B4 0.25 0.50 Pm = 75.35 Tn Pv = 22.00 Tn Mm x = 0.34 Tn-m Mm y = 0.02 Tn-m Mv x = 0.09 Tn-m Mv y = 0.01 Tn-m Ms x = 70.84 Tn-m Ms y = 56.21 Tn-m Ps x = 0.05 Tn Ps y = 0.02 Tn t = 10 Tn/n2 fc = 210 Kg/cm2 DIMENSIONAMIENTO SIN CONSIDERAR MOMENTO A = 11.20 m2 A x 10% = 12.31 m2 B = 3.40 m L = 3.60 m PRIMER PREDIMENSIONAMIENTO 1 = 9.20 < 10.00 CUMPLE 2 = 9.21 < 10.00 CUMPLE 3 = 18.86 > 13.00 NO CUMPLE Incrementamos las dimensiones de las zapatas en un: 17% B = 4.00 m L = 4.20 m DISEO DE ZAPATAS ZAPATA AISLADA g g g g 3 = 12.73 < 13.00 CUMPLE 4 = 11.72 < 13.00 CUMPLE SEGUNDO PREDIMENSIONAMIENTO (Considerando peso de la zapata) h pre. = 0.60 m Peso zap. = 24.20 Tn P. zap.+% = 14.60 Tn d = 0.53 m 1 = 7.27 < 10.00 CUMPLE 2 = 7.27 < 10.00 CUMPLE 3 = 13.30 > 13.00 NO CUMPLE Incrementamos las dimensiones de las zapatas en un: 10% B = 4.40 m L = 4.60 m 3 = 10.60 < 13.00 CUMPLE 4 = 9.82 < 13.00 CUMPLE TERCER PREDIMENSIONAMIENTO (Sin considerar el peso de la zapata) 1 = 4.84 < 10.00 CUMPLE g g g g g g g g 2 = 4.84 < 10.00 CUMPLE 3 = 9.41 < 13.00 CUMPLE 4 = 8.63 < 13.00 CUMPLE DISEO SERVICIO ULTIMO SERVICIO ULTIMO SERVICIO ULTIMO Mtos x Gravedad 9.20 15.19 4.84 7.98 7.27 12.00 Mtos x, y Gravedad 9.21 15.19 4.84 7.98 7.27 12.00 SISMO X 12.73 15.91 9.41 11.76 10.60 13.25 SISMO Y 11.72 14.66 8.63 10.79 9.82 12.28 u act. = 11.76 Tn/m2 VERIFICACION POR CORTANTE FLEXION Vu x = 80.19 Tn Vu y = 82.49 Tn CON 15% PESO ZAPATASIN PESO DE ZAPATA CON PESO TOTAL ZAPATA CON g g g g f V c = 150.81 Tn
Vu y < V c CUMPLE
VERIFICACION POR PUNZONAMIENTO
bo = 360.00 cm 2 Ao = 0.79 m2 Vu = 228.66 Tn Vcp = 295.80 Vcp = 251.43
Vu < Vcp CUMPLE VERIFICACION POR APLASTAMIENTO Pu = 136825.0 Tn A = 1250.00 cm2 fu act. = 109.46 Kg/cm2 Ac/Az = 0.0062 < 1/3 fu res. = 149.10 Kg/cm2 fu act. < fu res. CUMPLE f f f DISEO POR FLEXION Mu x = 97.11 Tn-m Mu y = 112.28 Tn-m DIRECCION X a = 10.50 cm As = 54.37 cm2 a = 2.91 cm As = 50.33 cm2 a = 2.69 cm As = 50.22 cm2 a = 2.69 cm As = 50.22 cm2 Usamos 5/8" 2 1/2" 5/8" Separacin = 17.52 cm 1" USAR f 5/8" @ 17.5 cm
DIRECCION Y a = 10.50 cm f As = 62.86 cm2 a = 3.22 cm As = 58.36 cm2 a = 2.99 cm As = 58.23 cm2 a = 2.98 cm As = 58.23 cm2 Usamos 3/4" #N/A 1/2" 5/8" Separacin = #N/A cm 1" USAR f 3/4" @ 20 cm f PREDIMENSIONAMIENTO COLUMNA ANCHO LARGO B4 0.25 0.50 Pm = 75.35 Tn Pv = 22.00 Tn Mm x = 0.34 Tn-m Mm y = 0.02 Tn-m Mv x = 0.09 Tn-m Mv y = 0.01 Tn-m Ms x = -70.84 Tn-m Ms y = 56.21 Tn-m Ps x = 0.05 Tn Ps y = 0.02 Tn COLUMNA ANCHO LARGO B5 0.25 0.50 Pm = 66.51 Tn Pv = 19.11 Tn Mm x = 0.34 Tn-m Mm y = 0.07 Tn-m Mv x = 0.09 Tn-m Mv y = 0.02 Tn-m Ms x = -70.84 Tn-m Ms y = 56.04 Tn-m Ps x = 0.05 Tn Ps y = 0.59 Tn t = 10 Tn/m2 fc = 210 Kg/cm2 fy = 4200.00 Kg/cm2 luz = 5.10 m AREA DE ZAPATA Az = 22.00 m2 Considerando % por no tomar momentos Az = 44.00 m2 Determinacin del centro de gravedad X = 2.39 m Para L = 7.00 B = 6.30 L = 8.00 B = 5.50 L = 9.00 B = 4.90 L = 9.00 B = 4.90
L = 9.00 B = 4.90 ZAPATA COMBINADA g Verificacin 1 = 3 = 4.98 T / m2 CUMPLE 2 = 4 = 4.98 T / m2 CUMPLE Considerando el sismo longitudinal Carga axial P1 = 97.30 P2 = 85.57 Mto. Long. M1 = 71.27 M2 = 71.27 Mto. Trans. M1 = 0.03 M2 = 0.09 X g = 3.17 m 1 = 3 = 9.47 T / m2 CUMPLE
Considerando el sismo longitudinal Carga axial P1 = 97.40 P2 = 85.67 Mto. Long. M1 = -70.41 M2 = -70.41 Mto. Trans. M1 = 0.03 M2 = 0.09 X g = 3.44 m 1 = 3 = 4.98 T / m2 CUMPLE RESUMEN DE PRESIONES 1 Verificacion 1 = 3 = 4.98 T / m2 u = 8.22 T / m2 2 Verificacion 1 = 3 = 9.47 T / m2 u = 11.83 T / m2 3 Verificacion 1 = 3 = 4.98 T / m2 u = 6.23 T / m2 u diseo = 11.83 T / m2 Wu = 57.98 T / m VERIFICACIONES Por Cortante Flexin: g g g g g g g g g g g g g g g g g g Asumiendo d = 50 cm Vu = 69.57 Tn Vc = 159.94 Tn Vu < Vc CUMPLE Por Cortante : x 1 = 1.95 m x 2 = 1.95 m Vx = 104.36 Tn Vc = 159.94 Tn Vx < Vc CUMPLE Por Punzonamiento bo = 350.00 cm Ao = 0.75 m2 Vup = 130.49 Tn Vcp = 383.44
Vup < Vcp CUMPLE DISEO POR FLEXION DIRECCION X Volado Izquierdo Mu = 83.78 Tn - m
a = 10.00 cm As = 49.25 cm2 a = 2.37 cm As = 45.40 cm2 a = 2.18 cm As = 45.40 cm2 f f f f f f Usamos 1/2" 1.27 1/2" 5/8" 3/4" Separacin = 13.71 cm 1" USAR f 1/2" @ 15 cm Volado Derecho Mu = 83.78 Tn - m
a = 10.00 cm As = 49.25 cm2 a = 2.37 cm As = 45.40 cm2 a = 2.18 cm As = 45.40 cm2 Usamos 1/2" 1.27 1/2" 5/8" 3/4" Separacin = 13.71 cm 1" USAR f 1/2" @ 15 cm Tramo Central Mu = 188.50 Tn - m
a = 10.00 cm As = 110.82 cm2 a = 5.32 cm As = 105.34 cm2 a = 5.06 cm f f As = 105.34 cm2 Usamos 3/4" #N/A 1/2" 5/8" Separacin = #N/A cm 1" USAR f 3/4" @ 15 cm DIRECCION Y Volado Izquierdo Mu = 153.88 Tn - m
a = 10.00 cm As = 90.46 cm2 a = 2.37 cm As = 83.39 cm2 a = 2.18 cm As = 83.39 cm2 Usamos 3/4" 2.84 1/2" 5/8" 3/4" Separacin = 16.69 cm 1" 1 1/4" 1 3/8" USAR f 3/4" @ 17.5 cm 1 1/2" Volado Derecho Mu = 153.88 Tn - m f f
a = 10.00 cm As = 90.46 cm2 a = 2.37 cm As = 83.39 cm2 a = 2.18 cm As = 83.39 cm2 Usamos 3/4" 2.84 1/2" 5/8" 3/4" Separacin = 16.69 cm 1" 1 1/4" 1 3/8" USAR f 3/4" @ 17.5 cm 1 1/2" ff PREDIMENSIONAMIENTO COLUMNA ANCHO LARGO A4 0.25 0.40 Pm = 32.75 Tn Pv = 8.35 Tn M1 = 1.80 Mm x = 1.41 Tn-m Mm y = 0.02 Tn-m Mv x = 0.39 Tn-m Mv y = 0.01 Tn-m Ms x = 37.05 Tn-m Ms y = 56.21 Tn-m Ps x = 0.07 Tn Ps y = 0.02 Tn COLUMNA ANCHO LARGO B4 0.25 0.50 Pm = 75.35 Tn Pv = 22.00 Tn M2 = 0.43 Mm x = 0.34 Tn-m Mm y = 0.02 Tn-m Mv x = 0.09 Tn-m Mv y = 0.01 Tn-m Ms x = 70.84 Tn-m Ms y = 56.21 Tn-m Ps x = 0.05 Tn Ps y = 0.02 Tn t = 10 Tn/n2 fc = 210 Kg/cm2 fy = 4200 Kg/cm2 luz = 5.40 m DIMENSIONAMIENTO Primera Verificacin Para Columna A4 Az = 4.52 m2 Considerando % por no tomar momentos Az = 6.10 m2
L = 1.90 m B = 3.20 m Clculo de excentricidad e = 0.75 m Determinacin de R, considerando Mtos. Long. R1 = 46.88 Tn Clculo de las presiones considerando Mtos. de gravedad
1 = 8.49 CUMPLE 2 = 8.47 CUMPLE ZAPATA CONECTADA g g g Para Columna B4 R2 = 111.65 Tn Az = 12.28 m2 Considerando % por no tomar momentos Az = 13.50 m2
L = 3.80 m B = 3.60 m Verificando presiones 1 = 8.98 Tn/m2 CUMPLE
Asumimos h = 60 cm. d = 52.5 cm. Ao = 0.51 m2 At = 6.08 m2 bo = 2.35
Cortante de Diseo por Punzonamiento Vup = 31.63 Tn Cortante Resistente por Punzonamiento Vcp = 340.59 Tn CUADRO RESUMEN DE PRESIONES ZAPATA N 1 ZAPATA N 2 g g g g g g g g g g g g g g g g g g g g g f Vcp = 289.50 Tn Vup < Vcp CUMPLE DISEO POR FLEXION Para volado de : 0.75 m Mu = 1.60 Tn-m a = 10.50 cm As = 0.89 cm2 a = 0.11 cm As = 0.81 cm2 a = 0.10 cm As = 0.81 cm2 Usamos 1/2" 1.27 1/2" 1.27 5/8" 2 3/4" 2.84 Separacin = 299.29 cm 1" 3.88 USAR f 1/2" @ 20 cm Para volado de : 1.48 m Mu = 6.18 Tn-m a = 10.50 cm As = 3.46 cm2 a = 0.25 cm As = 3.12 cm2 a = 0.23 cm As = 3.12 cm2 Usamos 1/2" 1.27 1/2" 1.27 5/8" 2 3/4" 2.84 Separacin = 77.27 cm 1" 3.88 USAR f 1/2" @ 20 cm DISEO Para Columna B4 u = 14.84 Tn/m2 g f f f f g VERIFICACIONES Peralte por Punzonamiento
Asumimos h = 75 cm. d = 67.5 cm. Ao = 0.71 m2 At = 13.68 m2 bo = 2.60
Cortante de Diseo por Punzonamiento Vup = 192.60 Tn Cortante Resistente por Punzonamiento Vcp = 274.67 Tn Vcp = 233.47 Tn Vup < Vcp CUMPLE DISEO POR FLEXION Para volado de : 1.65 m
Mu = 20.21 Tn-m a = 13.50 cm As = 8.80 cm2 a = 0.58 cm As = 7.95 cm2 a = 0.52 cm As = 7.95 cm2 Usamos 1/2" 1.27 1/2" 1.27 5/8" 2 3/4" 2.84 Separacin = 30.34 cm 1" 3.88 USAR f 1/2" @ 30 cm
Para volado de : 1.68 m
Mu = 20.82 Tn-m a = 13.50 cm As = 9.07 cm2 a = 0.59 cm f f f As = 8.20 cm2 a = 0.54 cm As = 8.20 cm2 Usamos 1/2" 1.27 1/2" 1.27 5/8" 2 3/4" 2.84 Separacin = 29.44 cm 1" 3.88 USAR f 1/2" @ 30 cm DISEO DE LA VIGA DE CONEXIN
Vud = 23.92 Tn Mu = 39.56 Tn-m
Peralte por Cortante h = 0.70 m b = 0.35 m d = 0.63 m
Cortante Resistente:
Vc = 16.80 Tn Vc = 13.44 Tn Nota: Como el cortante que toma el concreto no es suficiente, colocamos estribos Vs = 11.34 Tn Usamos 1/2" 1.27 Separacin = 58.80 cm
USAR ESTRIBOS f 1/2" @ 30 cm Calculo de M max M max = 66.92 Tn-m Mu < M max As TRACCION Mu = 39.56 Tn - m
a = 12.50 cm As = 18.60 cm2 a = 12.51 cm f f f As = 16.74 cm2 a = 11.26 cm As = 16.74 cm2