Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Metrado de Defensa Ribereñas
Metrado de Defensa Ribereñas
PROYECTO
ACTIVIDAD
FECHA
ITEM
01.02.00
05.05.01
05.05.02
05.05.03
05.05.04
05.06.05
PARTIDA
: Trazo y replanteo de gaviones
: Excavacin para estructuras en material suelto
: Enrocado
: Relleno de filtro
: Gaviones
: Eliminacin de material excedente de excavacin
UNIDAD METRADO
m
m
m
m
m
m
3,861.00
4,813.22
9,351.60
534.60
4,730.00
4,813.22
TOTAL
3,861.00
4,813.22
9,351.60
534.60
4,730.00
4,813.22
05.05.01
3861.00 m
LARGO
(m.)
80.00
130.00
150.00
50.00
40.00
20.00
10.00
10.00
170.00
660.00
ANCHO
(m)
5.85
5.85
5.85
5.85
5.85
5.85
5.85
5.85
5.85
Area
(m2)
468.00
760.50
877.50
292.50
234.00
117.00
58.50
58.50
994.50
3,861.00
Distancia (m)
Seciones (reas)
Corte (m2)
40+060.00
40+080.00
40+100.00
40+120.00
40+140.00
40+170.00
40+180.00
40+200.00
40+220.00
40+240.00
40+250.00
40+260.00
40+280.00
40+300.00
Relleno (m2)
4813.220 m
Volumen
Volumen
Corte
Relleno
20.00
20.00
20.00
20.00
8.67
3.46
6.35
9.18
10.56
0.00
0.00
0.00
0.00
0.00
121.30
98.10
155.30
197.40
10.00
20.00
20.00
20.00
10.00
10.00
20.00
20.00
4.94
6.50
8.54
6.91
8.31
7.47
8.01
6.91
7.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
57.20
150.40
154.50
152.20
78.90
77.40
149.20
146.80
40+340.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.55
0.00
40+360.00
40+370.00
40+380.00
40+390.00
20.00
10.00
10.00
10.00
5.94
5.29
6.05
6.00
0.00
0.00
0.00
0.00
104.90
56.15
56.70
60.25
40+400.00
40+420.00
40+440.00
10.00
20.00
20.00
6.08
5.67
6.05
0.00
0.00
0.00
60.40
117.50
117.20
40+450.00
40+460.00
10.00
10.00
6.04
6.04
0.00
0.00
60.45
60.40
40+480.00
40+490.00
20.00
10.00
6.45
7.83
0.00
0.00
124.90
71.40
40+630.00
40+640.00
10.00
10.57
7.61
0.00
0.00
90.90
40+660.00
40+680.00
20.00
20.00
6.25
7.83
0.00
0.00
138.60
140.80
0.00
0.00
0.00
40+880.00
40+900.00
20.00
10.98
9.52
0.00
0.00
205.00
0.00
40+920.00
20.00
10.84
0.00
203.60
0.00
10.91
0.00
0.00
0.00
0.00
0.00
40+980.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
218.60
0.00
0.00
0.00
0.00
0.00
20.00
7.90
0.00
79.00
0.00
0.00
0.00
41+420.00
20.00
6.72
0.00
67.20
0.00
0.00
0.00
41+770.00
41+780.00
41+790.00
41+800.00
10.00
10.00
10.00
5.78
9.77
8.01
8.06
0.00
0.00
0.00
0.00
77.75
88.90
80.35
0.00
41+810.00
41+819.00
10.00
9.00
6.42
7.03
0.00
0.00
72.40
60.53
41+820.00
41+840.00
41+850.00
1.00
20.00
10.00
7.36
5.98
6.50
0.00
0.00
0.00
7.20
133.40
62.40
0.00
0.00
0.00
41+860.00
41+877.50
10.00
17.50
5.66
6.24
0.00
0.00
60.80
104.13
41+880.00
41+900.00
41+920.00
41+940.00
2.50
20.00
20.00
20.00
7.14
8.95
6.96
8.64
0.00
0.00
0.00
0.00
16.73
160.90
159.10
156.00
41+000.00
20.00
40+080.00
40+100.00
10.95
41+400.00
4,813.22
Total
05.05.02
: Enrocado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9351.60 m
14.96
540.00
10.61
120.00
05.05.03
0.00
0.00
Volumen Total de
enrocado (m3)
8,078.40
1,273.20
9351.60 m3
: Relleno de filtro
534.60 m3
Ancho
Altura
Largo
(m)
(m)
(m)
Volumen
(m3)
0.30
2.70
660.00
534.60
05.05.04
: Gaviones
TIPO
A
B
4730.00 m3
UBICACIN
PROGRESIVA (Km.)
DE
HASTA
LONGITUD
DE MURO
(m.)
NIVEL
1
40+060
40+140
80
2
3
1
40+170
40+300
130
40+340
40+490
150
40+630
40+680
50
2
3
4
1
2
3
4
1
2
3
1
40+880
40+920
40
40+980
41+000
20
41+090
41+100
10
41+410
41+420
10
2
1
2
1
2
1
2
1
41+770
41+940
RESUMEN
Cantidad de gaviones tipo A
Cantidad de gaviones tipo B
170
2
3
4
2200 unidades
330 unidades
Descripcin
Dimensin de
una caja de
Gavion
Cantidad de total de
gaviones (Und)
Tipo A
1.0x1.0x2.0
2200
2.00
4,400.00
330
1.00
330.00
4730.00 m3
Tipo B
1.0x1.0x0.5
Volumen total de piedra para gavin
05.06.05
Cantidad
Volumen de excedente
4813.22
0.00
4,813.22
4813.22 m