CRONOGRAMA DE ADQUISICION DE MATERIALES

Proy.
Obra
Propiet.
Fecha

CONSTRUCCION DE ALAMEDAS
CONSTRUCCION DEL MALECON GRAU II ETAPA: Jr. E. PALACIOS - Jr. G. MOORE - CHIMBOTE
Municipalidad Provincial del Santa
Diciembre del 2005

Cdigo

Descripcin Insumo

Unidad

Mes 01

Mes 02

Mes 03

Total
1,151.90

470022

OPERADOR DE EQUIPO LIVIANO

HH

403.17

403.17

345.57

470032

TOPOGRAFO

HH

44.04

44.04

0.00

88.07

470101

CAPATAZ

HH

501.61

501.61

501.61

1,504.84

470102

OPERARIO

HH

3549.56

3549.56

3549.56

10,648.67

470103

OFICIAL

HH

1887.60

1887.60

1887.60

5,662.81

470104

PEON

HH

4804.82

4804.82

4804.82

14,414.47

470111

JARDINERO

HH

0.00

40.98

40.98

81.96

020162

CLAVOS PARA MADERA C/C 2 1/2", 3" Y 4"

KG

276.73

276.73

138.37

691.83

020409

ALAMBRE NEGRO N16

KG

1128.94

1128.94

250.88

2,508.75

020410

ALAMBRE NEGRO N8

KG

277.99

277.99

61.78

617.75

0303A1

FIERRO CORRUGADO DE FY=4200 KG/CM2

KG

16724.94

16724.94

8362.47

41,812.34

040000

ARENA FINA

M3

0.00

0.00

62.16

62.16

041112

TIERRA DE CHACRA

M3

0.00

0.00

133.51

133.51

041125

GUANO DE CABALLO

BOL

0.00

0.00

8.99

8.99

041127

ABONO O NPK x50Kg

BOL

0.00

0.00

7.50

7.50

050004

PIEDRA CHANCADA DE 3/4"

M3

70.98

0.00

0.00

70.98

050377

PIEDRA CHANCADA DE 1/2" y 3/4"

M3

172.60

172.60

86.30

431.51

050009

PIEDRA GRANDE DE 8"

M3

0.00

39.93

0.00

39.93

050011

PIEDRA MEDIANA DE 6"

M3

0.00

42.16

0.00

42.16

380000

HORMIGON

M3

57.29

57.29

0.00

114.58

050100

AFIRMADO

M3

487.70

487.70

243.85

1,219.24

050104

ARENA GRUESA

M3

180.33

180.33

90.16

450.82

050119

MATERIAL DE PRESTAMO-SELECCIONADO T.M. 4"

M3

2064.78

2064.78

1032.39

5,161.94

050305

PIEDRA CHANCADA DE 1 1/2" - 3/4"

M3

30.44

30.44

0.00

60.88

050376

ADOQUIN CONCRETO COLOR 4x10x20cm

M2

38.50

0.00

0.00

38.50

050379

ADOQUIN CONCRETO COLOR 8x10x20cm

M2

138.24

138.24

0.00

276.48

101523

REGISTRO DE BRONCE DE 6"

UND

0.00

0.00

19.00

19.00

101522

REGISTRO DE BRONCE DE 4"

UND

0.00

0.00

24.00

24.00

101529

REJILLA DE BRONCE DE 4"

UND

0.00

0.00

20.00

20.00

101559

SUMIDERO CROMADO DE 2"

UND

0.00

0.00

6.00

6.00

100493

LAVATORIO LOSA BLANCA INC. ACCESORIOS

PZA

0.00

0.00

22.00

22.00

102801

INODORO LOS.BLANC.C/VALVULA FLUXOMETRICA

UND

0.00

0.00

20.00

20.00

170025

LADRILLO KK ARCILLA 18 HUECOS 9x13x24cm

UND

11322.66

6793.60

4529.06

22,645.32

170119

LADRILLO P/TECHO DE 15x30x30cm ARCILLA

UND

0.00

1380.27

0.00

1,380.27

240029

PISO CERAMICA 30cmx30cm

M2

0.00

89.71

89.71

179.41

CRONOGRAMA DE ADQUISICION DE MATERIALES


Proy.
Obra
Propiet.
Fecha

CONSTRUCCION DE ALAMEDAS
CONSTRUCCION DEL MALECON GRAU II ETAPA: Jr. E. PALACIOS - Jr. G. MOORE - CHIMBOTE
Municipalidad Provincial del Santa
Diciembre del 2005

Cdigo

Descripcin Insumo

Unidad

Mes 01

Mes 02

Mes 03

Total

240030

CERAMICA 20cmx30cm

M2

0.00

111.25

111.25

222.50

240330

MAYOLICA BLANCA 20cm x 20cm DE 1ra

M2

0.00

0.00

11.55

11.55

260710

CERRADURA DE TRES GOLPES

UND

0.00

0.00

3.00

3.00

260814

BISAGRA ALUMINIZ.CAPUCHINA 3 1/2"x3 1/2"

UND

0.00

0.00

18.00

18.00

260867

BISAGRA ALUMINIZ.CAPUCHINA 2"x2"

UND

0.00

0.00

96.00

96.00

261062

CERROJO DE ALUMINIO 2"

UND

0.00

0.00

20.00

20.00

265120

CERRADURA CON SEGURO INTERIOR

PZA

0.00

0.00

6.00

6.00

302920

RODOPLAST PARA BORDE DE MAYOLICAS

0.00

0.00

21.00

21.00

302926

RODOPLAST PARA BORDE DE CERAMICOS

0.00

0.00

21.19

21.19

302925

PORCELANA COLOR

KG

0.00

0.00

42.38

42.38

305207

FRAGUA PARA CERAMICA

KG

0.00

0.00

42.72

42.72

306203

GRIFO LAVATORIO CROMADO 1/2"

UND

0.00

0.00

22.00

22.00

303146

CRISTAL TEMPLADO BRONCE DE 8mm SIST. DIRECTO

M2

0.00

0.00

10.82

10.82

130006

ASFALTO RC-250

GLN

0.00

132.00

0.00

132.00

500100

CAJA DE DESAGUE DE 12"X24"

UND

10.00

9.00

0.00

19.00

172207

CAJA DE REGISTRO AGUA 0.30x0.30

UND

6.00

0.00

0.00

6.00

172208

CAJA DE REGISTRO P/RIEGO 0.20x0.20m

UND

18.00

18.00

0.00

36.00

315401

MARCO Y TAPA DE CONCRETO REFORZADO

UND

18.00

18.00

0.00

36.00

315402

MARCO Y TAPA DE CONCRETO DESAGUE

UND

10.00

9.00

0.00

19.00

315403

MARCO Y TAPA DE CONCRETO AGUA

UND

6.00

0.00

0.00

6.00

210000

CEMENTO PORTLAND TIPO I (42.5KG)

BOL

972.42

1944.85

1944.85

4,862.12

210093

CEMENTO PORTLAND TIPO MS (42.5KG)

BOL

991.68

991.68

0.00

1,983.36

219928

CONCRETO PRE-MEZCLADO F'C=175 KG/CM2 INC/BOMBA

M3

289.86

289.86

0.00

579.71

219930

CONCRETO PRE-MEZCLADO 140 KG/CM2 INC/BOMBA

M3

147.20

147.20

0.00

294.40

290501

CINTA TEFLON

RLL

0.00

36.00

0.00

36.00

291599

OCRE BAYER

KG

152.58

152.58

0.00

305.15

293504

GRASS

M2

0.00

157.30

157.30

314.60

295594

SOLDADURA CELLOCORD

KG

0.00

24.78

24.78

49.56

300201

YESO DE 28 Kg

BOL

22.02

22.02

0.00

44.04

304611

PEGAMENTO PARA PVC AGUA FORDUIT

GLN

0.00

1.96

0.00

1.96

304635

PEGAMENTO PARA PVC 1/4 GLN

UND

0.00

3.86

0.00

3.86

304638

PEGAMENTO PARA TUBERIA PVC

GLN

0.00

3.86

0.00

3.86

306202

GRIFO DE RIEGO 1/2"

UND

0.00

18.00

18.00

36.00

309005

IMPRIMANTE

KG

0.00

511.68

511.68

1,023.36

390500

AGUA

M3

50.55

50.55

50.55

151.66

CRONOGRAMA DE ADQUISICION DE MATERIALES


Proy.
Obra
Propiet.
Fecha

CONSTRUCCION DE ALAMEDAS
CONSTRUCCION DEL MALECON GRAU II ETAPA: Jr. E. PALACIOS - Jr. G. MOORE - CHIMBOTE
Municipalidad Provincial del Santa
Diciembre del 2005

Cdigo

Descripcin Insumo

Unidad

Mes 01

Mes 02

Mes 03

Total
26.00

390974

PALMERA WASHINGTONIA

UND

0.00

0.00

26.00

391276

BASURERO DE FIBRA DE VIDRIO SEGUN DETALLE

UND

0.00

0.00

9.00

9.00

431652

REGLA DE MADERA

P2

90.58

105.68

105.68

301.94

435161

ESTACA DE MADERA

P2

88.07

88.07

0.00

176.13

435501

ANDAMIO DE MADERA

P2

0.00

229.62

229.62

459.23

430024

MADERA ANDAMIAJE

P2

0.00

50.72

50.72

101.43

450101

MADERA TORNILLO INC.CORTE P/ENCOFRADO

P2

5405.48

5405.48

5405.48

16,216.45

431392

PUERTA CONTRAPLACADA C/TRIPLAY 4mm, E=35mm P-1

UND

0.00

0.00

3.00

3.00

431393

PUERTA CONTRAPLACADA C/TRIPLAY 4mm, E=35mm P-2

UND

0.00

0.00

6.00

6.00

431394

PUERTA MELAPACK 10mm C/PERFIL ALUM. 0.70x1.60m

UND

0.00

0.00

20.00

20.00

431395

TABIQUERIA EN MELAPACK 10mm C/PERFIL ALUMINIO

M2

0.00

0.00

54.24

54.24

540329

PINTURA LATEX VENCELATEX

GLN

0.00

0.00

92.10

92.10

541190

PINTURA ESMALTE

GLN

0.00

0.00

1.76

1.76

542205

PINTURA ESMALTE EPOXICA

GLN

0.00

0.00

6.65

6.65

542209

PINTURA ANTICORROSIVA EPOXICA

GLN

0.00

0.00

7.68

7.68

560340

PLANCHA ACERO P/ANCLAJE 0.50mx0.5m

UND

0.00

11.00

11.00

22.00

570005

SEPARADOR C/PLANCHA ACERO E=1/4", ESP. 2", H=1.00m I/ACAB.

UND

0.00

15.00

15.00

30.00

650115

TUBO FO.GALV.ST.ISO-I 2"

0.00

187.23

187.23

374.46

650116

TUBO FO.GALV.ST.ISO-I 1"

650123

TUB. FO.GO. PESADO C-40 2"

650282

TUBERIA FG 1/2"

653214

0.00

456.07

456.07

912.14

UND

0.00

22.00

0.00

22.00

0.00

67.16

0.00

67.16

CODO F GALV. DE 1/2" X 90

PZA

0.00

45.00

0.00

45.00

650512

UNION UNIVERSAL DE Fo. GALV. DE 3/4"

UND

0.00

0.00

6.00

6.00

651385

NIPLE DE Fo Go DE 3/4" x 1 1/2"

UND

0.00

0.00

6.00

6.00

654508

NIPLE DE F GALV. DE 3/4" X 1 1/4"

PZA

0.00

0.00

30.00

30.00

651406

NIPLE DE Fo Go DE 1" x 1 1/2"

UND

0.00

0.00

6.00

6.00

653714

UNION DE F GALVANIZADO DE 1"

UND

0.00

0.00

6.00

6.00

653791

UNION DE F GALVANIZADO DE 3/4"

PZA

0.00

0.00

30.00

30.00

720112

TUBERIA PVC SAP C-7.5 DE 1"

UND

0.00

11.03

0.00

11.03

720113

TUBERIA PVC SAP C-7.5 DE 3/4"

UND

0.00

158.16

0.00

158.16

720115

TUBERIA PVC SAP C-10 DE 1/2"

0.00

54.00

0.00

54.00

720116

TUBERIA PVC SAP C-7.5 DE 1/2"

UND

0.00

5.78

0.00

5.78

721309

TUB. PVC SAL P/DESAGUE DE 2"

0.00

36.75

0.00

36.75

721311

TUB. PVC SAL P/DESAGUE DE 4"

0.00

215.80

0.00

215.80

730107

TUB. PVC SAL P/DESAGUE DE 2" x3m

PZA

0.00

57.54

0.00

57.54

730109

TUB. PVC SAL P/DESAGUE DE 4" x3m

PZA

0.00

25.55

0.00

25.55

CRONOGRAMA DE ADQUISICION DE MATERIALES


Proy.
Obra
Propiet.
Fecha
Cdigo

CONSTRUCCION DE ALAMEDAS
CONSTRUCCION DEL MALECON GRAU II ETAPA: Jr. E. PALACIOS - Jr. G. MOORE - CHIMBOTE
Municipalidad Provincial del Santa
Diciembre del 2005
Descripcin Insumo

Unidad

Mes 01

Mes 02

Mes 03

Total

721368

TEE PVC SAP 1/2" SP P/AGUA

UND

0.00

14.00

0.00

14.00

720781

TEE PVC SAP 3/4" SP P/AGUA

UND

0.00

49.00

0.00

49.00

721703

TEE SANITARIA SIMPLE PVC SAL DE 4"

UND

0.00

31.00

0.00

31.00

729004

ADAPTADOR PVC DE 1/2"

PZA

0.00

45.00

0.00

45.00

725371

CODO PVC SAP 1/2" X 90

PZA

0.00

54.00

0.00

54.00

725335

CODO PVC SAP 3/4" X 90

PZA

0.00

44.00

0.00

44.00

725367

CODO PVC SAP 1" X 90

PZA

0.00

6.00

0.00

6.00

725368

CODO PVC SAL 2" X 90

PZA

0.00

24.00

0.00

24.00

725369

CODO PVC SAL 2" X 45

PZA

0.00

4.00

0.00

4.00

725370

CODO PVC SAL 4" X 45

PZA

0.00

2.00

0.00

2.00

721403

CODO PVC SAL 4" X 90

PZA

0.00

12.00

0.00

12.00

721503

RAMAL YEE SIMPLE PVC SAL DE 4"

UND

0.00

20.00

0.00

20.00

721601

RAMAL TEE SIMPLE PVC SAL DE 2"

UND

0.00

25.00

0.00

25.00

731602

YEE PVC SAL DE 2" X 2"

PZA

0.00

11.00

0.00

11.00

731605

YEE PVC SAL DE 4" X 2"

PZA

0.00

4.00

0.00

4.00

731607

YEE PVC SAL DE 4" X 4"

PZA

0.00

14.00

0.00

14.00

725703

UNION PVC SAP (AGUA) 1"

PZA

0.00

0.27

0.00

0.27

725710

UNION PVC SAP (AGUA) 3/4"

PZA

0.00

4.89

0.00

4.89

722101

SOMBRERO DE VENTILACION PVC SAL DE 2"

UND

0.00

0.00

12.00

12.00

731811

REDUCCION PVC P/AGUA S/PRESION 3/4" A "

PZA

0.00

64.00

0.00

64.00

770021

VALVULA CIERRE RAPIDO DE 3/4"

UND

0.00

0.00

15.00

15.00

770152

VALVULA CIERRE RAPIDO GLOBO DE 1"

UND

0.00

0.00

3.00

3.00

770303

VALVULA CHECK DE BRONCE DE 3/4"

UND

0.00

0.00

3.00

3.00

770423

VALVULA DE PIE C/CANASTILLA DE 1"

UND

0.00

0.00

3.00

3.00

770501

VALVULA FLOTADORA 3/4" C/BOLA DE COBRE

UND

0.00

0.00

3.00

3.00

480108

MEZCLADORA CONCRETO TAMBOR 11 P3-18 HP

HM

79.26

79.26

79.26

237.78

491007

MEZCLADORA CONCRETO TAMBOR 18HP 11P3

HM

81.83

81.83

81.83

245.48

480401

CAMION CISTERNA 4x2 (AGUA) 122 HP 1,500

HM

54.77

54.77

0.00

109.53

481201

CAMION CISTERNA 4X2 (AGUA) 1,500 GAL.

HM

21.64

0.00

0.00

21.64

480427

CAMION VOLQUETE 6x4 330 HP 10 M3.

HM

194.62

194.62

97.31

486.56

490900

MOTONIVELADORA DE 125 HP

HM

43.28

0.00

0.00

43.28

481301

CAMION PLATAFORMA 4X2 , 122 HP, 8 TN

HM

24.00

24.00

0.00

48.00

490303

COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP

HM

21.55

21.55

10.78

53.88

490304

COMPACTADOR VIBR. TIPO PLANCHA 7 HP

HM

77.12

77.12

38.56

192.80

490307

RODILLO LISO VIBR AUTOP 101-135HP 10-12T

HM

60.07

60.07

0.00

120.14

490313

RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T.

HM

10.82

10.82

0.00

21.64

CRONOGRAMA DE ADQUISICION DE MATERIALES


Proy.
Obra
Propiet.
Fecha

CONSTRUCCION DE ALAMEDAS
CONSTRUCCION DEL MALECON GRAU II ETAPA: Jr. E. PALACIOS - Jr. G. MOORE - CHIMBOTE
Municipalidad Provincial del Santa
Diciembre del 2005

Cdigo

Descripcin Insumo

Unidad

Mes 01

Mes 02

Mes 03

Total

490409

CARGADOR S/LLANTAS 125 HP 2.5 YD3.

HM

64.78

64.78

32.39

161.94

490433

TRACTOR DE ORUGAS DE 140-160 HP

HM

139.42

92.94

0.00

232.36

490704

VIBRADOR DE CONCRETO 4 HP 2.40"

HM

161.73

161.73

161.73

485.19

490706

VIBRADOR DE 3/4" - 2" CONCRETO

HM

24.68

24.68

24.68

74.03

490750

MOTOSOLDADORA DE 250 AMP.

HM

0.00

156.96

156.96

313.92

498801

EQUIPO TOPOGRAFICO

HM

44.04

44.04

0.00

88.07

482152

EQUIPO DE CORTE

HM

0.00

74.61

74.61

149.21

379050

EQUIPO DE PINTURA

HM

0.00

89.53

208.90

298.43

VERIFICA NO BORRAR

DE 1 - 5
1,151.90
88.07
1,504.84
10,648.67
5,662.81
14,414.47
81.96
691.83
2,508.75
617.75
41,812.34
62.16
133.51
8.99
7.50
70.98
431.51
39.93
42.16
114.58
1,219.24
450.82
5,161.94
60.88
38.50
276.48
19.00
24.00
20.00
6.00
22.00
20.00
22,645.32
1,380.27
179.41

VERIFICA NO BORRAR

DE 1 - 5
222.50
11.55
3.00
18.00
96.00
20.00
6.00
21.00
21.19
42.38
42.72
22.00
10.82
132.00
19.00
6.00
36.00
36.00
19.00
6.00
4,862.12
1,983.36
579.71
294.40
36.00
305.15
314.60
49.56
44.04
1.96
3.86
3.86
36.00
1,023.36
151.66

VERIFICA NO BORRAR

DE 1 - 5
26.00
9.00
301.94
176.13
459.23
101.43
16,216.45
3.00
6.00
20.00
54.24
92.10
1.76
6.65
7.68
22.00
30.00
374.46
912.14
22.00
67.16
45.00
6.00
6.00
30.00
6.00
6.00
30.00
11.03
158.16
54.00
5.78
36.75
215.80
57.54
25.55

VERIFICA NO BORRAR

DE 1 - 5
14.00
49.00
31.00
45.00
54.00
44.00
6.00
24.00
4.00
2.00
12.00
20.00
25.00
11.00
4.00
14.00
0.27
4.89
12.00
64.00
15.00
3.00
3.00
3.00
3.00
237.78
245.48
109.53
21.64
486.56
43.28
48.00
53.88
192.80
120.14
21.64

VERIFICA NO BORRAR

DE 1 - 5
161.94
232.36
485.19
74.03
313.92
88.07
149.21
298.43