2.2.

12 Dismantle & remove Random Rubble masonry structures


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

4.55

4.55

32/1

31+678

4.22

4.22

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

7.45

7.45

36/2

35+635

5.90

5.90

36/4

35+964

5.30

5.30

37/1

36+899

1.93

1.93

38/1

37+486

4.57

4.57

38/2

37+744

Total Qty
1

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

12.78

12.78

15.20

15.20

3.15

3.15

39/1

6.03

39/2

38+432

40/2

39+797

41/1

40+025

6.03
3.22

3.22
-

41/2

4.88

4.88

4.38

4.38

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

2.83

2.83

45/2

4.22

4.22

23.59

23.59

4.57

4.57

44+666

3.45

3.45

45/3

44+963

6.81

6.81

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

52+215

Total

3.91

3.91

5.59

5.59

4.81

4.81

10.40

32.85

36.77

3.15

22.12

19.12

67.89

0.77

193.07

Balance
Qty

(12.78)
(4.55)
(4.22)
(15.20)
(7.45)
(5.90)
(5.30)
(1.93)
(4.57)
(3.15)
(6.03)
(3.22)
(4.88)
(4.38)
(4.22)
(23.59)
(4.57)
(2.83)
(3.45)
(6.81)
(3.91)
(5.59)
(4.81)
(143.34)

2.2.13 Dismantle & remove concrete structures


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

0.77

0.77

32/1

31+678

0.85

0.85

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

3.09

36/2

35+635

1.00

36/4

35+964

0.88

0.88

37/1

36+899

0.92

0.92

38/1

37+486

0.79

0.79

38/2

37+744

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

12.56

12.56

23.04

23.04

3.09
1.00

0.69

0.69

39/1

0.93

39/2

38+432

40/2

39+797

41/1

40+025

0.93
1.08

1.08
-

41/2

0.77

0.77

0.77

0.77

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

0.79

0.79

45/2

44+666

0.76

0.76

45/3

44+963

0.76

0.76

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

2.60

2.60

51/3

50+813

18.85

18.85

52/1

50+367

0.98

0.98

52/2

51+662

53/1

52+170

53/1a

0.93

0.93

8.24

8.24
0.93

0.93

1.00

1.00
1.00

1.00
-

0.93

0.93
-

0.76

0.76

52+215
Total

23.19

10.78

38.46

0.69

5.71

3.24

7.30

2.75

92.12

3.2.8 Excavation & backfill for structures with suitable soil


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

13.66

13.66

32/2

31+907

23.13

23.13

33/1

32+095

33/2

32+278

3.56

3.56

33/3

32+346

19.24

19.24

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

72.77

72.77
-

33.46

33.46

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

12.02

37/1

36+899

28.83

38/1

37+486

14.61

38/2

37+744

11.75

39/2

38+432

40/2

39+797

41/1

40+025

31.73

31.73

46.74

46.74
26.08

26.08

52.16
12.02
28.83
14.61

29.22
11.75

42.00

42.00
-

44.94

41/2

24.26

44.94

25.78

50.04

41/3

40+710

42/1

41+648

14.08

43/1

42+173

11.64

43/3

42+733

43/5

42+812

44/1

43+105

22.75

22.75

44/1 A

43+236

14.71

14.71

44/1 B

43+650

11.63

44/2

44+020

7.27

7.27

45/1

44+334

5.57

5.57

45/2

44+666

8.09

8.09

45/3

44+963

4.84

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

9.06

9.06

51/2

50+316

11.22

11.22

51/3

50+813

5.71

5.71

52/1

50+367

16.79

16.79

52/2

51+662

53/1

52+170

53/1a

52+215
Total

14.08
11.64
19.65

30.61

50.26

19.65

22.72

42.37

11.63

4.84
9.58

9.58

18.82

18.82
-

173.37

25.78

421.50

52.44

25.77

39.30

101.67

88.99

14.61

943.43

3.2.9 Excavation for structures, unsuitable soil


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

52+215
Total

43.22

43.22

6.2.16 Laying and jointing of pipes, 900mm dia. (Single row)


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

52+215

Total

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

21.12

21.12

11.70
-

11.70

11.70
-

21.12

32.82

6.2.18 Grade C 15 Concrete


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

1.46

1.46

32/1

31+678

1.45

1.45

32/2

31+907

33/1

32+095

33/2

32+278

1.14

1.14

33/3

32+346

1.43

1.43

33/4

32+820

34/1 A

33+250

0.54

36/1

35+506

2.14

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

1.61

1.61

38/2

37+744

1.29

1.29

39/2

38+432

2.15

2.15

40/2

39+797

41/1

40+025

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

4.08

4.08

1.45

1.45
2.03

2.03

0.54

1.08
2.14
2.06

2.06
1.74

1.74
1.22

1.22

1.52

1.52
2.26

41/2

0.10

2.26

1.11

1.21

41/3

40+710

1.03

42/1

41+648

1.21

43/1

42+173

1.52

43/3

42+733

5.24

5.24

43/5

42+812

5.24

5.24

44/1

43+105

1.33

1.33

44/1 A

43+236

0.90

0.90

44/1 B

43+650

0.90

44/2

44+020

0.86

45/1

44+334

0.86

45/2

44+666

0.86

0.86

45/3

44+963

0.86

0.86

45/3a

45+675

0.86

0.86

46/1

45+980

1.45

1.45

48/2

47+871

0.86

0.86

50/1

49+840

51/1

50+139

0.97

0.97

51/2

50+316

0.97

0.97

51/3

50+813

1.14

1.14

52/1

50+367

0.93

52/2

51+662

53/1

52+170

53/1a

0.51

1.21
1.52

0.90
0.86
0.86

1.48

1.48

0.93
0.98

0.98
1.45

52+215
Total

1.54

1.45

0.66
-

5.46

7.94

4.30

1.65

6.02

3.13

6.11

7.11

1.72

15.37

2.91

0.66
2.67

64.39

6.2.19 Grade C 20 Concrete


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

57.54

57.54

3.89

7.79

11.68

52+215
Total

3.89

7.79

57.54

69.22

6.2.20 Grade C 25 Concrete


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

4.60

14.46

19.06

33/3

32+346

8.57

17.95

26.52

33/4

32+820

34/1 A

33+250

2.63

20.92

36/1

35+506

10.67

30.55

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

7.18

39/2

38+432

14.69

40/2

39+797

41/1

40+025

10
5.23

11
68.94

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

2.53

76.70

27.68

27.68

27.42
1.37

16.68

27.42
9.42

27.47
14.35

27.03

41.38

23.55
41.22
10.67

26.61

37.28
9.39

15.50

24.89
-

10.47

24.29

34.76

20.51

27.69

24.20

38.89

27.03

27.03
38.90

41/2

38.90

1.19

1.19

41/3

40+710

8.10

42/1

41+648

16.69

43/1

42+173

24.87

43/3

42+733

43/5

42+812

44/1

43+105

21.23

44/1 A

43+236

12.57

1.57

44/1 B

43+650

12.57

1.57

44/2

44+020

4.45

10.24

14.69

45/1

44+334

4.45

11.31

15.76

45/2

44+666

12.00

45/3

44+963

4.45

9.94

45/3a

45+675

4.45

11.27

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

19.67

19.67

51/2

50+316

16.24

16.24

51/3

50+813

17.35

17.35

52/1

50+367

20.27

52/2

51+662

5.02

53/1

52+170

53/1a

4.67

12.77
16.69
24.87
23.15
3.91

44.61
21.23
14.14
14.14

12.00
14.39
15.72

18.58
8.72
8.05

4.00

22.58

2.56

11.28

18.87

26.92

20.27
15.53

20.55
1.22

52+215
Total

23.15
40.70

93.09

92.04

45.15

18.87

41.52

51.47

49.66

85.27

22.72

138.98

66.91

119.12

6.84

38.49

13.84

58.58

53.99

54.53

1.22
59.17

3.91

5.22

1,001.03

6.2.22 Tor Steel reinforcement


IPC No.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

3,266.63

32/2

31+907

1,953.78

33/1

32+095

33/2

32+278

2,602.03

33/3

32+346

3,604.01

10
5,357.41

3,524.31

11
2,170.97

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

3,137.14

10,665.52

296.93

3,821.24

348.21
1,367.64

Previous
Paid Total
Qty.

3,614.84

227.26

3,548.68
4,068.44

1,024.47

5,092.91

591.19

3,193.22
3,604.01

33/4

32+820

34/1 A

33+250

3,506.70

3,506.70

36/1

35+506

5,666.29

5,666.29

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

952.17

2,287.40

38/2

37+744

740.54

2,661.52

39/2

38+432

970.29

2,515.64

40/2

39+797

41/1

40+025

1,315.27

3,237.47

1,315.26

5,868.00
2,162.71

2,732.99

952.17

2,406.97

4,569.68

109.41

109.41

22.47

4,214.21

22.47

3,424.53

970.29

4,456.22

1,221.03

3,954.02
7,684.42

41/2

7,684.42

42.69

42.69

41/3

40+710

602.39

42/1

41+648

2,662.99

602.39

43/1

42+173

3,846.90

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

1,943.74

1,943.74

44/1 B

43+650

1,943.74

1,943.74

44/2

44+020

458.45

41.20

2,480.53

45/1

44+334

1,980.34

41.20

2,021.54

45/2

44+666

1,980.34

41.20

2,021.54

45/3

44+963

2,154.40

41.20

2,195.60

45/3a

45+675

1,035.31

1,035.30

41.20

2,111.81

46/1

45+980

3,936.27

41.20

3,977.47

48/2

47+871

41.20

2,077.52

50/1

49+840

51/1

50+139

51/2

2,662.99
3,846.90
1,484.08

7,787.21

82.41

9,353.70

7,477.80

82.41

7,560.21
-

1,980.88

2,036.32
384.76

4,314.48

2,304.68

673.75

2,978.43

50+316

2,136.21

850.80

2,987.01

51/3

50+813

2,170.32

723.20

2,893.52

52/1

50+367

2,324.28

714.67

3,038.95

52/2

51+662

1,023.88

3,339.03

53/1

52+170

53/1a

3,929.72

2,315.15

52+215
Total

8,935.49

13,741.59

4,891.95

3,929.72

2,732.99

16,271.36

6,509.89

12,174.29

9,425.85

7,173.71

15,820.05

14,366.96

642.95

3,052.05

763.01

23,042.24

6,066.60

763.01

4,458.01
-

145,845.71

6.2.24 Random rubble masonry


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

52+215
Total

6.2.25 Plastering, 1:3 cement sand mix, 16mm thick


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

52+215
Total

6.2.26 Formwork smooth finish


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

112.93

32/2

31+907

56.57

33/1

32+095

33/2

32+278

102.52

102.52

33/3

32+346

113.66

113.66

33/4

32+820

34/1 A

33+250

113.56

36/1

35+506

164.80

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

128.91

128.91

38/2

37+744

116.10

116.10

39/2

38+432

131.25

131.25

40/2

39+797

41/1

40+025

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

260.76

260.76

113.87

113.87
112.93

56.57

113.14
176.09

176.09

113.56
164.80
186.22

186.22
112.92

112.92
91.89

91.89

110.45

110.45
125.20

41/2

125.20

8.64

8.64

41/3

40+710

42/1

41+648

86.78

86.78

43/1

42+173

112.30

112.30

43/3

42+733

43/5

42+812

44/1

43+105

95.19

95.19

44/1 A

43+236

79.94

79.94

44/1 B

43+650

79.96

44/2

44+020

81.20

81.20

45/1

44+334

83.63

83.63

45/2

44+666

83.63

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

101.14

101.14

51/2

50+316

95.72

95.72

51/3

50+813

95.31

95.31

52/1

50+367

116.02

116.02

52/2

51+662

53/1

52+170

53/1a

31.84

33.47

211.86

211.86
205.17

15.08

220.25

79.96

83.63
83.08

83.08

94.72

94.72
98.46

98.46

86.88

86.88

134.75

134.75

116.22

116.22
-

52+215
Total

65.31

408.19

501.90

170.44

134.75

110.45

287.00

230.92

380.29

436.85

562.48

430.06

30.36

75.04

114.36

245.37

286.90

432.45

219.76
91.89

15.08

4,725.02

6.2.27 Formwork rough finish


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

52+215
Total

6.2.28 100mm crushed stone back fill material


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

5.02

5.02

6.42

6.42

52+215
Total

11.44

11.44

6.2.29 37.5mm maximum size crushed stone - filter material


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

52+215
Total

6.2.30 Weep hole, 75mm dia. PVC pipe (Type 600)


IPC No.

Previous
Paid Total
Qty.

Culvert
No.

Chainage

31/1

30+594

31/3

30+877

32/1

31+678

32/2

31+907

33/1

32+095

33/2

32+278

33/3

32+346

33/4

32+820

34/1 A

33+250

36/1

35+506

36/2

35+635

36/4

35+964

37/1

36+899

38/1

37+486

38/2

37+744

39/2

38+432

40/2

39+797

41/1

40+025

41/3

40+710

42/1

41+648

43/1

42+173

43/3

42+733

43/5

42+812

44/1

43+105

44/1 A

43+236

44/1 B

43+650

44/2

44+020

45/1

44+334

45/2

44+666

45/3

44+963

45/3a

45+675

46/1

45+980

48/2

47+871

50/1

49+840

51/1

50+139

51/2

50+316

51/3

50+813

52/1

50+367

52/2

51+662

53/1

52+170

53/1a

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

4.80

4.80

4.80

4.80

52+215
Total

9.60

9.60