Está en la página 1de 1

CLIENT LOGO PM LOGO ENGINEER’S LOGO CONTRACTOR’S LOGO

CONTRACTOR SUBMITTAL FIDIC Clause 2

PROJECT NAME: EMPLOYER

CONTRACTOR: ENGINEER WSP MIDDLE EAST LIMITED

DATE: SUBMITTAL NUMBER REV.

ARCHITECTUR
STRUCTURAL MECHANICAL ELECTRICAL CIVIL
AL
SUBMITTAL DESCRIPTION
X
MATERIAL SHOP METHOD CLAUSE 14 SUBCONTRACT TEST OTHER
SUBMITTAL DRAWINGS/C STATEMENT PROGRAMME OR SUPPLIER RESULTS (SPECIFY)
LCS
X

LOCATION:

LIST OF SUBMITTED ITEMS:


Item Description No. of Copies Remarks

REF. SPEC(s): REF. DRWG(s):

COMPLIANCE The Contractor hereby confirms that the submitted items have been reviewed in detail and
STATEMENT are correct and in strict conformance with the Contract Documents except otherwise stated.
For and on behalf of the Contractor

Name: Signature: Date:

ENGINEER’s REVIEW COMMENTS

Code 1 Code 2 Code 3 Code 4 Code 5


Approved Approved As Noted Revise And Resubmit Rejected For Information Only

Comments Sheet Attached Yes


No
Name: Signature: Date:

EMPLOYER’s COMMENTS

Name: Signature: Date:

Note: The Engineer’s approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor
shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents.

Distribution: 1. Contractor [Original], 2. Employer, 3. Project Manager, 4. QS/Cost Consultant, 5. Consultants, 6. File
File/Templ Rev Dat
25665521.doc 1 01.08.2008 By Dr SHH
ate . e

También podría gustarte