Documentos de Académico
Documentos de Profesional
Documentos de Cultura
(min)
Ramal
1-A
2-A
A-C
3-B
4-B
B-C
B-C
C-D
Ciclon 1
D-E
E-F
Ciclon 2
F-G
area
Area
(pie2)
Vel
(fpm)
VP
(pulg
agua)
He
(VP)
0.0873
0.2673
0.3940
0.2305
0.3491
0.5454
0.4418
0.6600
4581.90
4489.34
4311.73
4338.39
4010.31
4475.28
5524.71
6610.65
1.309
1.256
1.159
1.173
1.003
1.249
1.903
2.724
0.50
0.40
SPh
Long L equiv
(VP+He) tramo (pies)
recto
(pies)
1.9633
60
0
1.7591
90
13.5
140
11
1.7015
40
0
1.5040
60
16
100
21
100
18.5
80
0
caudal
(cfm)
400
1200
1,698.82
1000
1400
2,440.82
2,440.82
4,363.03
4000
4000
4000
4000
4000
4000
4000
6036
0.100
0.300
0.425
0.250
0.350
0.610
0.610
0.723
Diam
(pulg)
4.0
7.0
8.5
6.5
8.0
10.0
9.0
11.0
4,363.03
4,363.03
4000
5714
1.091
0.764
14.0
11.0
1.0690
0.6600
4081.41
6610.65
1.039
2.724
0.49
1.5474
120
40
42
15.5
4,363.03
5714
0.764
11.0
0.6600
6610.65
2.724
0.49
4.0595
80
15.5
0.45
0.50
Long
Total
(pies)
Hf(100)
Prdida
tramo
(pies)
60
103.5
151
40
76
121
118.5
80
9.1038
4.4246
3.2337
4.5386
3.0340
2.8465
4.8302
5.3176
5.4623
4.5795
4.8829
1.8154
2.3059
3.4442
5.7237
4.2541
162
55.5
1.5849
5.3176
2.5676
2.9513
95.5
5.3176
5.0783
FAN SP=
Q=
50.75
4,363.03
Pdida
Total
(pies)
7.4256
6.3386
4.8829
3.5169
3.8098
3.4442
5.7237
4.2541
10
4.1150
2.9513
8
9.1378
SP
Caudal Balance Diametro
tramo Corregido
Corregido
(pulg
(cfm)
agua)
7.4256
14.64
1,298.82
12.3084
1,040.82
7.69
3.8098
7.3971
39.90
9.03
10.3309 2,664.21
16.07
17.5881
27.5881
31.7031
2.9513
10.9513
20.0890
VPr
1.1056256
1.1056256
1.69889518
VP-VPr
0.143
0.797
1.026