Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ARCHITECTUR
STRUCTURAL MECHANICAL ELECTRICAL CIVIL
AL
SUBMITTAL DESCRIPTION
X
MATERIAL SHOP METHOD CLAUSE 14 SUBCONTRACT TEST OTHER
SUBMITTAL DRAWINGS/C STATEMENT PROGRAMME OR SUPPLIER RESULTS (SPECIFY)
LCS
X
LOCATION:
COMPLIANCE The Contractor hereby confirms that the submitted items have been reviewed in detail and
STATEMENT are correct and in strict conformance with the Contract Documents except otherwise stated.
For and on behalf of the Contractor
EMPLOYER’s COMMENTS
Note: The Engineer’s approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor
shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents.
Distribution: 1. Contractor [Original], 2. Employer, 3. Project Manager, 4. QS/Cost Consultant, 5. Consultants, 6. File
File/Templ Rev Dat
25665521.doc 1 01.08.2008 By Dr SHH
ate . e