Documentos de Académico
Documentos de Profesional
Documentos de Cultura
07/05/12
ITEM
DESCRIPCION
Unidad
2012
2012
VINCHOS
US$
CERRRO PASCO
US$
2011
(%)
INCREMENTO
INCIMMET
US$
37.10%
EXPLOTACIN
Explot OCF JackLeg + Scoop
Explot OCF Jumbo + Scoop
US$/m3
US$/m3
23.21
32.29
23.09
21.64
0.55%
49.23%
EXCAVACIONES MECANIZADAS
Rpa /crucero/by pass 4.0x4.0 (-)
Galeria /crucero/by pass 4.0x4.0 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x4.0 (H) o Rpa(+)
Rpa/crucero/by pass 3.5x3.5 (-)
Galeria/crucero/by pass 3.5x3.5 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x3.5 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x3.0 (H) o Rpa(+)
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
480.84
440.06
412.73
429.58
402.51
377.18
348.60
346.79
323.60
38.65%
35.99%
EXCAVACIONES CONVENCIONAL
Rpa /crucero/by pass 4.0x4.0 (-)
Galeria /crucero/by pass 4.0x4.0 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x4.0 (H) o Rpa(+)
Rpa/crucero/by pass 3.5x3.5 (-)
Galeria/crucero/by pass 3.5x3.5 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x3.5 (H) o Rpa(+)
Galeria/crucero/by pass 3.0x3.0 (H) o Rpa(+)
Chimenea 2.0 m x 2.0 m
Chimenea 1.5 m x 1.5 m
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
US$/ml
416.93
376.98
354.33
393.27
358.88
343.29
327.99
241.94
217.51
299.18
262.65
SOSTENIMIENTO
Instalacin Perno Split Set de 7'
Instalacin Malla Electrosoldada 4" x 4"
Instalacin Perno Helicoidal de 8'
Cuadro Armado de 15'X12', 15'X10',15'X9'
Cuadro Armado de 12'X12', 12'X10'
Cuadro Armado de 10'X10', 10'X9', 8'X8'
Colocacin Shotcrete Va Seca 1" y 2"
Instalacin de Cimbra 3.5 X 3.5
Instalacin de Cimbra 4.0 X 4.0
US$/und
US$/m2
US$/und
US$/und
US$/und
US$/und
US$/m2
US$/Pza
US$/Pza
10.30
7.58
10.87
311.41
266.20
260.10
13.99
259.26
311.11
SERVICIOS
Limpieza de Mineral/Desmonte - Scoop 150m
Instalacin de Tuberia de 2" y 4"
Desquinche JackLeg+Scoop RD
Servicios con Scoop de 4y3
Costo de tareas cuenta Administracin
Servicio de muestreo mina y superficie
Encofrado y Desencofrado
US$/m3
US$/ml
US$/m3
US$/hr
US$/tarea
S/. /mes
US$/m2
4.96
3.99
16.06
86.42
47.03
34,696.39
19.00
262.34
202.73
163.38
13.67
(%)
INCREMENTO
29.66%
398.73
367.40
20.59%
19.78%
347.25
322.08
23.71%
24.97%
289.62
20.36%
404.36
356.04
3.11%
5.88%
328.70
282.42
19.64%
27.07%
237.66
38.00%
129.67
67.74%
10.82
6.80
9.11
206.80
177.26
143.17
-4.81%
11.43%
19.35%
50.58%
50.18%
81.67%
175.34
228.06
47.86%
36.42%
14.15
34.29%
43.77%
39.36%
43.53%
69.33%
33.13%
17.41%
NOTA.
En el Sostenimiento no se esta considerando el costo de los elementos de sostenimiento.
Antecedentes:
PRIMERO.- EL ANALISIS DE PRECIOS UNITARIOS PLANTEADOS POR "CERRO DE PASCO - 2012" SON BAJOS PORQUE SUS GASTOS GENERALES + UTILIDADES LLEGAN
SOLO AL 10%, EN VINCHOS SE PLANTEA UN 25% A ESTOS GASTOS.
SEGUNDO.- SI BIEN ES CIERTO "INCIMMET - 2011" CONSIDERA LOS GASTOS GENERALES EN UN 17% Y UNA UTILIDAD DE 10% SUS PRECIOS SON BAJOS POR QUE EL
PRECIO DE MANO DE OBRA CONSIDERADA ES BAJA TAMBIEN
Conclusion.Los Precios Unitarios Entregados por Vinchos exeden a los demas en un 33% promedio.
-----------------------------------------------------------------------------------------------------------------------------------------------------YURAQMAYO SAC