MEJORAMIENTO DE PISTAS Y VEREDAS DE LA AV. RAMON CASTILLA: TRAMO JR. FRANCISCO PIZARRO - JR. SIMON BOLIVAR - JR.

SAN MARTIN - JR. UNIVERSIDAD, DISTRITO DE JUNIN - PROVINCIA


DE JUNIN - JUNIN
CRONOGRAMA GENERAL DE EJECUCION DE OBRA VALORIZADO
ITEM

DESCRIPCION

MESES DE EJECUCION

PRESUPUESTO
MES 01

01
01.01

OBRAS PROVISIONALES
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO

01.02

CARTEL DE IDENTIFICACION DE OBRA DE 2.60 X 3.60M

01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS

02
02.01
02.02
02.03
02.03.01
02.03.02
03
03.01

OBRAS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
MANTENIMIENTO DE TUBERIAS Y CONEXIONES
ALINEAMIENTO DE PREDIOS
CERCO RUSTICO
CONSTRUCCIONES DE MATERIAL RUSTICO
MOVIMIENTO DE TIERRA
CORTE CON MAQUINARIA HASTA SUB RASANTE

MES 02

MES 03

MES 04

PARCIALES
MES 05

3,600.00

3,600.00

3,600.00

700.00

700.00

700.00

9,621.38

4,810.69

4,810.69

9,621.38

13,927.07
1,304.00

6,963.54
1,304.00

6,963.54

13,927.07
1,304.00

12,000.00 12,000.00
12,000.00 12,000.00

12,000.00

26,314.56 26,314.56

26,314.56

12,000.00

03.02

CORTE MANUAL ( VEREDAS Y MARTILLOS)

15,113.42 15,113.42

15,113.42

03.03

EXCAVACION MANUAL EN TERRENO COMPACTO

29,558.05 29,558.05

03.04
03.05
03.06

ACARREO DE MATERIAL A PULSO


RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL PROPIO TRANSPORTADO

23,472.37 23,472.37
3,105.86 3,105.86

29,558.05
23,472.37
3,105.86

03.07
03.08
03.09
03.10

EXTRACCION Y APILAMIENTO
ZARANDEO
CARGUIO
TRANSPORTE EXTRACCION Y APILAMIENTO

1,615.75
1,259.25
1,322.50
2,121.75

1,615.75
1,259.25
1,322.50
2,121.75

1,615.75
1,259.25
1,322.50

03.11

EXTENDIDO RIEGO NIVELACION Y COMPACTACION

2,085.39

2,085.39

2,085.39

03.12

ELIMINACION DE MATERIAL EXCEDENTE

03.13

CARGUIO (ELIMINACION DE MAT. EXCEDENTE)

21,415.84 21,415.84

21,415.84

03.14

TRANSPORTE ( ELIMINACION DE MAT. EXCEDENTE)

42,926.86 42,926.86

42,926.86

03.15

ESCARIFICADO, PERF., RIEGO Y COMPACTADO DE SUB RASANTE

19,950.99 19,950.99

19,950.99

2,121.75

04
04.01

SUB BASE GRANULAR


EXTRACCION Y APILAMIENTO AGREGADOS

04.02

ZARANDEO DE MATERIAL DE CANTERA

04.03
04.04
04.05

CARGUIO ( AGREGADOS)
TRANSPORTE A LA OBRA
EXTENDIDO RIEGO NIVELACION Y COMPACTACION SUB BASE E=0.15M

05
05.01

BASE GRANULAR
EXTRACCION Y APILAMIENTO AGREGADOS

05.02

ZARANDEO DE MATERIAL DE CANTERA

05.03
05.04
05.05

CARGUIO ( AGREGADOS)
TRANSPORTE A LA OBRA
EXTENDIDO RIEGO NIVELACION Y COMPACTACION DE BASE E= 0.20 M

06
PAVIMENTO FLEXIBLE
06.01
IMPRIMACION ASFALTICA
06.02
CARPETA ASFALTICA
06.02.01
PREPARACION DE MEZCLA ASFALTICA
06.02.02

TRANSPORTE DE MEZCLA ASFALTICA

06.02.03

ESPARCIDO Y COMPACTADO DE M.ASFALTO EN CALIENTE (2")

07
07.01
07.02

OBRAS DE ARTE Y DRENAJE


SARDINEL - VEREDA
ENCOFRADO Y DESENCOFRADO NORMAL

6,342.48

6,342.48
7,587.81
11,063.14

7,587.81 7,587.81
11,063.14 11,063.14
18,985.62
18,985.62

18,985.62

8,138.07

8,138.07

8,138.07

6,342.48

6,342.48

6,342.48
7,587.81
11,063.14

7,587.81 7,587.81
11,063.14 11,063.14
89,779.47 53,867.68 35,911.79
137,565.31

89,779.47
96,295.72

551,226.61

41,269.59

137,565.31

275,613.31 220,490.64 55,122.66


66,383.43 53,106.74 13,276.69

132,766.85
20,916.36

10,458.18

8,366.54

2,091.64

551,226.61
132,766.85
20,916.36

29,565.63

29,565.63

3,091.16

3,091.16

CONCRETO F'C =140 kg/cm2 - ZAPATAS

61,543.60

ACERO DE REFUERZO FY=4200KG/CM2


SARDINEL CONFINAMIENTO
ENCOFRADO Y DESENCOFRADO NORMAL

31,768.01

61,543.60
31,768.01

61,543.60
31,768.01

7,552.19

7,552.19

7,552.19

8,593.15

8,593.15

8,593.15

42,908.74

42,908.74
45,534.85

42,908.74
45,534.85

07.04
07.05
07.06
07.06.01

07.07.02

8,138.07

6,342.48

3,091.16

CONCRETO f'c=175 kg/cm2 PARA VEREDAS

07.07
07.07.01

8,138.07

29,565.63

07.03

07.06.02

8,138.07

CONCRETO f'c=210 kg/cm2 PARA SARDINEL


SARDINEL - JARDIN
ENCOFRADO Y DESENCOFRADO NORMAL
CONCRETO EN f'c=175 kg/cm2

45,534.85

07.07.03

CONCRETO F'C =140 kg/cm2 - ZAPATAS

46,376.38

46,376.38

46,376.38

07.07.04

ACERO DE REFUERZO FY=4200KG/CM2

23,939.60

23,939.60

23,939.60

07.08
07.08.01

CUNETAS
ENCOFRADO Y DESENCOFRADO EN CUNETAS

5,338.17

5,338.17

5,338.17

07.08.02

CONCRETO f'c=175 kg/cm2 PARA CUNETAS

44,428.59

44,428.59

44,428.59

7,245.67
12,563.89
44,695.49

7,245.67
12,563.89
44,695.49

7,245.67
12,563.89
44,695.49

2,022.05

2,022.05

2,022.05

5,289.91

5,289.91

5,289.91

14,201.83
3,809.70

14,201.83

14,201.83

3,809.70

3,809.70

07.09
07.10

CANALETAS DE CRUCE
ENCOFRADO Y DESENCOFRADO NORMAL

07.11
07.12
07.13
07.13.01

CONCRETO EN f'c=175 kg/cm2


REJILLA DE ACERO
RAMPAS
ENCOFRADO Y DESENCOFRADO NORMAL

07.13.02
07.14
07.14.01
07.14.02
08
08.01
08.02
08.03
09
09.01
10
10.01
11
11.01
11.02
11.03
12
12.01
12.02
12.03
12.04
12.05
12.06

CONCRETO EN f'c=175 kg/cm2 EN RAMPAS


TUBERIAS Y SUMIDEROS
TENDIDO Y COLOCADO TUBERIA
CONSTRUCCION DE SUMIDEROS 0.90 X 1.20 M
VEREDAS
PERFILADO, NIVELADO Y COMPACTADO EN ZONA DE CORTE
EXTENDIDO RIEGO NIVELACION Y COMPACTACION CON MATERIAL BASE
VEREDA DE CONCRETO f'c= 175 kg/cm2
REVOQUES Y ENLUCIDOS
ACABADO FROTACHADO
TRATAMIENTO DE JUNTAS
RELLENO DE JUNTAS ASFALTICAS
TRATAMIENTODE JARDINERIA
SUMINISTRO Y COLOCACION DE TIERRA AGRICOLA
CORTE Y TRASLADO DE GRASS
COLOCACION DE GRASS
SEALIZACION
SEALIZACION VERTICAL PREVENTIVA 0.60 X 0.60
SEALIZACION VERTICAL REGLAMENTARIA OCTOGONAL 0.60 X 0.60
SEALIZACION VERTICAL REGLAMENTARIA SENTIDO DE CIRCULACION
SEALIZACION VERTICAL INFORMATIVA
MARCAS EN EL PAVIMENTO
PINTURA LATERAL DE SARDINELES DE VEREDA

6,089.23
2,444.43

6,089.23

6,089.23

65,273.03

2,444.43
65,273.03

2,444.43
65,273.03

63,018.07

63,018.07

63,018.07

7,342.22

7,342.22

7,342.22

12,877.69
8,333.89
4,263.85

12,877.69
8,333.89
4,263.85

12,877.69
8,333.89
4,263.85

195.84
524.18
19,437.93
3,285.36
29,235.86
30,288.48

195.84
524.18
19,437.93
3,285.36
29,235.86
30,288.48

195.84
524.18
19,437.93
3,285.36
29,235.86
30,288.48

12.07
13
13.01
13.02
13.03
13.04
13.05
14
15
16
17
18

SEAL VERTICAL CONTROL TRANSITO ZONA TRABAJO


PROTECCION AMBIENTAL
PLANTAS ARBOLES ARBUSTOS ALTO 1.20 M
LIMPIEZA FINAL DE OBRA
RESTAURACION AREAS DISTURBADAS EN CANTERAS
RESTAURACION DE AREAS UTILIZADAS COMO CAMPAMENTOS Y MAQUINARIAS
ACONDICIONAMIENTO EN BOTADEROS
OTROS
PLACA RECORDATORIA
FLETE
ROTURA DE VEREDAS
REPOSICION DE CUERPOS Y TAPAS DE BUZON

505.44

505.44

505.44

2,352.00
3,730.46
8,800.00

2,352.00
3,730.46
8,800.00

2,352.00
3,730.46
8,800.00

4,840.00

4,840.00
2,000.00

2,000.00
800.00
8,000.00
2,036.63
8,587.08

800.00
8,000.00
2,036.63
8,587.08

4,840.00
2,000.00
800.00
8,000.00
2,036.63
8,587.08