Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Ronald Vivienda Unifamiliar 10042014
Ronald Vivienda Unifamiliar 10042014
Obra
Form.
Cliente
Ubicac.
N
05.02.00
N de
N
Long.
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Peso
DESCRIPCION
Diam. Veces Piezas Pieza
0.25
0.56
1.02
1.56
2.26
4.04
Kg
TOTAL
kg
ACERO
114.19
Longitudinal
Transversal
05.02.00
3/8"
1/2"
1/4"
1/2"
0.00
6
6
4
24
2.9
1.2
0.00
70.99
43.20
0.00
69.60
172.80
0.00
VIGAS
VIGA 1
79.27
Longitudinal
Transversal
3/8"
1/2"
1/4"
1/2"
0.00
3
2
4
24
5.3
1.2
0.00
64.87
14.40
0.00
63.60
57.60
0.00
VIGA 2
63.65
Longitudinal
Transversal
05.03.03
3/8"
1/2"
1/4"
1/2"
0.00
2
2
4
34
5.3
1.2
1/4"
1/2"
1
1
20
15
5
6
0.00
0.00
43.25
20.40
0.00
90.00
265.60
25.00
91.80
373.91
42.40
81.60
ACERO
116.80
Longitudinal
Losa aligerada
100.00
412.00
0.00
0.00
0.00
0.00
373.91
PLANILLA DE METRADOS
Obra
Form.
Cliente
Ubicac.
N
PARTIDA
01.00.00
01.01.00
01.01.01
01.01.02
01.01.03
01.01.04
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
03.00.00
03.01.01
02.01.02
03.02.01
03.02.01.01
03.03.01
03.03.01.01
03.03.01.02
03.03.01.02
04.00.00
04.01.01
04.01.01.01
04.02.00
04.02.01
04.02.02
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
DESCRIPCION
OBRAS PROVISIONALES
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCION
DESAGUE PARA LA CONSTRUCCION
ENERGIA ELECTRICA PROVISIONAL
INSTALACIONES TELEFONICA Y COMUNICACIN PROVISIONAL
CONSTRUCCIONES PROVISIONALES
CERCO PERIMETRICO
CASETA GUARDIANIA
OFICINA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
VESTUARIO
SEVICIOS HIGIENICOS
ALMACENES
COMEDOR
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZOS, NIVELES Y REPLANTEO
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
REPLANTEO DURANTE EL PROCESO
ESTRUCTURAS
MOVIEMIENTO DE TIERRAS
NIVELACION DE TERRENO (HASTA 30 CM)
EXCAVACIONES
EXCAVACIONES SIMPLES
EJE A-A, ENTRE EJE 1-3
EJE 1-1, ENTRE EJE A-B
EJE 2-2, ENTRE EJE A-B
EJE A'-A', ENTRE EJE 1-3
RELLENOS
RELLENO CON MATERIAL PROPIO
EJE A-A, ENTRE EJE 1-3
EJE 1-1, ENTRE EJE A-B
EJE 2-2, ENTRE EJE A-B
EJE A'-A', ENTRE EJE 1-3
ESPONJAMIENTO 30%
NIVELACION INTERIOR Y APISONADO
Area bao
Area Cocina
Area sala comedor
ELIMINACION DE MATERIAL EXCEDENTE HASTA 30 MTS
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTO CORRIDO
EJE A-A, ENTRE EJE 1-3
EJE 1-1, ENTRE EJE A-B
EJE 2-2, ENTRE EJE A-B
EJE A'-A', ENTRE EJE 1-3
SOBRECIMIENTOS
CONCRETO
EJE A-A, ENTRE EJE 1-3
EJE 1-1, ENTRE EJE A-B
EJE 2-2, ENTRE EJE A-B
EJE A'-A', ENTRE EJE 1-3
ENCOFRADO Y DESENCOFRADO
EJE A-A, ENTRE EJE 1-3
EJE 1-1, ENTRE EJE A-B
EJE 2-2, ENTRE EJE A-B
EJE A'-A', ENTRE EJE 1-3
CONCRETO ARMADO
COLUMNAS
CONCRETO
ENCOFRADO Y DESENCOFRADO
ACERO
VIGAS
CONCRETO
VIGA 1
VIGA 2
VIGA 3
ENCOFRADO Y DESENCOFRADO
VIGA 1
VIGA 2
VIGA 3
ACERO
LOSA ALIGERADA
CONCRETO
ENCOFRADO Y DESENCOFRADO
LONGITUDINAL
TRANSVERSAL
ACERO
UND CANTIDAD
LARGO
ANCHO
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
ML
M2
M2
GLB
M2
M2
M2
Und
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
6.00
2.00
3.00
1.00
3.00
1.20
3.00
3.00
5.00
3.00
5.00
M2
1.00
M2
M2
M2
ALTO
PARCIAL
TOTAL
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
2.00
4.00
4.00
30.00
6.00
15.00
1.00
15.00
4.80
12.00
12.00
30.00
6.00
15.00
1.00
15.00
4.80
12.00
12.00
5.00
6.00
30.00
30.00
1.00
1.00
5.00
5.00
6.00
6.00
30.00
30.00
30.00
30.00
5.00
6.00
30.00
30.00
2.00
2.00
1.00
1.00
6.00
3.80
3.80
1.13
0.60
0.60
0.40
0.40
1.10
1.10
1.10
1.10
7.92
5.02
1.67
0.50
2.00
2.00
1.00
1.00
5.70
4.35
4.50
1.13
0.35
0.45
0.25
0.25
0.30
0.30
0.30
0.30
1.20
1.17
0.34
0.08
3.46
M2
M2
M2
M2
M3
1.00
1.00
1.00
1.00
2.18
2.18
4.50
15.11
1.70
1.70
3.85
6.25
M3
M3
M3
M3
M3
2.00
2.00
1.00
1.00
6.00
3.80
3.80
1.13
0.25
0.15
0.15
0.15
0.50
0.50
0.50
0.50
1.50
0.57
0.29
0.08
2.00
2.00
1.00
1.00
6.00
3.80
3.80
1.13
0.60
0.60
0.40
0.40
0.80
0.80
0.80
0.80
5.76
3.65
1.22
0.36
4.00
4.00
2.00
2.00
6.00
3.80
3.80
1.13
0.60
0.60
0.40
0.40
6.00
24.00
0.25
0.25
0.25
0.25
2.40
2.40
0.90
3.60
2.00
2.00
1.00
5.25
4.50
4.50
0.25
0.15
0.25
0.20
0.20
0.20
0.53
0.27
0.23
4.00
4.00
2.00
5.25
4.50
4.50
0.25
0.15
0.25
0.20
0.20
0.20
1.05
0.54
0.45
M3
15.11
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M3
M2
KG
M3
M3
M3
M3
M2
M2
M2
M2
KG
M3
M2
M2
M2
KG
6.25
24.74
3.71
3.71
17.33
8.85
8.85
2.44
10.99
27.46
14.40
9.12
3.04
0.90
0.90
3.60
114.19
1.02
2.04
142.92
1.00
5.00
6.00
0.20
6.00
2.00
2.00
5.00
6.00
6.00
5.00
0.20
0.20
12.00
12.00
6.00
24.00
116.80
05.03.04
06.00.00
06.01.00
07.00.00
07.01.00
07.01.01
07.01.02
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.04.01
08.04.02
08.05.00
08.05.01
08.05.02
08.06.00
08.07.00
08.08.00
1.00
30.00
8.33
249.90
1.00
5.00
6.00
30.00
2.00
1.00
1.00
1.00
1.00
5.25
7.02
10.06
5.10
3.06
2.40
25.20
7.02
10.06
5.10
3.06
2.00
1.00
1.00
1.00
1.00
5.25
7.02
10.06
5.10
4.43
2.40
25.20
7.02
10.06
5.10
4.43
1.00
1.00
8.16
25.50
4.98
2.00
1.00
1.00
1.00
1.00
1.00
1.00
5.70
3.75
2.72
0.75
0.50
0.25
0.30
2.40
2.40
2.40
2.40
2.40
2.40
1.00
27.36
9.00
6.53
1.80
1.20
0.60
0.30
2.00
1.00
1.00
1.00
1.00
1.00
5.50
8.20
0.75
0.50
0.25
0.30
2.60
2.60
2.60
2.60
1.00
28.60
8.20
1.95
1.30
0.65
0.30
6.00
6.00
0.25
0.25
2.60
2.40
2.85
2.65
4.00
8.00
2.60
2.40
10.40
19.20
4.00
4.00
5.50
5.50
22.00
22.00
2.00
2.00
2.00
2.00
2.18
0.80
1.50
1.50
0.30
1.00
1.00
8.16
25.50
4.98
2.76
15.90
25.50
12.00
36.00
0.01
0.01
0.01
0.01
2.40
2.40
14.42
2.42
249.90
30.00
50.44
51.81
41.40
2.76
15.90
25.50
46.79
41.00
5.50
29.60
22.00
22.00
13.01
6.00
6.53
0.48
41.40
16.84
Obra
Form.
Cliente
Ubicac.
ITEM
01.00.00
01.01.00
01.01.01
01.01.02
01.01.03
01.01.04
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
03.00.00
03.01.01
02.01.02
03.02.01
03.02.01.01
03.03.01
03.03.01.01
03.03.01.02
03.03.01.03
04.00.00
04.01.01
04.01.01.01
04.02.00
04.02.01
04.02.02
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.03.04
06.00.00
06.01.00
07.00.00
07.01.00
07.01.01
07.01.02
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.04.01
08.04.02
08.05.00
08.05.01
08.05.02
08.06.00
08.07.00
08.08.00
P. UNITARIO
800.00
800.00
800.00
800.00
22.57
22.57
22.57
800.00
22.57
528.70
453.30
303.78
2.65
4.90
4.90
2.61
34.05
34.05
2.43
22.70
221.17
269.99
36.31
650.46
51.94
41.18
444.58
59.36
7.48
464.71
87.09
8.69
6.48
38.45
156.39
101.93
21.66
23.99
51.85
33.80
10.19
47.35
11.32
15.61
21.66
8.39
7.850000%
7.500000%
P. PARCIAL
17,485.88
3,200.00
800.00
800.00
800.00
800.00
13,912.27
677.07
135.41
338.53
800.00
338.53
2,537.75
5,439.61
3,645.37
79.56
79.56
294.05
147.03
147.03
14,313.94
78.39
78.39
514.27
514.27
473.94
212.85
60.15
200.95
3,505.60
539.60
539.60
2,965.99
2,965.99
997.21
9,741.74
5,474.98
585.42
187.00
4,702.56
1,643.07
453.47
121.10
1,068.50
7,513.25
2,788.26
2,090.16
1,014.69
1,620.14
1,153.58
1,153.58
20,332.47
13,168.69
7,888.13
5,280.57
4,144.65
896.59
1,122.40
2,125.66
487.42
185.90
301.52
1,290.74
1,041.74
249.00
203.03
896.59
141.35
52,132.29
4,092.38
3,909.92
60,134.60
10,824.23
70,958.82
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
GLB
800.00
PARCIAL S/. TOTAL S/.
800.00
GLB
800.00
PARCIAL S/. TOTAL S/.
800.00
GLB
800.00
PARCIAL S/. TOTAL S/.
800.00
GLB
800.00
PARCIAL S/. TOTAL S/.
800.00
ML
22.57
PARCIAL S/. TOTAL S/.
17.11
5.00
4.30
7.81
4.60
0.55
0.55
3.50
0.86
0.86
M2
22.57
PARCIAL S/. TOTAL S/.
17.11
5.00
4.30
7.81
4.60
0.55
0.55
3.50
0.86
0.86
M2
22.57
PARCIAL S/. TOTAL S/.
17.11
5.00
4.30
7.81
4.60
0.55
0.55
3.50
0.86
0.86
GLB
800.00
PARCIAL S/. TOTAL S/.
800.00
M2
22.57
PARCIAL S/. TOTAL S/.
17.11
5.00
4.30
7.81
4.60
0.55
0.55
3.50
0.86
0.86
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
M2
4.90
PARCIAL S/. TOTAL S/.
2.48
0.25
1.25
0.98
1.00
0.55
0.45
1.42
0.07
1.33
0.02
M2
2.61
PARCIAL S/. TOTAL S/.
2.35
0.13
1.25
0.98
0.26
0.07
0.14
0.06
M3
34.05
PARCIAL S/. TOTAL S/.
33.05
3.75
29.30
0.99
0.99
M3
34.05
PARCIAL S/. TOTAL S/.
33.05
3.75
29.30
0.99
0.99
M2
2.43
PARCIAL S/. TOTAL S/.
2.18
0.13
1.07
0.98
0.26
0.07
0.14
0.06
M3
22.70
PARCIAL S/. TOTAL S/.
22.04
2.50
19.54
0.66
0.66
M3
221.17
PARCIAL S/. TOTAL S/.
64.24
1.13
11.25
9.67
37.51
4.69
123.00
71.55
31.85
19.60
33.93
32.00
1.93
M3
269.99
PARCIAL S/. TOTAL S/.
122.05
2.40
24.01
20.63
75.02
4.40
144.28
96.73
29.10
18.45
3.66
51.20
3.66
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
HABILITACION
ENCOFRADO
PARTIDA
RENDIMIENTO
DESENCOFRA
DO
PARTIDA
RENDIMIENTO
ENCOFRADO
PARTIDA
RENDIMIENTO
HABILITACION
ENCOFRADO
PARTIDA
RENDIMIENTO
DESENCOFRA
DO
PARTIDA
RENDIMIENTO
ENCOFRADO
M2
59.36
PARCIAL S/. TOTAL S/.
32.66
1.67
16.67
14.33
25.72
24.35
0.83
0.55
0.98
0.98
KG
7.48
PARCIAL S/. TOTAL S/.
1.18
0.06
0.60
0.52
5.15
4.82
0.33
1.16
0.04
1.12
M3
464.71
PARCIAL S/. TOTAL S/.
142.06
7.50
15.00
25.79
93.77
315.55
257.85
31.20
26.50
7.10
7.10
M2
64.00
PARCIAL S/. TOTAL S/.
3.92
0.20
2.00
1.72
M2
10.09
3.58
6.51
M2
24.50
1.25
12.50
10.74
24.33
23.18
0.61
0.55
1.16
1.16
M2
23.09
PARCIAL S/. TOTAL S/.
3.06
0.16
1.56
1.34
M2
5.05
1.79
3.26
M2
12.25
0.63
6.25
5.37
2.13
2.07
0.06
0.61
0.61
PARTIDA
RENDIMIENTO
HABILITACION
PARTIDA
RENDIMIENTO
COLOCACION
PARTIDA
RENDIMIENTO
SUBIDA Y
COLOCACION
PARTIDA
RENDIMIENTO
ASENTADO
RENDIMIENTO
FRAGUADO
RENDIMIENTO
ACARREO
PARTIDA
RENDIMIENTO
COLOCACION
RENDIMIENTO
ACARREO
PARTIDA
RENDIMIENTO
COLOCACION
RENDIMIENTO
ACARREO
PARTIDA
RENDIMIENTO
05.03.03 ACERO
KG/DIA 250.00
DESCRIPCION DEL RECURSO
UND
MANO DE OBRA
CAPATAZ
HH
OPERARIO
HH
OFICIAL
HH
05.03.03 ACERO
KG/DIA 250.00
CAPATAZ
HH
OPERARIO
HH
OFICIAL
HH
MATEREIALES
FIERRO CORRUGADO DE 1/2" (PROMEDIO)
KG
ALAMBRE NEGRO RECOGIDO #8
KG
EQUIPOS
HERRAMIENTAS MANUALES
%MO
CIZALLA
HM
05.03.04 LADRILLO PARA EL TECHO (30X30*15 CM) (08.33/M2)
UND/DIA 2000.00
DESCRIPCION DEL RECURSO
UND
MANO DE OBRA
CAPATAZ
HH
OPERARIO
HH
OFICIAL
HH
PEON
HH
MATEREIALES
LADRILLO 15X30X30 ARC. HUECO
PZA
EQUIPOS
HERRAMIENTAS MANUALES
%MO
06.01.00 LADRILLO PASTELERO
M2/DIA 30.00
DESCRIPCION DEL RECURSO
UND
MANO DE OBRA
CAPATAZ
HH
OFICIAL
HH
PEON
HH
M2/DIA 40.00
CAPATAZ
HH
OFICIAL
HH
PEON
HH
M2/DIA 65.00
PEON
HH
MATEREIALES
LADRILLO PASTELERO SOLIDO 24X24X3
PZA
CEMENTO PORTLAND TIPO IP (42.5KG)
BLS
ARENA FINA
M3
EQUIPOS
REGLA DE MADERA
P2
HERRAMIENTAS MANUALES
%MO
07.01.01 MURO DE LADRILLO KING KONG DE CABEZA
M2/DIA 6.45
DESCRIPCION DEL RECURSO
UND
MANO DE OBRA
CAPATAZ
HH
OPERARIO
HH
PEON
HH
M2/DIA 16.13
PEON
HH
MATEREIALES
LADRILLO KING KONG 24X12X9 DE SOGA
PZA
CEMENTO PORTLAND TIPO IP (42.5KG)
BLS
ARENA GRUESA
M3
EQUIPOS
ANDAMIO DE MADERA
P2
CLAVOS DE 3"
KG
HERRAMIENTAS MANUALES
%MO
07.01.02 MURO DE LADRILLO KING KONG DE SOGA
M2/DIA 9.46
DESCRIPCION DEL RECURSO
UND
MANO DE OBRA
CAPATAZ
HH
OPERARIO
HH
PEON
HH
M2/DIA 27.03
PEON
HH
MATEREIALES
LADRILLO KING KONG 24X12X9 DE SOGA
PZA
CEMENTO PORTLAND TIPO IP (42.5KG)
BLS
ARENA GRUESA
M3
EQUIPOS
ANDAMIO DE MADERA
P2
CLAVOS DE 3"
KG
HERRAMIENTAS MANUALES
%MO
08.01.00 TARRAJEO PRIMARIO O RAYADO
M2/DIA 15.00
DESCRIPCION DEL RECURSO
UND
MANO DE OBRA
CAPATAZ
HH
OPERARIO
HH
PEON
HH
MATEREIALES
CEMENTO PORTLAND TIPO IP (42.5KG)
BLS
ARENA FINA
M3
EQUIPOS
ANDAMIO DE MADERA
P2
CLAVOS DE 3"
KG
REGLA DE MADERA
P2
HERRAMIENTAS MANUALES
%MO
KG
1.18
0.06
0.60
0.52
5.15
1.0700000
0.0600000
4.50
5.50
4.82
0.33
3.0000000
0.0320000
2.35
35.00
0.07
1.12
1.19
1.0000
PARTIDA
RENDIMIENTO
PAETEO
RENDIMIENTO
TARRAJEO
PARTIDA
RENDIMIENTO
PAETEO
RENDIMIENTO
TARRAJEO
RENDIMIENTO
ARMAR
ANDAMIO
RENDIMIENTO
DESARMAR
ANDAMIO
PARTIDA
RENDIMIENTO
PAETEO Y
TARRAJEO
PARTIDA
RENDIMIENTO
PAETEO Y
TARRAJEO
PARTIDA
RENDIMIENTO
PAETEO Y
TARRAJEO
PARTIDA
RENDIMIENTO
PAETEO Y
TARRAJEO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PARTIDA
RENDIMIENTO
PAETEO Y
TARRAJEO
0.24
%MO
3.0000000
8.15
0.24
UNIDAD
M3
CONCRETO
METRADO
157
C.U.
307.9333333
UNIDAD
HH
HH
BOLSAS
M3
M3
%MO
HM
CUADRILLA
2
10
15
8
CANTIDAD
1.066666667
5.333333333
10
0.5
0.5
10%
0.533333333
PARCIAL
48345.53333
M3/DIA
HORAS/DIA
PRECIO
PARCIAL
15
16
10
53.33333333
MO
17
170
30
15
40
20
MATERIALES
69.33333333 6.933333333
50
26.66666667
EQUIPOS
69.33333333
205
33.6