
188.92 S/.
188.92 S/.
6,423.28
02.03.00
CONEXIONES DOMICILIARIAS
02.03.01
MOVIMIENTO DE TIERRAS
02.03.01.01
430.10
S/.
13.70 S/.
18.27 S/.
7,857.93
02.03.01.02
m2
275.26
S/.
4.79 S/.
4.79 S/.
1,318.50
02.03.01.03
m3
93.38
S/.
80.80 S/.
80.80 S/.
7,545.10
02.03.01.04
m3
205.44
S/.
34.26 S/.
34.26 S/.
7,038.37
02.03.01.05
m3
238.81
S/.
27.02 S/.
27.02 S/.
6,452.65
02.03.02.01
und
50.00
S/.
284.57 S/.
284.57 S/.
14,228.50
02.03.02.02
und
50.00
S/.
166.81 S/.
166.81 S/.
8,340.50
02.04.00
PRUEBAS
02.04.02
pto
33.00
S/.
71.39 S/.
71.39 S/.
2,355.87
03.00.00
03.01.00
TRABAJOS PRELIMINARES
03.01.01
184.50
S/.
8.04 S/.
8.04 S/.
1,483.38
03.02.00
CONEXIONES DOMICILIARIAS
03.02.01
m3
29.52
S/.
39.43 S/.
39.43 S/.
1,163.97
03.02.02
m2
73.80
S/.
4.79 S/.
4.79 S/.
353.50
03.02.03
m3
7.38
S/.
80.80 S/.
80.80 S/.
596.30
03.02.04
m3
22.14
S/.
37.14 S/.
37.14 S/.
822.28
03.02.05
und
23.00
S/.
215.02 S/.
215.02 S/.
4,945.46
03.02.06
und
23.00
S/.
155.81 S/.
155.81 S/.
3,583.63
04.00.00
04.01.00
CONEXIONES DOMICILIARIAS
04.01.01
und
23.00
S/.
215.02 S/.
215.02 S/.
4,945.46
04.01.02
und
23.00
S/.
155.81 S/.
155.81 S/.
3,583.63
05.00.00
SISTEMA DE ELECTRIFICACION
05.01.00
46.00
S/.
20.41 S/.
20.41 S/.
938.86
05.02.00
m3
11.04
S/.
71.69 S/.
71.69 S/.
791.46
05.03.00
73.00
S/.
36.00 S/.
36.00 S/.
2,628.00
05.04.00
pto
23.00
S/.
252.45 S/.
252.45 S/.
5,806.35
05.05.00
und
23.00
S/.
135.04 S/.
135.04 S/.
3,105.92
05.06.00
pto
23.00
S/.
42.03 S/.
42.03 S/.
966.69
CAM-02
pto
23.00
S/.
64.89 S/.
1,492.47
02.02.06.01
02.03.02
S/.
S/.
TOTAL
6,000.00
S/.
25,377.73
S/.
4,857.96
S/.
102,352.22
S/.
8,496.16
S/.
47,879.70
S/.
21,374.70
S/.
39,102.94
S/.
30,212.55
S/.
22,569.00
S/.
2,355.87
S/.
1,483.38
S/.
11,465.15
S/.
8,529.09
S/.
15,729.75
347,786.19
HOJA DE METRADO
PROYECTO
OBRA:
ENTIDAD
ZONA
DPTO.
PROVINCIA
DISTRITO
Item
01.00.00
01.03.00
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
Descripcin
OBRAS PROVISIONALES
FLETE TERRESTRE LIMA - MARCONA TRANSPORTE DE TUBERIAS Y SIMILARES
Transporte de materiales y herramientas para la obra
REDES DE DESAGUE
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO PERMANENTE PARA RED DE DESAGUE
Tramo 01
Tramo 02
Tramo 03
Tramo 04
und
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/EQUIPO EN TERRENO NORMAL h= 1.20 - 2.00 m
EXCAVACION DE ZANJA C/EQUIPO EN TERRENO NORMAL h= 2.00 - 2.50 m
EXCAVACION DE ZANJA C/EQUIPO EN TERRENO NORMAL h= 2.50 - 3.00m
02.02.02.05
Metrado
Alto
Kg/ml
Parcial
2.00
1,086.20
1
1
1
1
226.50
289.05
178.70
293.20
226.50
289.05
178.70
293.20
1
1
57.40
63.40
1
1
1
1
4.00
4.00
4.00
4.00
15.00
1.00
0.65
0.65
0.65
2.20
2.20
0.65
0.65
0.65
2.75
2.75
0.65
0.65
0.65
1.65
1.65
2
1
5
4
0.65
0.65
0.65
0.65
0.65
0.65
2.75
1.10
2.75
1.10
362.40
3.00
3.00
172.20
190.20
16.00
4.00
4.00
4.00
4.00
15.00
15.00
m3
10.44
m
m
m
m2
m3
Total
2.00
m2
Tramo 01
Bz-13A / Bz-01
Bz-01 / Bz-02
Bz-02 / Bz-03
Bz-03 / Bz-04
Tramo 02
Bz-14A / Bz-05
Bz-05 / Bz-06
Bz-06 / Bz-07
Bz-07 / Bz-08
Bz-08 / Bz-09
Tramo 03
Bz-16A / Bz-10
Bz-10 / Bz-11
Bz-11 / Bz-12
Tramo 04
Bz-17A / Bz-13
Bz-13 / Bz-14
Bz-14 / Bz-15
Bz-15 / Bz-16
Bz-16 / Bz-17
02.02.02.04
Ancho
ml
02.02.01.02
Long
m2
COLECTORES DE DESAGUE
DEMOLICION
CORTE, DEMOLICION Y REPOSICION DE PAVIMENTO RIGIDO Y FLEXIBLE
corte de pavimento en buzon 13A - Bz 01
Cant.
vje
02.02.00
02.02.01
02.02.01.01
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
Und
944.52
65.45
76.23
Cant.
Long
h=1.20-2.00
1
1
1
1
41.80
59.50
64.00
61.20
64.00
61.20
1
1
1
1
1
27.50
59.00
65.50
74.50
62.55
59.00
65.50
74.50
62.55
1
1
1
59.00
58.50
61.20
59.00
58.50
61.20
1
1
1
1
1
54.80
57.40
63.40
58.80
58.80
54.80
57.40
63.40
58.80
58.80
944.52
h=2.00-2.50
944.52
65.45
76.23
h=2.50-3.00
41.80
59.50
27.50
65.45
76.23
1,086.20
Cant.
1
1
1
1
Long
41.80
59.50
64.00
61.20
1.00
1.00
1.00
1.00
41.80
59.50
64.00
61.20
1
1
1
1
1
27.50
59.00
65.50
74.50
62.55
1.00
1.00
1.00
1.00
1.00
27.50
59.00
65.50
74.50
62.55
1
1
1
59.00
58.50
61.20
1.00
1.00
1.00
59.00
58.50
61.20
1
1
1
1
1
54.80
57.40
63.40
58.80
58.80
1.00
1.00
1.00
1.00
1.00
54.80
57.40
63.40
58.80
58.80
1
1
1
1
41.80
59.50
64.00
61.20
1.00
1.00
1.00
1.00
0.10
0.10
0.10
0.10
4.18
5.95
6.40
6.12
1
1
1
1
1
27.50
59.00
65.50
74.50
62.55
1.00
1.00
1.00
1.00
1.00
0.10
0.10
0.10
0.10
0.10
2.75
5.90
6.55
7.45
6.26
1
1
1
59.00
58.50
61.20
1.00
1.00
1.00
0.10
0.10
0.10
5.90
5.85
6.12
108.62
HOJA DE METRADO
PROYECTO
OBRA:
ENTIDAD
ZONA
DPTO.
PROVINCIA
DISTRITO
Item
Descripcin
Und
Tramo 04
Bz-17A / Bz-13
Bz-13 / Bz-14
Bz-14 / Bz-15
Bz-15 / Bz-16
Bz-16 / Bz-17
02.02.02.06
Long
Ancho
1
1
1
1
1
54.80
57.40
63.40
58.80
58.80
1.00
1.00
1.00
1.00
1.00
0.10
0.10
0.10
0.10
0.10
Cant.
h=1.20-2.00
h=2.00-2.50
1
1
1
1
41.80
59.50
64.00
61.20
64.00
61.20
1
1
1
1
1
27.50
59.00
65.50
74.50
62.55
59.00
65.50
74.50
62.55
1
1
1
59.00
58.50
61.20
59.00
58.50
61.20
1
1
1
1
1
54.80
57.40
63.40
58.80
58.80
54.80
57.40
63.40
58.80
58.80
944.52
1.50
0.80
1,133.42
65.45
2.00
1.00
130.90
20.00
3.00
0.25
Long
Ancho
Alto
RELLENO EN TRAMO 01
Bz-01 / Bz-02 (NIVELACION Y RELLENO, PARA COTA BUZON)
02.02.03
02.02.03.01
02.02.04
02.02.04.01
02.02.04.02
CAM-01
02.02.05
02.02.05.01
ENTIBADOS
ENTIBADO DE ZANJA
EXCAVACION DE ZANJA C/EQUIPO EN TERRENO NORMAL h= 2.00 - 2.50 m
EXCAVACION DE ZANJA C/EQUIPO EN TERRENO NORMAL h= 2.50 - 3.00m
SUMINISTRO E INSTALACION DE TUBERIAS
PROVISION E INSTALACION DE TUBERIAS S-25 PVC-U UF NTP ISO 4435 SN 4 DN 200MM INC. ANILLO+2%DESP.
Tramo 01
Bz-13A / Bz-01
Bz-01 / Bz-02
Bz-02 / Bz-03
Bz-03 / Bz-04
Tramo 02
Bz-14A / Bz-05
Bz-05 / Bz-06
Bz-06 / Bz-07
Bz-07 / Bz-08
Bz-08 / Bz-09
Tramo 03
Bz-16A / Bz-10
Bz-10 / Bz-11
Bz-11 / Bz-12
Tramo 04
Bz-17A / Bz-13
Bz-13 / Bz-14
Bz-14 / Bz-15
Bz-15 / Bz-16
Bz-16 / Bz-17
PRUEBA HIDRAULICA A ZANJA ABIERTA TUBERIA DESAGUE
Tramo 01
Bz-13A / Bz-01
Bz-01 / Bz-02
Bz-02 / Bz-03
Bz-03 / Bz-04
Tramo 02
Bz-14A / Bz-05
Bz-05 / Bz-06
Bz-06 / Bz-07
Bz-07 / Bz-08
Bz-08 / Bz-09
Tramo 03
Bz-16A / Bz-10
Bz-10 / Bz-11
Bz-11 / Bz-12
Tramo 04
Bz-17A / Bz-13
Bz-13 / Bz-14
Bz-14 / Bz-15
Bz-15 / Bz-16
Bz-16 / Bz-17
1
m3
Total
5.48
5.74
6.34
5.88
5.88
h=2.50-3.00
41.80
59.50
27.50
76.23
2.50
1.00
190.58
15.00
Parcial
435.67
1,920.56
944.52
65.45
76.23
1,086.00
0.80
1.00
1.20
0.20
1.50
2.00
2.50
0.20
1,133.42
130.90
228.69
43.44
20.00
3.00
0.25
1,469.89
15.00
68.43
79.70
1.00
1.00
1,484.89
1
148.12
68.43
79.70
1,086.20
1
1
1
1
41.80
59.50
64.00
61.20
41.80
59.50
64.00
61.20
1
1
1
1
1
27.50
59.00
65.50
74.50
62.55
27.50
59.00
65.50
74.50
62.55
1
1
1
59.00
58.50
61.20
59.00
58.50
61.20
1
1
1
1
1
54.80
57.40
63.40
58.80
58.80
54.80
57.40
63.40
58.80
58.80
1
1
1
1
41.80
59.50
64.00
61.20
41.80
59.50
64.00
61.20
1
1
1
1
1
27.50
59.00
65.50
74.50
62.55
27.50
59.00
65.50
74.50
62.55
1
1
1
59.00
58.50
61.20
59.00
58.50
61.20
1
1
1
1
1
54.80
57.40
63.40
58.80
58.80
54.80
57.40
63.40
58.80
58.80
1
1
1
1
41.80
59.50
64.00
61.20
41.80
59.50
64.00
61.20
1
1
1
1
1
27.50
59.00
65.50
74.50
62.55
27.50
59.00
65.50
74.50
62.55
1
1
1
59.00
58.50
61.20
59.00
58.50
61.20
1
1
1
1
1
54.80
57.40
63.40
58.80
58.80
54.80
57.40
63.40
58.80
58.80
Parcial
1,469.89
ML
Alt
Anc
m3
ELIMINACION DE TUBERIAS DE DESAGUE Y MATERIAL EXCEDENTE DIST. PROM. 15KM, CARGUIO C/MAQ
EXCAVACION
CORTE DE TERRENO
EXCAVACION DE ZANJA C/EQUIPO EN TERRENO NORMAL h= 1.20 - 2.00 m
EXCAVACION DE ZANJA C/EQUIPO EN TERRENO NORMAL h= 2.00 - 2.50 m
EXCAVACION DE ZANJA C/EQUIPO EN TERRENO NORMAL h= 2.50 - 3.00m
TUBERIAS
RELLENO
RELLENO DE ZANJA CON MATERIAL PROPIO COMPACTADO ZARANDEADO
Bz-01 / Bz-02 (NIVELACION Y RELLENO, PARA COTA BUZON)
Kg/ml
m3
Tramo 01
Bz-13A / Bz-01
Bz-01 / Bz-02
Bz-02 / Bz-03
Bz-03 / Bz-04
Tramo 02
Bz-14A / Bz-05
Bz-05 / Bz-06
Bz-06 / Bz-07
Bz-07 / Bz-08
Bz-08 / Bz-09
Tramo 03
Bz-16A / Bz-10
Bz-10 / Bz-11
Bz-11 / Bz-12
Tramo 04
Bz-17A / Bz-13
Bz-13 / Bz-14
Bz-14 / Bz-15
Bz-15 / Bz-16
Bz-16 / Bz-17
02.02.02.07
Metrado
Alto
Cant.
1,086.20
1,086.20
da
30
30.00
30.00
HOJA DE METRADO
PROYECTO
OBRA:
ENTIDAD
ZONA
DPTO.
PROVINCIA
DISTRITO
Item
02.02.06
02.02.06.01
Descripcin
CAMARAS DE INSPECCION
BUZON DE CONCRETO H=1.50m (Fc=175KG/CM2, Fy=4200 KG/CM2 CEMENTO TIPO V, IMPERM, ACELER..)
Tramo 01
Bz-02
Und
und
02.02.06.02
Cant.
Long
Ancho
Metrado
Alto
Kg/ml
Parcial
und
Total
1.00
1.00
1
1
1
1
1.00
1.00
1.00
1.00
1
1
1.00
1.00
17.00
HOJA DE METRADO
PROYECTO
OBRA:
ENTIDAD
ZONA
DPTO.
PROVINCIA
DISTRITO
Item
Descripcin
Und
Bz-06 / Bz-07
Bz-07 / Bz-08
Bz-08 / Bz-09
Tramo 03
Bz-16A / Bz-10
Bz-10 / Bz-11
Bz-11 / Bz-12
Tramo 04
Bz-17A / Bz-13
Bz-13 / Bz-14
Bz-14 / Bz-15
Bz-15 / Bz-16
Bz-16 / Bz-17
02.02.06.03
02.02.06.04
02.02.06.05
02.02.06.06
02.03.00
02.03.01
02.03.01.01
MANTENIMIENTO DE BUZONES
Bz-17A
Bz-16A
Bz-14A
Bz-13A
und
Pto
und
und
CONEXIONES DOMICILIARIAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA EN TERRENO NORMAL
Tramo 01
R-01
R-02
R-03
R-04
R-05
R-06
R-07
Tramo 02
R-08
R-09
R-10
R-11
R-12
R-13
R-14
R-15
R-16
R-17
R-18
R-19
Tramo 03
R-20
R-21
R-22
R-23
R-24
R-25
R-26
R-27
Tramo 04
R-28
R-29
R-30
R-31
R-32
R-33
R-34
R-35
R-36
Cant.
1
1
1
Long
Ancho
Metrado
Alto
Kg/ml
Parcial
1.00
1.00
1.00
1
1
1
1.00
1.00
1.00
1
1
1
1
1
1.00
1.00
1.00
1.00
1.00
1
1
1
1
1.00
1.00
1.00
1.00
1
1
1
1
1.00
1.00
1.00
1.00
1
1
1
1
1.00
1.00
1.00
1.00
1
1
1
1
1
1.00
1.00
1.00
1.00
1.00
1
1
1
1.00
1.00
1.00
1
1
1
1
1
1.00
1.00
1.00
1.00
1.00
2
2
2
1
2.00
2.00
2.00
1.00
2
2
2
2
1
2.00
2.00
2.00
2.00
1.00
2
2
1
2.00
2.00
1.00
2
2
2
2
1
4
2.00
2.00
2.00
2.00
1.00
4.00
Total
4.00
4.00
17.00
34.00
430.10
2
0
0
2
0
1
2
3.50
0.00
0.00
3.50
0.00
3.50
3.50
7.00
0.00
0.00
7.00
0.00
3.50
7.00
0
2
2
2
1
2
2
2
0
0
2
2
0.00
11.50
11.50
11.50
11.50
11.50
11.50
11.50
0.00
0.00
3.50
3.50
0.00
23.00
23.00
23.00
11.50
23.00
23.00
23.00
0.00
0.00
7.00
7.00
2
2
2
0
0
0
0
2
11.50
11.50
11.50
0.00
0.00
0.00
0.00
3.50
23.00
23.00
23.00
0.00
0.00
0.00
0.00
7.00
0
0
2
2
2
2
2
0
2
0.00
0.00
11.50
11.50
11.50
11.50
3.50
0.00
3.50
0.00
0.00
23.00
23.00
23.00
23.00
7.00
0.00
7.00
HOJA DE METRADO
PROYECTO
OBRA:
ENTIDAD
ZONA
DPTO.
PROVINCIA
DISTRITO
Item
Descripcin
Und
R-37
R-38
R-39
R-40
02.03.01.02
m2
02.03.01.03
m3
02.03.01.04
m3
02.03.01.05
ELIMINACION DE TUBERIAS DE DESAGUE Y MATERIAL EXCEDENTE, DIST. PROM. 15KM, CARGUIO C/MAQ
EXCAVACION
RELLENO CAMA DE ARENA
RELLENO CON MATERIAL PROPIO
m3
02.03.02
02.03.02.01
02.03.02.02
02.04.02
Metrado
Alto
Cant.
2
2
0
2
Long
3.50
3.50
0.00
3.50
Ancho
Kg/ml
Parcial
7.00
7.00
0.00
7.00
2
0
0
2
0
1
2
3.50
0.00
0.00
3.50
0.00
3.50
3.50
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
4.48
0.00
0.00
4.48
0.00
2.24
4.48
0
2
2
2
1
2
2
2
0
0
2
2
2
0.00
11.50
11.50
11.50
11.50
11.50
11.50
11.50
0.00
0.00
3.50
3.50
11.50
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.00
14.72
14.72
14.72
7.36
14.72
14.72
14.72
0.00
0.00
4.48
4.48
14.72
2
2
0
0
0
0
2
11.50
11.50
0.00
0.00
0.00
0.00
3.50
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
14.72
14.72
0.00
0.00
0.00
0.00
4.48
0
0
2
2
2
2
2
0
2
2
2
0
2
0.00
0.00
11.50
11.50
11.50
11.50
3.50
0.00
3.50
3.50
3.50
0.00
3.50
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.00
0.00
14.72
14.72
14.72
14.72
4.48
0.00
4.48
4.48
4.48
0.00
4.48
466.90
0.80
0.25
93.38
Total
275.26
93.38
205.44
1
466.90
0.80
0.55
430.10
93.38
205.44
EXP.
1.25
1.00
1.00
Parcial
537.63
93.38
205.44
TOTAL
238.81
205.44
238.81
und
50.00
2
0
0
2
0
1
2
2.00
0.00
0.00
2.00
0.00
1.00
2.00
0
2
2
2
1
2
2
2
0
0
2
2
2
0.00
2.00
2.00
2.00
1.00
2.00
2.00
2.00
0.00
0.00
2.00
2.00
2.00
2
2
0
0
0
0
2
2.00
2.00
0.00
0.00
0.00
0.00
2.00
0
0
2
2
2
2
2
0
2
2
2
0
2
0.00
0.00
2.00
2.00
2.00
2.00
2.00
0.00
2.00
2.00
2.00
0.00
2.00
50.00
50.00
und
50.00
pto
33.00
2
2
2
2
41.80
59.50
64.00
61.20
2.00
2.00
2.00
2.00
1
2
2
2
2
27.50
59.00
65.50
74.50
62.55
1.00
2.00
2.00
2.00
2.00
HOJA DE METRADO
PROYECTO
OBRA:
ENTIDAD
ZONA
DPTO.
PROVINCIA
DISTRITO
Item
Descripcin
Und
Tramo 03
Bz-16A / Bz-10
Bz-10 / Bz-11
Bz-11 / Bz-12
Tramo 04
Bz-17A / Bz-13
Bz-13 / Bz-14
Bz-14 / Bz-15
Bz-15 / Bz-16
Bz-16 / Bz-17
03.00.00
03.01.00
03.01.01
03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
04.00.00
04.01.00
04.01.01
Long
2
2
2
59.00
58.50
61.20
Kg/ml
Parcial
2.00
2.00
2.00
2
2
2
2
2
54.80
57.40
63.40
58.80
58.80
2.00
2.00
2.00
2.00
2.00
1
1
1
3.50
3.50
3.50
3.50
3.50
3.50
1
1
2
2
2
1
11.50
11.50
11.50
11.50
3.50
11.50
11.50
11.50
23.00
23.00
7.00
11.50
2
2
2
11.50
11.50
3.50
23.00
23.00
7.00
2
2
1
11.50
3.50
3.50
23.00
7.00
3.50
m2
m3
m3
und
und
Total
184.50
m3
Ancho
Metrado
Alto
Cant.
29.52
10.50
87.50
53.00
33.50
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
1.68
14.00
8.48
5.36
10.50
87.50
53.00
33.50
0.40
0.40
0.40
0.40
10.50
87.50
53.00
33.50
0.40
0.40
0.40
0.40
0.10
0.10
0.10
0.10
0.42
3.50
2.12
1.34
10.50
87.50
53.00
33.50
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
1.26
10.50
6.36
4.02
73.80
4.20
35.00
21.20
13.40
7.38
22.14
23.00
1
1
1
1.00
1.00
1.00
1
1
2
2
2
1
1.00
1.00
2.00
2.00
2.00
1.00
2
2
2
2.00
2.00
2.00
2
2
1
2.00
2.00
1.00
23.00
23.00
1
1
1
1.00
1.00
1.00
1
1
2
2
2
1
1.00
1.00
2.00
2.00
2.00
1.00
2
2
2
2.00
2.00
2.00
2.00
23.00
und
23.00
HOJA DE METRADO
PROYECTO
OBRA:
ENTIDAD
ZONA
DPTO.
PROVINCIA
DISTRITO
Item
04.01.02
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
CAM-02
Descripcin
Und
R-34
R-37
CAJA DE INSPECCION DOMICILIARIA 12"x12"
CONEXIONES DOMICILIARIAS AGUA SALADA
SISTEMA DE ELECTRIFICACION
PROVISION E INSTALACION DE TUBERIAS ELECTRICA PESADA PVC 1 1/2"
Tramo 01
R-04
R-06
R-07
Tramo 02
R-09
R-13
R-14
R-15
R-18
R-20
Tramo 03
R-21
R-22
R-27
Tramo 04
R-30
R-34
R-37
Cant.
2
1
Long
Ancho
Metrado
Alto
Kg/ml
Parcial
2.00
1.00
Total
23.00
1
23.00
23.00
1
1
1
2.00
2.00
2.00
2.00
2.00
2.00
1
1
2
2
2
1
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
4.00
4.00
4.00
2.00
2
2
2
2.00
2.00
2.00
4.00
4.00
4.00
2
2
1
2.00
2.00
2.00
4.00
4.00
2.00
1
1
1
2.00
2.00
2.00
0.40
0.40
0.40
0.60
0.60
0.60
0.48
0.48
0.48
1
1
2
2
2
1
2.00
2.00
2.00
2.00
2.00
2.00
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.60
0.60
0.60
0.60
0.60
0.48
0.48
0.96
0.96
0.96
0.48
2
2
2
2.00
2.00
2.00
0.40
0.40
0.40
0.60
0.60
0.60
0.96
0.96
0.96
2
2
1
2.00
2.00
2.00
0.40
0.40
0.40
0.60
0.60
0.60
0.96
0.96
0.48
1
1
1
3.00
3.00
3.00
3.00
3.00
3.00
1
1
2
2
2
1
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
6.00
6.00
6.00
3.00
2
2
2
3.00
3.00
3.00
6.00
6.00
6.00
2
2
1
3.00
5.00
3.00
6.00
10.00
3.00
m3
pto
und
pto
pto
46.00
11.04
73.00
23.00
1
1
1
1.00
1.00
1.00
1
1
2
2
2
1
1.00
1.00
2.00
2.00
2.00
1.00
2
2
2
2.00
2.00
2.00
2
2
1
2.00
2.00
1.00
23
23.00
23
23.00
23
23.00
23.00
23.00
23.00