Project Work Breakdown Structure:

New School of Business and Administration (SBA) building)


1 Concrete / construction work
1.1 Contact general contractor
1.2 Construction labor
1.3 Demolition and Excavation
1.4 Pour Foundation
1.5 Raft
1.5.1.1 water proofing
1.5.1.2 reinforcing Steel for raft
1.5.1.3 Concrete Pour
1.5.1.4 Installing the Rafts
1.6 Retaining Walls
1.6.1.1 reinforcing Steel
1.6.1.2 retaining wall
1.7 Pour floors
1.8 Pour stairways
2 Framing
2.1 Frame exterior walls
2.1.1.1 Roof Water Proofing
2.1.1.2 GRC Works
2.1.1.3 GRP Dome
2.1.1.4 MEP install Proof
2.2 Frame interior walls
3 Interior
3.1 Walls
3.1.1Build walls
3.1.2Paint walls
3.2 Flooring
3.2.1 Fit in carpets
3.1.1 fit in tiles
3.2 Ceiling
3.3 Windows
3.4 Electrical
3.4.1 Install wiring
3.4.2 Install lighting
3.4.2.1 Install neon bulbs
3.4.2.2 Install sensor system
3.4.2.3 Install dimming and lighting system in classrooms
3.4.3 Install outlet/switches
3.5 Install MEP
3.5.1 Ground Floor
3.5.2 First Floor
3.5.3 Second Floor
4 Install fire alarm system
4.1 Install water reels
4.2 Embedded sprinklers
5 External Works
5.1 Chiller and Piping Installation
5.2 Testing and Commisioning
5.3 Cleaning and Handover
5.4 Handover