PREDIMENSIONAMIENTO

COLUMNA ANCHO LARGO


B4 0.25 0.50
Pm = 75.35 Tn Pv = 22.00 Tn
Mm x = 0.34 Tn-m Mm y = 0.02 Tn-m
Mv x = 0.09 Tn-m Mv y = 0.01 Tn-m
Ms x = 70.84 Tn-m Ms y = 56.21 Tn-m
Ps x = 0.05 Tn Ps y = 0.02 Tn
t = 10 Tn/n2
fc = 210 Kg/cm2
DIMENSIONAMIENTO SIN CONSIDERAR MOMENTO
A = 11.20 m2
A x 10% = 12.31 m2
B = 3.40 m
L = 3.60 m
PRIMER PREDIMENSIONAMIENTO
1
= 9.20 < 10.00 CUMPLE
2
= 9.21 < 10.00 CUMPLE
3
= 18.86 > 13.00 NO CUMPLE
Incrementamos las dimensiones de las zapatas en un: 17%
B = 4.00 m
L = 4.20 m
DISEO DE ZAPATAS
ZAPATA AISLADA
g
g
g
g
3
= 12.73 < 13.00 CUMPLE
4
= 11.72 < 13.00 CUMPLE
SEGUNDO PREDIMENSIONAMIENTO (Considerando peso de la zapata)
h pre. = 0.60 m
Peso zap. = 24.20 Tn
P. zap.+% = 14.60 Tn
d = 0.53 m
1
= 7.27 < 10.00 CUMPLE
2
= 7.27 < 10.00 CUMPLE
3
= 13.30 > 13.00 NO CUMPLE
Incrementamos las dimensiones de las zapatas en un: 10%
B = 4.40 m
L = 4.60 m
3
= 10.60 < 13.00 CUMPLE
4
= 9.82 < 13.00 CUMPLE
TERCER PREDIMENSIONAMIENTO (Sin considerar el peso de la zapata)
1
= 4.84 < 10.00 CUMPLE
g
g
g
g
g
g
g
g
2
= 4.84 < 10.00 CUMPLE
3
= 9.41 < 13.00 CUMPLE
4
= 8.63 < 13.00 CUMPLE
DISEO
SERVICIO ULTIMO SERVICIO ULTIMO SERVICIO ULTIMO
Mtos x
Gravedad
9.20 15.19 4.84 7.98 7.27 12.00
Mtos x, y
Gravedad
9.21 15.19 4.84 7.98 7.27 12.00
SISMO X 12.73 15.91 9.41 11.76 10.60 13.25
SISMO Y 11.72 14.66 8.63 10.79 9.82 12.28
u act. = 11.76 Tn/m2
VERIFICACION POR CORTANTE FLEXION
Vu x = 80.19 Tn
Vu y = 82.49 Tn
CON 15% PESO ZAPATASIN PESO DE ZAPATA CON PESO TOTAL ZAPATA
CON
g
g
g
g
f
V c = 150.81 Tn


Vu y < V c CUMPLE

VERIFICACION POR PUNZONAMIENTO

bo = 360.00 cm 2
Ao = 0.79 m2
Vu = 228.66 Tn
Vcp = 295.80
Vcp = 251.43

Vu < Vcp CUMPLE
VERIFICACION POR APLASTAMIENTO
Pu = 136825.0 Tn
A = 1250.00 cm2
fu act. = 109.46 Kg/cm2
Ac/Az = 0.0062 < 1/3
fu res. = 149.10 Kg/cm2
fu act. < fu res. CUMPLE
f
f
f
DISEO POR FLEXION
Mu x = 97.11 Tn-m
Mu y = 112.28 Tn-m
DIRECCION X
a = 10.50 cm
As = 54.37 cm2 a = 2.91 cm
As = 50.33 cm2 a = 2.69 cm
As = 50.22 cm2 a = 2.69 cm
As = 50.22 cm2
Usamos 5/8" 2 1/2"
5/8"
Separacin = 17.52 cm 1"
USAR f 5/8" @ 17.5 cm

DIRECCION Y
a = 10.50 cm
f
As = 62.86 cm2 a = 3.22 cm
As = 58.36 cm2 a = 2.99 cm
As = 58.23 cm2 a = 2.98 cm
As = 58.23 cm2
Usamos 3/4" #N/A 1/2"
5/8"
Separacin = #N/A cm 1"
USAR f 3/4" @ 20 cm
f
PREDIMENSIONAMIENTO
COLUMNA ANCHO LARGO
B4 0.25 0.50
Pm = 75.35 Tn Pv = 22.00 Tn
Mm x = 0.34 Tn-m Mm y = 0.02 Tn-m
Mv x = 0.09 Tn-m Mv y = 0.01 Tn-m
Ms x = -70.84 Tn-m Ms y = 56.21 Tn-m
Ps x = 0.05 Tn Ps y = 0.02 Tn
COLUMNA ANCHO LARGO
B5 0.25 0.50
Pm = 66.51 Tn Pv = 19.11 Tn
Mm x = 0.34 Tn-m Mm y = 0.07 Tn-m
Mv x = 0.09 Tn-m Mv y = 0.02 Tn-m
Ms x = -70.84 Tn-m Ms y = 56.04 Tn-m
Ps x = 0.05 Tn Ps y = 0.59 Tn
t = 10 Tn/m2
fc = 210 Kg/cm2
fy = 4200.00 Kg/cm2
luz = 5.10 m
AREA DE ZAPATA
Az = 22.00 m2
Considerando % por no tomar momentos
Az = 44.00 m2
Determinacin del centro de gravedad
X = 2.39 m
Para
L = 7.00 B = 6.30
L = 8.00 B = 5.50
L = 9.00 B = 4.90
L = 9.00 B = 4.90

L = 9.00 B = 4.90
ZAPATA COMBINADA
g
Verificacin
1 = 3 = 4.98 T / m2 CUMPLE
2 = 4 = 4.98 T / m2 CUMPLE
Considerando el sismo longitudinal
Carga axial P1 = 97.30 P2 = 85.57
Mto. Long. M1 = 71.27 M2 = 71.27
Mto. Trans. M1 = 0.03 M2 = 0.09
X g = 3.17 m
1 = 3 = 9.47 T / m2 CUMPLE

Considerando el sismo longitudinal
Carga axial P1 = 97.40 P2 = 85.67
Mto. Long. M1 = -70.41 M2 = -70.41
Mto. Trans. M1 = 0.03 M2 = 0.09
X g = 3.44 m
1 = 3 = 4.98 T / m2 CUMPLE
RESUMEN DE PRESIONES
1 Verificacion 1 = 3 = 4.98 T / m2 u = 8.22 T / m2
2 Verificacion 1 = 3 = 9.47 T / m2 u = 11.83 T / m2
3 Verificacion 1 = 3 = 4.98 T / m2 u = 6.23 T / m2
u diseo = 11.83 T / m2
Wu = 57.98 T / m
VERIFICACIONES
Por Cortante Flexin:
g g
g g
g g
g g
g
g
g g
g g
g
g
g
g
Asumiendo d = 50 cm
Vu = 69.57 Tn
Vc = 159.94 Tn
Vu < Vc CUMPLE
Por Cortante :
x
1
= 1.95 m
x
2
= 1.95 m
Vx = 104.36 Tn
Vc = 159.94 Tn
Vx < Vc CUMPLE
Por Punzonamiento
bo = 350.00 cm
Ao = 0.75 m2
Vup = 130.49 Tn
Vcp = 383.44

Vup < Vcp CUMPLE
DISEO POR FLEXION
DIRECCION X
Volado Izquierdo
Mu = 83.78 Tn - m

a = 10.00 cm
As = 49.25 cm2 a = 2.37 cm
As = 45.40 cm2 a = 2.18 cm
As = 45.40 cm2
f
f
f
f
f
f
Usamos 1/2" 1.27 1/2"
5/8"
3/4"
Separacin = 13.71 cm 1"
USAR f 1/2" @ 15 cm
Volado Derecho
Mu = 83.78 Tn - m

a = 10.00 cm
As = 49.25 cm2 a = 2.37 cm
As = 45.40 cm2 a = 2.18 cm
As = 45.40 cm2
Usamos 1/2" 1.27 1/2"
5/8"
3/4"
Separacin = 13.71 cm 1"
USAR f 1/2" @ 15 cm
Tramo Central
Mu = 188.50 Tn - m

a = 10.00 cm
As = 110.82 cm2 a = 5.32 cm
As = 105.34 cm2 a = 5.06 cm
f
f
As = 105.34 cm2
Usamos 3/4" #N/A 1/2"
5/8"
Separacin = #N/A cm 1"
USAR f 3/4" @ 15 cm
DIRECCION Y
Volado Izquierdo
Mu = 153.88 Tn - m

a = 10.00 cm
As = 90.46 cm2 a = 2.37 cm
As = 83.39 cm2 a = 2.18 cm
As = 83.39 cm2
Usamos 3/4" 2.84 1/2"
5/8"
3/4"
Separacin = 16.69 cm 1"
1 1/4"
1 3/8"
USAR f 3/4" @ 17.5 cm 1 1/2"
Volado Derecho
Mu = 153.88 Tn - m
f
f

a = 10.00 cm
As = 90.46 cm2 a = 2.37 cm
As = 83.39 cm2 a = 2.18 cm
As = 83.39 cm2
Usamos 3/4" 2.84 1/2"
5/8"
3/4"
Separacin = 16.69 cm 1"
1 1/4"
1 3/8"
USAR f 3/4" @ 17.5 cm 1 1/2"
ff
PREDIMENSIONAMIENTO
COLUMNA ANCHO LARGO
A4 0.25 0.40
Pm = 32.75 Tn Pv = 8.35 Tn M1 = 1.80
Mm x = 1.41 Tn-m Mm y = 0.02 Tn-m
Mv x = 0.39 Tn-m Mv y = 0.01 Tn-m
Ms x = 37.05 Tn-m Ms y = 56.21 Tn-m
Ps x = 0.07 Tn Ps y = 0.02 Tn
COLUMNA ANCHO LARGO
B4 0.25 0.50
Pm = 75.35 Tn Pv = 22.00 Tn M2 = 0.43
Mm x = 0.34 Tn-m Mm y = 0.02 Tn-m
Mv x = 0.09 Tn-m Mv y = 0.01 Tn-m
Ms x = 70.84 Tn-m Ms y = 56.21 Tn-m
Ps x = 0.05 Tn Ps y = 0.02 Tn
t = 10 Tn/n2
fc = 210 Kg/cm2
fy = 4200 Kg/cm2
luz = 5.40 m
DIMENSIONAMIENTO
Primera Verificacin
Para Columna A4
Az = 4.52 m2
Considerando % por no tomar momentos
Az = 6.10 m2

L = 1.90 m
B = 3.20 m
Clculo de excentricidad
e = 0.75 m
Determinacin de R, considerando Mtos. Long.
R1 = 46.88 Tn
Clculo de las presiones considerando Mtos. de gravedad

1 = 8.49 CUMPLE
2 = 8.47 CUMPLE
ZAPATA CONECTADA
g
g
g
Para Columna B4
R2 = 111.65 Tn
Az = 12.28 m2
Considerando % por no tomar momentos
Az = 13.50 m2

L = 3.80 m
B = 3.60 m
Verificando presiones
1 = 8.98 Tn/m2 CUMPLE

2 = 8.97 Tn/m2 CUMPLE
Segunda Verificacin
Para Columna A4
R1 = 40.30 Tn
1 = 7.31 Tn/m2 CUMPLE
2 = 7.29 Tn/m2 CUMPLE
Para Columna B4
R2 = 105.05 Tn
1 = 8.45 Tn/m2 CUMPLE
2 = 8.44 Tn/m2 CUMPLE
Tercera Verificacin
Para Columna A4
R1 = 53.80 Tn
1 = 9.75 Tn/m2 CUMPLE
2 = 9.72 Tn/m2 CUMPLE
Para Columna B4
R2 = 118.59 Tn
1 = 9.54 Tn/m2 CUMPLE
1 = 9.53 Tn/m2 CUMPLE
Cuarta Verificacin
g
g
g
g
g
g
g
g
g
g
Para Columna A4
R1 = 47.07 Tn
1 = 8.53 Tn/m2 CUMPLE
2 = 8.50 Tn/m2 CUMPLE
Para Columna B4
R2 = 111.85 Tn
1 = 9.00 Tn/m2 CUMPLE
2 = 8.99 Tn/m2 CUMPLE
1 Verificacin: 1 = 14.01 Tn/m2 1 Verificacin: 1 = 14.82 Tn/m2
2 = 13.98 Tn/m2 2 = 14.81 Tn/m2
2 Verificacin: 1 = 9.13 Tn/m2 2 Verificacin: 1 = 10.56 Tn/m2
2 = 9.11 Tn/m2 2 = 10.55 Tn/m2
3 Verificacin: 1 = 12.18 Tn/m2 3 Verificacin: 1 = 11.92 Tn/m2
2 = 12.15 Tn/m2 2 = 11.92 Tn/m2
4 Verificacin: 1 = 10.66 Tn/m2 4 Verificacin: 1 = 11.25 Tn/m2
2 = 10.63 Tn/m2 2 = 11.24 Tn/m2
DISEO
Para Columna A4
u = 5.68 Tn/m2
VERIFICACIONES
Peralte por Punzonamiento

Asumimos h = 60 cm.
d = 52.5 cm.
Ao = 0.51 m2
At = 6.08 m2
bo = 2.35

Cortante de Diseo por Punzonamiento
Vup = 31.63 Tn
Cortante Resistente por Punzonamiento
Vcp = 340.59 Tn
CUADRO RESUMEN DE PRESIONES
ZAPATA N 1 ZAPATA N 2
g
g
g
g
g
g
g
g
g
g
g
g
g
g
g
g
g
g
g
g
g
f
Vcp = 289.50 Tn
Vup < Vcp CUMPLE
DISEO POR FLEXION
Para volado de : 0.75 m
Mu = 1.60 Tn-m
a = 10.50 cm
As = 0.89 cm2 a = 0.11 cm
As = 0.81 cm2 a = 0.10 cm
As = 0.81 cm2
Usamos 1/2" 1.27 1/2" 1.27
5/8" 2
3/4" 2.84
Separacin = 299.29 cm 1" 3.88
USAR f 1/2" @ 20 cm
Para volado de : 1.48 m
Mu = 6.18 Tn-m
a = 10.50 cm
As = 3.46 cm2 a = 0.25 cm
As = 3.12 cm2 a = 0.23 cm
As = 3.12 cm2
Usamos 1/2" 1.27 1/2" 1.27
5/8" 2
3/4" 2.84
Separacin = 77.27 cm 1" 3.88
USAR f 1/2" @ 20 cm
DISEO
Para Columna B4
u = 14.84 Tn/m2
g
f
f
f
f
g
VERIFICACIONES
Peralte por Punzonamiento

Asumimos h = 75 cm.
d = 67.5 cm.
Ao = 0.71 m2
At = 13.68 m2
bo = 2.60

Cortante de Diseo por Punzonamiento
Vup = 192.60 Tn
Cortante Resistente por Punzonamiento
Vcp = 274.67 Tn
Vcp = 233.47 Tn
Vup < Vcp CUMPLE
DISEO POR FLEXION
Para volado de : 1.65 m

Mu = 20.21 Tn-m
a = 13.50 cm
As = 8.80 cm2 a = 0.58 cm
As = 7.95 cm2 a = 0.52 cm
As = 7.95 cm2
Usamos 1/2" 1.27 1/2" 1.27
5/8" 2
3/4" 2.84
Separacin = 30.34 cm 1" 3.88
USAR f 1/2" @ 30 cm

Para volado de : 1.68 m

Mu = 20.82 Tn-m
a = 13.50 cm
As = 9.07 cm2 a = 0.59 cm
f
f
f
As = 8.20 cm2 a = 0.54 cm
As = 8.20 cm2
Usamos 1/2" 1.27 1/2" 1.27
5/8" 2
3/4" 2.84
Separacin = 29.44 cm 1" 3.88
USAR f 1/2" @ 30 cm
DISEO DE LA VIGA DE CONEXIN

Vud = 23.92 Tn
Mu = 39.56 Tn-m

Peralte por Cortante
h = 0.70 m
b = 0.35 m
d = 0.63 m

Cortante Resistente:

Vc = 16.80 Tn
Vc = 13.44 Tn
Nota: Como el cortante que toma el concreto no es suficiente, colocamos estribos
Vs = 11.34 Tn
Usamos 1/2" 1.27
Separacin = 58.80 cm

USAR ESTRIBOS f 1/2" @ 30 cm
Calculo de M max
M max = 66.92 Tn-m
Mu < M max As TRACCION
Mu = 39.56 Tn - m

a = 12.50 cm
As = 18.60 cm2 a = 12.51 cm
f
f
f
As = 16.74 cm2 a = 11.26 cm
As = 16.74 cm2


USAR 4 f 3/4" + 1f 1"