LOSA 1
f'c = 21 Mpa
fy = 420 Mpa
c = 0.000024 N/mm3
1. DEFINIMOS MATERIALES:
2. PREDIMENSIONAMIENTO:
L1 = 5900 mm
L2 = 5900 mm
LOSA
TOTALMENTE
EMPOTRADA
1.00
L1
3080
Sabemos:
3600
< 2
hf 125 mm
hf = L1/33 =
hf = L2/33 =
hf =
Entonces:
Dimensiones de elementos:
178.79 mm
178.79 mm
200 mm
bw 250 mm
125 mm
125 mm
bw = 200 mm
h = 200 mm
3. METRADO DE CARGAS:
Wcm = Pp + Acabados =
Tenemos:
Wcv
0 N/mm2
0 N/mm2
0 N/mm2
0 N/mm2
4 PISO
3 PISO
2 PISO
1 PISO
0.0058 N/mm2
Wu = 1.4Wcm + 1.7Wcv
Wu =
0.00812 N/mm2
Wu =
0.00812 N/mm2
Wu =
0.00812 N/mm2
Wu =
0.00812 N/mm2
L1
4. ANALISIS DE LA LOSA:
POR TRABAJO VIRTUAL
B
L2
L2/2
L2/2
B
X
Porcion A:
Por Trabajo Externo:
L1 - 2X
L2/2
A = 1/3
PCA
L2
2A: 2*(L2*Wu*x)*a/2
2A: L2*X*Wu/3
L2/2
=1
-------(1)
L2/2
m'
m' = m
L2*X*Wu/3 = 4*L2*m/X
m = (Wu*X^2)/12
-------(A)
Porcion B:
Por Trabajo Externo:
B1
B1 = 1/3
B2 = 1/2
B2
L1
4B1 + 2B2 =
4B1 + 2B2 =
4*X*(L2/2)*Wu*B1/2 + 2*(L1-2X)*(L2/2)*Wu*B2
X*L2*Wu/3 + (L1-2X)*L2*Wu/2
-------(3)
B1
L2/2
=1
B1
B2
Trabajo Interno:
B = 1/(L2/2)
B = 2/L2
2B = 2*(L1*m'+L1*m)*B
2B =
8L1/L2
-------(4)
L1 m'
m' = m
L2/2
Reemplazando valores:
X=
2950.00 mm
-------(B)
200 mm
5900 mm
5900 mm
0.0058 N/mm2
0 N/mm2
0.008 N/mm2
0.0012 N/mm2
0.0018 N/mm2
f'c = 21 Mpa
fy = 420 Mpa
As =
a=
a=
B=
(4 Piso)
(3 Piso)
(2 Piso)
(1 Piso)
X
mm
2950.00
2950.00
2950.00
2950.00
4 PISO
3 PISO
2 PISO
1 PISO
Mu/(*fy*(d-a/2))
As*fy/(0.85*f'c*bw)
d (d - B)
2*Mu/(0.85**f'c*bw)
Asumiendo db = N13 y r = 20 mm
d = 167 mm
= 0.9
bw = 1000 mm
Wu
N/mm
8.12
21.72
10.16
11.18
Mu
N-mm
5.89E+06
1.58E+07
7.37E+06
8.11E+06
a
mm
2.21
5.98
2.77
3.05
As
mm2
93.906
254.073
117.697
129.622
556.67 mm2
= 0.0018
hb = hw = 200 mm
Areas:
A2
A1
A1 =
A2 =
Centroide:
xc =
yc =
I A1x = bw*h/12 =
I A2x = hb*hf/12 =
1.00E+05 mm2
4.00E+04 mm2
189.29 mm
228.57 mm
1.33E+09 mm4
1.33E+08 mm4
Areas:
A2
A1 =
A2 =
Centroide:
xc =
yc =
I A1x = bw*h/12 =
I A2x = hb*hf/12 =
A2
A1
1.00E+05 mm2
4.00E+04 mm2
325.00 mm
244.44 mm
1.33E+09 mm4
1.33E+08 mm4
Tenemos:
f = Ecb*Ib/(Ecs+Is)
f = Ib/Is
Ecb = Ecs
Para L1 = 5900 mm
Is1 =
L1*hf /12 =
3.93E+09 mm4
f = Ib1/Is1 = 0.45
f' = Ib2/Is1= 0.52
f 1 = 0.48
3.93E+09 mm4
f = Ib1/Is2 = 0.45
f' = Ib2/Is1 = 0.52
f 2 = 0.48
Para L2 = 5900 mm
Is2 = L2*hf /12 =
Cumple
0.48 1
0.48 1
Mo = (qu * L2 * L1^2)/8
4 PISO
3 PISO
2 PISO
1 PISO
qu
N/mm2
0.0081
0.0217
0.0102
0.0112
qu = Wu/1000
Mu
N-mm
5.89E+06
1.58E+07
7.37E+06
8.11E+06
Mo
N-mm
Mu < Mo
2.08E+08 N-mm
Cumple
Cumple
Cumple
Cumple
5.58E+08 N-mm
2.61E+08 N-mm
2.87E+08 N-mm
L1 = 5900 mm
M1 - M2 = 0
Cortante Resistente:
Vc = *(f'c)*bw*d/6
Vc =
1.08E+05 N
4 PISO
3 PISO
2 PISO
1 PISO
Vc
N
1.08E+05
1.08E+05
1.08E+05
1.08E+05
Wu
N/mm
8.12
21.72
10.16
11.18
= 0.85
Vu
N
2.40E+04 N
6.41E+04 N
3.00E+04 N
3.30E+04 N
Vc Vu
CUMPLE, NO FALLA POR CORTE
CUMPLE, NO FALLA POR CORTE
CUMPLE, NO FALLA POR CORTE
CUMPLE, NO FALLA POR CORTE
Donde:
(Asumiendo N13)
S = 238.92mm
S 5*hf
S 1000 mm
Segn el ACI:
Entonces:
S = 350 mm
N13 1@ 0.35 m
S=
Donde:
S 1000 mm
369.44 mm
Entonces:
S = 500 mm
Acero minimo por corte:
N10, 1 @ .40
N13, 1@ 0.5 m