Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Cap3 Cielo Abierto
Cap3 Cielo Abierto
M
E
R
O
D
E
C
A
M
I
O
N
E
S
C
A
R
G
A
D
O
S
P
O
R
T
U
R
N
O
T
I
E
M
P
O
D
E
E
S
P
E
R
A
A
C
U
M
U
L
A
T
I
V
O
-
M
I
N
U
T
O
S
B
U
E
N
A R
E
G
U
L
A
R
NMERO DE CAMIONES ASIGNADO A ESTA PALA DE UNA FLOTA DE 12 CAMIONES OPERATIVOS
MALA
REGULAR
MALA
REGULAR
BUENA
EXCAVACIN
BUENA
EXCAVACIN
M
A
L
A
E
X
C
A
V
A
C
I
N
Figura 3.3
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_______Peter N. Calder
TITAN - 2000
Figura 3.4A
Grfico Dinmico de Retardo
A
L
T
U
R
A
E
N
L
I
B
R
A
S
P
E
S
O
E
N
K
I
L
G
R
A
M
O
S
R
E
S
I
S
T
E
N
C
I
A
T
O
T
A
L
E
N
P
O
R
C
E
N
T
A
J
E
F
U
E
R
Z
A
E
N
L
I
B
R
A
S
F
U
E
R
Z
A
E
N
K
I
L
G
R
A
M
O
S
VELOCIDAD
Tpicos de Ingeniera en MInas a Rajo Abierto, Captulo 3________ Peter N. Calder
Figura 3.4B
TITAN - 2000
Grfico de Rendimiento
P
E
S
O
E
N
L
I
B
R
A
S
P
E
S
O
E
N
K
I
L
G
R
A
M
O
S
R
E
S
I
S
T
E
N
C
I
A
T
O
T
A
L
E
N
P
O
R
C
E
N
T
A
J
E
F
U
E
R
Z
A
E
N
L
I
B
R
A
S
F
U
E
R
Z
A
E
N
K
I
L
G
R
A
M
O
S
VELOCIDAD
Tpicos de Ingeniera en MInas a Rajo Abierto, Captulo 3________ Peter N. Calder
24,390 Kg.
36,633 Kg.
FIGURE 3.5 - A FIGURE 3.5 - B
A
B
C
D
FIGURA 3.5 A
FIGURA 3.5 B
Figura 3.6 - Red de caminos utilizada en Ejemplo 3.1 para clculos de tiempos de ciclo
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_____ Peter N. Calder
time = 1020 sec.
Figure 3.7 - A general road network diagram.
Figura 3.7 - Diagrama general de una red de caminos
CICLO
Trfico en Camino 33
Chancadora
EAGLE-22
Camino 46
Camino 47
en espera
Pala
Botadero
tiempo = 1020 seg.
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_____ Peter N. Calder
0
50
100
150
200
250
300
350
400
450
500
Number of
Loads
4 8 12 16 20 24 28 32 36
Number of Trucks
Figure 3.af - Simulation Study Results,
Number of Loads vs Truck Fleet Size.
Fixed
Auto.
Figure 3.8A -
Nmero de
cargas
Figura 3.8A - Resultados del estudio de simulacin -
Nmero de cargas vs. Tamao de la flota de camiones
Nmero de camiones
Fijo
Auto.
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3____________ Peter N. Calder
0
20
40
60
80
100
120
$/Load.
4 8 12 16 20 24 28 32 36
Number of Trucks.
Figure 3.af2 - Simulation Study Results, $/Load vs
Fleet Size.
$/load fixed
$/load auto
Figure 3.8B -
Figura 3.8B - Resultados del estudio de simulacin. $/carga vs. tamao de la flota
$/carga
$/carga fijo
$/carga auto.
Nmero de camiones
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_____________ Peter N. Calder
TABLA 1: VALORES TIPICOS PARA RESISTENCIA A LA RODADURA
SUPERFICIE DEL TERRENO RESISTENCIA A LA RODADURA
(pendiente equivalente y pendiente del
camino de tranporte)
Asfalto 1.5
Concreto 1.5
Terreno llano, duro, seco, bien
mantenido, libre de material suelto
2.0
Terreno seco, pero no slidamente
compacto
3.0
Terreno suave, sin arar, con escasa
mantencin
4.0
Terreno suave, arado 8.0
Terreno con rellenos poco slidos 8.0
Terreno profundamente surcado 16.0
Terreno de ripio muy compacto; seco;
libre de material suelto
2.0
Terreno de ripio no firmemente
compacto, pero seco
3.0
Terreno de ripio con material suelto 10.0
Terreno fangoso, pero slido 4.0
Terreno fangoso suave, poroso 16.0
Terreno arenoso, con material suelto 10.0
Terreno nevado y compacto 2.5
Terreno nevado con 4 de profundidad,
material suelto
4.5
Tabla 3.1 - Valores tpicos de resistencia a la rodadura
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3______ Peter N. Calder
Peter N. Calder, Topics in Open Pit Engineering, Chapter 3
Velocity kph Velocity mph Rimpull Lb Retard Lb Weight Lb Grade Propel Lb Brake Lb Roll. Res.
0 0 160,000 185,000 673,000 0 149,905 195,095 0
1.6 1 157,000 185,000 146,905 195,095
3.2 2 155,000 150,000 144,905 160,095
4.8 3 150,000 90,000 139,905 100,095
6.4 4 120,000 78,000 109,905 88,095
8.0 5 105,000 70,000 94,905 80,095
9.7 6 92,000 69,000 81,905 79,095
11.3 7 83,000 69,000 72,905 79,095
12.9 8 74,000 70,000 63,905 80,095
14.5 9 67,000 72,000 56,905 82,095
16.1 10 60,000 77,000 49,905 87,095
17.7 11 55,000 80,000 44,905 90,095
19.3 12 51,000 81,000 40,905 91,095
20.9 13 47,000 81,000 36,905 91,095
22.5 14 44,000 79,000 33,905 89,095
24.1 15 40,000 72,000 29,905 82,095
25.7 16 38,000 71,000 27,905 81,095
27.4 17 36,000 70,000 25,905 80,095
29.0 18 34,000 68,000 23,905 78,095
30.6 19 33,000 63,000 22,905 73,095
32.2 20 32,000 60,000 21,905 70,095
33.8 21 30,000 56,000 19,905 66,095
35.4 22 28,000 55,000 17,905 65,095
37.0 23 27,000 52,000 16,905 62,095
38.6 24 26,000 50,000 15,905 60,095
40.2 25 25,000 45,000 14,905 55,095
41.8 26 24,000 40,000 13,905 50,095
43.5 27 23,000 36,000 12,905 46,095
45.1 28 22,000 33,000 11,905 43,095
46.7 29 21,000 30,000 10,905 40,095
48.3 30 20,000 27,000 9,905 37,095
TABLE 3.2A - PERFORMANCE CHARTS FOR A TITAN 2000 HAULAGE TRUCK
ROAD GRADE = 0%, TRUCK IS LOADED, ROLLING RESISTANCE IS 1.5%.
RESULTANT PROPEL AND BRAKING FORCES ARE GIVEN.
PERFORMANCE
CHART
RESULTANT
FORCES
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_____________ Peter N. Calder
Tabla 3.2A - Tabla de referencia de grficos de rendimiento para un camin Titan 2000 cargado
que circula en superficie horizontal con una resistencia a la rodadura del 1.5%. Se dan las
fuerzas resultantes de propulsin y frenado.
GRFICO DE
RENDIMIENTO
FUERZAS
RESULTANTES
Velocidad kph Velocidad mph
Fuerza
Rimpull Lb
Retardo Lb. Peso Lb. Pendiente Propulsin Lb. Frenado Lb. Resis. Rod.
0.015
Peter N. Calder, Topics in Open Pit Mine Engineering, Chaptrer 3
Velocity kph Velocity mph Rimpull Lb Retard Lb Weight Lb Grade Propel Lb Brake Lb Roll. Res.
0 0 160,000 185,000 273,000 0.00 155,905 189,095 0.015
1.6 1 157,000 185,000 152,905 189,095
3.2 2 155,000 150,000 150,905 154,095
4.8 3 150,000 90,000 145,905 94,095
6.4 4 120,000 78,000 115,905 82,095
8.0 5 105,000 70,000 100,905 74,095
9.7 6 92,000 69,000 87,905 73,095
11.3 7 83,000 69,000 78,905 73,095
12.9 8 74,000 70,000 69,905 74,095
14.5 9 67,000 72,000 62,905 76,095
16.1 10 60,000 77,000 55,905 81,095
17.7 11 55,000 80,000 50,905 84,095
19.3 12 51,000 81,000 46,905 85,095
20.9 13 47,000 81,000 42,905 85,095
22.5 14 44,000 79,000 39,905 83,095
24.1 15 40,000 72,000 35,905 76,095
25.7 16 38,000 71,000 33,905 75,095
27.4 17 36,000 70,000 31,905 74,095
29.0 18 34,000 68,000 29,905 72,095
30.6 19 33,000 63,000 28,905 67,095
32.2 20 32,000 60,000 27,905 64,095
33.8 21 30,000 56,000 25,905 60,095
35.4 22 28,000 55,000 23,905 59,095
37.0 23 27,000 52,000 22,905 56,095
38.6 24 26,000 50,000 21,905 54,095
40.2 25 25,000 45,000 20,905 49,095
41.8 26 24,000 40,000 19,905 44,095
43.5 27 23,000 36,000 18,905 40,095
45.1 28 22,000 33,000 17,905 37,095
46.7 29 21,000 30,000 16,905 34,095
48.3 30 20,000 27,000 15,905 31,095
TABLE 3.2B - PERFORMANCE CHARTS FOR A TITAN 2000 HAULAGE TRUCK
ROAD GRADE = 0%, TRUCK IS EMPTY, ROLLING RESISTANCE IS 1.5%.
RESULTANT PROPEL AND BRAKING FORCES ARE GIVEN.
PERFORMANCE
CHART
RESULTANT
FORCES
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_______ Peter N. Calder
Tabla 3.2B - Tabla de referencia de grficos de rendimiento para un camin Titan
2000 descargado, circulando en superficie horizontal, con una resistencia a la
rodadura de 1.5%. Se dan las fuerzas resultantes de propulsin y frenado.
GRFICO DE
RENDIMIENTO
FUERZAS
RESULTANTES
Velocidad kph Velocidad mph Rimpull Lb. Retardo Lb. Peso Lb. Pendiente Propulsin Lb. Frenado Lb. Res. Rod.
Peter N. Calder, Topics in Open Pit Engineering, Chapter 3
Velocity kph Velocity mph Rimpull Lb Retard Lb Weight Lb Grade Propel Lb Brake Lb Roll. Res.
0 0 160,000 185,000 673,000 0.10 82,605 127,795 0.015
1.6 1 157,000 185,000 79,605 127,795
3.2 2 155,000 150,000 77,605 92,795
4.8 3 150,000 90,000 72,605 32,795
6.4 4 120,000 78,000 42,605 20,795
8.0 5 105,000 70,000 27,605 12,795
9.7 6 92,000 69,000 14,605 11,795
11.3 7 83,000 69,000 5,605 11,795
12.9 8 74,000 70,000 -3,395 12,795
14.5 9 67,000 72,000 -10,395 14,795
16.1 10 60,000 77,000 -17,395 19,795
17.7 11 55,000 80,000 -22,395 22,795
19.3 12 51,000 81,000 -26,395 23,795
20.9 13 47,000 81,000 -30,395 23,795
22.5 14 44,000 79,000 -33,395 21,795
24.1 15 40,000 72,000 -37,395 14,795
25.7 16 38,000 71,000 -39,395 13,795
27.4 17 36,000 70,000 -41,395 12,795
29.0 18 34,000 68,000 -43,395 10,795
30.6 19 33,000 63,000 -44,395 5,795
32.2 20 32,000 60,000 -45,395 2,795
33.8 21 30,000 56,000 -47,395 -1,205
35.4 22 28,000 55,000 -49,395 -2,205
37.0 23 27,000 52,000 -50,395 -5,205
38.6 24 26,000 50,000 -51,395 -7,205
40.2 25 25,000 45,000 -52,395 -12,205
41.8 26 24,000 40,000 -53,395 -17,205
43.5 27 23,000 36,000 -54,395 -21,205
45.1 28 22,000 33,000 -55,395 -24,205
46.7 29 21,000 30,000 -56,395 -27,205
48.3 30 20,000 27,000 -57,395 -30,205
TABLE 3.2C - PERFORMANCE CHARTS FOR A TITAN 2000 HAULAGE TRUCK
ROAD GRADE = 10%, TRUCK IS LOADED, ROLLING RESISTANCE IS 1.5%.
RESULTANT PROPEL AND BRAKING FORCES ARE GIVEN.
PERFORMANCE
CHART
RESULTANT
FORCES
BEYOND 33 KPH, TRUCK CAN NOT
STOP WITH DYNAMIC BRAKES.
Tpicos de Ingeniera de Minas a Rajo Abierto, Captulo 3__________Peter N. Calder
Tabla 3.2C - Tabla de referencia de grficos para un camin Titan 2000 cargado,
circulando en una pendiente del 10% con una resistencia a la rodadura de 1.5%.
Se dan las fuerzas de propulsin y frenado.
GRFICO DE
RENDIMIENTO
FUERZAS
RESULTANTES
Velocidad kph Velocidad mph Rimpull Lb. Retardo Lb. Peso Lb. Pendiente Propulsin Lb. Resis. Rod. Frenado Lb.
SUPERANDO LOS 33 KPH., EL CAMIN NO
PUEDE DETENERSE CON EL SISTEMA
DINMICO DE FRENOS
Peter N. Calder, Topics in Open Pit Engineering, Chapter 3
Velocity kph Velocity mph Rimpull Lb Retard Lb Weight Lb Grade Propel Lb Brake Lb Roll. Res.
0 0 160,000 185,000 273,000 0.10 128,605 161,795 0.015
1.6 1 157,000 185,000 125,605 161,795
3.2 2 155,000 150,000 123,605 126,795
4.8 3 150,000 90,000 118,605 66,795
6.4 4 120,000 78,000 88,605 54,795
8.0 5 105,000 70,000 73,605 46,795
9.7 6 92,000 69,000 60,605 45,795
11.3 7 83,000 69,000 51,605 45,795
12.9 8 74,000 70,000 42,605 46,795
14.5 9 67,000 72,000 35,605 48,795
16.1 10 60,000 77,000 28,605 53,795
17.7 11 55,000 80,000 23,605 56,795
19.3 12 51,000 81,000 19,605 57,795
20.9 13 47,000 81,000 15,605 57,795
22.5 14 44,000 79,000 12,605 55,795
24.1 15 40,000 72,000 8,605 48,795
25.7 16 38,000 71,000 6,605 47,795
27.4 17 36,000 70,000 4,605 46,795
29.0 18 34,000 68,000 2,605 44,795
30.6 19 33,000 63,000 1,605 39,795
32.2 20 32,000 60,000 605 36,795
33.8 21 30,000 56,000 -1,395 32,795
35.4 22 28,000 55,000 -3,395 31,795
37.0 23 27,000 52,000 -4,395 28,795
38.6 24 26,000 50,000 -5,395 26,795
40.2 25 25,000 45,000 -6,395 21,795
41.8 26 24,000 40,000 -7,395 16,795
43.5 27 23,000 36,000 -8,395 12,795
45.1 28 22,000 33,000 -9,395 9,795
46.7 29 21,000 30,000 -10,395 6,795
48.3 30 20,000 27,000 -11,395 3,795
TABLE 3.2D - PERFORMANCE CHARTS FOR A TITAN 2000 HAULAGE TRUCK
ROAD GRADE = 10%, TRUCK IS EMPTY, ROLLING RESISTANCE IS 1.5%.
RESULTANT PROPEL AND BRAKING FORCES ARE GIVEN.
PERFORMANCE
CHART
RESULTANT
FORCES
Tpicos de Ingeniera de Minas a Rajo Abierto, Captulo 3__________ Peter N. Calder
Tabla 3.2D - Tabla de referencia de grficos de rendimiento para un camin Titan
2000 descargado circulando en una pendiente del 10%, con una resistencia a la
rodadura de 1.5%. Se dan las fuerzas resultantes de propulsin y frenado.
GRFICO DE
RENDIMIENTO
FUERZAS
RESULTANTES
Velocidad kph Velocidad mph Rimpull Lb. Retardo Lb. Peso Lb. Pendiente Propulsin Lb. Frenado Lb. Resis. Rod.
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 3.3 - MOTION CALCULATIONS BASED ON
PERFORMANCE CHARTS FOR A TITAN 2000
HAULAGE TRUCK. ROAD GRADE IS 0%, TRUCK IS
LOADED, ROLLING RESISTANCE IS 1.5%
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 0.00 0.00 0.00
1 149,905 7.17 1.09 3.59 7.17 4.89 7.87
2 109,905 5.26 4.08 13.39 12.43 8.48 13.64
3 63,905 3.06 8.34 27.35 15.49 10.56 16.99
4 49,905 2.39 13.42 44.03 17.88 12.19 19.61
5 40,905 1.96 19.17 62.88 19.83 13.52 21.76
6 36,905 1.77 25.48 83.60 21.60 14.73 23.70
7 33,905 1.62 32.31 106.01 23.22 15.83 25.48
8 29,905 1.43 39.61 129.95 24.65 16.81 27.05
9 27,905 1.34 47.33 155.27 25.99 17.72 28.51
10 25,905 1.24 55.44 181.87 27.23 18.56 29.87
11 23,905 1.14 63.91 209.67 28.37 19.34 31.13
12 22,905 1.10 72.72 238.59 29.47 20.09 32.33
13 21,905 1.05 81.86 268.58 30.51 20.80 33.48
14 21,905 1.05 91.32 299.62 31.56 21.52 34.63
15 19,905 0.95 101.09 331.66 32.51 22.17 35.68
16 17,905 0.86 111.13 364.60 33.37 22.75 36.62
17 17,905 0.86 121.43 398.40 34.23 23.34 37.56
18 16,905 0.81 131.99 433.03 35.04 23.89 38.44
19 16,905 0.81 142.79 468.47 35.85 24.44 39.33
20 15,905 0.76 153.83 504.70 36.61 24.96 40.17
21 15,905 0.76 165.11 541.68 37.37 25.48 41.00
22 14,905 0.71 176.61 579.41 38.08 25.96 41.78
23 14,905 0.71 188.32 617.85 38.79 26.45 42.57
24 13,905 0.67 200.25 656.97 39.46 26.90 43.30
25 13,905 0.67 212.38 696.76 40.12 27.36 44.03
26 12,905 0.62 224.70 737.20 40.74 27.78 44.70
27 12,905 0.62 237.21 778.25 41.36 28.20 45.38
28 11,905 0.57 249.91 819.89 41.93 28.59 46.01
29 11,905 0.57 262.77 862.11 42.50 28.98 46.63
30 11,905 0.57 275.81 904.89 43.07 29.36 47.26
31 10,905 0.52 289.02 948.22 43.59 29.72 47.83
32 10,905 0.52 302.39 992.07 44.11 30.08 48.40
33 9,905 0.47 315.90 1036.42 44.59 30.40 48.92
34 9,905 0.47 329.57 1081.24 45.06 30.72 49.44
35 9,905 0.47 343.37 1126.54 45.53 31.04 49.96
36 9,905 0.47 357.32 1172.31 46.01 31.37 50.48
37 9,905 0.47 371.42 1218.55 46.48 31.69 51.00
38 9,905 0.47 385.66 1265.27 46.96 32.01 51.52
39 9,905 0.47 400.04 1312.46 47.43 32.34 52.04
Velocity
APPROXIMATELT 30 SECONDS ARE REQUIRED TO ACCELERATE FROM 0
TO 30 MPH, THE MAXIMUM RECOMMENDED SPEED.
Tpicos en Ingeniera de Minas a Rajo Abierto, Captulo 3__________ Peter N. Calder
Tabla 3.3 - Clculos de movimiento basados en
grficos de rendimiento de un camin Titan 2000,
el cual circula cargado en una pendiente de 0% y
una resistencia a la rodadura de 1.5%
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
Velocidad
Pies/Seg. MPH KPH
Se requieren aproximadamente 30 segundos para
acelerar desde 0 a 30 MPH, la velocidad mxima
recomendada
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 3.4 - MOTION CALCULATIONS BASED ON
PERFORMANCE CHARTS FOR A TITAN 2000
HAULAGE TRUCK. ROAD GRADE IS 0%, TRUCK IS
EMPTY, ROLLING RESISTANCE IS 1.5%
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 0.00 0.00 0.00
1 155,905 18.39 2.80 9.19 18.39 12.54 20.18
2 46,905 5.53 9.25 30.35 23.92 16.31 26.25
3 33,905 4.00 17.15 56.27 27.92 19.04 30.64
4 28,905 3.41 26.18 85.89 31.33 21.36 34.38
5 25,905 3.06 36.20 118.75 34.39 23.44 37.73
6 22,905 2.70 47.09 154.49 37.09 25.29 40.69
7 20,905 2.47 58.77 192.81 39.55 26.97 43.40
8 19,905 2.35 71.18 233.53 41.90 28.57 45.98
9 17,905 2.11 84.28 276.49 44.01 30.01 48.29
Velocity
THE TRUCK ACCELERATES TO THE MAXIMUM
RECOMMENDED SPEED IN 9 SECONDS.
Tpicos en Ingeniera de Minas a Rajo Abierto, Captulo 3______Peter N. Calder
Tabla 3.4 - Clculos de movimiento basados en grficos de
rendimiento de un camin Titan 2000 descargado,
circulando en una pendiente de 0% y una resistencia a la
rodadura de 1.5%
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
Velocidad
Pies/Seg. MPH KPH
El camin acelera hasta alcanzar la mxima
velocidad recomendada en 9 segundos
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 3.5 - BRAKING CALCULATIONS FOR A TITAN 2000
HAULAGE TRUCK. ROAD GRADE IS 0%, TRUCK IS
LOADED, ROLLING RESISTANCE IS 1.5%.
Time Force Accel. DistanceDistance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 36.67 25.00 40.23
1 55095 -2.64 10.77 35.35 34.03 23.20 37.34
2 62095 -2.97 20.69 67.90 31.06 21.18 34.08
3 66095 -3.16 29.68 97.37 27.90 19.02 30.61
4 73095 -3.50 37.65 123.52 24.40 16.64 26.77
5 81095 -3.88 44.50 145.99 20.52 13.99 22.52
6 91095 -4.36 50.09 164.33 16.16 11.02 17.73
7 90095 -4.31 54.36 178.33 11.85 8.08 13.00
8 80095 -3.83 57.39 188.27 8.02 5.47 8.80
9 80095 -3.83 59.25 194.37 4.19 2.85 4.59
10 160095 -7.66 59.35 194.73 -3.47 -2.37 -3.81
Velocity
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_____Peter N. Calder
Tabla 3.5 - Clculos de frenado de un camin de
transporte Titan 2000, que circula cargado en una
pendiente de 0% y una resistencia a la rodadura de
1.5%
Tiempo
Seg.
Velocidad
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
Pies/Seg. MPH KPH
El camin circulando a 25 MPH, se detiene en 9 segundos
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 3.6 - MOTION CALCULATIONS BASED ON
PERFORMANCE CHARTS FOR A TITAN 2000
HAULAGE TRUCK. ROAD GRADE IS 10%, TRUCK
IS EMPTY, ROLLING RESISTANCE IS 1.5%
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 0.00 0.00 0.00
1 128,605 15.17 2.31 7.58 15.17 10.34 16.64
2 28,605 3.37 7.45 24.44 18.54 12.64 20.35
3 19,605 2.31 13.45 44.14 20.86 14.22 22.88
4 12,605 1.49 20.04 65.74 22.34 15.23 24.51
5 8,605 1.01 27.00 88.59 23.36 15.92 25.63
6 8,605 1.01 34.28 112.45 24.37 16.62 26.74
7 6,605 0.78 41.82 137.21 25.15 17.15 27.60
8 4,605 0.54 49.57 162.63 25.69 17.52 28.19
9 4,605 0.54 57.49 188.60 26.24 17.89 28.79
10 4,605 0.54 65.57 215.11 26.78 18.26 29.38
11 2,605 0.31 73.78 242.04 27.09 18.47 29.72
12 2,605 0.31 82.08 269.28 27.39 18.68 30.06
13 2,605 0.31 90.48 296.83 27.70 18.89 30.40
14 2,605 0.31 98.97 324.69 28.01 19.10 30.73
15 1,605 0.19 107.53 352.79 28.20 19.23 30.94
16 1,605 0.19 116.16 381.09 28.39 19.35 31.15
17 1,605 0.19 124.84 409.57 28.58 19.48 31.36
18 1,605 0.19 133.58 438.24 28.77 19.61 31.56
19 1,605 0.19 142.37 467.10 28.96 19.74 31.77
20 1,605 0.19 151.23 496.15 29.15 19.87 31.98
Velocity
THE TRUCK REACHES A STEADY STATE VELOCITY OF 32
KPH IN APPROXIMATELY 20 SECONDS.
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3________Peter N. Calder
Tabla 3.6 - Tabla de referencia de grficos de rendimiento
para un camin Titan 2000 descargado, circulando en
una pendiente del 10% y una resistencia a la rodadura de
1.5%
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
Velocidad
El camin alcanza una velocidad constante de 32
KPH en aproximadamente 20 segundos
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 3.7 - MOTION CALCULATIONS BASED ON
PERFORMANCE CHARTS FOR A TITAN 2000
HAULAGE TRUCK. ROAD GRADE IS 10%, TRUCK
IS LOADED , ROLLING RESISTANCE IS 1.5%
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 0.00 0.00 0.00
1 82,605 3.95 0.60 1.98 3.95 2.69 4.34
2 77,605 3.71 2.37 7.78 7.67 5.23 8.41
3 27,605 1.32 4.91 16.11 8.99 6.13 9.86
4 14,605 0.70 7.76 25.45 9.68 6.60 10.63
5 14,605 0.70 10.81 35.48 10.38 7.08 11.39
6 5,605 0.27 14.02 46.00 10.65 7.26 11.69
7 5,605 0.27 17.31 56.78 10.92 7.45 11.98
8 5,605 0.27 20.68 67.84 11.19 7.63 12.28
9 5,605 0.27 24.13 79.16 11.46 7.81 12.57
10 5,605 0.27 27.66 90.75 11.72 7.99 12.86
11 5,605 0.27 31.28 102.61 11.99 8.18 13.16
12 -3,395 -0.16 34.91 114.52 11.83 8.07 12.98
13 -3,395 -0.16 38.49 126.27 11.67 7.96 12.80
THE TRUCK ACCELERATES TO 13 KPH (STEADY
STATE) IN APPROXIMATELY 10 SECONDS.
Tabla 3.7 - Clculos de movimientos en base a los
grficos de rendimiento para un camin Titan 2000,
circulando en una pendiente de 10%, cargado y una
resistencia a la rodadura de 1.5%
Tiempo
Seg.
MPH
Aceler.
Pies/Seg.2
Fuerza
Lbs.
Distancia
Mts.
Distancia
Pies
Pies/Seg. KPH
El camin acelera hasta 13 kph (estado estable) en
aproximadamente 10 segundos
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3______Peter N. Calder
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 3.8 - MOTION CALCULATIONS BASED ON
PERFORMANCE CHARTS FOR A TITAN 2000
HAULAGE TRUCK. ROAD GRADE IS 8%, TRUCK
IS LOADED , ROLLING RESISTANCE IS 1.5%
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 0.00 0.00 0.00
1 96,065 4.60 0.70 2.30 4.60 3.13 5.04
2 86,065 4.12 2.73 8.95 8.71 5.94 9.56
3 41,065 1.96 5.68 18.65 10.68 7.28 11.72
4 19,065 0.91 9.08 29.78 11.59 7.90 12.72
5 19,065 0.91 12.75 41.83 12.50 8.52 13.72
6 10,065 0.48 16.63 54.58 12.98 8.85 14.25
7 10,065 0.48 20.67 67.80 13.47 9.18 14.78
8 3,065 0.15 24.79 81.34 13.61 9.28 14.94
9 3,065 0.15 28.96 95.03 13.76 9.38 15.10
10 3,065 0.15 33.18 108.86 13.91 9.48 15.26
11 3,065 0.15 37.44 122.84 14.05 9.58 15.42
12 3,065 0.15 41.75 136.97 14.20 9.68 15.58
13 3,065 0.15 46.10 151.24 14.35 9.78 15.74
14 3,065 0.15 50.49 165.66 14.49 9.88 15.90
15 3,065 0.15 54.93 180.22 14.64 9.98 16.06
16 3,065 0.15 59.42 194.94 14.79 10.08 16.22
17 -3,935 -0.19 63.90 209.63 14.60 9.95 16.02
Tabla 3.8 - Clculos de movimientos en base a los
grficos de rendimiento de un camin Titan 2000,
circulando en una pendiente del 8%, cargado,con
una resistencia a la rodadura de 1.5%
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
Pies/seg. MPH KPH
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3________________Peter N. Calder
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 3.9 - BRAKING CALCULATIONS FOR A TITAN 2000
HAULAGE TRUCK. ROAD GRADE IS 0%, TRUCK IS
LOADED, ROLLING RESISTANCE IS 1.5%.
Time Force Accel. DistanceDistance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 29.33 20.00 32.19
1 2795 -0.13 8.92 29.27 29.20 19.91 32.04
2 5795 -0.28 17.78 58.33 28.92 19.72 31.74
3 5795 -0.28 26.55 87.11 28.65 19.53 31.43
4 5795 -0.28 35.24 115.62 28.37 19.34 31.13
5 5795 -0.28 43.85 143.85 28.09 19.15 30.82
6 5795 -0.28 52.37 171.80 27.81 18.96 30.52
7 10795 -0.52 60.77 199.36 27.30 18.61 29.95
8 10795 -0.52 69.01 226.40 26.78 18.26 29.39
9 10795 -0.52 77.09 252.92 26.26 17.91 28.82
10 12795 -0.61 85.00 278.88 25.65 17.49 28.15
11 12795 -0.61 92.73 304.22 25.04 17.07 27.48
12 12795 -0.61 100.27 328.96 24.43 16.66 26.80
13 13795 -0.66 107.61 353.06 23.77 16.21 26.08
14 13795 -0.66 114.76 376.49 23.11 15.76 25.36
15 14795 -0.71 121.69 399.25 22.40 15.27 24.58
16 14795 -0.71 128.41 421.29 21.69 14.79 23.80
17 21795 -1.04 134.87 442.47 20.65 14.08 22.66
18 21795 -1.04 141.00 462.59 19.61 13.37 21.51
19 23795 -1.14 146.80 481.63 18.47 12.59 20.26
20 23795 -1.14 152.26 499.53 17.33 11.82 19.01
21 22795 -1.09 157.37 516.31 16.24 11.07 17.82
22 22795 -1.09 162.16 532.01 15.15 10.33 16.62
23 19795 -0.95 166.63 546.68 14.20 9.68 15.58
24 14795 -0.71 170.85 560.53 13.49 9.20 14.81
25 14795 -0.71 174.86 573.67 12.79 8.72 14.03
26 12795 -0.61 178.66 586.15 12.17 8.30 13.36
27 12795 -0.61 182.28 598.02 11.56 7.88 12.69
28 11795 -0.56 185.72 609.29 11.00 7.50 12.07
29 11795 -0.56 188.98 620.01 10.43 7.11 11.45
30 11795 -0.56 192.07 630.16 9.87 6.73 10.83
31 11795 -0.56 195.00 639.74 9.30 6.34 10.21
32 11795 -0.56 197.75 648.77 8.74 5.96 9.59
33 12795 -0.61 200.32 657.20 8.13 5.54 8.92
34 12795 -0.61 202.70 665.02 7.52 5.12 8.25
35 12795 -0.61 204.90 672.23 6.90 4.71 7.57
36 20795 -0.99 206.85 678.64 5.91 4.03 6.48
37 20795 -0.99 208.50 684.05 4.91 3.35 5.39
38 32795 -1.57 209.76 688.17 3.34 2.28 3.67
39 92795 -4.44 210.10 689.30 -1.10 -0.75 -1.20
THE TRUCK COMES TO A STOP IN 38 SECONDS, TRAVELLING A
DISTANCE OF 210 METERS WHILE BRAKING.
Tpicos en Ingeniera de Minas a Rajo Abierto, Captulo 3___________Peter N. Calder
Tabla 3.9 - Clculos de frenado para un
camin Titan 2000, circulando cargado
en una pendiente de 0% y una
resistencia a la rodadura de 1.5%
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg2
Distancia
M
Distancia
Pies
Pies/Seg. MPH KPH
El camin se detiene en 38 segundos, despus de
desplazarse 210 metros durante el frenado
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 10 - BRAKING CALCULATIONS FOR A TITAN 2000
HAULAGE TRUCK. ROAD GRADE IS 10%, TRUCK IS
LOADED, ROLLING RESISTANCE IS 1.5%.
TRUCK ENTERS RAMP AT 40 KPH.
Time Force Accel. DistanceDistance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 36.67 25.00 40.23
1 -12205 0.58 11.27 36.96 37.25 25.40 40.87
2 -12205 0.58 22.71 74.50 37.84 25.80 41.52
3 -12205 0.58 34.33 112.63 38.42 26.19 42.16
4 -17205 0.82 46.17 151.46 39.24 26.76 43.06
5 -17205 0.82 58.25 191.12 40.07 27.32 43.96
6 -21205 1.01 70.62 231.69 41.08 28.01 45.08
7 -24205 1.16 83.32 273.35 42.24 28.80 46.35
8 -24205 1.16 96.37 316.17 43.40 29.59 47.62
9 -27205 1.30 109.79 360.21 44.70 30.48 49.05
10 -30205 1.45 123.64 405.63 46.14 31.46 50.63
11 -30205 1.45 137.92 452.50 47.59 32.45 52.22
12 -30205 1.45 152.65 500.81 49.03 33.43 53.80
13 -30205 1.45 167.81 550.57 50.48 34.42 55.39
14 -30205 1.45 183.42 601.77 51.92 35.40 56.97
15 -30205 1.45 199.47 654.41 53.37 36.39 58.56
16 -30205 1.45 215.96 708.51 54.81 37.37 60.15
17 -30205 1.45 232.88 764.04 56.26 38.36 61.73
18 -30205 1.45 250.25 821.03 57.70 39.34 63.32
19 -30205 1.45 268.06 879.45 59.15 40.33 64.90
20 -30205 1.45 286.31 939.32 60.60 41.31 66.49
21 -30205 1.45 305.00 1000.64 62.04 42.30 68.07
22 -30205 1.45 324.13 1063.41 63.49 43.28 69.66
23 -30205 1.45 343.70 1127.61 64.93 44.27 71.25
24 -30205 1.45 363.71 1193.27 66.38 45.26 72.83
25 -30205 1.45 384.16 1260.36 67.82 46.24 74.42
26 -30205 1.45 405.06 1328.91 69.27 47.23 76.00
27 -30205 1.45 426.39 1398.90 70.71 48.21 77.59
28 -30205 1.45 448.16 1470.33 72.16 49.20 79.17
29 -30205 1.45 470.38 1543.21 73.60 50.18 80.76
30 -30205 1.45 493.03 1617.53 75.05 51.17 82.35
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_____________Peter N. Calder
Tabla 3.10 - Clculos de frenado para un camin de
transporte Titan 2000 cargado, circulando en una rampa
con pendiente del 10% y resistencia a la rodadura de
1.5%. El camin entra en rampa a 40 kph
Tiempo Fuerza Aceler. Distancia Distancia
Seg.
Mts.
Lbs.
Pies/seg2 Pies Pies/Seg. MPH KPH
Peter N. Calder, Topics in Open Pit Engineering, Chapter 3
TABLE 3.11A - Truck Motion Example Solution
Truck is travelling loaded, A to B.
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 Ft. M Ft/Sec MPH KPH
0 149,905 0.00 0.00 0.00 0.00 0.00 0.00
1 149,905 7.17 3.59 1.09 7.17 4.89 7.87
2 109,905 5.26 13.39 4.08 12.43 8.48 13.64
3 63,905 3.06 27.35 8.34 15.49 10.56 16.99
4 49,905 2.39 44.03 13.42 17.88 12.19 19.61
5 40,905 1.96 62.88 19.17 19.83 13.52 21.76
6 36,905 1.77 83.60 25.48 21.60 14.73 23.70
7 33,905 1.62 106.01 32.31 23.22 15.83 25.48
8 29,905 1.43 129.95 39.61 24.65 16.81 27.05
9 27,905 1.34 155.27 47.33 25.99 17.72 28.51
10 25,905 1.24 181.87 55.44 27.23 18.56 29.87
11 23,905 1.14 209.67 63.91 28.37 19.34 31.13
12 22,905 1.10 238.59 72.72 29.47 20.09 32.33
13 21,905 1.05 268.58 81.86 30.51 20.80 33.48
14 21,905 1.05 299.62 91.32 31.56 21.52 34.63
15 19,905 0.95 331.66 101.09 32.51 22.17 35.68
16 17,905 0.86 364.60 111.13 33.37 22.75 36.62
17 17,905 0.86 398.40 121.43 34.23 23.34 37.56
18 16,905 0.81 433.03 131.99 35.04 23.89 38.44
19 16,905 0.81 468.47 142.79 35.85 24.44 39.33
20 15,905 0.76 504.70 153.83 36.61 24.96 40.17
21 15,905 0.76 541.68 165.11 37.37 25.48 41.00
22 14,905 0.71 579.41 176.61 38.08 25.96 41.78
23 14,905 0.71 617.85 188.32 38.79 26.45 42.57
24 13,905 0.67 656.97 200.25 39.46 26.90 43.30
25 13,905 0.67 696.76 212.38 40.12 27.36 44.03
26 12,905 0.62 737.20 224.70 40.74 27.78 44.70
27 12,905 0.62 778.25 237.21 41.36 28.20 45.38
28 11,905 0.57 819.89 249.91 41.93 28.59 46.01
29 11,905 0.57 862.11 262.77 42.50 28.98 46.63
30 11,905 0.57 904.89 275.81 43.07 29.36 47.26
31 10,905 0.52 948.22 289.02 43.59 29.72 47.83
32 10,905 0.52 992.07 302.39 44.11 30.08 48.40
Velocity
Travel time from A to B is 32 seconds.
Tpicos de Ingeniera de Minas a rajo Abierto, Captulo 3________Peter N. Calder
TABLA 3.11A - Ejemplo de movimiento de un camin Solucin
circulando cargado desde A hasta B
Velocidad
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Pies
Distancia
Mts.
Pies/Seg.
MPH KPH
El tiempo de viaje desde A hasta B es de 32 segundos
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3.
TABLE 11B , Truck Motion Example. Solution
Truck is travelling from B to C loaded.
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 10,905 0.00 0.00 0.00 44.15 30.10 48.44
1 -57,395 -2.75 13.04 42.77 41.40 28.23 45.43
2 -55,395 -2.65 25.25 82.85 38.75 26.42 42.52
3 -53,395 -2.55 36.68 120.32 36.20 24.68 39.72
4 -51,395 -2.46 47.33 155.29 33.74 23.00 37.02
5 -50,395 -2.41 57.25 187.82 31.33 21.36 34.37
6 -47,395 -2.27 66.45 218.02 29.06 19.81 31.88
7 -44,395 -2.12 74.99 246.01 26.93 18.36 29.55
8 -43,395 -2.08 82.88 271.91 24.86 16.95 27.28
9 -39,395 -1.88 90.17 295.82 22.97 15.66 25.21
10 -37,395 -1.79 96.90 317.90 21.18 14.44 23.24
11 -33,395 -1.60 103.11 338.29 19.59 13.35 21.49
12 -30,395 -1.45 108.86 357.15 18.13 12.36 19.90
13 -26,395 -1.26 114.19 374.65 16.87 11.50 18.51
14 -22,395 -1.07 119.17 390.98 15.80 10.77 17.33
15 -17,395 -0.83 123.86 406.36 14.97 10.20 16.42
16 -17,395 -0.83 128.30 420.91 14.13 9.64 15.51
17 -10,395 -0.50 132.53 434.80 13.64 9.30 14.96
18 -10,395 -0.50 136.61 448.19 13.14 8.96 14.42
19 -3,395 -0.16 140.59 461.24 12.98 8.85 14.24
20 -3,395 -0.16 144.52 474.14 12.81 8.74 14.06
21 -3,395 -0.16 148.40 486.87 12.65 8.63 13.88
22 -3,395 -0.16 152.23 499.44 12.49 8.51 13.70
23 -3,395 -0.16 156.01 511.85 12.33 8.40 13.53
24 -3,395 -0.16 159.75 524.09 12.16 8.29 13.35
25 -3,395 -0.16 163.43 536.18 12.00 8.18 13.17
26 -3,395 -0.16 167.06 548.10 11.84 8.07 12.99
27 -3,395 -0.16 170.65 559.85 11.68 7.96 12.81
28 5,605 0.27 174.25 571.66 11.94 8.14 13.11
29 -3,395 -0.16 177.86 583.53 11.78 8.03 12.93
30 -3,395 -0.16 181.43 595.23 11.62 7.92 12.75
31 5,605 0.27 185.01 606.98 11.89 8.11 13.04
32 -3,395 -0.16 188.61 618.79 11.73 7.99 12.87
Total distance B to C is 750 meters ( 2460 ft. ). Remaining distance is 1843 ft.
Time remaining at 11.8 ft/sec = 156 sec.
Total time from B to C loaded is 32 + 156 = 188 sec.
Velocity
Tpicos en Ingeniera de Minas a Rajo Abierto, Captulo 3________Peter N. Calder
Tabla 3.11B - Ejemplo de movimientos del camin. Solucin
El camin se desplaza desde B hasta C cargado
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
Velocidad
Pies/Seg. MPH KPH
La distancia total desde B hasta C es de 750 metros (2460 pies). La
distancia remanente es de 1843 pies.
El tiempo remanente a 11.8 pies/seg. = 156 seg.
El tiempo total desde B hasta C, cargado, es de 32 + 156 = 188 seg.
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3.
Table 11C- Truck Motion Example Solution
Truck is travelling from C to D loaded.
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 -3,395 0.00 0.00 11.73 8.00 12.87
1 63,905 3.06 4.04 13.26 14.79 10.08 16.23
2 49,905 2.39 8.91 29.25 17.18 11.71 18.85
3 44,905 2.15 14.48 47.50 19.33 13.18 21.21
4 36,905 1.77 20.64 67.71 21.09 14.38 23.14
5 33,905 1.62 27.31 89.62 22.72 15.49 24.92
6 29,905 1.43 34.46 113.05 24.15 16.46 26.49
7 27,905 1.34 42.02 137.86 25.48 17.37 27.96
8 25,905 1.24 49.98 163.96 26.72 18.22 29.32
9 23,905 1.14 58.29 191.25 27.86 19.00 30.57
10 23,905 1.14 66.96 219.69 29.01 19.78 31.83
11 22,905 1.10 75.97 249.25 30.10 20.53 33.03
12 21,905 1.05 85.31 279.87 31.15 21.24 34.18
13 19,905 0.95 94.95 311.50 32.10 21.89 35.23
14 19,905 0.95 104.88 344.08 33.06 22.54 36.27
15 17,905 0.86 115.08 377.57 33.91 23.12 37.21
16 16,905 0.81 125.54 411.89 34.72 23.67 38.10
17 16,905 0.81 136.25 447.01 35.53 24.23 38.99
18 15,905 0.76 147.20 482.92 36.29 24.74 39.82
19 15,905 0.76 158.38 519.60 37.05 25.26 40.66
20 14,905 0.71 169.78 557.01 37.77 25.75 41.44
21 14,905 0.71 181.40 595.13 38.48 26.24 42.22
22 13,905 0.67 193.23 633.94 39.14 26.69 42.95
23 13,905 0.67 205.26 673.42 39.81 27.14 43.68
24 12,905 0.62 217.49 713.54 40.43 27.56 44.36
25 12,905 0.62 229.91 754.27 41.04 27.98 45.04
26 12,905 0.62 242.51 795.63 41.66 28.41 45.71
27 11,905 0.57 255.30 837.58 42.23 28.79 46.34
28 11,905 0.57 268.26 880.09 42.80 29.18 46.96
29 10,905 0.52 281.38 923.15 43.32 29.54 47.54
30 10,905 0.52 294.67 966.74 43.85 29.89 48.11 APPLY BRAKES
1 40,095 -1.92 307.74 1009.62 41.93 28.59 46.00
2 43,095 -2.06 320.20 1050.52 39.86 27.18 43.74
3 46,095 -2.21 332.02 1089.28 37.66 25.68 41.32
4 55,095 -2.64 343.09 1125.62 35.02 23.88 38.43
5 62,095 -2.97 353.32 1159.16 32.05 21.85 35.17
6 66,095 -3.16 362.60 1189.63 28.89 19.70 31.70
7 73,095 -3.50 370.88 1216.77 25.39 17.31 27.86
8 80,095 -3.83 378.03 1240.25 21.56 14.70 23.66
9 89,095 -4.26 383.96 1259.68 17.30 11.79 18.98
10 90,095 -4.31 388.57 1274.82 12.99 8.85 14.25
11 80,095 -3.83 391.95 1285.89 9.15 6.24 10.05
12 79,095 -3.78 394.16 1293.16 5.37 3.66 5.89
13 100,095 -4.79 395.07 1296.13 0.58 0.40 0.64
13 seconds are required to
brake from 48 kph (maximum
velocity) to a stop.
Distance travelled while
braking is 99 meters.
Remaining distance to be
travelled at 48 kph is 1000 - 294
- 99 = 607 meters. Time
required to travel the
remaining distance at 48 kph
is 45.5 seconds.
Total time C to D is 30+13+45.5
= 88.5 seconds.
30 seconds are required to
accelerate to the maximum
velocity of 48 kph. Distance
travelled while accelerating is
294 meters.
Velocity
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3 ___________ Peter N. Calder
Tabla 11C - Ejemplo de movimientos del camin Solucin
El camin se desplaza desde C hasta D cargado.
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
Velocidad
Pies/Seg.
MPH KPH
Se requieren 30 segundos para
acelerar hasta alcanzar la
velocidad mxima de 48 kph. La
distancia recorrida durante la
aceleracin es de 294 metros.
Se requieren 13 segundos para
frenar de 48 kph (velocidad
mxima) hasta detenerse. La
distancia recorrida durante el
frenado es de 99 mts. La
distancia remanente a ser
recorrida en 48 kph es de 1000 -
294 - 99 = 607 metros. El tiempo
requerido para recorrer la
distancia remanente a 48 kph es
de 45.5 segundos. El tiempo total
desde C hasta D es 30 + 13 +
45.5 = 88.5 segundos
APLICANDO FRENOS
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3.
TABLE 3.11D - Truck Motion Example Example
Truck travelling D to C to B empty.
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 0.00 0.00 0.00 Leaving the crusher.
1 155905 18.39 2.80 9.19 18.39 12.54 20.18
2 46905 5.53 9.25 30.35 23.92 16.31 26.25
3 33905 4.00 17.15 56.27 27.92 19.04 30.64
4 28905 3.41 26.18 85.89 31.33 21.36 34.38
5 25905 3.06 36.20 118.75 34.39 23.44 37.73
6 22905 2.70 47.09 154.49 37.09 25.29 40.69
7 20905 2.47 58.77 192.81 39.55 26.97 43.40
8 19905 2.35 71.18 233.53 41.90 28.57 45.98
9 17905 2.11 84.28 276.49 44.01 30.01 48.29 Truck should not exceed 48 kph.
1 31095 -3.67 97.13 318.67 40.34 27.51 44.27 Brake 0
2 40095 -4.73 108.71 356.65 35.62 24.28 39.08
3 54095 -6.38 118.59 389.07 29.23 19.93 32.08 Allow 3 sec for truck to brake below 40 kph.
Distance to accelerate to 48 mph = 84 m (9 sec.), distance to brake from 48 to 40 kph (to enter C) = 34.4 m (3 sec.).
Remaining distance = 881.6 m, time @ 48 kph = 66 sec.
Total time D to C empty = 78 sec.
Truck travels from C to B empty @ 24 mph. Exit velocity is not restricted.
Time required = 750 m @ 40 kph = 68 sec.
Total time D to B empty = 146 sec.
Distance
Tabla 3.11 D - Ejemplo de movimiento del camin Ejemplo
El camin se desplaza desde D a C a B, descargado
Tiempo
Seg.
Fuerza
Lbs.
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
Distancia
Pies/Seg. MPH KPH
Abandonando la chancadora
El camin no debera exceder los 48 kph
Frena
En 3 segundos el camin debera frenar a una
velocidad inferior a 40 kph
La distancia para acelerar hasta 48 kph = 84 mts. (9 seg.), distancia para frenar desde 48 a 40 kph (para entrar a C) =
34.4 mts. (3 seg).
Distancia remanente = 881.6 mts., tiempo a 48 kph = 66 seg.
Tiempo total desde D hasta C,descargado = 78 seg.
El camin se desplaza desde C hasta B descargado a una velocidad de 24 mph. La velocidad de salida
no es restringida. Tiempo requerido = 750 mts. a 40 kph = 68 seg.
Tiempo total desde D hasta B, descargado = 146 seg.
Tpicos en Ingeniera de Minas a Rajo Abierto, Captulo 3_________ P. N. Calder
Peter N. Calder, Topics in Open Pit Engineering, Chapter 3.
TABLE 3.11E , Truck Motion Example Solution
Truck travelling B to A empty.
Time Force Accel. Distance Distance
Sec Lb Ft/Sec*2 M Ft. Ft/Sec MPH KPH
0 0 0.00 0.00 0.00 35.20 24.00 38.62
1 21905 2.58 11.12 36.49 37.78 25.76 41.46
2 20905 2.47 23.02 75.51 40.25 27.44 44.16
3 18905 2.23 35.62 116.88 42.48 28.96 46.61
4 17905 2.11 48.89 160.41 44.59 30.40 48.93 Truck should not exceed 48 kph.
1 31095 -3.67 61.93 203.17 40.92 27.90 44.90 Brake 0
2 40095 -4.73 73.68 241.73 36.20 24.68 39.72
3 54095 -6.38 83.74 274.73 29.81 20.33 32.71
4 64095 -7.56 91.68 300.77 22.25 15.17 24.42
5 76095 -8.98 97.09 318.54 13.28 9.05 14.57
6 76095 -8.98 99.77 327.33 4.30 2.93 4.72
Distance to accelerate to 48 kph = 49 m (4 sec.), distance to brake from 48 to to enter the shovel = 51m (7 sec.).
Remaining distance = 200 m, time @ 48kph = 15 sec.
Total time B to A empty = 26 sec.
Velocity
Tabla 3.11 E, Ejemplo de movimientos del camin Solucin
El camin se traslada desde B hasta A, descargado
Tiempo
Seg.
Fuerza
Lbs.
Velocidad
Aceler.
Pies/Seg.2
Distancia
Mts.
Distancia
Pies
El camin no debera exceder los 48 kph
Frena
La distancia para acelerar hasta 48 kph = 49 mts. (4 seg.), distancia para frenar desde 48 para entrar a
la pala = 51 mts. (7 seg.)
Distancia remanente = 200 mts., tiempo a 48 kph = 15 seg.
Tiempo total desde B hasta A, descargado = 26 seg.
Tpicos en Ingeniera de Minas a Rajo Abierto, Captulo 3___________ Peter N. Calder
Peter N. Calder, Topics in Open Pit Mining Engineering, Chapter 3
TABLE 3.12 - SUMMARY OF CYCLE TIME CALCULATIONS FOR EXAMPLE 3.1.
Segment Conditions Time, sec.
A to B 300 m @ 0%, Excavator to Main Ramp, 48 kph Speed Limit. 32
B to C 750 m Up Main Ramp @ 10% Loaded, Steady State Speed is 13 kph. 188
C to D 1000 m @ 0%, Pit Exit to Crusher, 48 kph Speed Limit, Must Stop at Crusher. 89
Dump 100
D to C Crusher to Pit Enterance Empty. Speed Limit is 48 kph. Max. Speed at C = 40 kph. 78
C to B Down Main Ramp Empty, Speed is Constant at Speed Limit of 40 kph. 68
B to A Pit Floor Enterance to Excavator. 48 kph Speed Limit, Must Stop at Excavator. 26
Spot 30
Load 200
Total 811
Match Factor = Total Cycle Time / Load + Spot = 3.53
Note that this is a bad combination of parameters, ideally we want the
match factor to be an even number. We can select a different shovel -
truck combination and try to eliminate the spot time. Automatic truck
dispatching may help but will not eliminate the problem.
Tpicos en Ingeniera de Minas a Rajo Abierto, Captulo 3_________ Peter N. Calder
Match Factor = Tiempo total de ciclo/carga + tiempo entre
cargas = 3.53
Observe que esta es una mala combinacin de parmetros.
De manera ideal, vamos a querer que el match factor sea un
nmero par. Podemos seleccionar una combinacin de
pala-camin distinta e intentar eliminar el tiempo entre
cargas. El sistema de despacho automtico podra ayudar,
pero no solucionar el problema.
Segmento
Condiciones
Tiempo, seg.
A a B
B a C
C a D
Descarga
D a C
C a B
B a A
Tiempo entre cargas
Carga
Total
300 mts. a 0%, Excavadora a la rampa principal, velocidad lmite 48 kph
750 mts. rampa principal cuesta arriba a 10%, cargado, velocidad constante es de 13 kph
1000 mts. a 0%, salida del pit a la chancadora, 48 kph velocidad lmite, se detiene en la chancadora
Chancadora hasta entrada del pit, descargado, velocidad lmite es de 48 kph. Vel. mx. en C = 40 kph
Rampa principal cuesta abajo, velocidad es constante a una vel. lmite de 40 kph
Entrada del pit hasta la excavadora. Vel. lmite 48 kph. se detiene en la excavadora
32
188
89
100
78
68
26
30
200
811
Tabla 3.12 - Resumen de Clculos para Tiempos de Ciclos de Ejemplo 3.1
INFORME CARGADORES PIT_S
TURNO UNIDAD CARGAS PENDIENTE TIEMPO DE ESPERA TIEMPO DE RETRASO
1 CARGADORA 1 115 39.1 711 1720
1 CARGADORA 2 108 44.0 484 3600
1 CARGADORA 3 75 25.0 9521 1200
1 CARGADORA 4 82 39.1 6828 3080
1 CHANCADORA 1 240 37.6 9581 960
1 CHANCADORA 2 132 37.8 14521 2920
INFORME CAMIONES PIT_S
CAMIN TIEMPO DE ESPERA SUBIENDO BAJANDO SUBIENDO BAJANDO CARGA DESCARGA OTRO $/HORA CARGAS $/CARGA
DESCARGADO DESCARGADO CARGADO CARGADO
0 6 6 18 30 10 14 4 12 123 21 46
1 4 6 17 30 11 15 4 13 124 23 43
2 2 6 18 32 10 15 4 13 127 22 46
3 11 5 17 29 9 13 3 13 118 19 49
4 10 6 15 27 10 15 4 13 117 22 42
5 9 6 16 28 10 14 4 13 119 21 45
6 15 6 15 25 9 13 4 13 112 20 44
7 4 6 17 31 9 13 4 16 123 20 49
8 5 6 16 29 10 15 4 15 121 22 44
9 16 5 14 25 9 13 3 15 110 19 46
10 5 6 17 30 10 15 4 13 123 23 42
11 19 5 14 24 9 13 3 13 109 19 45
12 5 6 16 29 10 15 4 15 121 22 44
13 5 6 16 29 10 15 4 15 121 22 44
14 8 6 16 28 10 14 4 14 119 21 45
15 4 6 17 30 10 14 4 15 123 21 46
16 14 6 14 23 10 15 4 14 110 22 40
17 4 6 17 30 10 14 4 15 123 21 46
Se producen 380 cargas a un costo entre palas y camiones de $ 60/carga
% OF TOTAL TIME
Tabla 3.13
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3___________ Peter N. Calder
ACTIVIDAD CAMIN CONSUMO COMBUSTIBLE CAMIN EN OPERACIN
LITROS/HR. COSTO/HR. $
115 110
TRAVELLING
EMPTY, DOWN GRADE 70 84
TRAVELLING
FULL, UP GRADE 255 214
TRAVELLING
FULL, DOWN GRADE 125 130
LOADING 20 98
WAITING 20 42
DUMPING 20 87
SHOVEL OPERATING COST, $/hr. 180.00
FUEL COST, $/ LITER 0.35
Table 3.14 - Data used in determining shift operating costs.
DESPLAZNDOSE
DESCARGADO, RAMPA ABAJO
DESPLAZNDOSE
DESCARGADO, RAMPA ARRIBA
DESPLAZNDOSE
CARGADO, RAMPA ARRIBA
DESPLAZNDOSE
CARGADO, RAMPA ABAJO
CARGA
EN ESPERA
DESCARGA
COSTO OPERACIONAL PALA, $/hra. 180.00
COSTO COMBUSTIBLE, $/LITRO 0.35
Tabla 3.14 - Datos empleados para determinar los
costos operacionales por turnos
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_______ Peter N. Calder
Loads Wait % Delay % Loads Wait % Delay %
Loader 0 115 2.2 6.0 Loader 0 97 15.7 6.0
Loader 1 107 2.4 12.5 Loader 1 95 11.9 12.5
Loader 4 93 20.2 4.2 Loader 4 69 37.2 4.2
Loader 5 89 17.3 10.7 Loader 5 69 31.1 10.7
Crusher 0 249 35.0 3.3 Crusher 0 189 44.2 3.3
Crusher 1 144 47.3 10.1 Crusher 1 129 60.7 10.1
Total Loads 404 330
$/ Load $60.00 $80.00
NORMAL ENGINE PERFORMANCE
HALF OF THE TRUCK FLEET ENGINES
ARE DE-RATED BY 75%
Table 3.15 - Comparing a 20 truck fleet with similar truck engines to one
in which half of the engines are de-rated by 25%.
Tabla 3.15 - Comparacin de una flota de 20 camiones con motores similares a aqulla en
la cual al 50% de los motores se les ha reducido su capacidad mxima en un 25%
Chancadora 0
RENDIMIENTO NORMAL DEL MOTOR
LA MITAD DE LOS MOTORES DE LA FLOTA DE
CAMIONES SE LES HA REDUCIDO SU CAPACIDAD
MXIMA EN UN 75%
Cargas
Tiempo
de Espera
Atraso %
Cargas Tiempo de Espera % Atraso %
Cargador 0
Cargador 1
Cargador 4
Cargador 5
Chancadora 1
Cargas Totales
Chancadora 0
Chancadora 1
Cargador 0
Cargador 1
Cargador 4
Cargador 5
$/carga
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3__________ P. N. Calder
CASE A
Trucks Loads Wait % Cycle - sec $/Load Match-Fact.
Loader 0 1 26 82 1115 98.00 5.6
Loader 1 1 25 82 1151 102.00 5.8
Loader 4 1 22 85 1340 118.00 6.7
Loader 5 1 22 84 1342 117.00 6.7
CASE B
Trucks Loads Wait % Cycle - sec $/Load Match-Fact.
Loader 0 6 142 0 1207 53.00 6.0
Loader 1 6 141 1 1214 55.00 6.1
Loader 4 7 141 2 1426 62.00 7.1
Loader 5 7 140 1 1433 65.00 7.2
Total 564
CASE C
Trucks Loads Wait % Cycle - sec $/Load Match-Fact.
Loader 0 5 127 11 1125 54.00 5.6
Loader 1 5 123 14 1162 55.00 5.8
Loader 4 6 126 12 1363 65.00 6.8
Loader 5 6 126 12 1371 65.00 6.9
Total 502
FIGURE 3.16 - MATCH FACTORS ARE DETERMINED WITH 1 TRUCK ASSIGNED
TO EACH OPERATING SHOVEL ( CASE A ). SHIFT PRODUCTION IS THEN
ESTIMATED, USING THE CYCLE PROGRAM,WITH THE SINGLE TRUCK MATCH
FACTOR ROUNDED UP ( CASE B ) AND ROUNDED DOWN ( CASE C ).
Tabla 3.16 - Los factores de compatibilidad se determinan con un
camin asignado a cada pala operativa (caso A). La generacin de
turnos luego se estima utilizando el programa CICLO con el nico
factor de compatibilidad del camin truncado hacia arriba (Caso B) y
truncado hacia abajo (Caso C).
CASO A
CASO B
CASO C
Camiones
Tiempo de
Espera %
Cargas
carga
Cargador 0
Cargador 1
Cargador 4
Cargador 5
Cargador 0
Cargador 1
Cargas
Cargador 4
Cargador 5
Cargador 0
Cargador 1
Cargador 4
Cargador 5
Camiones
Tiempo de
Espera %
Ciclo- seg. $/carga
Ciclo - seg.
Camiones Cargas
Tiempo de
Espera %
Ciclo - seg. $/carga
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3 _________Peter N. Calder
CASE A
Trucks Loads Wait %
Loader 0 1 26 82
Loader 1 1 25 82
Loader 4 1 22 85
Loader 5 1 22 84
CASE B
Trucks Loads Wait %
Loader 0 6 121 1.4
Loader 1 6 110 1.4
Loader 4 7 112 7.1
Loader 5 7 101 8.2
Total 444
CASE C
Trucks Loads Wait %
Loader 0 5 115 4.4
Loader 1 5 104 5.1
Loader 4 6 93 19.9
Loader 5 6 94 12.6
Total 406
Figure 3.17 - Similar tests as in Table 3.16 using the
Pit_s program, which includes equipment breakdowns
and other shift delays.
Tabla 3.17 - Pruebas similares a Tabla 3.16 utilizando el
programa Pit_s, que incluye atrasos por fallas de
equipos y turnos
CASO A
CASO B
Camiones Cargas Tiempo de Espera %
Camiones Cargas Tiempo de Espera %
Camiones Cargas Tiempo de Espera %
CASO C
Cargador 0
Cargador 4
Cargador 1
Cargador 5
Cargador 0
Cargador 1
Cargador 4
Cargador 5
Total
Cargador 0
Cargador 1
Cargador 4
Cargador 5
Total
Tpicos en Ingeniera de Minas a Rajo Abierto, Captulo 3_________Peter N. Calder
Table 3.18 Changes in cycle times with engine
de-rating for the example road network.
Loaded
Up
Loaded
Down
Grade Derating Cycle %
Increase
Grade Derating Cycle %
Increase
8% 0% 2630 8% 0% 2025
8% 10% 2797 6.3 8% 10% 2027 0.1
8% 20% 3037 15.5 8% 20% 2032 0.3
8% 30% 3400 29.3 8% 30% 2032 0.3
Loaded
Up
Loaded
Down
Grade Derating Cycle %
Increase
Grade Derating Cycle %
Increase
10% 0% 2405 10% 0% 1690
10% 10% 2586 7.5 10% 10% 1692 0.1
10% 20% 2882 19.8 10% 20% 1708 1.1
10% 30% 3261 35.6 10% 30% 1804 6.7
Tabla 3.18 - Cambios en los tiempos de ciclo con
reduccin de la capacidad mxima del motor para
el ejemplo de redes de caminos
Cargado
Arriba
Pendiente Derating Ciclo
%
Aumento
Cargado
Abajo
Pendiente Derating Ciclo %
Aumento
Cargado
Arriba
Pendiente Derating Ciclo
%
Aumento
Cargado
Abajo
Pendiente Derating Ciclo %
Aumento
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3___________Peter N. Calder
Tabla 3.19 - Cambio en los Tiempos de Ciclo en Funcin del
Porcentaje de Reduccin de la Capacidad Mxima del Motor
(Deration) para Camiones de 155 y 220 Toneladas Mtricas
con una Pendiente con Carga Cuesta Arriba Equivalente a un 10%
0%
(Derating)
(en seg.)
10%
Derating
(en seg.)
Cambio
%
20%
Derating
(en seg.)
Cambio
%
30%
Derating
(en seg.)
Cambio %
Carga de
155
Toneladas
2492 2645 6.1 2842 14.0 3124 25.4
Carga de
220
Toneladas
2753 2952 7.2 3248 18.0 3671 33.3
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3 ________ Peter N. Calder
Tabla 3.19 - Cambio en los tiempos de ciclo en funcin del porcentaje
de reduccin de la capacidad mxima del motor (deration) para
Camiones de 155 y 220 Toneladas Mtricas con una pendiente con
carga cuesta arriba equivalente a 10%
Tabla 3.20 - Cambio en los Tiempos de Ciclo en Funcin de la Reduccin de
Carga Expresada en Porcentaje para Camiones de 155 y 220 Toneladas Mtricas
con una Pendiente con Carga Cuesta Arriba Equivalente a un 10%
Carga de
155
Toneladas
Mtricas
0%
Derating
(en seg.)
10%
Derating
(en seg.)
Cambio
%
20%
Derating
(en seg.)
Cambio
%
30%
Derating
(en seg.)
Cambio
%
Cero
Reduccin
De Carga
2492 2645 2842 3124
10% de
Reduccin
De Carga
2406 2560 3.2 2732 3.9 2988 4.4
20% de
Reduccin
De Carga
2322 2465 6.8 2635 7.3 2855 8.6
Carga de
220
Toneladas
Mtricas
0%
Derating
(en seg.)
10%
Derating
(en seg.)
Cambio
%
20%
Derating
(en seg.)
Cambio
%
30%
Derating
(en seg.)
Cambio
%
Cero
Reduccin
De Carga
2753 2952 3248 3671
10% de
Reduccin
De Carga
2646 2829 4.2 3080 5.2 3511 4.4
20% de
Reduccin
De Carga
2543 2719 7.9 2936 9.6 3276 10.8
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_________________ P. N. Calder
Tabla 3.20 - Cambio en los tiempos de ciclo en funcin de la reduccin de
carga expresada en porcentaje para Camiones de 155 y 220 Toneladas
Mtricas con una pendiente con carga cuesta arriba equivalente a 10%
Tpicos de Ingeniera en Minas a Rajo Abierto, Captulo 3_____________ Peter N. Calder
TABLA 3.21 - ESTIMACIN DE LOS REQUERIMIENTOS DE CAMIONES Y PRODUCCIN DE PALAS
Toneladas / metro cbico 2,70 Toneladas desplazadas 1,80
Factor de esponjamiento ( en el balde ) 1,50 Toneladas / Balde 42,93
Capacidad del balde (m
3
) 26,50
Factor de llenado 0,90 Tonelaje acumulativo Tiempo (segs.)
Tiempo de ciclo de la excavadora (segs.) 30,00 43 30
Disponibilidad mecnica 0,80 86 60
Uilizacin 0,80 129 90
En operacin (%) 0,64 172 120
Tiempo en descargar 60,00 215 150
Tiempo en desplazarse cargado 840 258 180
Tiempo en desplazarse descargado 480 301 210
Tiempo entre cargas 30 343 240
Match factor 6,75 386 270
Das operativos / Ao 350 429 300
Disponibilidad mecnica de los camiones 0,8 472 330
Match factor/Disponibilidad mecnica camiones 8,44
Nmero de camiones a comprar 9,00 Tonelaje mximo/Hora 4.500
Seleccin de Tabla Toneladas estimadas promedio / Hora 2.880
Capacidad del camin utilizada 300 Toneladas estimadas promedio / Da 69.120
Tiempo en cargar real 210 Toneladas estimadas promedio / Ao 24.192.000
Tpicos de Ingeniera de Minas a Rajo Abierto, Captulo 3 _______________________ P. N. Calder
Tabla 3.21 - Estimacin de los requerimientos de camiones y produccin de palas