Está en la página 1de 1

Fecha:

07/05/12

COMPARATIVOS DE PRECIOS UNITARIOS


VINCHOS 2012

ITEM

DESCRIPCION

Unidad

2012

2012

VINCHOS
US$

CERRRO PASCO
US$

2011
(%)
INCREMENTO

INCIMMET
US$

37.10%
EXPLOTACIN
Explot OCF JackLeg + Scoop
Explot OCF Jumbo + Scoop

US$/m3
US$/m3

23.21
32.29

23.09
21.64

0.55%
49.23%

EXCAVACIONES MECANIZADAS
Rpa /crucero/by pass 4.0x4.0 (-)
Galeria /crucero/by pass 4.0x4.0 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x4.0 (H) o Rpa(+)
Rpa/crucero/by pass 3.5x3.5 (-)
Galeria/crucero/by pass 3.5x3.5 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x3.5 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x3.0 (H) o Rpa(+)

US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml

480.84
440.06
412.73
429.58
402.51
377.18
348.60

346.79
323.60

38.65%
35.99%

EXCAVACIONES CONVENCIONAL
Rpa /crucero/by pass 4.0x4.0 (-)
Galeria /crucero/by pass 4.0x4.0 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x4.0 (H) o Rpa(+)
Rpa/crucero/by pass 3.5x3.5 (-)
Galeria/crucero/by pass 3.5x3.5 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x3.5 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x3.0 (H) o Rpa(+)
Chimenea 2.0 m x 2.0 m
Chimenea 1.5 m x 1.5 m

US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml

416.93
376.98
354.33
393.27
358.88
343.29
327.99
241.94
217.51

299.18
262.65

SOSTENIMIENTO
Instalacin Perno Split Set de 7'
Instalacin Malla Electrosoldada 4" x 4"
Instalacin Perno Helicoidal de 8'
Cuadro Armado de 15'X12', 15'X10',15'X9'
Cuadro Armado de 12'X12', 12'X10'
Cuadro Armado de 10'X10', 10'X9', 8'X8'
Colocacin Shotcrete Va Seca 1" y 2"
Instalacin de Cimbra 3.5 X 3.5
Instalacin de Cimbra 4.0 X 4.0

US$/und
US$/m2
US$/und
US$/und
US$/und
US$/und
US$/m2
US$/Pza
US$/Pza

10.30
7.58
10.87
311.41
266.20
260.10
13.99
259.26
311.11

SERVICIOS
Limpieza de Mineral/Desmonte - Scoop 150m
Instalacin de Tuberia de 2" y 4"
Desquinche JackLeg+Scoop RD
Servicios con Scoop de 4y3
Costo de tareas cuenta Administracin
Servicio de muestreo mina y superficie
Encofrado y Desencofrado

US$/m3
US$/ml
US$/m3
US$/hr
US$/tarea
S/. /mes
US$/m2

4.96
3.99
16.06
86.42
47.03
34,696.39
19.00

262.34

202.73

163.38

13.67

(%)
INCREMENTO
29.66%

398.73
367.40

20.59%
19.78%

347.25
322.08

23.71%
24.97%

289.62

20.36%

404.36
356.04

3.11%
5.88%

328.70
282.42

19.64%
27.07%

237.66

38.00%

129.67

67.74%

10.82
6.80
9.11
206.80
177.26
143.17

-4.81%
11.43%
19.35%
50.58%
50.18%
81.67%

175.34
228.06

47.86%
36.42%

14.15

34.29%

43.77%

39.36%
43.53%

69.33%

33.13%

17.41%

NOTA.
En el Sostenimiento no se esta considerando el costo de los elementos de sostenimiento.
Antecedentes:
PRIMERO.- EL ANALISIS DE PRECIOS UNITARIOS PLANTEADOS POR "CERRO DE PASCO - 2012" SON BAJOS PORQUE SUS GASTOS GENERALES + UTILIDADES LLEGAN
SOLO AL 10%, EN VINCHOS SE PLANTEA UN 25% A ESTOS GASTOS.
SEGUNDO.- SI BIEN ES CIERTO "INCIMMET - 2011" CONSIDERA LOS GASTOS GENERALES EN UN 17% Y UNA UTILIDAD DE 10% SUS PRECIOS SON BAJOS POR QUE EL
PRECIO DE MANO DE OBRA CONSIDERADA ES BAJA TAMBIEN
Conclusion.Los Precios Unitarios Entregados por Vinchos exeden a los demas en un 33% promedio.

-----------------------------------------------------------------------------------------------------------------------------------------------------YURAQMAYO SAC

DEPARTAMENTO TECNICO YURAQMAYO

También podría gustarte