MUNICIPALIDAD

DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011

02.00.00 OBRAS PRELIMINARES


02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

Partida Especifica :

02.02.00 DEMOLICION MANUAL DE LOSA DE CONCRETO

DESCRIPCION
DEMOLICION MANUAL DE LOSA DE CONCRETO
Fecha :

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

TOTAL METRADO :
Partida Especifica :

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00

ESTIMADO
PARCIAL
m2
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

02.03.00 DEMOLICION DE MUROS DE CONTENCION EXISTENTE


DESCRIPCION

DEMOLICION DE MUROS DE CONTENCION EXISTENTE


Fecha :

DIST/LONG
(ML)
6.10
6.10
6.10
6.10
6.10
6.10
6.10

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
1.10
0.75
0.60
0.55
0.60
0.60
0.40

0.35
0.35
0.35
0.35
0.35
0.50
0.50

2.35
1.60
1.28
1.17
1.28
1.83
1.22

TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

6.40

640.00

30.00
45.00
40.00
25.00
50.00
65.00
45.00
55.00
40.00
30.00
68.00
42.00
62.00
43.00

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
m3
2.35
1.60
1.28
1.17
1.28
1.83
1.22

TOTAL
METRADO
m2
30.00
45.00
40.00
25.00
50.00
65.00
45.00
55.00
40.00
30.00
68.00
42.00
62.00
43.00

TOTAL
METRADO
m3
2.35
1.60
1.28
1.17
1.28
1.83
1.22

10.74

02.04.00 TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA


DESCRIPCION

1.50
2.25
2.00
1.25
2.50
3.25
2.25
2.75
2.00
1.50
3.40
2.10
3.10
2.15

ESTIMADO
PARCIAL
m3

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
m2

2.60

ESTIMADO
PARCIAL
m2
16.64

N VECES
1.00

TOTAL
m2
16.64

TOTAL
METRADO
m2
16.64

16.64

TOTAL METRADO :

04.00.00 LOSA DEPORTIVA


04.01.00

MOVIMIENTOS DE TIERRAS

Partida Especifica :

002.01.01 #N/A

DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
#N/A
0.00

002.02

#N/A

002.02.01 #N/A
DESCRIPCION

DIST/LONG

DIMENSIONES
ALTURA
ANCHO

1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

ESTIMADO
PARCIAL

N VECES

TOTAL

TOTAL
METRADO

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

SUSTENTACION
DESCRIPCION

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

DE METRADOS
(ML)

#N/A

(ML)

(ML)

MES DE MAYO
2011
N VECES
#N/A

(Ver hoja de metrados de movimiento de tierras)

1.00

002.02.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

ESTIMADO
PARCIAL
#N/A

(Ver hoja de metrados de movimiento de tierras)

002.02.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

DESCRIPCION

#N/A

DIST/LONG
(ML)

DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

003.01

TOTAL
METRADO
#N/A
0.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

#N/A
#N/A

Partida Especifica :

003.01.01 #N/A
DESCRIPCION

#N/A

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :

003

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES
1.00

TOTAL METRADO :
002.02.06 #N/A

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

(Ver hoja de metrados de movimiento de tierras)

Partida Especifica :

0.00

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :
002.02.05 #N/A

N VECES
1.00

(Ver hoja de metrados de movimiento de tierras)

Partida Especifica :

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
002.02.04 #N/A

0.00

0.00

(Ver hoja de metrados de movimiento de tierras)

Partida Especifica :

N VECES
1.00

TOTAL METRADO :
Partida Especifica :

0.00

#N/A

0.00

TOTAL METRADO :
Partida Especifica :

#N/A

DIST/LONG
(ML)
0.00
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
6.00
6.00

ESTIMADO
PARCIAL
#N/A
0.00
0.00

N VECES
1.00
1.00

TOTAL
#N/A
0.00
0.00

TOTAL
METRADO
#N/A
0.00
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011


0.00

TOTAL METRADO :
Partida Especifica :

003.01.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
#N/A
0.00

003.01.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

003.01.04 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

003.02

#N/A

003.02.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00
0.00
0.00
0.00

8.10

0.00

003.02.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

6.00
1.20
1.00
9.00

0.00
0.00
0.00
0.00

003.02.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

TOTAL METRADO :

0.00

1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00
1.00
1.00
1.00

TOTAL
#N/A
0.00
0.00
0.00
0.00

TOTAL
METRADO
#N/A
0.00
0.00
0.00
0.00

0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.50
8.00
1.00
0.60

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
#N/A

0.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

0.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
Partida Especifica :

MES DE MAYO 2011

003.02.04 #N/A
DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

ESTIMADO
PARCIAL
#N/A

N VECES

TOTAL
#N/A

TOTAL
METRADO
#N/A

#N/A
Fecha :
2.00

1.50

3.00

003.03

#N/A

003.03.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

003.03.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

003.03.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

003.03.04 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

003.04

#N/A

003.04.01 #N/A
DESCRIPCION

DIST/LONG
(ML)

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

#N/A

0.00

1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

TOTAL METRADO :

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00

N VECES
1.00

0.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
Partida Especifica :

MES DE MAYO 2011

003.04.02 #N/A
DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

#N/A

ESTIMADO
PARCIAL
#N/A
0.00

003.04.03 #N/A
DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

#N/A

004.01

0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

#N/A
#N/A

Partida Especifica :

004.01.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
#N/A
0.00

Partida Especifica :

004.01.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

004.01.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

#N/A

004.02.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

TOTAL METRADO :
Partida Especifica :

004.02.02 #N/A
DESCRIPCION

DIMENSIONES

0.00

1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
1.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

1.00

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

N VECES

0.00

TOTAL METRADO :

004.02

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :

004

1.00

TOTAL
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

6.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00
ESTIMADO

TOTAL
METRADO

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
DESCRIPCION

MES DE MAYO 2011

DIST/LONG
(ML)

#N/A

0.00

ALTURA
(ML)
0.00

ANCHO
(ML)
0.00

PARCIAL
#N/A
0.00

004.02.03 #N/A
DESCRIPCION

DIST/LONG
(ML)

#N/A

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00
0.00

004.02.04 #N/A
DESCRIPCION

DIST/LONG
(ML)

#N/A

0.00
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

DESCRIPCION

DIST/LONG
(ML)

N VECES
1.00
1.00

TOTAL
#N/A
0.00
0.00

ESTIMADO
PARCIAL
#N/A
0.00

0.00

TOTAL
METRADO
#N/A
0.00
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

TOTAL METRADO :
004.02.05 #N/A

TOTAL
METRADO
#N/A

0.00

0.00

Partida Especifica :

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

ESTIMADO
PARCIAL
#N/A

N VECES

TOTAL
#N/A

TOTAL
METRADO
#N/A

#N/A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

004.02.06 #N/A
DESCRIPCION

#N/A
Fecha :
8/2/2010
8/3/2010
8/5/2010
8/6/2010

0+500
0+412
0+000
0+120

a
a
a
a

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0+412
0+304
0+120
0+180

ESTIMADO
PARCIAL
#N/A

0.00
0.00
0.00
0.00

004.02.07 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

N VECES

1.00
1.00
1.00
1.00

TOTAL
#N/A

0.00
0.00
0.00
0.00

TOTAL
METRADO
#N/A

0.00
0.00
0.00
0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

TOTAL METRADO :
Partida Especifica :

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011


0.00

TOTAL METRADO :
004.03

#N/A

004.03.01 #N/A

Partida Especifica :

DESCRIPCION

DIST/LONG
(ML)

#N/A

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
#N/A
0.00

004.03.02 #N/A
DESCRIPCION

#N/A
Fecha :

Prog
0+000
0+120

a
a

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0+120
0+180

0.00
0.00

004.03.03 #N/A
DESCRIPCION

#N/A
Fecha :
8/2/2010

0+000

DIST/LONG
(ML)

0+000

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

004.03.04 #N/A
DESCRIPCION

Fecha :
8/2/2010
8/3/2010

0+500
0+412

a
a

DIST/LONG
(ML)
0+412
0+304

DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

004.03.06 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

Partida Especifica :

004.03.07 #N/A
DESCRIPCION

DIMENSIONES

0.00
0.00

1.00

TOTAL
#N/A

0.00

TOTAL
METRADO
#N/A

0.00

N VECES
1.00
1.00

TOTAL
#N/A
0.00
0.00

TOTAL
METRADO
#N/A
0.00
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00
ESTIMADO
PARCIAL
#N/A
0.00

TOTAL METRADO :

N VECES

ESTIMADO
PARCIAL
#N/A
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

0.00
0.00

ESTIMADO
PARCIAL
#N/A
0.00
0.00

004.03.05 #N/A

1.00
1.00

TOTAL
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

ESTIMADO
PARCIAL
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
#N/A

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00
ESTIMADO

TOTAL
METRADO

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
DESCRIPCION

#N/A

MES DE MAYO 2011

DIST/LONG
(ML)

ALTURA
(ML)

ANCHO
(ML)

0.00

PARCIAL
#N/A
0.00

004.03.08 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

004.03.09 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

004.04

#N/A

004.04.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

004.04.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

005.01

0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00
ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

TOTAL METRADO :

005

1.00

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

ESTIMADO
PARCIAL
#N/A
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

#N/A
#N/A

Partida Especifica :

005.01.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
#N/A
0.00

005.01.02 #N/A
DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

ESTIMADO
PARCIAL
#N/A

N VECES

TOTAL
#N/A

TOTAL
METRADO
#N/A

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
#N/A

MES DE MAYO 2011


0.00

0.00

0.00

005.02

#N/A

005.02.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

005.02.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

005.02.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

005.02.04 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

005.03

#N/A

005.03.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

005.03.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

Ver hoja de metrados de acero

TOTAL METRADO :

1.00

TOTAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

ESTIMADO
PARCIAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

1.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

0.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
Partida Especifica :

MES DE MAYO 2011

005.03.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

005.03.04 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

005.04

#N/A

005.04.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

005.05

#N/A

005.05.01 #N/A
DESCRIPCION

DIST/LONG
(ML)

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

#N/A

006.01

N VECES
1.00

TOTAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

ESTIMADO
PARCIAL
#N/A
0.00

0.00

TOTAL
METRADO
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

TOTAL METRADO :

006

0.00

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :

DESCRIPCION

1.00

ESTIMADO
PARCIAL
#N/A
0.00

005.05.02 #N/A

0.00

0.00

#N/A

Partida Especifica :

N VECES

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

#N/A
#N/A

Partida Especifica :

006.01.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

TOTAL METRADO :
Partida Especifica :

006.01.02 #N/A

0.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

0.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
DESCRIPCION

#N/A

MES DE MAYO 2011

DIMENSIONES
DIST/LONG ALTURA
ANCHO
(ML)
(ML)
(ML)
0.00

3.80

ESTIMADO
PARCIAL
#N/A
0.00

006.01.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

006.02

#N/A

006.02.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

006.02.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

006.02.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

006.02.04 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

006.02.05 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

1.00

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

1.00

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

0.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011


0.00

TOTAL METRADO :
Partida Especifica :

006.02.06 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

006.03

#N/A

006.03.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

006.04

#N/A

006.04.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

006.04.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

Ver hoja de metrados de acero

006.04.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

006.04.04 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

TOTAL METRADO :

0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

0.00

ESTIMADO
PARCIAL
#N/A
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

1.00

TOTAL
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
#N/A

0.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

0.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
Partida Especifica :

MES DE MAYO 2011

006.04.05 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

Ver hoja de metrados de acero

ESTIMADO
PARCIAL
#N/A
0.00

006.04.06 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

006.04.07 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

006.05

#N/A

006.05.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

006.05.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

006.06

#N/A

006.06.01 #N/A
DESCRIPCION

DIST/LONG
(ML)

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

#N/A

0.00

DESCRIPCION

DIST/LONG

1.00

0.00

N VECES
1.00

TOTAL
#N/A
0.00

DIMENSIONES
ALTURA
ANCHO

N VECES
1.00

TOTAL
#N/A
0.00

ESTIMADO
PARCIAL
#N/A
0.00

006.06.02 #N/A

0.00

TOTAL
METRADO
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

1.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

ESTIMADO
PARCIAL

N VECES

TOTAL

TOTAL
METRADO

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

SUSTENTACION
DESCRIPCION

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

DE METRADOS
(ML)

(ML)

(ML)

#N/A

MES DE MAYO
2011
N VECES
#N/A

0.00

006.07

#N/A

006.07.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
#N/A
0.00

006.07.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

006.08

#N/A

006.08.01 #N/A
DESCRIPCION

DIST/LONG
(ML)

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

#N/A

007.01

0.00

0.00

1.00

0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

#N/A
#N/A

Partida Especifica :

007.01.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

#N/A

Partida Especifica :

007.02.01 #N/A
DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

TOTAL METRADO :
007.02

N VECES

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :

007

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :

DESCRIPCION

0.00

ESTIMADO
PARCIAL
#N/A
0.00

006.08.02 #N/A

1.00

TOTAL
#N/A

0.00

#N/A

Partida Especifica :

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00

#N/A

0.00

TOTAL METRADO :
Partida Especifica :

1.00

#N/A

ESTIMADO
PARCIAL
#N/A

N VECES

TOTAL
#N/A

TOTAL
METRADO
#N/A

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
#N/A

MES DE MAYO 2011


0.00

0.00

0.00

0.00

007.02.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

007.02.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

007.03

#N/A

007.03.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

007.03.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

007.03.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

007.04

#N/A

007.04.01 #N/A
DESCRIPCION

#N/A
Fecha :

DIST/LONG
(ML)

0.00

0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00
0.00
0.00

1.00

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

1.00

1.22
1.22
1.22

ESTIMADO
PARCIAL
#N/A
0.00
0.00
0.00

N VECES
0.00
0.00
0.00

TOTAL
#N/A
0.00
0.00
0.00

TOTAL
METRADO
#N/A
0.00
0.00
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011


0.00

TOTAL METRADO :
Partida Especifica :

007.04.02 #N/A
DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
Diametro CANTIDAD
(")
(UND)

ESTIMADO
PARCIAL
#N/A

N VECES

TOTAL
#N/A

TOTAL
METRADO
#N/A

#N/A
Fecha :
3/8
1/2
3/8
1/2
3/8
1/2
1/2
1/2
1/2
5/8
5/8

9.00
4.00
270.00
76.00
85.00
32.00
104.00
48.00
56.00
18.00
8.00

5.22
4.08
156.60
77.52
49.30
32.64
106.08
48.96
57.12
28.80
12.80

007.04.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

007.04.04 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

007.05

#N/A

007.05.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

007.06

#N/A

007.06.01 #N/A
DESCRIPCION

DIST/LONG
(ML)

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

#N/A

0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

TOTAL METRADO :

0.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

N VECES
1.00

0.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
Partida Especifica :

MES DE MAYO 2011

007.06.02 #N/A
DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

#N/A

ESTIMADO
PARCIAL
#N/A
0.00

008.01

#N/A

008.01.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
1.00

1.00

ESTIMADO
PARCIAL
#N/A
0.00

0.00

Partida Especifica :

008.01.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

#N/A

008.02.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00
0.00
0.00

0.00

0.00

008.02.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

1.00
1.00
1.00

0.00
0.00
0.00

008.02.03 #N/A
DESCRIPCION

DIST/LONG
(ML)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00
1.00
1.00

TOTAL
#N/A
0.00
0.00
0.00

TOTAL
METRADO
#N/A
0.00
0.00
0.00

0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
1.20
2.20
1.00
0.60
2.10
2.50
1.20
0.50

1.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

N VECES

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
1.00
1.00
1.00

1.00

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

N VECES

0.00

TOTAL METRADO :

#N/A

0.00

#N/A

Partida Especifica :

008.02

1.00

TOTAL
METRADO
#N/A

0.00

TOTAL METRADO :

008

N VECES

TOTAL
#N/A

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

ESTIMADO
PARCIAL
#N/A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
#N/A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
METRADO
#N/A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011


0.00

1.40

0.60

0.00

009.01

#N/A

009.01.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

1.00

ESTIMADO
PARCIAL
#N/A
0.00

#N/A

Partida Especifica :

009.02.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
1.50

009.02.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

2.00

0.00

009.02.03 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

#N/A

009.03.01 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)

0.00

0.00

009.03.02 #N/A
DESCRIPCION

#N/A

DIST/LONG
(ML)
0.00

0.00

0.00

1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

N VECES

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

1.00

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

N VECES

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

0.00

TOTAL
METRADO
#N/A

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

1.00

TOTAL
#N/A

ESTIMADO
PARCIAL
#N/A

TOTAL METRADO :
Partida Especifica :

N VECES

0.00

TOTAL METRADO :

009.03

0.00

#N/A

Partida Especifica :

009.02

0.00

0.00

TOTAL METRADO :

009

1.00

0.00

ESTIMADO
PARCIAL
#N/A
0.00

N VECES
1.00

TOTAL
#N/A
0.00

TOTAL
METRADO
#N/A
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011


0.00

TOTAL METRADO :

010

010.01

IMPLEMENTOS DE SEGURIDAD
IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.01.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
est.
0.00

0.00

0.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.02.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
est.
0.00

Partida Especifica :

010.02.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

010.02.03 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

0.00

TOTAL
METRADO
est.
0.00

0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

1.00

TOTAL
est.

ESTIMADO
PARCIAL
est.

TOTAL METRADO :
Partida Especifica :

N VECES

0.00

TOTAL METRADO :

0.00

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
010.03

1.00

TOTAL
METRADO
est.

0.00

TOTAL METRADO :
010.02

N VECES

TOTAL
est.

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.03.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO
PARCIAL
est.
0.00

010.03.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

IMPLEMENTOS DE SEGURIDAD

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

TOTAL METRADO :

1.00

0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
est.

0.00

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

0.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
Partida Especifica :

MES DE MAYO 2011

010.03.03 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

0.00

ESTIMADO
PARCIAL
est.
0.00

0.00

0.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.04.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
est.
0.00

Partida Especifica :

010.04.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

010.04.03 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

1.00

0.00

ESTIMADO
PARCIAL
est.

TOTAL
METRADO
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
est.

0.00

TOTAL METRADO :

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
010.05

1.00

TOTAL
METRADO
est.

0.00

TOTAL METRADO :
010.04

N VECES

TOTAL
est.

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.05.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
est.
0.00

010.05.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

010.05.03 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
est.

0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
METRADO
est.

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
est.

ESTIMADO
PARCIAL
est.

N VECES

TOTAL
est.

TOTAL
METRADO
est.

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011

IMPLEMENTOS DE SEGURIDAD

0.00

010.05.04 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO
PARCIAL
est.
0.00

010.05.05 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

010.05.06 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

N VECES
1.00

TOTAL
est.
0.00

ESTIMADO
PARCIAL
est.
0.00

TOTAL
METRADO
est.
0.00

TOTAL
METRADO
est.
0.00

N VECES
2.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.06.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
est.
0.00

Partida Especifica :

010.06.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
010.07

1.00

TOTAL
est.

0.00

IMPLEMENTOS DE SEGURIDAD

010.06

N VECES

ESTIMADO
PARCIAL
est.

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

0.00

0.00

TOTAL METRADO :
Partida Especifica :

1.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.07.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

IMPLEMENTOS DE SEGURIDAD

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011


0.00

TOTAL METRADO :
Partida Especifica :

010.07.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
est.
0.00

011.01

0.00

TOTAL
METRADO
est.
0.00

IMPLEMENTOS DE SEGURIDAD
IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.01.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

3.00

ESTIMADO
PARCIAL
est.
0.00

Partida Especifica :

011.01.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

3.00

N VECES
2.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :

3.00

ESTIMADO
PARCIAL
est.
9.00

N VECES
2.00

TOTAL
est.
18.00

TOTAL
METRADO
est.
18.00

18.00

TOTAL METRADO :
011.02

1.00

TOTAL
est.

0.00

TOTAL METRADO :

011

N VECES

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.02.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

2.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
2.00

2.50

ESTIMADO
PARCIAL
est.
10.00

011.02.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

011.02.03 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

0.00

TOTAL METRADO :
Partida Especifica :

011.02.04 IMPLEMENTOS DE SEGURIDAD

10.00

0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

10.00

ESTIMADO
PARCIAL
est.

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
METRADO
est.

10.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
est.

0.00

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

0.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS
DESCRIPCION

MES DE MAYO 2011

DIMENSIONES
DIST/LONG ALTURA
ANCHO
(ML)
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

2.00

2.50

ESTIMADO
PARCIAL
est.
1.3

011.03.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

0.00

ESTIMADO
PARCIAL
est.
0.00

Partida Especifica :

011.03.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)
0.00

N VECES
1.00

TOTAL
est.
0.00

0.00

ESTIMADO
PARCIAL
est.
0.00

TOTAL
METRADO
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.04.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
001.01

0.00

0.00

TOTAL METRADO :

001

0.00

TOTAL
METRADO
est.

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.04

0.00

TOTAL
est.

0.00

TOTAL METRADO :
011.03

N VECES

#N/A
#N/A

Partida Especifica :

011.04.01 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO
PARCIAL
est.
0.00

011.04.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

011.04.03 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG

DIMENSIONES
ALTURA
ANCHO

0.00

ESTIMADO
PARCIAL
est.

0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
Partida Especifica :

1.00

TOTAL
METRADO
est.

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

TOTAL
est.

ESTIMADO
PARCIAL

N VECES

TOTAL

TOTAL
METRADO

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

SUSTENTACION
DESCRIPCION

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

DE METRADOS
(ML)

(ML)

(ML)

IMPLEMENTOS DE SEGURIDAD

MES DE MAYO
2011
N VECES
est.

0.00

011.04.04 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

011.04.05 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.05.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

4.20

0.00

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
011.06

0.00

ESTIMADO
PARCIAL
est.

TOTAL METRADO :
011.05

1.00

TOTAL
METRADO
est.

0.00

TOTAL METRADO :

DESCRIPCION

N VECES

TOTAL
est.

ESTIMADO
PARCIAL
est.
0.00

011.04.06 IMPLEMENTOS DE SEGURIDAD

0.00

0.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

0.00

ESTIMADO
PARCIAL
est.

TOTAL METRADO :
Partida Especifica :

est.

0.00

TOTAL METRADO :
Partida Especifica :

1.00

est.

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.06.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

0.00

ESTIMADO
PARCIAL
est.
0.00

011.06.02 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

IMPLEMENTOS DE SEGURIDAD

DIST/LONG
(ML)
0.00

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :
Partida Especifica :

N VECES

ESTIMADO
PARCIAL
est.
0.00

N VECES
1.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

MUNICIPALIDAD
DISTRITAL DE
SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA


VECINAL MIRAFLORES COMIT 7 DEL DISTRITO DE
SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011


0.00

TOTAL METRADO :
Partida Especifica :

011.06.03 IMPLEMENTOS DE SEGURIDAD


DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO
PARCIAL
est.
0.00

012.01

1.00

0.00

TOTAL
METRADO
est.
0.00

0.00

TOTAL METRADO :

012

N VECES

TOTAL
est.

IMPLEMENTOS DE SEGURIDAD
IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

012.01.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG
(ML)

DIMENSIONES
ALTURA
ANCHO
(ML)
(ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO
PARCIAL
est.
0.00

TOTAL METRADO :

N VECES
1.00

0.00

TOTAL
est.
0.00

TOTAL
METRADO
est.
0.00

CONTROL DE AVANCE DE OBRA


OBRA: MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES, COMIT 7 DEL DISTRITO DE SAMEGUA
MES : DE MAYO 2011

Item
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00
01.08.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.02.00
04.02.01
04.02.02
04.02.03
04.03.00
04.03.01
04.04.00
04.04.01
04.04.02
04.04.03
04.04.04
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06
05.03.07
05.03.08
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.05.00
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
05.06.00
05.06.01
05.06.02
05.06.03
05.06.04
05.06.05
05.06.06
05.06.07
06.00.00
06.01.00
06.01.01
06.01.02

Descripcin
OBRAS Y TRABAJOS PROVISIONALES
CERCO PROVISIONAL DE ESTERAS
CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44
CASETA P/OFICINA RESIDENTE
LETRINA PROVISIONAL P/PERSONAL OBRERO
INSTALACION PROVISIONAL DE AGUA
INSTALACION PROVISIONAL DE ENERGIA ELECTRICA
ALMACEN Y CASETA DE GUARDIANIA
IMPLEMENTOS DE SEGURIDAD
OBRAS PRELIMINARES
DESMONTAJE DE ARCOS DE FUTBOL
DEMOLICION MANUAL DE LOSA DE CONCRETO
DEMOLICION DE MUROS DE CONTENCION EXISTENTE
TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA
MOVILIZACION Y DESMOVILIZACION
IMPACTO AMBIENTAL
MITIGACION DE IMPACTO AMBIENTAL
LOSA DEPORTIVA
MOVIMIENTOS DE TIERRAS
CORTE DE TERRENO NATURAL C/MAQUINARIA
PERFILADO Y COMPACTADO EN LOSA DEPORTIVA
BASE GRANULAR E=0.15m
EXCAVACION MANUAL P/SARDINEL SUMERGIDO
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140KG/CM2 P/ SARDINEL SUMERGIDO
CONCRETO F'C=140KG/CM2 PARA LOSA E=10CM
ENCOFRADO Y DESENCOFRADO PARA LOSA
PINTURA
PINTURA ESMALTE DE LOSA CON FRANJA 0.05m
OTROS
CURADO DE SUPERFICIES HORIZONTALES
JUNTAS RELLENAS CON ASFALTO
PINTURA ARCO DE FULBITO INCLUYE TABLERO DE BASKET
NET P/VOLEY INCL. PARANTES Y SOPORTE METALICO
CERCO PERIMETRICO
MOVIMIENTOS DE TIERRAS
CORTE O EXCAVACION EN MATERIAL SUELTO MANUAL
EXCAVACION DE ZANJAS PARA ZAPATAS MANUAL
ACARREO DE MATERIAL EXCEDENTE HASTA 30m
RELLENO CON MATERIAL PRESTAMO SELECCIONADO
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ 10m3
OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS E=2" 1:12 (C:H)
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO H= 0.40m
SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210KG/CM2 ZAPATAS
ACERO FY= 4200KG/CM2 EN ZAPATAS
ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA
CONCRETO F'C=210KG/CM2 MUROS DE CONCRETO
ACERO FY= 4200KG/CM2 MUROS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO F'C=210KG/CM2 COLUMNAS
ACERO FY= 4200KG/CM2
CARPINTERIA METALICA
REPARACION PUERTA METALICA SECUNDARIA SEGN DISEO
CERCO METALICO MODULOS SEGN DISEO TIPO I
CERCO METALICO MODULOS SEGN DISEO TIPO II
PUERTA METALICA TIPO 1 SEGN DETALLE
PINTURA ANTICORROSIVA P/CARP. MET.
PINTURA
PINTURA ESMALTE EN COLUMNAS
PINTURA ESMALTE EN MUROS DE CONTENCION
PINTURA ESMALTE EN GRADERIAS
PINTURA ESMALTE EN SOBRECIMIENTOS
PINTURA ESMALTE EN CARPINTERIA METALICA
OTROS
ENSAYO DE SUELO
ENSAYO DE COMPACTACION
PRUEBA DE CALIDAD
JUNTAS DE CONSTRUCCION CON TECKNOPORT
CURADO DE SUPERFICIES VERTICALES
SOLAQUEADO DE OBRAS DE CONCRETO ARMADO
IMPERMEABILIZACION DE MUROS CON ASFALTO
GRADERIAS Y AREAS VERDES
MOVIMIENTO DE TIERRA
CORTE O EXCAVACION MANUAL EN TERRENO NATURAL
RELLENO CON MATERIAL PROPIO C/EQUIPO

Unidad

Metrado

DO
01

LU
02

MA
03

MI
04

JU
05

VI
06

SA
07

DO
08

LU
09

MA
10

MI
11

JU
12

VI
13

SA
14

DO
15

LU
16

MA
17

MI
18

JU
19

VI
20

SA
21

DO
22

LU
23

MA
24

MI
25

JU
26

VI
27

SA
28

DO
29

LU
30

MA
31

ACUMULADO
ANTERIOR
Metrado

AVANCE
ACTUAL
Metrado

ACUMULADO
ACTUAL
Metrado

Metrado

0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00

0.00
100.00
1.00
24.00
1.00
1.00
0.00
36.00
1.00

0.00
0.00
10.73
16.64
1.00
0.00
1.00
0.00
0.00
0.00

2.00
160.00
41.77
703.36
2.00
0.00
2.00
0.00
0.00
24.00

0.00
0.00
0.00

160.00
1.20
24.00

0.00
0.00
0.00
0.00
0.00

1.20
16.00
8.00
0.00
369.19
160.00
40.00
2.00
1.00
0.00
0.00
321.70
26.33
22.20
250.00
398.00
0.00
64.65
28.00
2.10
0.00
2.50
50.00
170.30
59.41
1,097.30
39.90
2.21
742.80
0.00
2.50
10.00
22.00
9.60
219.43
0.00
39.90
112.50
67.20
33.25
219.43

m
Und.
m2
glb
glb
glb
m2
est.

100.00
1.00
24.00
1.00
1.00
1.00
36.00
1.00

Und.
m2
m3
m2
glb

2.00
160.00
52.50
720.00
3.00

glb

3.00

m3
m2
m2
m3
m3

24.00
160.00
160.00
1.20
24.00

0.00
0.00
0.00
0.00
0.00

m3
m2
m2

1.20
16.00
8.00

0.00
0.00
0.00

1.00

2.35

1.60

1.28

1.17

1.28

1.83

0.00
0.00
10.73
16.64
1.00

1.22
16.64

1.00
1.00

1.00

SALDO

ml

369.19

0.00

m2
ml
est.
est.

160.00
40.00
2.00
1.00

0.00
0.00
0.00
0.00

m3
m3
m3
m3
m3

358.00
40.00
40.00
250.00
398.00

m2
m2
m3

80.00
28.00
2.10

m3
KG
m2
m3
KG
m2
m3
KG

2.50
50.00
225.00
76.88
1977.94
39.90
2.21
742.80

m2
Und.
Und.
m2
m2

2.50
10.00
22.00
9.60
219.43

0.00
0.00
0.00
0.00
0.00

m2
m2
m2
m2
m2

39.90
112.50
67.20
33.25
219.43

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
36.30
13.67
62.20
0.00
0.00
0.00
15.35
0.00
0.00
0.00
0.00
0.00
54.70
17.47
880.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

glb
glb
Und.
ml
m2
m2
m2

2.00
5.00
10.00
27.00
112.50
112.50
112.50

0.00
1.00
0.00
0.00
0.00
54.70
0.00

0.00
1.00
0.00
0.00
0.00
54.70
0.00

2.00
4.00
10.00
27.00
112.50
57.80
112.50

m3
m3

38.82
4.00

0.00
0.00

0.00
0.00

38.82
4.00

5.20

5.00

6.50

6.25

2.50
3.00

5.20
2.60
9.75

2.00
2.50

5.20
2.62
9.63

4.50
2.80
9.13

5.20
6.50

36.30
13.67
62.20
0.00
0.00

6.00
7.50

1.15
1.44

15.35
0.00
0.00

15.35

44.20
9.47
492.00

0.00
0.00
54.70
17.47
880.64
0.00
0.00
0.00

10.50
8.00

388.64

1.00

54.70

06.01.03
06.01.04
06.02.00
06.02.01
06.03.00
06.03.01
06.03.02
06.03.03
06.04.00
06.04.01
06.04.02
06.04.03
06.04.04
06.04.05
06.04.06
06.04.07
06.05.00
06.05.01
06.05.02
06.06.00
06.06.01
06.06.02
06.06.03
06.06.04
06.06.05
06.06.06
06.06.07
06.06.08
06.06.09
06.06.10

ACARREO DE MATERIAL EXCEDENTE HASTA 30M


ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE
OBRAS DE CONCRETO SIMPLE
CONCRETO 1:10 + 30% P.G. P/CIMIENTO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175KG/CM2
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CARAVISTA
ACERO FY=4200KG/CM2
INSTALACIONES SANITARIAS
EMPALME DE TUBERIA A RED EXISTENTE DE PVC 4" C/ABRAZADERA DE 4" A 3/4"
CAJA CONCRETO 0.60X0.60X0.40M
CAJA DE CONCRETO P/MEDIDOR
EXCAVACION DE ZANJAS MANUAL P/AGUA
RELLENO CON MATERIAL PROPIO SELECCIONADO Y COMPACTADO
TUBERIA PVC SAP 3/4"
VALVULA COMPUERTA DE BRONCE DE 3/4"
PINTURA
PINTURA ESMALTE EN SARDINELES
PINTURA CON BREA EN JARDINERIAS
OTROS
JUNTAS RELLENAS CON ASFALTO
CAPSULAS PARA BASURERO SEGN DISEO
PREPARACION DE TERRENO P/JARDINERIA
SIEMBRA DE GRASS
SUMINISTRO E INSTALACION DE FLORES/ARBOLES
JARDINERIAS PARA INS/ARBOLES
ESTRUCTURA METALICA EN GRADERIA SEGN DISEO
SUMINISTRO E INSTALACION DE POSTES C/REFLECTOR
ILUMINACION DE CANCHA
REHUBICACION DE POSTES DE CONCRETO

m3
m3

38.82
29.95

0.00
0.00

0.00
0.00

38.82
29.95

m3

28.82

0.00

0.00

28.82

m3
m2
kg

6.43
55.20
213.23

0.00
0.00
0.00

0.00
0.00
0.00
0.00

6.43
55.20
213.23
0.00

Und.
Und.
Und.
m3
m3
ml
Und.

1.00
2.00
1.00
6.00
5.04
15.00
1.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

2.00
1.00
6.00
5.04
15.00
1.00

m2
m2

75.90
27.60

0.00
0.00

0.00
0.00

75.90
27.60

ml
Und.
m2
m2
Und.
Und.
glb
Und.
glb
Und.

8.00
2.00
77.50
15.50
10.00
10.00
1.00
4.00
1.00
2.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

8.00
2.00
77.50
15.50
10.00
10.00
1.00
4.00
1.00
2.00

07.00.00
07.01.00
07.01.01

LOSA DEPORTIVA
OBRAS PRELIMINARES
DEMOLICION DE LOSA DE CONCRETO MANUAL

MATERIALES UTILIZADOS
CEMENTO
ARENA GRUESA
PIEDRA CHANCADA DE 1/2"
PIEDRA DE 4"
MATERIAL BASE
COMBUSTIBLE
GASOLINA 84 OCTANOS
PETROLEO D-2

CAMION
GRUPO ELECTROGENO

M3

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

96.00

6.00

UNIDAD CANTIDAD
BOLSA
650.00
M3
70.00
M3
70.00
M3
66.00

GLN
GLN

DIA

150

1.00

1.00

1.00

1.00

6.00

Obra:

MUNICIPALIDAD
DISTRITAL
DE SAMEGUA

ITEM

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA


JUNTA VECINAL MIRAFLORES, COMITE 7 DEL
DISTRITO DE SAMEGUA"

DESCRIPCION

UNIDAD

CANTIDAD

01.00.00

OBRAS Y TRABAJOS PROVISIONALES

01.01.00

CERCO PROVISIONAL DE ESTERAS

0.00

01.02.00

CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44

Und.

0.00

01.03.00

CASETA P/OFICINA RESIDENTE

m2

0.00

01.04.00

LETRINA PROVISIONAL P/PERSONAL OBRERO

glb

0.00

01.05.00

INSTALACION PROVISIONAL DE AGUA

glb

0.00

01.06.00

INSTALACION PROVISIONAL DE ENERGIA ELECTRICA

glb

1.00

01.07.00

ALMACEN Y CASETA DE GUARDIANIA

m2

0.00

01.08.00
02.00.00

IMPLEMENTOS DE SEGURIDAD
OBRAS PRELIMINARES

est.

0.00

02.01.00

DESMONTAJE DE ARCOS DE FUTBOL

Und.

0.00

02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

m2

0.00

02.03.00

DEMOLICION DE MUROS DE CONTENCION EXISTENTE

m3

10.73

02.04.00

TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA

m2

16.64

02.05.00
03.00.00

MOVILIZACION Y DESMOVILIZACION
IMPACTO AMBIENTAL

glb

1.00

03.01.00
04.00.00

MITIGACION DE IMPACTO AMBIENTAL


LOSA DEPORTIVA

glb

1.00

04.01.00

MOVIMIENTOS DE TIERRAS

04.01.01

CORTE DE TERRENO NATURAL C/MAQUINARIA

m3

0.00

04.01.02

PERFILADO Y COMPACTADO EN LOSA DEPORTIVA

m2

0.00

04.01.03

BASE GRANULAR E=0.15m

m2

0.00

04.01.04

EXCAVACION MANUAL P/SARDINEL SUMERGIDO

m3

0.00

04.01.05
04.02.00

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE


OBRAS DE CONCRETO SIMPLE

m3

0.00

04.02.01

CONCRETO F'C=140KG/CM2 P/ SARDINEL SUMERGIDO

m3

0.00

04.02.02

CONCRETO F'C=140KG/CM2 PARA LOSA E=10CM

m2

0.00

04.02.03
04.03.00

ENCOFRADO Y DESENCOFRADO PARA LOSA


PINTURA

m2

0.00

04.03.01
04.04.00

PINTURA ESMALTE DE LOSA CON FRANJA 0.05m


OTROS

ml

0.00

04.04.01

CURADO DE SUPERFICIES HORIZONTALES

m2

0.00

04.04.02

JUNTAS RELLENAS CON ASFALTO

ml

0.00

04.04.03

PINTURA ARCO DE FULBITO INCLUYE TABLERO DE BASKET

est.

0.00

04.04.04

NET P/VOLEY INCL. PARANTES Y SOPORTE METALICO

est.

0.00

05.00.00

CERCO PERIMETRICO

05.01.00

MOVIMIENTOS DE TIERRAS

05.01.01

CORTE O EXCAVACION EN MATERIAL SUELTO MANUAL

m3

36.30

05.01.02

EXCAVACION DE ZANJAS PARA ZAPATAS MANUAL

m3

13.67

05.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30m

m3

62.20

05.01.04

RELLENO CON MATERIAL PRESTAMO SELECCIONADO

m3

0.00

05.01.05
05.02.00

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ 10m3


OBRAS DE CONCRETO SIMPLE

m3

0.00

05.02.01

SOLADO PARA ZAPATAS E=2" 1:12 (C:H)

m2

15.35

05.02.02

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO H= 0.40m

m2

0.00

Obra:

MUNICIPALIDAD
DISTRITAL
DE SAMEGUA

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA


JUNTA VECINAL MIRAFLORES, COMITE 7 DEL
DISTRITO DE SAMEGUA"

ITEM

DESCRIPCION

05.02.03
05.03.00

SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M.


OBRAS DE CONCRETO ARMADO

05.03.01
05.03.02

UNIDAD

CANTIDAD

m3

0.00

CONCRETO F'C=210KG/CM2 ZAPATAS

m3

0.00

ACERO FY= 4200KG/CM2 EN ZAPATAS

KG

0.00

05.03.03

ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA

m2

54.70

05.03.04

CONCRETO F'C=210KG/CM2 MUROS DE CONCRETO

m3

17.47

05.03.05

ACERO FY= 4200KG/CM2 MUROS

KG

880.64

05.03.06

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

0.00

05.03.07

CONCRETO F'C=210KG/CM2 COLUMNAS

m3

0.00

05.03.08

ACERO FY= 4200KG/CM2

KG

0.00

05.04.00

CARPINTERIA METALICA

05.04.01

REPARACION PUERTA METALICA SECUNDARIA SEGN DISEO

m2

0.00

05.04.02

CERCO METALICO MODULOS SEGN DISEO TIPO I

Und.

0.00

05.04.03

CERCO METALICO MODULOS SEGN DISEO TIPO II

Und.

0.00

05.04.04

PUERTA METALICA TIPO 1 SEGN DETALLE

m2

0.00

05.04.05
05.05.00

PINTURA ANTICORROSIVA P/CARP. MET.


PINTURA

m2

0.00

05.05.01

PINTURA ESMALTE EN COLUMNAS

m2

0.00

05.05.02

PINTURA ESMALTE EN MUROS DE CONTENCION

m2

0.00

05.05.03

PINTURA ESMALTE EN GRADERIAS

m2

0.00

05.05.04

PINTURA ESMALTE EN SOBRECIMIENTOS

m2

0.00

05.05.05
05.06.00

PINTURA ESMALTE EN CARPINTERIA METALICA


OTROS

m2

0.00

05.06.01

ENSAYO DE SUELO

glb

0.00

05.06.02

ENSAYO DE COMPACTACION

glb

1.00

05.06.03

PRUEBA DE CALIDAD

Und.

0.00

05.06.04

JUNTAS DE CONSTRUCCION CON TECKNOPORT

ml

0.00

05.06.05

CURADO DE SUPERFICIOS VERTICALES

m2

0.00

05.06.06

SOLAQUEADO DE OBRAS DE CONCRETO ARMADO

m2

54.70

05.06.07
06.00.00

IMPERMEABILIZACION DE MUROS CON ASFALTO


GRADERIAS Y AREAS VERDES

m2

0.00

06.01.00

MOVIMIENTO DE TIERRA

06.01.01

CORTE O EXCAVACION MANUAL EN TERRENO NATURAL

m3

0.00

06.01.02

RELLENO CON MATERIAL PROPIO C/EQUIPO

m3

0.00

06.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30M

m3

0.00

06.01.04
06.02.00

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE


OBRAS DE CONCRETO SIMPLE

m3

0.00

06.02.01
06.03.00

CONCRETO 1:10 + 30% P.G. P/CIMIENTO


OBRAS DE CONCRETO ARMADO

m3

0.00

06.03.01

CONCRETO F'C=175KG/CM2

m3

0.00

06.03.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CARAVISTA

m2

0.00

06.03.03
06.04.00

ACERO FY=4200KG/CM2
INSTALACIONES SANITARIAS

kg

0.00

06.04.01

EMPALME DE TUBERIA A RED EXISTENTE DE PVC 4" C/ABRAZADERA DE 4" A 3/4"

Und.

0.00

06.04.02

CAJA CONCRETO 0.60X0.60X0.40M

Und.

0.00

Obra:

MUNICIPALIDAD
DISTRITAL
DE SAMEGUA

ITEM

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA


JUNTA VECINAL MIRAFLORES, COMITE 7 DEL
DISTRITO DE SAMEGUA"

DESCRIPCION

UNIDAD

CANTIDAD

06.04.03

CAJA DE CONCRETO P/MEDIDOR

Und.

0.00

06.04.04

EXCAVACION DE ZANJAS MANUAL P/AGUA

m3

0.00

06.04.05

RELLENO CON MATERIAL PROPIO SELECCIONADO Y COMPACTADO

m3

0.00

06.04.06

TUBERIA PVC SAP 3/4"

ml

0.00

06.04.07
06.05.00

VALVULA COMPUERTA DE BRONCE DE 3/4"


PINTURA

Und.

0.00

06.05.01

PINTURA ESMALTE EN SARDINELES

m2

0.00

06.05.02
06.06.00

PINTURA CON BREA EN JARDINERIAS


OTROS

m2

0.00

06.06.01

JUNTAS RELLENAS CON ASFALTO

ml

0.00

06.06.02

CAPSULAS PARA BASURERO SEGN DISEO

Und.

0.00

06.06.03

PREPARACION DE TERRENO P/JARDINERIA

m2

0.00

06.06.04

SIEMBRA DE GRASS

m2

0.00

06.06.05

SUMINISTRO E INSTALACION DE FLORES/ARBOLES

Und.

0.00

06.06.06

JARDINERIAS PARA INS/ARBOLES

Und.

0.00

06.06.07

ESTRUCTURA METALICA EN GRADERIA SEGN DISEO

glb

0.00

06.06.08

SUMINISTRO E INSTALACION DE POSTES C/REFLECTOR

Und.

0.00

06.06.09

ILUMINACION DE CANCHA

glb

0.00

06.06.10

REHUBICACION DE POSTES DE CONCRETO

Und.

0.00

RESIDENTE DE OBRA

Obra:

MUNICIPALIDAD
DISTRITAL
DE SAMEGUA
OBRA
MODALIDAD DE EJECUCION
FINANCIAMIENTO
PRESUPUESTO
PLAZO DE EJECUCION
FECHA DE INICIO DE OBRA
REGION
PROVINCIA
DISTRITO
RESIDENTE DE OBRA
INSPECTOR DE OBRA
ASISTENTE TECNICO
MES DE REPORTE
INFORME AL MES DE
INFORMES
MAYO

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL


MIRAFLORES, COMITE 7 DEL DISTRITO DE SAMEGUA"

MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES, COMIT 7 DEL DISTRITO DE SAMEGUA
ADMINISTRACION DIRECTA
CANON, SOBRECANON Y REGALIAS MINERAS
283,127.04
90 DIAS CALENDARIO
12 DE AGOSTO DEL 2010
MOQUEGUA
MARISCAL NIETO
SAMEGUA
Ing. EDY FLORES SOSA
Ing. FREDY MARCA HUANCA
Bach, Ing. RENE JHONSON FLORES MAMANI
04 al 31 DE MAYO DEL 2011
MAYO 2011

01

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

VALORIZACIN SEGN EXPEDIENTE TECNICO


PARTIDA

DESCRIPCION

UND

PRESUPUESTO
METRADOS

P.U

01.00.00 OBRAS Y TRABAJOS PROVISIONALES


01.01.00

CERCO PROVISIONAL DE ESTERAS

01.02.00

CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44

01.03.00

CASETA P/OFICINA RESIDENTE

01.04.00

LETRINA PROVISIONAL P/PERSONAL OBRERO

01.05.00

INSTALACION PROVISIONAL DE AGUA

01.06.00

INSTALACION PROVISIONAL DE ENERGIA ELECTRICA

01.07.00

ALMACEN Y CASETA DE GUARDIANIA

01.08.00

IMPLEMENTOS DE SEGURIDAD
DESMONTAJE DE ARCOS DE FUTBOL

02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

02.03.00

DEMOLICION DE MUROS DE CONTENCION EXISTENTE

02.04.00

TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA

02.05.00

MOVILIZACION Y DESMOVILIZACION

m
Und.
m2
glb
glb
glb
m2
est.

MITIGACION DE IMPACTO AMBIENTAL

CORTE DE TERRENO NATURAL C/MAQUINARIA

04.01.02

PERFILADO Y COMPACTADO EN LOSA DEPORTIVA

04.01.03

BASE GRANULAR E=0.15m

04.01.04

EXCAVACION MANUAL P/SARDINEL SUMERGIDO

04.01.05

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE

AVANCE MES ACTUAL


METRADO

MONTO

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

SALDO ACTUAL
METRADO

MONTO

17.73

1,773.00

100.00

1,773.00

100.00%

0.00

0.00

0.00%

100.00

1,773.00

100.00%

0.00

0.00

0.00%

1.00

957.81

957.81

1.00

957.81

100.00%

0.00

0.00

0.00%

1.00

957.81

100.00%

0.00

0.00

0.00%

24.00

155.49

3,731.76

24.00

3,731.76

100.00%

0.00

0.00

0.00%

24.00

3,731.76

100.00%

0.00

0.00

0.00%

1.00

243.57

243.57

1.00

243.57

100.00%

0.00

0.00

0.00%

1.00

243.57

100.00%

0.00

0.00

0.00%

1.00

455.88

455.88

1.00

455.88

100.00%

0.00

0.00

0.00%

1.00

455.88

100.00%

0.00

0.00

0.00%

1.00

455.88

455.88

0.00

0.00

0.00%

1.00

455.88

100.00%

1.00

455.88

100.00%

0.00

0.00

0.00%

36.00

25.89

932.04

36.00

932.04

100.00%

0.00

0.00

0.00%

36.00

932.04

100.00%

0.00

0.00

0.00%

1.00

5,000.00

5,000.00

1.00

5,000.00

100.00%

0.00

0.00

0.00%

1.00

5,000.00

100.00%

0.00

0.00

0.00%
0.00%

26,970.79

Und.
m2
m3
m2
glb

2.00

132.47

264.94

2.00

264.94

100.00%

0.00

0.00

0.00%

2.00

264.94

100.00%

0.00

0.00

160.00

17.73

2,836.80

160.00

2,836.80

100.00%

0.00

0.00

0.00%

160.00

2,836.80

100.00%

0.00

0.00

0.00%

52.50

230.10

12,080.25

33.17

7,632.42

63.18%

10.73

2,468.97

20.44%

43.90

10,101.39

83.62%

8.60

1,978.86

16.38%

720.00

1.79

1,288.80

0.00

0.00

0.00%

16.64

29.79

2.31%

16.64

29.79

2.31%

703.36

1,259.01

97.69%

3.00

3,500.00

10,500.00

1.00

3,500.00

33.33%

1.00

3,500.00

33.33%

2.00

7,000.00

66.67%

1.00

3,500.00

33.33%

1.00

300.00

33.33%

1.00

300.00

33.33%

2.00

600.00

66.67%

1.00

300.00

33.33%

900.00

glb

3.00

300.00

04.00.00 LOSA DEPORTIVA


04.01.00 MOVIMIENTOS DE TIERRAS
04.01.01

MONTO

100.00

03.00.00 IMPACTO AMBIENTAL


03.01.00

METRADO

13,549.94

02.00.00 OBRAS PRELIMINARES


02.01.00

AVANCE ACUMULADO ANTERIOR


PARCIAL

900.00
9,126.27
5,290.60

m3
m2
m2
m3
m3

24.00

0.50

12.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

12.00

100.00%

160.00

8.68

1,388.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

1,388.80

100.00%

160.00

19.98

3,196.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

3,196.80

100.00%

1.20

26.10

31.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.20

31.32

100.00%

24.00

27.57

661.68

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

661.68

100.00%

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

FECHA DE INICIO DE OBRA


04.02.00 OBRAS DE CONCRETO SIMPLE
04.02.01

CONCRETO F'C=140KG/CM2 P/ SARDINEL SUMERGIDO

04.02.02

CONCRETO F'C=140KG/CM2 PARA LOSA E=10CM

04.02.03

ENCOFRADO Y DESENCOFRADO PARA LOSA

1,170.60

m3
m2
m2

1.20

274.43

329.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.20

329.32

100.00%

16.00

37.77

604.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

16.00

604.32

100.00%

8.00

29.62

236.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

8.00

236.96

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

369.19

557.48

100.00%

04.03.00 PINTURA
04.03.01

PINTURA ESMALTE DE LOSA CON FRANJA 0.05m

557.48

ml

369.19

1.51

04.04.00 OTROS
04.04.01

CURADO DE SUPERFICIES HORIZONTALES

04.04.02

JUNTAS RELLENAS CON ASFALTO

04.04.03

PINTURA ARCO DE FULBITO INCLUYE TABLERO DE BASKET

04.04.04

NET P/VOLEY INCL. PARANTES Y SOPORTE METALICO

m2
ml
est.
est.

160.00

7.35

1,176.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

1,176.00

100.00%

40.00

5.79

231.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

40.00

231.60

100.00%

2.00

100.00

200.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

200.00

100.00%

1.00

500.00

500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

500.00

100.00%

05.00.00 CERCO PERIMETRICO


05.01.00 MOVIMIENTOS DE TIERRAS
05.01.01

CORTE O EXCAVACION EN MATERIAL SUELTO MANUAL

05.01.02

EXCAVACION DE ZANJAS PARA ZAPATAS MANUAL

05.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30m

05.01.04

RELLENO CON MATERIAL PRESTAMO SELECCIONADO

05.01.05

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ 10m3

149,159.60
30,949.76

m3
m3
m3
m3
m3

358.00

0.50

179.00

211.83

105.92

59.17%

36.30

18.15

10.14%

248.13

124.07

69.31%

109.87

54.94

30.69%

40.00

30.41

1,216.40

26.33

800.70

65.83%

13.67

415.70

34.18%

40.00

1,216.40

100.00%

0.00

0.00

0.00%

40.00

17.40

696.00

29.15

507.21

72.88%

10.85

188.79

27.13%

40.00

696.00

100.00%

0.00

0.00

0.00%

250.00

77.91

19,477.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

250.00

19,477.50

100.00%

398.00

23.57

9,380.86

90.00

2,121.30

22.61%

0.00

0.00

0.00%

90.00

2,121.30

22.61%

308.00

7,259.56

77.39%

05.02.00 OBRAS DE CONCRETO SIMPLE


05.02.01

SOLADO PARA ZAPATAS E=2" 1:12 (C:H)

05.02.02

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO H= 0.40m

05.02.03

SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M.

557.48
2,107.60

4,313.95

m2
m2
m3

80.00

28.69

2,295.20

64.65

1,854.81

80.81%

15.35

440.39

19.19%

80.00

2,295.20

100.00%

0.00

0.00

0.00%

28.00

52.32

1,464.96

20.67

1,081.45

73.82%

0.00

0.00

0.00%

20.67

1,081.45

73.82%

7.33

383.51

26.18%

2.10

263.71

553.79

1.03

271.62

49.05%

0.00

0.00

0.00%

1.03

271.62

49.05%

1.07

282.17

50.95%

05.03.00 OBRAS DE CONCRETO ARMADO


m3
KG
05.03.03
ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA m2
05.03.04
CONCRETO F'C=210KG/CM2 MUROS DE CONCRETO
m3
05.03.05
ACERO FY= 4200KG/CM2 MUROS
KG
05.03.06
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m2
05.03.07
CONCRETO F'C=210KG/CM2 COLUMNAS
m3
05.03.08
ACERO FY= 4200KG/CM2
KG
05.04.00 CARPINTERIA METALICA
05.04.01
REPARACION PUERTA METALICA SECUNDARIA SEGN DISEO
m2
05.04.02
CERCO METALICO MODULOS SEGN DISEO TIPO I
Und.
05.04.03
CERCO METALICO MODULOS SEGN DISEO TIPO II
Und.
05.04.04
PUERTA METALICA TIPO 1 SEGN DETALLE
m2
05.04.05
PINTURA ANTICORROSIVA P/CARP. MET.
m2
05.05.00 PINTURA
05.05.01
PINTURA ESMALTE EN COLUMNAS
m2
05.05.02
PINTURA ESMALTE EN MUROS DE CONTENCION
m2
05.05.03
PINTURA ESMALTE EN GRADERIAS
m2
05.05.04
PINTURA ESMALTE EN SOBRECIMIENTOS
m2

81,183.90

05.03.01

CONCRETO F'C=210KG/CM2 ZAPATAS

2.50

446.14

1,115.35

1.50

669.21

60.00%

0.00

0.00

0.00%

1.50

669.21

60.00%

1.00

446.14

40.00%

05.03.02

ACERO FY= 4200KG/CM2 EN ZAPATAS

50.00

7.23

361.50

25.62

185.23

51.24%

0.00

0.00

0.00%

25.62

185.23

51.24%

24.38

176.27

48.76%

225.00

99.52

22,392.00

170.31

16,949.25

75.69%

54.69

5,442.75

24.31%

225.00

22,392.00

100.00%

0.00

0.00

0.00%

76.88

447.11

34,373.82

59.08

26,415.26

76.85%

17.47

7,811.01

22.72%

76.55

34,226.27

99.57%

0.33

147.55

0.43%

1,977.94

7.23

14,300.51

1,180.01

8,531.47

59.66%

797.93

5,769.03

40.34%

1,977.94

14,300.51

100.00%

0.00

0.00

0.00%

39.90

56.44

2,251.96

31.00

1,749.64

77.69%

0.00

0.00

0.00%

31.00

1,749.64

77.69%

8.90

502.32

22.31%

2.21

460.78

1,018.32

1.69

778.72

76.47%

0.00

0.00

0.00%

1.69

778.72

76.47%

0.52

239.61

23.53%

742.80

7.23

5,370.44

380.74

2,752.75

51.26%

0.00

0.00

0.00%

380.74

2,752.75

51.26%

362.06

2,617.69

48.74%

23,098.11
2.50

116.76

291.90

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.50

291.90

100.00%

10.00

550.48

5,504.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

5,504.80

100.00%

22.00

550.48

12,110.56

22.00

12,110.56

100.00%

0.00

0.00

0.00%

22.00

12,110.56

100.00%

0.00

0.00

0.00%

9.60

425.97

4,089.31

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

9.60

4,089.31

100.00%

219.43

5.02

1,101.54

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

219.43

1,101.54

100.00%

6,828.92
39.90

18.78

749.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

39.90

749.32

100.00%

112.50

18.78

2,112.75

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

112.50

2,112.75

100.00%

67.20

18.78

1,262.02

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

67.20

1,262.02

100.00%

33.25

18.39

611.47

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

33.25

611.47

100.00%

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011


219.43
9.54
m2

INSPECTOR DE OBRA

05.05.05

PINTURA ESMALTE EN CARPINTERIA METALICA

05.06.00 OTROS
05.06.01

ENSAYO DE SUELO

2,093.36

: Ing. FREDY MARCA HUANCA

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

219.43

2,093.36

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

300.00

100.00%

2,784.96

glb

2.00

150.00

300.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011


5.00
25.00
glb
10.00
25.00
Und.
27.00
3.48
ml
112.50
0.51
m2
112.50
11.34
m2
112.50
6.07
m2

INSPECTOR DE OBRA

05.06.02

ENSAYO DE COMPACTACION

05.06.03

PRUEBA DE CALIDAD

05.06.04

JUNTAS DE CONSTRUCCION CON TECKNOPORT

05.06.05

CURADO DE SUPERFICIES VERTICALES

05.06.06

SOLAQUEADO DE OBRAS DE CONCRETO ARMADO

05.06.07

IMPERMEABILIZACION DE MUROS CON ASFALTO

06.00.00 GRADERIAS Y AREAS VERDES


06.01.00 MOVIMIENTO DE TIERRA
06.01.01

CORTE O EXCAVACION MANUAL EN TERRENO NATURAL

06.01.02

RELLENO CON MATERIAL PROPIO C/EQUIPO

06.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30M

06.01.04

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE


CONCRETO 1:10 + 30% P.G. P/CIMIENTO
CONCRETO F'C=175KG/CM2

06.03.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CARAVISTA

06.03.03

ACERO FY=4200KG/CM2

0.00%

1.00

25.00

20.00%

1.00

25.00

20.00%

4.00

100.00

80.00%

250.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

250.00

100.00%

93.96

11.20

38.98

41.48%

0.00

0.00

0.00%

11.20

38.98

41.48%

15.80

54.98

58.52%

57.38

35.46

18.08

31.52%

0.00

0.00

0.00%

35.46

18.08

31.52%

77.04

39.29

68.48%

1,275.75

35.46

402.12

31.52%

54.70

620.30

48.62%

90.16

1,022.41

80.14%

22.34

253.34

19.86%

682.88

84.15

510.79

74.80%

0.00

0.00

0.00%

84.15

510.79

74.80%

28.35

172.08

25.20%

84.60%

38.82

30.41

1,180.52

5.98

181.85

15.40%

0.00

0.00

0.00%

5.98

181.85

15.40%

32.84

998.66

4.00

41.35

165.40

4.00

165.40

100.00%

0.00

0.00

0.00%

4.00

165.40

100.00%

0.00

0.00

0.00%

38.82

17.40

675.47

7.78

135.37

20.04%

0.00

0.00

0.00%

7.78

135.37

20.04%

31.04

540.10

79.96%

29.95

27.57

825.72

7.80

215.05

26.04%

0.00

0.00

0.00%

7.80

215.05

26.04%

22.15

610.68

73.96%

5.98

1,159.76

20.75%

0.00

0.00

0.00%

5.98

1,159.76

20.75%

22.84

4,429.59

79.25%

5,589.35

m3

28.82

193.94

5,589.35
7,795.27

m3
m2
kg

6.43

389.75

2,506.09

6.43

2,506.09

100.00%

0.00

0.00

0.00%

6.43

2,506.09

100.00%

0.00

0.00

0.00%

55.20

67.89

3,747.53

55.20

3,747.53

100.00%

0.00

0.00

0.00%

55.20

3,747.53

100.00%

0.00

0.00

0.00%

213.23

7.23

1,541.65

202.72

1,465.67

95.07%

0.00

0.00

0.00%

202.72

1,465.67

95.07%

10.51

75.99

4.93%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

78.83

100.00%

06.04.00 INSTALACIONES SANITARIAS


06.04.01

0.00

2,847.11

m3
m3
m3
m3

06.03.00 OBRAS DE CONCRETO ARMADO


06.03.01

0.00

43,948.32

06.02.00 OBRAS DE CONCRETO SIMPLE


06.02.01

: Ing. FREDY MARCA HUANCA

125.00

EMPALME DE TUBERIA A RED EXISTENTE DE PVC 4" C/ABRAZADERA DE


4" A 3/4"
Und.

966.36
1.00

78.83

78.83

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011


06.04.02
CAJA CONCRETO 0.60X0.60X0.40M
2.00
95.82
Und.
06.04.03
CAJA DE CONCRETO P/MEDIDOR
1.00
84.66
Und.
06.04.04
EXCAVACION DE ZANJAS MANUAL P/AGUA
6.00
30.41
m3
06.04.05
RELLENO CON MATERIAL PROPIO SELECCIONADO Y COMPACTADO
5.04
41.91
m3
06.04.06
TUBERIA PVC SAP 3/4"
15.00
10.52
ml
06.04.07
VALVULA COMPUERTA DE BRONCE DE 3/4"
1.00
59.74
Und.
06.05.00 PINTURA
06.05.01
PINTURA ESMALTE EN SARDINELES
75.90
9.96
m2
06.05.02
PINTURA CON BREA EN JARDINERIAS
27.60
8.49
m2
06.06.00 OTROS
06.06.01
JUNTAS RELLENAS CON ASFALTO
8.00
5.79
ml
06.06.02
CAPSULAS PARA BASURERO SEGN DISEO
2.00
220.65
Und.
06.06.03
PREPARACION DE TERRENO P/JARDINERIA
77.50
22.12
m2
06.06.04
SIEMBRA DE GRASS
15.50
4.35
m2
06.06.05
SUMINISTRO E INSTALACION DE FLORES/ARBOLES
10.00
39.06
Und.
06.06.06
JARDINERIAS PARA INS/ARBOLES
10.00
60.00
Und.
06.06.07
ESTRUCTURA METALICA EN GRADERIA SEGN DISEO
1.00
10,000.00
glb
06.06.08
SUMINISTRO E INSTALACION DE POSTES C/REFLECTOR
4.00
1,500.00
Und.
06.06.09
ILUMINACION DE CANCHA
1.00
5,000.00
glb
06.06.10
REHUBICACION DE POSTES DE CONCRETO
2.00
750.00
Und.
COSTO DIRECTO (S/.)

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

191.64

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

191.64

100.00%

84.66

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

84.66

100.00%

182.46

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

182.46

100.00%

211.23

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.04

211.23

100.00%

157.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.00

157.80

100.00%

59.74

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

59.74

100.00%

755.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

75.90

755.96

100.00%

234.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

27.60

234.32

100.00%

990.29

25,759.95
46.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

8.00

46.32

100.00%

441.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

441.30

100.00%

1,714.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

77.50

1,714.30

100.00%

67.43

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.50

67.43

100.00%

390.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

390.60

100.00%

600.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

600.00

100.00%

10,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

10,000.00

100.00%

6,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

4.00

6,000.00

100.00%

5,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

5,000.00

100.00%

1,500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

1,500.00

100.00%

243,654.94

115,060.00

47.22%

27,485.77

11.28%

142,545.77

58.50%

101,109.15

41.50%

21,928.94

21,928.94

10,355.40

47.22%

2,473.72

11.28%

12,829.12

58.50%

9,099.83

41.50%

GASTOS DE SUPERVISION

7,309.65

7,309.65

3,451.80

47.22%

824.57

11.28%

4,276.37

58.50%

3,033.28

41.50%

GASTOS DE LIQUIDACION

1,461.93

1,461.93

690.36

47.22%

164.91

11.28%

855.27

58.50%

606.66

41.50%

GASTOS GENERALES DE GESTION ADMINISTRATIVA

7,309.65

7,309.65

3,451.80

47.22%

824.57

11.28%

4,276.37

58.50%

3,033.28

41.50%

GASTOS GENERALES DE SEGURIDAD EN OBRA

1,461.93

1,461.93

39,472.10

18,639.72

47.22%

4,452.69

11.28%

23,092.41

58.50%

16,379.69

41.50%

283,127.04

133,699.72

47.22%

31,938.46

11.28%

165,638.18

58.50%

117,488.84

41.50%

GASTOS GENERALES

COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

VALORIZACIN (MAYORES METRADOS) MES DE OCTUBRE 2010


OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04DE MAYO DEL 2011

INSPECTOR DEOBRA

: Ing.

PARTIDA

DESCRIPCION

UND

PRESUPUESTO
METRADOS

P.U

02.00.00 OBRAS PRELIMINARES


02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

ACARREO DE MATERIAL EXCEDENTE HASTA 30m

METRADO

MONTO

AVANCE MES ACTUAL

METRADO

MONTO

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

SALDO ACTUAL

METRADO

MONTO

0.00

m2

0.00

17.73

05.00.00 CERCO PERIMETRICO


05.01.00 MOVIMIENTOS DE TIERRAS
05.01.03

AVANCE ACUMULADO ANTERIOR


PARCIAL

0.00

0.00

0.00

640.00

11,347.20

640.00

11,347.20

640.00

-11,347.20

0.00

0.00

51.35

893.49

51.35

893.49

51.35

-893.49

0.00
0.00

m3

0.00

17.40

05.03.00 OBRAS DE CONCRETO ARMADO

0.00
0.00

05.03.03

ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA m2

0.00

99.52

0.00

0.00

0.00

0.01

1.00

0.01

1.00

0.01

-1.00

05.03.05

ACERO FY= 4200KG/CM2 MUROS

KG

0.00

7.23

0.00

0.00

0.00

82.71

597.99

82.71

597.99

82.71

-597.99

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

COSTO DIRECTO (S/.)

243,654.94

0.00

0.00%

12,839.68

5.27%

12,839.68

5.27%

-12,839.68

-5.27%

21,928.94

21,928.94

10,355.40

47.22%

2,473.72

11.28%

12,829.12

58.50%

9,099.83

41.50%

GASTOS DE SUPERVISION

7,309.65

7,309.65

3,451.80

47.22%

824.57

11.28%

4,276.37

58.50%

3,033.28

41.50%

GASTOS DE LIQUIDACION

1,461.93

1,461.93

690.36

47.22%

164.91

11.28%

855.27

58.50%

606.66

41.50%

GASTOS GENERALES DE GESTION ADMINISTRATIVA

7,309.65

7,309.65

3,451.80

47.22%

824.57

11.28%

4,276.37

58.50%

3,033.28

41.50%

GASTOS GENERALES DE SEGURIDAD EN OBRA

1,461.93

39,472.10

0.00

0.00%

2,080.03

5.27%

2,080.03

5.27%

37,392.07

94.73%

283,127.04

0.00

0.00%

14,919.71

5.27%

14,919.71

5.27%

24,552.39

8.67%

GASTOS GENERALES

COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

1,461.93

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

VALORIZACIN (PARTIDAS ADICIONALES) MES DE MAYO 2011


A
A.01
A.01.01
A.01.02
B
B1.01
B.01.01
B2.01
B.02.01
C
C3.01
C.03.01

LOSA DEPORTIVA
MOVIMIENTOS DE TIERRAS
0.00
ACARREO DE MATERIAL EXCEDENTE HASTA 40 mt.
m3
0.00
LIMPIEZA
m2
CERCO PERIMETRICO
MOVIMIENTOS DE TIERRAS
0.00
PERFILADO Y COMPACTADO EN ZAPATA DE MURO
m3
OBRAS DE CONCRETO ARMADO
0.00
HABILITADO DE MADERA P/ENCOFRADO EN MURO DE CONTENCION
m5
REVOQUES, ENLUCIDOS Y MOLDURAS
COLUMNAS RECTAS: TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, E=2cm)
0.00
TARRAJEO DE SUPERFICIE DE COLUMNETAS CON CEMENTO-ARENA
m3
COSTO DIRECTO (S/.)

0.00
0.00
17.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

589.08

6.00

589.08

6.00

-589.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
21.80

0.00
0.00

98.18

0.00

0.00
0.00
25.70

0.00

243,654.94

0.00

0.00%

589.08

0.24%

589.08

0.24%

0.00

0.00%

GASTOS GENERALES

36,031.32

36,031.32

0.00

0.00%

87.11

0.24%

87.11

0.24%

35,944.21

99.76%

GASTOS DE SUPERVISION

12,054.15

12,054.15

0.00

0.00%

29.14

0.24%

29.14

0.24%

12,025.00

99.76%

GASTOS DE LIQUIDACION

1,901.53

1,901.53

0.00

0.00%

4.60

0.24%

4.60

0.24%

1,896.94

99.76%

GASTOS DE ELABORACION DE ET

2,347.23

2,347.23

0.00

0.00%

5.67

0.24%

5.67

0.24%

2,341.56

99.76%

52,334.23

0.00

0.00%

126.53

0.24%

126.53

0.24%

52,207.71

99.76%

295,989.17

0.00

0.00%

715.61

0.24%

715.61

0.24%

52,207.71

17.64%

COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA

VALORIZACION N 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011


: MOQUEGUA
: MARISCAL NIETO

RESUMEN DE VALORIZACIN AL MES DE MAYO DEL 2011


OBRA

: Mantenimiento de Losa Deportiva en la Junta Vecinal - Comit 07, del distrito de Samegua.

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

REGION
PROVINCIA

FORMULA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DEOBRA

: Ing. Freddy Huanca Marca

PARTIDA

DESCRIPCION

UND

PRESUPUESTO
METRADOS

VALORIZACION DE EXPEDIENTE TECNICO COSTO DIRECTO (S/.)


VALORIZACION MAYORES METRADOS COSTO DIRECTO (S/.)
VALORIZACION DE PARTIDAS NUEVAS COSTO DIRECTO (S/.)

TOTAL % AVANCE FISICO ACTUAL A AGOSTO (S/.)

2,347.23

P.U

AVANCE ACUMULADO ANTERIOR


PARCIAL

METRADO

MONTO

AVANCE MES ACTUAL


METRADO

MONTO

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

SALDO ACTUAL
METRADO

MONTO

243,654.94

115,060.00

47.22%

27,485.77

11.28%

142,545.77

58.50%

101,109.17

41.50%

243,654.94

0.00

0.00%

12,839.68

5.27%

12,839.68

5.27%

230,815.26

0.00%

243,654.94

0.00

0.00%

589.08

0.24%

589.08

0.24%

243,065.86

100.00%

243,654.94

115,060.00

47.22%

40,914.53

16.79%

155,974.53

64.01%

87,680.41

41.50%

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA
ING. EDY FLORES SOSA

RESUMEN DE VALORIZACIN N 01 MES DE MAYO DEL 2011


OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

ENTIDAD EJECUTORA

: MUNICIPALIDAD DISTRITAL DE SAN CRISTOBAL

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: ING. FREDY MARCA HUANCA

DESCRIPCION

PRESUPUESTO
( S/. )

VALORIZACION
ACUMULADO ANTERIOR

MES ACTUAL

ACUMULADO ACTUAL

SALDO ACTUAL

( S/. )

( S/. )

( S/. )

( S/. )

01.00.00

OBRAS Y TRABAJOS PROVISIONALES

13,549.94

13,094.06

455.88

13,549.94

02.00.00

OBRAS PRELIMINARES

26,970.79

14,234.16

5,998.76

20,232.92

03.00.00

IMPACTO AMBIENTAL

04.00.00

LOSA DEPORTIVA

05.00.00

CERCO PERIMETRICO

06.00.00

GRADERIAS Y AREAS VERDES

COSTO DIRECTO

(S/.)

COSTOS INDIRECTOS (S/.)


COSTO TOTAL

(S/.)

900.00

300.00

300.00

600.00

9,126.27

0.00

0.00

0.00

149,159.60

77,855.07

20,731.13

98,586.19

43,948.32

9,576.72

0.00

9,576.72

243,654.94

115,060.00

27,485.77

142,545.77

39,472.10

18,639.72

4,452.69

23,092.41

283,127.04

133,699.72

31,938.46

165,638.18

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT 7
RESIDENTE DE OBRA
ING. EDY FLORES SOSA

RESUMEN DE VALORIZACIN N 01 MES DE MAYO DEL 2011


OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

ENTIDAD EJECUTORA

: MUNICIPALIDAD DISTRITAL DE SAN CRISTOBAL

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: ING. FREDY MARCA HUANCA

DESCRIPCION

PRESUPUESTO
( S/. )

RESIDENTE DE OBRA

VALORIZACION
ACUMULADO ANTERIOR

MES ACTUAL

ACUMULADO ACTUAL

SALDO ACTUAL

( S/. )

( S/. )

( S/. )

( S/. )

INSPECTOR DE OBRA

l 31 DE MAYO 2011

QUEGUA

RISCAL NIETO

MEGUA

. FREDY MARCA HUANCA

SALDO ACTUAL
( S/. )

6,737.87
300.00
9,126.27
50,573.40
34,371.60

101,109.15
16,379.69
117,488.86

l 31 DE MAYO 2011

QUEGUA

RISCAL NIETO

MEGUA

. FREDY MARCA HUANCA

SALDO ACTUAL
( S/. )

S/.

2164156.01

+'05.'!B17

Mensual
Acumulado
31,938.46
115,060.00
27,485.77
142,545.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Mensual
Acumulado

142,545.77

27,485.77

115,060.00

3,000,000
2,900,000
2,800,000
2,700,000
2,600,000
2,500,000
2,400,000
2,300,000
2,200,000
2,100,000
2,000,000
1,900,000
1,800,000
1,700,000
1,600,000
1,500,000
1,400,000
1,300,000
1,200,000
1,100,000
1,000,000
900,000
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0

31,938.46

CUADRO COMPARATIVO MO
OBRA: Mantenimiento de Losa Deportiva En la Junta
Samegua-

MONTO VALORIZADO (S/.)

Anterior
Mayo
Junio
Julio
Agosto
Setiembre

Anterior

Mayo

31,938.46
115,060.00

27,485.77
142,545.77

Acumulado

115,060.00

142,545.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CUADRO COMPARATIVO MONTO VS TIEMPO


OBRA: Mantenimiento de Losa Deportiva En la Junta Vecinal Miraflores - Comite 07, Distrito de
Samegua- Mariscal Nieto - Moquegua

Junio

Julio

Agosto

Setiembre

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

PERIODO MENSUAL 2011

0.00

0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT N 7
RESIDENTE DE OBRA
ING. EDY FLORES SOSA

VALORIZACIN N 01 MES DE MAYO 2011


OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

: OBRAS PRELIMINARES

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 17 DE MAYO DEL 2010

INSPECTOR DEOBRA

: ING FREDY FLORES SOSA

PARTIDA

DESCRIPCION

UND

PRESUPUESTO
METRADOS

P.U

02.00.00 OBRAS PRELIMINARES

AVANCE ACUMULADO ANTERIOR


PARCIAL

METRADO

AVANCE MES ACTUAL

MONTO

METRADO

MONTO

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

SALDO ACTUAL
METRADO

MONTO

26,970.79

02.01.00

DESMONTAJE DE ARCOS DE FUTBOL

02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

02.03.00

DEMOLICION DE MUROS DE CONTENCION EXISTENTE

02.04.00

TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA

02.05.00

MOVILIZACION Y DESMOVILIZACION

Und.
m2
m3
m2
glb

2.00

132.47

264.94

2.00

264.94

#########

0.00

0.00

0.00%

2.00

264.94

100.00%

0.00

0.00

160.00

17.73

2,836.80

160.00

2,836.80

#########

0.00

0.00

0.00%

160.00

2,836.80

100.00%

0.00

0.00

0.00%

52.50

230.10

12,080.25

33.17

7,632.42

63.18%

10.73

2,468.97 20.44%

43.90

10,101.39

83.62%

8.60

1,978.86

16.38%

720.00

1.79

1,288.80

0.00

0.00

0.00%

16.64

3.00

3,500.00

10,500.00

1.00

3,500.00

33.33%

1.00

COSTO DIRECTO (S/.)

29.79

0.00%

2.31%

16.64

29.79

2.31%

703.36

1,259.01

97.69%

3,500.00 33.33%

2.00

7,000.00

66.67%

1.00

3,500.00

33.33%

26,970.79

14,234.16

52.78%

5,998.76 22.24%

6,737.87

24.98%

2,427.37

2,427.37

1,281.07

52.78%

539.89 22.24%

1,820.96

75.02%

606.41

24.98%

GASTOS DE SUPERVISION

809.12

809.12

427.02

52.78%

179.96 22.24%

606.99

75.02%

202.14

24.98%

GASTOS DE LIQUIDACION

161.82

161.82

85.40

52.78%

35.99 22.24%

121.40

75.02%

40.43

24.98%

GASTOS GENERALES DE GESTION ADMINISTRATIVA

809.12

809.12

427.02

52.78%

179.96 22.24%

606.99

75.02%

202.14

24.98%

GASTOS GENERALES DE SEGURIDAD EN OBRA

161.82

161.82

85.40

52.78%

35.99 22.24%

121.40

75.02%

40.43

24.98%

4,369.27

2,305.93

52.78%

971.80 22.24%

3,277.73 75.02%

1,091.54

24.98%

31,340.06

16,540.09

52.78%

6,970.56 22.24%

23,510.65 75.02%

7,829.41

24.98%

GASTOS GENERALES

COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

INSPECTOR DE OBRA

20,232.92 75.02%

DESARROLLO DE LA CURVA "S"


OBRA

:Mejoramiento de Canal y Construccin del Reservorio Choja,


de la Localidad de Muylaque, Distrito de San Cristobal - Mariscal Nieto - Moque

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

ENTIDAD EJECUTORA

: MUNICIPALIDAD DISTRITAL DE SAN CRISTOBAL

FECHA DE INICIO DE OBRA


INSPECTOR DE OBRA

: 17 DE MAYO DEL 2010


: ING. J. MIGUEL TICONA MAQUERA

AVANCE DEL PROYECTO

Performance del Tiempo - Curva "S"


110%
Avance Prog.

100%

Avance Real

90%

Linear (Avance Real)

AVANCE (%)

80%

64.0%

70%

60.0%

60%
50%

45.0%

40%
30%

25.0%

20%
10%

2.5% 10.0%

0.0%

0.0%

0%

ANTERIOR

Presupuesto Proyectado (S/.)


Presup. Actual Total (S/.)
IC-Indice de Costo

Presupuesto Proyectado (S/.)


Presup. Actual Total (S/.)
IT-Indice de Tiempo

Indicadores de Costo
IC=1
El Costo del Proyecto es el Programado
0.95<IC<1.05
El Costo del Py tiene una variacin significativa
IC<0.95 >1.05
El Costo del Py tiene una variacin considerable

JUNIO

JULIO
ANTERIOR
28,312.70
31,938.46
1.13
MAYO
10.0%
2.5%
0.25

AGOSTO
JUNIO
70,781.76
115,060.00
1.63
JUNIO
25.0%
64.0%
2.56

Indicadores del Tiempo


IT=1
El Cronograma del Proyecto es el Programado
0.95<IC<1.05
El Crong. tiene una variacin significativa
IC<0.95 >1.05
El Crong. tiene una variacin considerable

COMENTARIOS SUPERVISOR - AVANCE DEL PROYECTO - ACCIONES A TOMAR

JULIO
127,407.17
0.00
0.00
JULIO
45.0%
0.0%
0.00

SOLICITUD DE CAMBIOS DEL PROYECTO

LECCIONES APRENDIDAS

SUPERVISOR

SUB GERENCIA DE SUPERVISION

Nombre:

Nombre:

Firma y Fecha :

Firma y Fecha

MEMORIA:

El usuario debera colocar en los casilleros donde indica estado, los calificativos de Muy Bueno, Bueno, Regular, Malo, Muy Malo

A CURVA "S"

rvorio Choja,
istobal - Mariscal Nieto - Moquegua

Curva "S"

100.0%
80.0%
60.0%

AGOSTO

0.0%
SETIEMBRE

0.0%
OCTUBRE

AGOSTO
169,876.22
0.00
0.00

SETIEMBRE
226,501.63
0.00
0.00

OCTUBRE
283,127.04
0.00
0.00

AGOSTO
60.0%
0.0%
0.00

SETIEMBRE
80.0%
0.0%
0.00

OCTUBRE
100.0%
0.0%
0.00

HITOS FASE EJECUCION - MDT


Inicio
Proyectado
01-05-10
Real
17-05-10

Fin
Proyectado
Real

283,127.04

30-09-10
14-10-10

A DE SUPERVISION

no, Bueno, Regular, Malo, Muy Malo

ESTADO

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL MIRAFLORES-COMIT 7
RESIDENTE DE OBRA DE OBRA
ING. FREDY MARCA SOSA

VALORIZACIN N 01 MES DE MAYO 2011


OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

: OBRAS Y TRABAJOS PROVICIONALES PROVISIONALES

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DEOBRA : ING. FREDY FLORES SOSA

PARTIDA

DESCRIPCION

UND

PRESUPUESTO
METRADOS

P.U

01.00.00 OBRAS Y TRABAJOS PROVISIONALES


01.01.00

CERCO PROVISIONAL DE ESTERAS

01.02.00

CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44

01.03.00

CASETA P/OFICINA RESIDENTE

01.04.00

LETRINA PROVISIONAL P/PERSONAL OBRERO

01.05.00

INSTALACION PROVISIONAL DE AGUA

01.06.00

INSTALACION PROVISIONAL DE ENERGIA ELECTRICA

01.07.00

ALMACEN Y CASETA DE GUARDIANIA

01.08.00

IMPLEMENTOS DE SEGURIDAD

AVANCE ACUMULADO ANTERIOR


PARCIAL

METRADO

MONTO

AVANCE MES ACTUAL


METRADO

MONTO

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

SALDO ACTUAL
METRADO

MONTO

13,549.94

m
Und.
m2
glb
glb
glb
m2
est.

100.00

17.73

1,773.00

100.00

1,773.00

100.00%

0.00

0.00

0.00%

100.00

1,773.00

100.00%

0.00

0.00

0.00%

1.00

957.81

957.81

1.00

957.81

100.00%

0.00

0.00

0.00%

1.00

957.81

100.00%

0.00

0.00

0.00%

24.00

155.49

3,731.76

24.00

3,731.76

100.00%

0.00

0.00

0.00%

24.00

3,731.76

100.00%

0.00

0.00

0.00%

1.00

243.57

243.57

1.00

243.57

100.00%

0.00

0.00

0.00%

1.00

243.57

100.00%

0.00

0.00

0.00%

1.00

455.88

455.88

1.00

455.88

100.00%

0.00

0.00

0.00%

1.00

455.88

100.00%

0.00

0.00

0.00%

1.00

455.88

455.88

0.00

0.00

0.00%

1.00

455.88

100.00%

1.00

455.88

100.00%

0.00

0.00

0.00%

36.00

25.89

932.04

36.00

932.04

100.00%

0.00

0.00

0.00%

36.00

932.04

100.00%

0.00

0.00

0.00%

1.00

5,000.00

5,000.00

1.00

5,000.00

100.00%

0.00

0.00

0.00%

1.00

5,000.00

100.00%

0.00

0.00

0.00%

COSTO DIRECTO (S/.)

13,549.94

13,094.06

96.64%

455.88

3.36%

0.00

0.00%

1,219.49

1,219.49

1,178.47

96.64%

41.03

3.36%

1,219.49

100.00%

0.00

0.00%

GASTOS DE SUPERVISION

406.50

406.50

392.82

96.64%

13.68

3.36%

406.50

100.00%

0.00

0.00%

GASTOS DE LIQUIDACION

81.30

81.30

78.56

96.64%

2.74

3.36%

81.30

100.00%

0.00

0.00%

406.50

406.50

392.82

96.64%

13.68

3.36%

406.50

100.00%

0.00

0.00%

81.30

81.30

78.56

96.64%

2.74

3.36%

81.30

100.00%

0.00

0.00%

2,195.09

2,121.24

96.64%

73.85

3.36%

2,195.09 100.00%

0.00

0.00%

15,745.03

15,215.30

96.64%

529.73

3.36%

15,745.03 100.00%

0.00

0.00%

GASTOS GENERALES

GASTOS GENERALES DE GESTION ADMINISTRATIVA


GASTOS GENERALES DE SEGURIDAD EN OBRA
COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

INSPECTOR DE OBRA

13,549.94 100.00%

SUSTENTACION DE METRADOS DE MOVIMIENTO DE TIERRAS


FECHA

PARTIDA :
OBRA

UBICACIN

Prog.
0+000
0+005
0+010
0+015
0+020
0+025
0+030
0+035
0+040
0+045
0+050
0+055
0+060

MEJORAMIENTO DE CANAL Y CONSTRUCCIN DE RESERVORIO CHOJA

PROPIETARIO

MUYLAQUE - MOQUEGUA

REALIZADO POR

corte
base
1.00
1.20
1.20
1.50
1.30
1.50
1.50
1.30
2.10
1.20

Resumen Volumenes
altura
1.30
1.60
1.20
1.70
1.60
3.50
5.00
2.00
1.50
1.30

Corte
4.80
3.60
6.38
5.20
13.13
18.75
6.50
7.88
3.90
0.00
0.00
0.00

Total Volumenes afectados por el coef

TRADOS DE MOVIMIENTO DE TIERRAS


MAYO - 2010
MUNICIPALIDAD DIST. SAN CRISTOBAL
BACH. ING. R.J.F.M.

70.13
Total Volumenes metrados
Total Volumenes afectados por el coef. de esponjamiento = 30%

#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!

SUSTENTACION DE METRADOS
FECHA

PARTIDA :
OBRA

UBICACIN

Prog.
0+205
0+210
0+215
0+220
0+225
0+230
0+235
0+240
0+245
0+250
0+255
0+260
0+265
0+270
0+275
0+280
0+285
0+290
0+295
0+300
0+305
0+310
0+315
0+320
0+325
0+330
0+335
0+340
0+345
0+350
0+355
0+360
0+365
0+370
0+375
0+380
0+385
0+390
0+395
0+400
0+405
0+410
0+415
0+420
0+425
0+430
0+435

MAYO - 2010

MEJORAMIENTO DE CANAL Y CONSTRUCCIN DE RESERVORIO CHOJA


PROPIETARIO

MUNICIPALIDAD DIST. SAN CRISTOBAL

MUYLAQUE - MOQUEGUA

BACH. ING. R.J.F.M.

corte
base

altura

REALIZADO POR

Area de corte
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Relleno
Ancho
Espesor

0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65

0.60
0.30
0.40
0.40
0.40
0.40
0.40
0.40
0.50
0.30
0.40
1.00
3.00
2.50
2.00
2.50
3.00
2.30
1.10

Area
Relleno
0.00
0.00
0.00
0.39
0.20
0.26
0.26
0.26
0.26
0.26
0.26
0.33
0.20
0.26
0.65
1.95
1.63
1.30
1.63
1.95
1.50
0.72

Longitud

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

Muro seco
altura

0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.80
0.90
1.20
3.50
2.80
2.10
2.65
3.15
2.50
1.40

0+440
0+445
0+450
0+455
0+460
0+465
0+470
0+475
0+480
0+485
0+490
0+495
0+500

0.00
0.00
0.00
0.00

#REF!
#REF!

Total Volumenes metrados


Volumenes afectados por el coef. de esponjamiento = 30%

ADOS

DIST. SAN CRISTOBAL

Muro seco
espesor

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

Corte
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Resumen Volumenes
excavacion
Relleno
#REF!
#REF!
#REF!
#REF!
1.95
#REF!
0.98
#REF!
1.30
#REF!
1.30
#REF!
1.30
#REF!
1.30
#REF!
1.30
#REF!
1.30
#REF!
1.63
#REF!
0.98
#REF!
1.30
#REF!
3.25
#REF!
9.75
#REF!
8.13
#REF!
6.50
#REF!
8.13
#REF!
9.75
#REF!
7.48
#REF!
3.58
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00

Muro seco
0.00
0.00
0.00
1.75
1.75
1.75
1.75
1.75
1.75
1.75
1.75
2.10
2.40
2.70
3.60
10.50
8.40
6.30
7.95
9.45
7.50
4.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

oef. de esponjamiento = 30%

0.00
0.00
0.00
0.00

0.00

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

0.00
0.00
0.00
0.00

71.18

0.00
0.00
0.00
0.00

79.10
79.10
102.83

FORMATO N 02 C.O.
MUNICIPALIDAD DISTRITAL
SAMEGUA

REPORTE DIARIO DE AVANCE DE OBRA


OBRA:
RESIDENTE:

FECHA:

SUP. / INSPEC.:
Item

Prog

Descripcin de Partida

MAESTRO DE OBRA

Unidad

CUADRILLA
OP OF
PE

N Veces

Metrado

Area

Largo

Ancho

V B

Altura

Total

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT N 7

METRADO

RESIDENTE DE OBRA

DE

ACE RO

ING. EDY FLORES SOSA

SECTOR:
...........................................................

UBICACIN

Mayo de 2011

ELEMENTO
DIA METRO

FORMA
O TIPO

CALCULO
LONGITUD
PESO DE ACERO SEGUN DIAMETRO
LONGITUD
N
TOTAL
1/4 "
3/8 "
1/2"
5/8"
3/4"
1"
0.25 KG / M 0.58 KG / M 1.02 KG / M 1.60 KG / M 2.29 KG / M 4. 00 KG / M
ELEMENTO

CALCULADO POR:

OBSERVA CIONES

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL MIRAFLORES-COMIT 7
RESIDENTE DE OBRA DE OBRA
ING. FREDY MARCA SOSA

VALORIZACIN N 01 M
OBRA

: Mantenimiento de Losa Deportiva en l

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

FORMULA

: IMPACTO AMBIENTAL

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

PARTIDA

DESCRIPCION

03.00.00 IMPACTO AMBIENTAL


03.01.00 MITIGACION DE IMPACTO AMBIENTAL

UND

glb

PRESUPUESTO
METRADOS

3.00

COSTO DIRECTO (S/.)


GASTOS GENERALES
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION
GASTOS GENERALES DE GESTION ADMINISTRATIVA
GASTOS GENERALES DE SEGURIDAD EN OBRA
COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

81.00
27.00
5.40
27.00
5.40

VALORIZACIN N 01 MES DE MAYO 2011


MES DE REPORTE

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

REGION

: ADMINISTRACION DIRECTA

PROVINCIA

: IMPACTO AMBIENTAL

DISTRITO

: 04 DE MAYO DEL 2011

INSPECTOR DEOBRA

PRESUPUESTO
P.U

AVANCE ACUMULADO ANTERIOR


PARCIAL

METRADO

MONTO

AVANCE MES ACTUAL


METRADO

MONTO

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

900.00
300.00

900.00

1.00

300.00

33.33%

1.00

300.00

33.33%

2.00

600.00

900.00

300.00

33.33%

300.00

33.33%

600.00

81.00

27.00

33.33%

27.00

33.33%

54.00

27.00

9.00

33.33%

9.00

33.33%

18.00

5.40

1.80

33.33%

1.80

33.33%

3.60

27.00

9.00

33.33%

9.00

33.33%

18.00

5.40

1.80

33.33%

1.80

33.33%

3.60

145.80

48.60
348.60

33.33%
33.33%

48.60
348.60

33.33%
33.33%

97.20
697.20

1,045.80

INSPECTOR DE OBRA

: 04 al 31 DE MAYO DEL 2011


: MOQUEGUA
: MARISCAL NIETO
: SAMEGUA
: ING. FREDY FLORES SOSA
AVANCE ACUMULADO ACTUAL
%

66.67%

66.67%
66.67%
66.67%
66.67%
66.67%
66.67%

66.67%
66.67%

SALDO ACTUAL
METRADO

1.00

MONTO

300.00

300.00
27.00
9.00
1.80
9.00
1.80
48.60
348.60

33.33%

33.33%
33.33%
33.33%
33.33%
33.33%
33.33%

33.33%
33.33%

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT N 7
RESIDENTE DE OBRA
ING. EDY FLORES SOSA

VALORIZACIN N 01 MES DE MAYO 2011


OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

: LOSA DEPORTIVA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2010

INSPECTOR DEOBRA : ING FREDY FLORES SOSA

PARTIDA

04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.02.00
04.02.01
04.02.02
04.02.03
04.03.00
04.03.01
04.04.00
04.04.01
04.04.02
04.04.03
04.04.04

DESCRIPCION

LOSA DEPORTIVA
MOVIMIENTOS DE TIERRAS
CORTE DE TERRENO NATURAL C/MAQUINARIA
PERFILADO Y COMPACTADO EN LOSA DEPORTIVA
BASE GRANULAR E=0.15m
EXCAVACION MANUAL P/SARDINEL SUMERGIDO
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140KG/CM2 P/ SARDINEL SUMERGIDO
CONCRETO F'C=140KG/CM2 PARA LOSA E=10CM
ENCOFRADO Y DESENCOFRADO PARA LOSA
PINTURA
PINTURA ESMALTE DE LOSA CON FRANJA 0.05m
OTROS
CURADO DE SUPERFICIES HORIZONTALES
JUNTAS RELLENAS CON ASFALTO
PINTURA ARCO DE FULBITO INCLUYE TABLERO DE BASKET
NET P/VOLEY INCL. PARANTES Y SOPORTE METALICO

UND

PRESUPUESTO
METRADOS

AVANCE ACUMULADO ANTERIOR


PARCIAL

METRADO

MONTO

AVANCE MES ACTUAL

METRADO

MONTO

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

SALDO ACTUAL
METRADO

MONTO

9,126.27
5,290.60
m3
m2
m2
m3
m3

24.00

0.50

12.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

12.00

160.00

8.68

1,388.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

1,388.80

160.00

19.98

3,196.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

3,196.80

1.20

26.10

31.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.20

31.32

24.00

27.57

661.68

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

661.68

1.20

274.43

329.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.20

329.32

16.00

37.77

604.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

16.00

604.32

8.00

29.62

236.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

8.00

236.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

369.19

557.48

1,170.60
m3
m2
m2

557.48
ml

369.19

1.51

557.48

2,107.60
m2
ml
est.
est.

160.00

7.35

1,176.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

1,176.00

40.00

5.79

231.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

40.00

231.60

2.00

100.00

200.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

200.00

1.00

500.00

500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

COSTO DIRECTO (S/.)


GASTOS GENERALES
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION
GASTOS GENERALES DE GESTION ADMINISTRATIVA
GASTOS GENERALES DE SEGURIDAD EN OBRA
COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

P.U

9,126.27

0.00

0.00%

0.00

0.00%

0.00

0.00%

821.36

821.36

0.00

0.00%

0.00

0.00%

0.00

0.00%

273.79

273.79

0.00

0.00%

0.00

0.00%

0.00

0.00%

54.76

54.76

0.00

0.00%

0.00

0.00%

0.00

0.00%

273.79

273.79

0.00

0.00%

0.00

0.00%

0.00

0.00%

54.76

54.76

0.00

0.00%

0.00

0.00%

0.00

0.00%

1,478.46

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

10,604.73

500.00

9,126.27
821.36
273.79
54.76
273.79
54.76
1,478.46
10,604.73

RESIDENTE DE OBRA

INSPECTOR DE OBRA

DEL 2011

ES SOSA

SALDO ACTUAL
%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT N 7
RESIDENTE DE OBRA
ING. EDY FLORES SOSA

VALORIZACIN N 01 MES
OBRA

: Mantenimiento de Losa Deportiva en la junta Vecina

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

FORMULA

: LOSA DEPORTIVA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2010

PARTIDA

05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06
05.03.07
05.03.08
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.05.00
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
05.06.00
05.06.01
05.06.02
05.06.03

DESCRIPCION

CERCO PERIMETRICO
MOVIMIENTOS DE TIERRAS
CORTE O EXCAVACION EN MATERIAL SUELTO MANUAL
EXCAVACION DE ZANJAS PARA ZAPATAS MANUAL
ACARREO DE MATERIAL EXCEDENTE HASTA 30m
RELLENO CON MATERIAL PRESTAMO SELECCIONADO
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ 10m3
OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS E=2" 1:12 (C:H)
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO H= 0.40m
SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210KG/CM2 ZAPATAS
ACERO FY= 4200KG/CM2 EN ZAPATAS
ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA
CONCRETO F'C=210KG/CM2 MUROS DE CONCRETO
ACERO FY= 4200KG/CM2 MUROS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
CONCRETO F'C=210KG/CM2 COLUMNAS
ACERO FY= 4200KG/CM2
CARPINTERIA METALICA
REPARACION PUERTA METALICA SECUNDARIA SEGN DISEO
CERCO METALICO MODULOS SEGN DISEO TIPO I
CERCO METALICO MODULOS SEGN DISEO TIPO II
PUERTA METALICA TIPO 1 SEGN DETALLE
PINTURA ANTICORROSIVA P/CARP. MET.
PINTURA
PINTURA ESMALTE EN COLUMNAS
PINTURA ESMALTE EN MUROS DE CONTENCION
PINTURA ESMALTE EN GRADERIAS
PINTURA ESMALTE EN SOBRECIMIENTOS
PINTURA ESMALTE EN CARPINTERIA METALICA
OTROS
ENSAYO DE SUELO
ENSAYO DE COMPACTACION
PRUEBA DE CALIDAD

UND

PRESUPUESTO
METRADOS

P.U

m3
m3
m3
m3
m3

358.00

0.50

40.00

30.41

40.00

17.40

250.00

77.91

398.00

23.57

m2
m2
m3

80.00

28.69

m3
KG
m2
m3
KG
m2
m3
KG
m2
Und.
Und.
m2
m2
m2
m2
m2
m2
m2
glb
glb
Und.

28.00

52.32

2.10

263.71

2.50

446.14

50.00

7.23

225.00

99.52

76.88

447.11

1,977.94

7.23

39.90

56.44

2.21

460.78

742.80

7.23

2.50

116.76

10.00

550.48

22.00

550.48

9.60

425.97

219.43

5.02

39.90

18.78

112.50

18.78

67.20

18.78

33.25

18.39

219.43

9.54

2.00

150.00

5.00

25.00

10.00

25.00

05.06.04
05.06.05
05.06.06
05.06.07

JUNTAS DE CONSTRUCCION CON TECKNOPORT


CURADO DE SUPERFICIES VERTICALES
SOLAQUEADO DE OBRAS DE CONCRETO ARMADO
IMPERMEABILIZACION DE MUROS CON ASFALTO

ml
m2
m2
m2

27.00
112.50

0.51

112.50

11.34

112.50

6.07

COSTO DIRECTO (S/.)


GASTOS GENERALES
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION
GASTOS GENERALES DE GESTION ADMINISTRATIVA
GASTOS GENERALES DE SEGURIDAD EN OBRA
COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

3.48

13,424.36
4,474.79
894.96
4,474.79
894.96

LORIZACIN N 01 MES DE MAYO 2011

de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

PRESUPUESTO

AVANCE ACUMULADO ANTERIOR


PARCIAL

METRADO

MONTO

AVANCE MES ACTUAL


METRADO

MONTO

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

PROVINCIA

: MARISCAL NIETO

DISTRITO

: SAMEGUA

INSPECTOR DEOBRA

: ING FREDY MARCA SOSA

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

SALDO ACTUAL
METRADO

149,159.60
30,949.76
179.00

211.83

105.92

59.17%

36.30

18.15

10.14%

248.13

124.07

69.31%

109.87

1,216.40

26.33

800.70

65.83%

13.67

415.70

34.18%

40.00

1,216.40

100.00%

0.00

696.00

29.15

507.21

72.88%

10.85

188.79

27.13%

40.00

696.00

100.00%

0.00

19,477.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

250.00

9,380.86

90.00

2,121.30

22.61%

0.00

0.00

0.00%

90.00

2,121.30

22.61%

308.00

4,313.95
2,295.20

64.65

1,854.81

80.81%

15.35

440.39

19.19%

80.00

2,295.20

100.00%

0.00

1,464.96

20.67

1,081.45

73.82%

0.00

0.00

0.00%

20.67

1,081.45

73.82%

7.33

553.79

1.03

271.62

49.05%

0.00

0.00

0.00%

1.03

271.62

49.05%

1.07

1,115.35

1.50

669.21

60.00%

0.00

0.00

0.00%

1.50

669.21

60.00%

1.00

361.50

25.62

185.23

51.24%

0.00

0.00

0.00%

25.62

185.23

51.24%

24.38

22,392.00

170.31

16,949.25

75.69%

54.69

5,442.75

24.31%

225.00

22,392.00

100.00%

0.00

34,373.82

59.08

26,415.26

76.85%

17.47

7,811.01

22.72%

76.55

34,226.27

99.57%

0.33

14,300.51

1,180.01

8,531.47

59.66%

797.93

5,769.03

40.34%

1,977.94

14,300.51

100.00%

0.00

2,251.96

31.00

1,749.64

77.69%

0.00

0.00

0.00%

31.00

1,749.64

77.69%

8.90

1,018.32

1.69

778.72

76.47%

0.00

0.00

0.00%

1.69

778.72

76.47%

0.52

5,370.44

380.74

2,752.75

51.26%

0.00

0.00

0.00%

380.74

2,752.75

51.26%

362.06

81,183.90

23,098.11
291.90

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.50

5,504.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

12,110.56

22.00

12,110.56

100.00%

0.00

0.00

0.00%

22.00

12,110.56

100.00%

0.00

4,089.31

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

9.60

1,101.54

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

219.43

6,828.92
749.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

39.90

2,112.75

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

112.50

1,262.02

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

67.20

611.47

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

33.25

2,093.36

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

219.43

300.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

125.00

0.00

0.00

0.00%

1.00

25.00

20.00%

1.00

25.00

20.00%

4.00

250.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

2,784.96

93.96

11.20

38.98

41.48%

0.00

0.00

0.00%

11.20

38.98

41.48%

15.80

57.38

35.46

18.08

31.52%

0.00

0.00

0.00%

35.46

18.08

31.52%

77.04

1,275.75

35.46

402.12

31.52%

54.70

620.30

48.62%

90.16

1,022.41

80.14%

22.34

682.88

84.15

510.79

74.80%

0.00

0.00

0.00%

84.15

510.79

74.80%

28.35

149,159.60

77,855.07

52.20%

20,731.13 13.90%

13,424.36

7,006.96

52.20%

1,865.80 13.90%

8,872.76

66.09%

4,474.79

2,335.65

52.20%

621.93 13.90%

2,957.59

66.09%

894.96

467.13

52.20%

124.39 13.90%

591.52

66.09%

4,474.79

2,335.65

52.20%

621.93 13.90%

2,957.59

66.09%

591.52

66.09%

894.96

467.13

52.20%

124.39 13.90%

24,163.85

12,612.52
90,467.59

52.20%
52.20%

3,358.44 13.90%
24,089.57 13.90%

173,323.45

INSPECTOR DE OBRA

98,586.19 66.09%

15,970.96 66.09%
114,557.16 66.09%

31 DE MAYO DEL 2011

UEGUA

SCAL NIETO

GUA

REDY MARCA SOSA


SALDO ACTUAL
MONTO

54.94

30.69%

0.00

0.00%

0.00

0.00%

19,477.50

100.00%

7,259.56

77.39%

0.00

0.00%

383.51

26.18%

282.17

50.95%

446.14

40.00%

176.27

48.76%

0.00

0.00%

147.55

0.43%

0.00

0.00%

502.32

22.31%

239.61

23.53%

2,617.69

48.74%

291.90

100.00%

5,504.80

100.00%

0.00

0.00%

4,089.31

100.00%

1,101.54

100.00%

749.32

100.00%

2,112.75

100.00%

1,262.02

100.00%

611.47

100.00%

2,093.36

100.00%

300.00

100.00%

100.00

80.00%

250.00

100.00%

54.98

58.52%

39.29

68.48%

253.34

19.86%

172.08

25.20%

50,573.40 33.91%
4,551.61 33.91%
1,517.20 33.91%
303.44 33.91%
1,517.20 33.91%
303.44 33.91%
8,192.89 33.91%
58,766.29 33.91%

MUNICIPALIDAD DISTRITAL DE SAMEGUA


JUNTA VECINAL COMIT N 7
RESIDENTE DE OBRA
ING. EDY FLORES SOSA

OBRA

VALORIZACIN N 01 M

: Mantenimiento de Losa Deportiva en la junt

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

FORMULA

: LOSA DEPORTIVA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2010

PARTIDA

06.00.00
06.01.00
06.01.01
06.01.02
06.01.03
06.01.04
06.02.00
06.02.01
06.03.00
06.03.01
06.03.02
06.03.03
06.04.00
06.04.01
06.04.02
06.04.03
06.04.04
06.04.05
06.04.06
06.04.07
06.05.00
06.05.01
06.05.02
06.06.00
06.06.01
06.06.02
06.06.03
06.06.04
06.06.05
06.06.06
06.06.07
06.06.08
06.06.09
06.06.10

DESCRIPCION

GRADERIAS Y AREAS VERDES


MOVIMIENTO DE TIERRA
CORTE O EXCAVACION MANUAL EN TERRENO NATURAL
RELLENO CON MATERIAL PROPIO C/EQUIPO
ACARREO DE MATERIAL EXCEDENTE HASTA 30M
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE
OBRAS DE CONCRETO SIMPLE
CONCRETO 1:10 + 30% P.G. P/CIMIENTO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175KG/CM2
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CARAVISTA
ACERO FY=4200KG/CM2
INSTALACIONES SANITARIAS
EMPALME DE TUBERIA A RED EXISTENTE DE PVC 4" C/ABRAZADERA DE 4" A 3/4"
CAJA CONCRETO 0.60X0.60X0.40M
CAJA DE CONCRETO P/MEDIDOR
EXCAVACION DE ZANJAS MANUAL P/AGUA
RELLENO CON MATERIAL PROPIO SELECCIONADO Y COMPACTADO
TUBERIA PVC SAP 3/4"
VALVULA COMPUERTA DE BRONCE DE 3/4"
PINTURA
PINTURA ESMALTE EN SARDINELES
PINTURA CON BREA EN JARDINERIAS
OTROS
JUNTAS RELLENAS CON ASFALTO
CAPSULAS PARA BASURERO SEGN DISEO
PREPARACION DE TERRENO P/JARDINERIA
SIEMBRA DE GRASS
SUMINISTRO E INSTALACION DE FLORES/ARBOLES
JARDINERIAS PARA INS/ARBOLES
ESTRUCTURA METALICA EN GRADERIA SEGN DISEO
SUMINISTRO E INSTALACION DE POSTES C/REFLECTOR
ILUMINACION DE CANCHA
REHUBICACION DE POSTES DE CONCRETO

UND

PRESUPUESTO
METRADOS

m3
m3
m3
m3

38.82

30.41

4.00

41.35

38.82

17.40

29.95

27.57

m3

28.82

193.94

m3
m2
kg

6.43

389.75

55.20

67.89

213.23

7.23

1.00

78.83

2.00

95.82

1.00

84.66

6.00

30.41

5.04

41.91

15.00

10.52

1.00

59.74

75.90

9.96

27.60

8.49

Und.
Und.
Und.
m3
m3
ml
Und.
m2
m2
ml
Und.
m2
m2
Und.
Und.
glb
Und.
glb
Und.

8.00

5.79

2.00

220.65

77.50

22.12

15.50

4.35

10.00

39.06

10.00

60.00

1.00

10,000.00

4.00

1,500.00

1.00

5,000.00

2.00

750.00

COSTO DIRECTO (S/.)


GASTOS GENERALES

P.U

3,955.35

GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION
GASTOS GENERALES DE GESTION ADMINISTRATIVA
GASTOS GENERALES DE SEGURIDAD EN OBRA
COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

1,318.45
263.69
1,318.45
263.69

ORIZACIN N 01 MES DE MAYO 2011

de Losa Deportiva en la junta Vecinal Miralores, Comit 7 del Distrito de Samegua

PRESUPUESTO

AVANCE ACUMULADO ANTERIOR


PARCIAL

METRADO

MONTO

AVANCE MES ACTUAL


METRADO

MONTO

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

PROVINCIA

: MARISCAL NIETO

DISTRITO

: SAMEGUA

INSPECTOR DEOBRA

: ING FREDY MARCA SOSA

AVANCE ACUMULADO ACTUAL


%

METRADO

MONTO

SALDO ACTUAL
METRADO

43,948.32
2,847.11
1,180.52

5.98

181.85

15.40%

0.00

0.00

0.00%

5.98

181.85

15.40%

32.84

165.40

4.00

165.40

100.00%

0.00

0.00

0.00%

4.00

165.40

100.00%

0.00

675.47

7.78

135.37

20.04%

0.00

0.00

0.00%

7.78

135.37

20.04%

31.04

825.72

7.80

215.05

26.04%

0.00

0.00

0.00%

7.80

215.05

26.04%

22.15

5.98

1,159.76

20.75%

0.00

0.00

0.00%

5.98

1,159.76

20.75%

22.84

2,506.09

6.43

2,506.09

100.00%

0.00

0.00

0.00%

6.43

2,506.09

100.00%

0.00

3,747.53

55.20

3,747.53

100.00%

0.00

0.00

0.00%

55.20

3,747.53

100.00%

0.00

1,541.65

202.72

1,465.67

95.07%

0.00

0.00

0.00%

202.72

1,465.67

95.07%

10.51

5,589.35
5,589.35

7,795.27

966.36
78.83

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

191.64

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

84.66

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

182.46

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

211.23

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.04

157.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.00

59.74

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

990.29
755.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

75.90

234.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

27.60

25,759.95
46.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

8.00

441.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

1,714.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

77.50

67.43

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.50

390.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

600.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

10,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

6,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

4.00

5,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

1,500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

43,948.32

9,576.72

21.79%

0.00

0.00%

9,576.72

21.79%

3,955.35

861.90

21.79%

0.00

0.00%

861.90

21.79%

1,318.45

287.30

21.79%

0.00

0.00%

287.30

21.79%

263.69

57.46

21.79%

0.00

0.00%

57.46

21.79%

1,318.45

287.30

21.79%

0.00

0.00%

287.30

21.79%

263.69

57.46

21.79%

0.00

0.00%

57.46

21.79%

7,119.63

1,551.43
11,128.15

21.79%
21.79%

0.00
0.00

0.00%
0.00%

1,551.43
11,128.15

21.79%
21.79%

51,067.95

INSPECTOR DE OBRA

1 DE MAYO DEL 2011

EGUA

CAL NIETO

GUA

REDY MARCA SOSA


SALDO ACTUAL
MONTO

998.66

84.60%

0.00

0.00%

540.10

79.96%

610.68

73.96%

4,429.59

79.25%

0.00

0.00%

0.00

0.00%

75.99

4.93%

78.83

100.00%

191.64

100.00%

84.66

100.00%

182.46

100.00%

211.23

100.00%

157.80

100.00%

59.74

100.00%

755.96

100.00%

234.32

100.00%

46.32

100.00%

441.30

100.00%

1,714.30

100.00%

67.43

100.00%

390.60

100.00%

600.00

100.00%

10,000.00

100.00%

6,000.00

100.00%

5,000.00

100.00%

1,500.00

100.00%

34,371.60
3,093.44

78.21%
78.21%

1,031.15
206.23
1,031.15
206.23
5,568.20
39,939.80

78.21%
78.21%
78.21%
78.21%

78.21%
78.21%

También podría gustarte

  • Hay Edy
    Hay Edy
    Documento1 página
    Hay Edy
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Topografia Proyecto Productivo Los Andes
    Topografia Proyecto Productivo Los Andes
    Documento4 páginas
    Topografia Proyecto Productivo Los Andes
    Edy Juan Flores Sosa
    100% (1)
  • Organized
    Organized
    Documento18 páginas
    Organized
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Lectura de Planos
    Lectura de Planos
    Documento87 páginas
    Lectura de Planos
    Leidys Paola Daza Molina
    100% (11)
  • Grado Académico
    Grado Académico
    Documento2 páginas
    Grado Académico
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Sesion de Aprendizaje N°04
    Sesion de Aprendizaje N°04
    Documento67 páginas
    Sesion de Aprendizaje N°04
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Ciclos
    Ciclos
    Documento1 página
    Ciclos
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Sio Eros
    Sio Eros
    Documento1 página
    Sio Eros
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Yamelinidor
    Yamelinidor
    Documento1 página
    Yamelinidor
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Pilotos
    Pilotos
    Documento1 página
    Pilotos
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Elio Ptero Sos
    Elio Ptero Sos
    Documento1 página
    Elio Ptero Sos
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • 3.-Suelos Freddy2
    3.-Suelos Freddy2
    Documento26 páginas
    3.-Suelos Freddy2
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • TELEDETECCION
    TELEDETECCION
    Documento13 páginas
    TELEDETECCION
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • TDR - Petroleo Asequia Ok
    TDR - Petroleo Asequia Ok
    Documento2 páginas
    TDR - Petroleo Asequia Ok
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Chino
    Chino
    Documento12 páginas
    Chino
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • El
    El
    Documento1 página
    El
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Ciloso
    Ciloso
    Documento1 página
    Ciloso
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Movim Materiales Camal
    Movim Materiales Camal
    Documento98 páginas
    Movim Materiales Camal
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Libro 1
    Libro 1
    Documento1 página
    Libro 1
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Ujm Promedios Alumnos
    Ujm Promedios Alumnos
    Documento6 páginas
    Ujm Promedios Alumnos
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Autorizacion Oficial de Viaje Yunga
    Autorizacion Oficial de Viaje Yunga
    Documento3 páginas
    Autorizacion Oficial de Viaje Yunga
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Chino
    Chino
    Documento12 páginas
    Chino
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Ejercicio en Clase (Pelicano)
    Ejercicio en Clase (Pelicano)
    Documento3 páginas
    Ejercicio en Clase (Pelicano)
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Panel Fotogrfico Antes
    Panel Fotogrfico Antes
    Documento1 página
    Panel Fotogrfico Antes
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Estado Situacional Físico Financiero de La Obra
    Estado Situacional Físico Financiero de La Obra
    Documento20 páginas
    Estado Situacional Físico Financiero de La Obra
    Edy Juan Flores Sosa
    50% (2)
  • Clasificacion de Los Suelos
    Clasificacion de Los Suelos
    Documento69 páginas
    Clasificacion de Los Suelos
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Inf. Mensual de Agosto 2011 Ok
    Inf. Mensual de Agosto 2011 Ok
    Documento26 páginas
    Inf. Mensual de Agosto 2011 Ok
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • 3 Memoria Colegios OK
    3 Memoria Colegios OK
    Documento12 páginas
    3 Memoria Colegios OK
    Edy Juan Flores Sosa
    Aún no hay calificaciones
  • Informe Final Agencia Agraria
    Informe Final Agencia Agraria
    Documento178 páginas
    Informe Final Agencia Agraria
    Edy Juan Flores Sosa
    Aún no hay calificaciones