210 das
PRESUPUESTO:
COSTO DIRECTO (CD)
S/. 1,485,509.56
S/.
S/. 1,686,053.35
S/.
S/ 2,006,403.49
200,543.79
320,350.14
UBICACION GEOGRAFICA:
-
APLICANDO LA METODOLOGIA
PRIMER PASO: CONVERTIR DIAS UTILES A DIAS CALENDARIOS
Entonces los 210 dias se convierten en 210/1.2 = 175 das tiles(du)
SEGUNDO PASO: Determinar el buffer o amortiguador del plazo del proyecto.
Elegimos el 20% de 175du = 35 du
Nuestro buffer ser de 35 dias
TERCER PASO: Elaborar el wbs del proyecto. (ANEXO DEL TRABAJO)
HOJA DE PROGRAMACION
DESCRIPCIN
LABORATORIO DE CIENCIAS
MDULO UNO
ESTRUCTURAS
MOVIMIENTO DE TIERRA
EXCAVACION DE ZANJA EN TERR./ ROCA SUELTA
EXCAVACION MASIVA
EXCAVACION DE ZAPATAS EN ROCA SUELTA H=1.20 M.
RELLENO + COMPACTACION CON MATERIAL PROPIO.
REFINE,NIVELACION Y COMPACT EN ROCA SUELTA
ACARREO DE MATERIAL DISTANCIA 30 M.
ELIMINACION DE MATERIAL
CONCRETO SIMPLE
CONCRETO 1:10 +30% P.G. c/corr-falso cimiento corrido
CONCRETO 1:10 +30% P.G. c/corr-cimiento corrido
ENCOFRADO Y DESENCOFRADO NORM. - cimiento corrido
SOLADO DE CONCRETO (C:H) 1:12 E=2"
CONCRETO 1:6+25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORM. - SOBREC.
CONCRETO ARMADO
ZAPATAS
CONCRETO F'C=210 KG/CM2 ZAPATAS
ENCOFRADO PARA ZAPATAS
ACERO FY= 4200 KG/CM2 R- 250kg/dia
VIGAS DE CIMENTACION
CONCRETO F'C=210 KG/CM2 - VIGAS DE CIMENTACION
ENCOFRADO PARA VIGAS DE CIMENTACION
ACERO FY= 4200 KG/CM2 R- 250kg/dia
TABIQUES Y PLACAS
UND
CANT.
CD (S/.)
M3
M3
M3
M3
M2
M3
M3
116.49
2,433.81
371.73
227.39
2,792.10
260.83
3,503.03
4,148.19
10,698.68
22,043.61
3,993.06
2,792.10
2,847.16
49,121.96
0.10
0.10
0.10
0.10
0.10
0.10
0.10
M3
M3
M2
M2
M3
M2
47.13
24.18
132.14
391.59
7.77
110.79
5,522.14
2,837.22
3,415.71
5,243.29
1,460.95
2,329.23
0.20
0.20
0.10
0.20
0.30
0.10
M3
M2
KG
165.24
277.87
4,669.86
M3
M2
KG
14.97
85.59
1,746.70
CAP OP
OF
PE
Ru
Rend
HH
1.00
1.00
1.00
0.00
0.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
2.50
180.00
1.50
24.00
100.00
8.00
280.00
3.5200
0.0933
5.8667
1.0333
0.1680
1.1000
0.0314
410
227
2181
235
469
287
110
2.00
2.00
1.00
3.00
3.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
8.00
8.00
8.00
8.00
-
25.00
25.00
13.50
120.00
12.50
16.00
3.9040
3.5840
1.2444
0.8133
7.8720
1.0500
184
87
164
318
61
116
40,629.82
8,083.56
14,364.97
25.00
22.00
250.00
2.3520
0.9455
0.0672
389
263
314
3,857.12
2,747.22
5,372.89
25.00
14.00
250.00
2.9440
1.2000
0.0672
44
103
117
M3
M2
KG
76.45
1,006.40
7,061.44
23,126.09
27,463.54
21,721.72
12.00
12.00
250.00
8.1333
1.4000
0.0672
622
1409
475
M3
M2
KG
40.63
398.79
8,672.43
11,416.71
12,304.15
26,677.17
25.00
10.00
250.00
2.6240
1.6800
0.0672
107
670
583
M3
M2
KG
11.58
201.27
1,567.98
3,545.05
6,210.00
4,823.34
8.00
10.00
250.00
12.0000
1.6800
0.0672
139
338
105
M3
M2
KG
143.65
1,043.68
17,606.33
40,478.89
34,162.54
54,158.51
20.00
10.00
250.00
2.8800
1.6800
0.0672
414
1753
1183
M3
9.91
2,913.63
12.00
8.1333
81
M2
117.32
KG
599.42
3,619.96
1,843.88
1.00 1.00
0.10
0.10 1.00 1.00
10.00
250.00
1.6800
0.0672
197
40
M3
M2
KG
UND
97.11
1,096.83
5,268.66
9,138.00
27,451.58
26,806.61
16,207.38
13,733.96
0.20
0.10
0.10
0.10
2.3040
1.1586
0.0672
0.0555
224
1271
354
507
M3
M2
KG
23.40
90.24
1,781.22
6,721.99
3,441.54
5,479.21
20.00
8.00
250.00
2.8800
2.1000
0.0672
67
190
120
M3
M2
KG
31.73
206.72
2,998.77
9,006.61
5,713.09
9,224.53
25.00
12.00
250.00
2.3040
1.4000
0.0672
73
289
202
1.00
1.00
1.00
1.00
TANQUE ELEVADO
CONCRETO F'C=245 KG/CM2 - TANQUE ELEVADO
ENCOFRADO Y DESENCOFRADO . -TANQUE ELEVADO
ACERO FY= 4200 KG/CM2 R- 250kg/dia
BASES DE CONCRETO
CONCRETO fc=140Kg/cm2 BASE PARA MUEBLES
ENCOFRADO Y DESENCOFRADO - MESAS DE CONCRETO
MURO DE CONTENCION
CONCRETO F'C=210 KG/CM2 - MURO DE CONTENCION
ENCOFRADO Y DESENCOFR- MUROS DE CONTENCION
ACERO FY= 4200 KG/CM2 R- 250kg/dia
ARQUITECTURA
ACABADOS HUMEDOS
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK, APAREJO DE CABEZA C:A: 1:4
MURO DE LADRILLO KK, APAREJO DE SOGA C:A: 1:4
MURO DE LADRILLO KK, APAREJO DE CANTO C:A: 1:4
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO O RAYADO
TARRAJEO FROTACHADO EN INTERIORES MEZ C:A 1:4 E
TARRAJEO FROTACHADO EXTERIORES
TARRAJEO ELEMENTOS ESTRUCTURALES
VESTIDURA DE DERRAMES C:A 1:5 E= 1.5 C.M.
TARRAJEO IMPERMEABLE
BRUAS
CIELORRASOS
TARRAJEO DE CIELO RASOS C:A 1:4 E=1.5CM
VESTIDURA DE FONDO ESCALERA CON CEMENTO-ARENA
PISOS Y PAVIMENTOS
FALSO PISO e=0.10 m
CONTRAPISO DE CEMENTO e= 40 mm
VEREDA DE CONCRETO F'C=140 KG/CM2 E=10CM.
M3
M2
KG
11.47
109.26
907.71
3,550.63
3,293.10
2,792.16
15.00
10.00
250.00
4.3733
1.6800
0.0672
50
184
61
M3
M2
47.47
6.65
1,245.10
214.47
100.00
10.00
0.5760
1.6800
27
11
M3
M2
KG
37.80
170.16
1,350.73
12,083.03
4,643.59
4,154.88
25.00
12.00
250.00
2.3040
1.4000
0.0672
87
238
91
M2
M2
M2
47.84
656.95
2.42
2,323.44
20,149.42
58.44
0.10 1.00
0.10 1.00
0.10 1.00
0.75
0.75
0.75
7.30
10.50
12.00
2.0274
1.4095
1.2333
97
926
3
M2
M2
M2
M2
ML
M2
M
244.46
1,316.26
762.27
1,454.16
247.25
184.05
1,144.76
3,086.83
16,930.90
12,004.29
31,802.65
2,032.38
3,775.85
4,828.56
0.10
0.10
0.10
0.10
0.10
0.10
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.33
14.00
14.00
12.00
7.40
20.00
10.00
30.00
0.9143
0.9143
1.0667
1.7297
0.6400
1.2800
0.3813
224
1203
813
2515
158
236
437
M2
1,196.98
23,742.80
0.10 1.00
0.75
10.00
1.4800
1772
M2
86.21
1,753.12
0.10 1.00
0.50
8.00
1.6000
138
M2
M2
M2
641.38
1,234.83
44.44
14,591.87
21,013.51
1,477.57
100.00
120.00
100.00
0.8960
0.8200
1.2080
575
1013
54
M2
M2
M2
M2
239.01
370.39
429.52
216.00
7,739.75
20,007.68
8,926.57
16,931.69
0.10
0.10
0.10
0.10
1.00
1.00
1.00
1.00
0.50
2.00
1.00
0.50
40.00
25.00
18.00
13.00
0.3200
0.9920
0.9333
0.9846
76
367
401
213
M
M
M
327.64
186.86
317.65
1,857.28
1,055.88
3,303.85
0.10 1.00
0.10 1.00
0.10 1.00
0.33
0.33
0.50
25.00
24.00
36.00
0.4576
0.4767
0.3556
150
89
113
M2
195.03
9,286.41
0.10 1.00
0.50
8.00
1.6000
312
M
M2
M2
M2
25.30
26.04
11.94
97.18
720.54
1,406.69
739.49
4,036.79
0.10
0.10
0.10
0.10
1.00
1.00
1.00
1.00
1.00
2.00
0.75
0.50
16.00
25.00
10.00
12.00
1.0500
0.9920
1.4800
1.0667
27
26
18
104
M2
745.40
16,797.13
0.10 1.00
2.00
20.00
1.2400
924
M2
M2
M2
M2
1,312.36
730.92
2,084.96
159.56
7,181.42
4,151.57
12,745.12
2,031.12
0.10
0.10
0.10
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
70.00
60.00
60.00
50.00
0.2400
0.2800
0.2800
0.3360
315
205
584
54
ML
255.85
M2
32.76
1,108.78
132.05
0.10 1.00
0.10 1.00
1.00
1.00
60.00
15.00
0.2800
1.1200
72
37
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
M3
M2
6.13
81.75
1,182.33
2,180.15
ML
165.00
696.06
M2
M2
M3
M2
M2
M2
UND
24.23
158.24
158.24
158.24
14.20
31.20
11.90
551.48
1,356.68
1,085.34
6,802.17
295.17
1,801.69
278.31
0.20
0.10
0.10
0.10
0.10
0.20
ML
M2
8.68
89.08
126.73
4,885.46
0.10 1.00
0.10 1.00
ML
ML
MES
GLB
GLB
ML
ML
17.80
6.60
1.00
1.00
1.00
94.00
308.30
467.96
73.82
5,475.97
1,064.77
2,203.76
1,717.87
846.19
1.00
25.00
12.50
3.9040
1.3440
24
110
0.10 1.00
0.33
30.00
0.3813
63
100.00
100.00
75.00
12.00
18.00
25.00
15.00
0.8960
0.4080
0.4373
1.0667
0.9333
0.7040
0.5333
22
65
69
169
13
22
6
0.50
1.00
12.00
8.00
1.0667
2.1000
9
187
1.00
1.00 1.00
12.00
14.00
1.00
1.00
1.00
20.00
20.00
1.00
1.00
25.00
34.00
34.00
0.20
0.8000
14
0.8800
6
96.0000
96
112.0000 112
0.3200
0
0.2353
22
0.2353
73
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
sub-contrato
sub-contrato
INTERRUPTORES
REDES DE DISTRIBUICION DE DATA Y VOZ
ARTEFACTO ILUMINACION INTERIORES
SISTEMA CONTRA INCENDIO
SISTEMA DE GAS
SALIDA DE GAS
SISTEMA DE AIRE COMPRIMIDO
SALIDA DE AIRE COMPRIMIDO
ALUMBRADO EXTERIOR
EQUIPOS
TANQUE DE GAS
COMPRESOR DE AIRE
CAMPANAS EXTRACTORAS ( INCLUYE DUCTERIA)
EQUIPO DE VACIO
EXTRACTOR DE AIRE
ESTABILIZADOR DE 30 KVA
PRUEBAS GENERALES
PRUEBA DE REDES ELECTRICAS Y RED DE PUESTA A
TIERRA
INSTALACIONES SANITARIAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA REDES SANITARIAS
REFINE Y ALINEAMIENTO DE ZANJA
CAMA DE APOYO DE ARENA 2"
RELLENO Y COMPACTACION C/EQUIPO
ELIMINACION DE MATERIAL
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE
REDES DE DISTRIBUICION Y VENTILACION
ADITAMENTOS VARIOS
CAMARA DE INSPECCION
ACCESORIOS DE DESAGUE
SISTEMA DE AGUA FRIA
PTO
24.00
1,330.29
0.10 1.00
1.00
10.00
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
1.6800
40
PTO
12.00
650.74
0.10 1.00
1.00
10.00
1.6800
UND
UND
UND
GLB
GLB
UND
1.00
1.00
1.00
1.00
1.00
1.00
3,867.76
0.10 1.00
1.00
1.00
4,500.00
3,250.00
13,061.09
0.10 2.00
1.00
0.50
16.8000
17
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
1,250.00
3,216.15
1.00
1.00
100.00
sub-contrato
M
M
m
M
M3
150.50
150.50
150.50
150.50
4.57
1.00
1.00
1.00
2.00
1.00
12.00
24.70
60.00
50.00
280.00
1,117.05
458.96
818.80
2,451.65
2,828.97
0.10
0.10
0.10
0.7333
0.3239
0.1467
0.3200
0.0314
20
110
49
22
48
0
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
UND
UND
1.00
1.00
5,254.00
35,160.00
Por Pareto: (20/80), hay 140 procesos: entonces 0.20x110 = 22, por el momento escogemos 7 procesos.
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
QUINTO PASO: Definimos la duracin de la actividades restrictivas, en este caso sern Excavacin de Zapatas en Roca Suelta y Tarrajeo de
Elementos Estructurales.
SEXTO PASO: Subordinar todas las duraciones (Tp) de todas las tareas a la (Tp) de la tarea restrictiva.
RECURSOS UNITARIOS
DESCRIPCIN
LABORATORIO DE CIENCIAS
MDULO UNO
ESTRUCTURAS
MOVIMIENTO DE TIERRA
EXCAVACION DE ZANJA EN TERR./ ROCA SUELTA
EXCAVACION MASIVA
EXCAVACION DE ZAPATAS EN ROCA SUELTA H=1.20
M.
RELLENO + COMPACTACION CON MATERIAL PROPIO.
REFINE,NIVELACION Y COMPACT EN ROCA SUELTA
ACARREO DE MATERIAL DISTANCIA 30 M.
ELIMINACION DE MATERIAL
CONCRETO SIMPLE
CONCRETO 1:10 +30% P.G. c/corr-falso cimiento corrido
CONCRETO 1:10 +30% P.G. c/corr-cimiento corrido
ENCOFRADO Y DESENCOFRADO NORM. - cimiento
corrido
SOLADO DE CONCRETO (C:H) 1:12 E=2"
CONCRETO 1:6+25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORM. - SOBREC.
CONCRETO ARMADO
ZAPATAS
CONCRETO F'C=210 KG/CM2 - ZAPATAS
ENCOFRADO PARA ZAPATAS
ACERO FY= 4200 KG/CM2 R- 250kg/dia
VIGAS DE CIMENTACION
UND
CANT.
CD (S/.)
CAP
OP
OF
PE
Ru
Rend
HH
Tu
Tp
M3
M3
116.49
2,433.81
4,148.19
10,698.68
0.10
0.10
1.00
1.00
1.00
2.50
180.00
3.5200
0.0933
410
227
47
14
30
14
1.55
0.97
M3
371.73
227.39
2,792.10
260.83
3,503.03
0.10
0.10
0.10
0.10
0.10
M3
M2
M3
M3
22,043.61
3,993.06
2,792.10
2,847.16
49,121.96
1.00
1.00
0.00
0.00
1.00
2.00
1.00
1.00
1.00
1.50
24.00
100.00
8.00
280.00
5.8667
1.0333
0.1680
1.1000
0.0314
2181 248 30
235
9
9
469
28 28
287
33 30
110
13 13
8.26
1.05
1
1.09
0.96
M3
M3
47.13
24.18
5,522.14
2,837.22
0.20
0.20
2.00
2.00
2.00
1.00
8.00
8.00
25.00
25.00
3.9040
3.5840
184
87
2
1
2
1
0.94
0.97
M2
132.14
1.00
391.59
7.77
110.79
0.10
0.20
0.30
0.10
1.00
M2
M3
M2
3,415.71
5,243.29
1,460.95
2,329.23
3.00
3.00
1.00
1.00
1.00
1.00
8.00
8.00
-
13.50
120.00
12.50
16.00
1.2444
0.8133
7.8720
1.0500
164
318
61
116
10
3
1
7
10
3
1
7
0.98
1.09
0.62
0.99
M3
M2
KG
165.24
277.87
4,669.86
40,629.82
8,083.56
14,364.97
0.35
0.10
0.10
1.00
1.00
1.00
2.00
1.50
1.00
4.00
-
25.00
22.00
250.00
2.3520
0.9455
0.0672
389
263
314
7
13
19
7
13
19
0.94
0.97
0.98
M3
14.97
1.00
2.00
M2
KG
1.00
1.00
1.00
1.00
6.00
-
25.00
14.00
250.00
2.9440
1.2000
0.0672
44
103
117
1
6
7
1
6
7
0.6
1.02
1
2.00
2.00
8.00
12.00
8.1333
622
1.06
1.00
1.00
1.00
1.00
12.00
250.00
1.4000
0.0672
1409
475
84
28
30
28
2.8
1.01
2.00
2.00
4.00
25.00
2.6240
107
0.81
1.00
1.00
1.00
1.00
10.00
250.00
1.6800
0.0672
670
583
40
35
30
30
1.33
1.16
2.00
2.00
8.00
8.00
12.0000
139
1.45
6,210.00
4,823.34
0.10
0.10
1.00
1.00
1.00
1.00
10.00
250.00
1.6800
0.0672
338
105
20
6
20
6
1.01
1.05
143.65
1,043.68
17,606.33
40,478.89
34,162.54
54,158.51
0.20
0.10
0.10
1.00
1.00
1.00
2.00
1.00
1.00
4.00
-
20.00
10.00
250.00
2.8800
1.6800
0.0672
414
7
7
1753 104 30
1183 70 30
1.03
3.48
2.35
M3
9.91
2,913.63
0.20
2.00
2.00
8.00
12.00
8.1333
81
0.83
M2
117.32
1.00
599.42
0.10
0.10
1.00
KG
3,619.96
1,843.88
1.00
1.00
10.00
250.00
1.6800
0.0672
197
40
12
2
12
2
0.98
1.2
M3
97.11
27,451.58
0.20
1.00
2.00
4.00
25.00
2.3040
224
0.97
M2
1,096.83
1.00
5,268.66
9,138.00
0.10
0.10
0.10
1.00
KG
UND
26,806.61
16,207.38
13,733.96
1.00
1.00
1.00
1.00
9.00
14.50
250.00
1600.00
1.1586
0.0672
0.0555
1271
354
507
76
21
6
30
21
6
2.52
1
0.95
85.59
1,746.70
3,857.12
2,747.22
5,372.89
0.20
0.10
0.10
M3
76.45
23,126.09
0.20
M2
1,006.40
KG
7,061.44
27,463.54
21,721.72
0.10
0.10
M3
40.63
11,416.71
0.20
M2
398.79
KG
8,672.43
12,304.15
26,677.17
0.10
0.10
M3
11.58
3,545.05
M2
201.27
KG
1,567.98
M3
M2
KG
ALIGERADO
ESCALERAS
CONCRETO F'C=210 KG/CM2 - ESCALERA
ENCOFRADO Y DESENCOFRADO NORM. -ESCALERA
ACERO FY= 4200 KG/CM2 R- 250kg/dia
CISTERNA
CONCRETO F'C=210 KG/CM2 - CISTERNA
ENCOFRADO Y DESENCOFRADO NORM. - CISTERNA
ACERO FY= 4200 KG/CM2 R- 250kg/dia
TANQUE ELEVADO
CONCRETO F'C=245 KG/CM2 - TANQUE ELEVADO
ENCOFRADO Y DESENCOFRADO N -TANQUE
ELEVADO
ACERO FY= 4200 KG/CM2 R- 250kg/dia
BASES DE CONCRETO
CONCRETO fc=140Kg/cm2 BASE PARA MUEBLES
ENCOFRADO Y DESENCOFRADO NORM. - MESAS DE
CONCRETO
MURO DE CONTENCION
CONCRETO F'C=210 KG/CM2 - MURO DE
CONTENCION
ENCOFRADO Y DESENCOFR - MUROS DE
CONTENCION
ACERO FY= 4200 KG/CM2 R- 250kg/dia
ARQUITECTURA
ACABADOS HUMEDOS
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK, APAREJO DE CABEZA C:A:
1:4
MURO DE LADRILLO KK, APAREJO DE SOGA C:A: 1:4
MURO DE LADRILLO KK, APAREJO DE CANTO C:A:
1:4
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO O RAYADO
M3
M2
KG
23.40
90.24
1,781.22
6,721.99
3,441.54
5,479.21
0.20
0.10
0.10
2.00
1.00
1.00
1.00
1.00
1.00
4.00
-
20.00
8.00
250.00
2.8800
2.1000
0.0672
67
190
120
1
11
7
1
11
7
1.17
1.03
1.02
M3
M2
KG
31.73
206.72
2,998.77
9,006.61
5,713.09
9,224.53
0.20
0.10
0.10
2.00
1.00
1.00
1.00
1.00
1.00
4.00
-
25.00
12.00
250.00
2.3040
1.4000
0.0672
73
289
202
1
17
12
1
17
12
1.27
1.01
1
M3
11.47
3,550.63
0.20
2.00
2.00
4.00
15.00
4.3733
50
0.76
M2
109.26
1.00
907.71
0.10
0.10
1.00
KG
3,293.10
2,792.16
1.00
1.00
10.00
250.00
1.6800
0.0672
184
61
11
4
11
4
0.99
0.91
M3
47.47
1,245.10
0.20
2.00
1.00
4.00
100.00
0.5760
27
M2
6.65
214.47
0.10
1.00
1.00
10.00
1.6800
11
0.67
M3
37.80
12,083.03
0.20
2.00
1.00
4.00
25.00
2.3040
87
0.76
M2
170.16
KG
1,350.73
4,643.59
4,154.88
0.10
0.10
1.00
1.00
1.00
1.00
12.00
250.00
1.4000
0.0672
238
91
14
5
14
5
1.01
1.08
M2
47.84
M2
656.95
2,323.44
20,149.42
0.10
0.10
1.00
1.00
0.75
0.75
7.30
10.50
2.0274
1.4095
97
926
7
63
7
63
0.94
0.99
M2
2.42
58.44
0.10
1.00
0.75
12.00
1.2333
M2
244.46
3,086.83
0.10
1.00
0.50
14.00
0.9143
224
17
17
1.03
M2
M2
M2
ML
M2
M
1,316.26
762.27
1,454.16
247.25
184.05
1,144.76
16,930.90
12,004.29
31,802.65
2,032.38
3,775.85
4,828.56
0.10
0.10
0.10
0.10
0.10
0.10
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.33
14.00
12.00
7.40
20.00
10.00
30.00
0.9143
1.0667
1.7297
0.6400
1.2800
0.3813
1203 94 30
813
64 30
2515 197 30
158
12 12
236
18 18
437
38 30
3.13
2.12
6.55
1.03
1.02
1.27
M2
1,196.98
23,742.80
0.10
1.00
0.75
10.00
1.4800
1772 120 30
3.99
M2
86.21
1,753.12
0.10
1.00
0.50
8.00
1.6000
138
11
11
0.98
M2
M2
M2
M2
M2
M2
M2
641.38
1,234.83
44.44
239.01
370.39
429.52
216.00
14,591.87
21,013.51
1,477.57
7,739.75
20,007.68
8,926.57
16,931.69
0.20
0.30
0.10
0.10
0.10
0.10
0.10
2.00
3.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
-
8.00
8.00
8.00
0.50
2.00
1.00
0.50
100.00
120.00
100.00
40.00
25.00
18.00
13.00
0.8960
0.8200
1.2080
0.3200
0.9920
0.9333
0.9846
575
1013
54
76
367
401
213
6
10
1
6
15
24
17
6
10
1
6
15
24
17
1.07
1.03
1
1
0.99
0.99
0.98
M
M
M
327.64
186.86
317.65
1,857.28
1,055.88
3,303.85
0.10
0.10
0.10
1.00
1.00
1.00
0.33
0.33
0.50
25.00
24.00
36.00
0.4576
0.4767
0.3556
150
89
113
13
8
9
13
8
9
1.01
0.97
0.98
M2
195.03
9,286.41
0.10
1.00
0.50
8.00
1.6000
312
24
24
1.02
M
M2
M2
M2
25.30
26.04
11.94
97.18
720.54
1,406.69
739.49
4,036.79
0.10
0.10
0.10
0.10
1.00
1.00
1.00
1.00
1.00
2.00
0.75
0.50
16.00
25.00
10.00
12.00
1.0500
0.9920
1.4800
1.0667
27
26
18
104
2
1
1
8
2
1
1
8
0.79
1.04
1.19
1.01
M2
745.40
16,797.13
0.10
1.00
2.00
20.00
1.2400
924
37
30
1.24
M2
1,312.36
7,181.42
0.10
1.00
1.00
70.00
0.2400
315
19
19
0.99
M2
M2
M2
730.92
2,084.96
159.56
ML
255.85
M2
32.76
4,151.57
12,745.12
2,031.12
0.10
0.10
0.10
1.00
1.00
1.00
1.00
1.00
1.00
60.00
60.00
50.00
0.2800
0.2800
0.3360
205
584
54
12
35
3
12
30
3
1.02
1.16
1.06
1,108.78
132.05
0.10
0.10
1.00
1.00
1.00
1.00
60.00
15.00
0.2800
1.1200
72
37
4
2
4
2
1.07
1.09
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
M3
M2
6.13
81.75
1,182.33
2,180.15
0.20
0.10
3.00
1.00
1.00
1.00
8.00
-
25.00
12.50
3.9040
1.3440
24
110
1
7
1
7
1
0.93
ML
165.00
696.06
0.10
1.00
0.33
30.00
0.3813
63
0.92
M2
24.23
551.48
0.20
2.00
1.00
8.00
100.00
0.8960
22
M2
158.24
M3
M2
M2
M2
UND
158.24
158.24
14.20
31.20
11.90
1,356.68
1,085.34
6,802.17
295.17
1,801.69
278.31
0.10
0.10
0.10
0.10
0.20
2.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
0.50
1.00
1.00
100.00
75.00
12.00
18.00
25.00
15.00
0.4080
0.4373
1.0667
0.9333
0.7040
0.5333
65
69
169
13
22
6
2
2
13
1
1
1
2
2
13
1
1
1
0.79
1.05
1.01
0.79
1.25
0.79
ML
M2
8.68
89.08
126.73
4,885.46
0.10
0.10
1.00
1.00
0.50
1.00
12.00
8.00
1.0667
2.1000
9
187
1
11
1
11
0.72
1.01
ML
ML
17.80
6.60
467.96
73.82
0.20
1.00
-
1.00
1.00
1.00
20.00
20.00
0.8000
0.8800
14
6
1
1
1
1
0.89
1
MES
GLB
GLB
ML
ML
1.00
1.00
1.00
94.00
308.30
5,475.97
1,064.77
2,203.76
1,717.87
846.19
1.00
1.00
12.00
14.00
1.00
1.00
1.00
25.00
34.00
34.00
96.0000
112.0000
0.3200
0.2353
0.2353
96
112
0
22
73
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
UND
UND
UND
GLB
GLB
UND
1.00
1.00
1.00
1.00
1.00
1.00
1,250.00
3,867.76
4,500.00
3,250.00
13,061.09
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
3,216.15
sub-contrato
1
1
1
3
9
1
1
1
3
9
1
1
1
0.92
1.01
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA REDES SANITARIAS
REFINE Y ALINEAMIENTO DE ZANJA
CAMA DE APOYO DE ARENA 2"
RELLENO Y COMPACTACION C/EQUIPO
ELIMINACION DE MATERIAL
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE
REDES DE DISTRIBUICION Y VENTILACION
ADITAMENTOS VARIOS
CAMARA DE INSPECCION
ACCESORIOS DE DESAGUE
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
REDES DE DISTRIBUICION
LLAVES, VALVULAS
ACCESORIOS DE AGUA
ALMACENAMIENTO DE AGUA Y OTRAS
INSTALACIONES
CISTERNA EQUIPAMIENTO
TANQUE EQUIPAMIENTO
SISTEMA CONTRA INCENDIO
SISTEMA PLUVIAL
PRUEBAS HIDRAULICA
M
M
m
M
M3
150.50
150.50
150.50
150.50
4.57
1,117.05
458.96
818.80
2,451.65
2,828.97
0.10
0.10
0.10
1.00
1.00
1.00
2.00
1.00
12.00
24.70
60.00
50.00
280.00
0.7333
0.3239
0.1467
0.3200
0.0314
110
49
22
48
0
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
UND
UND
1.00
1.00
5,254.00
35,160.00
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
RECURSOS UNITARIOS
13
6
3
3
1
13
6
3
3
1
0.96
1.02
0.84
1
1
RECURSOS DIARIOS
DESCRIPCIN
LABORATORIO DE CIENCIAS
MDULO UNO
ESTRUCTURAS
MOVIMIENTO DE TIERRA
EXCAVACION DE ZANJA EN TERR./ ROCA SUELTA
EXCAVACION MASIVA
EXCAVACION DE ZAPATAS EN ROCA SUELTA H=1.20
M.
RELLENO + COMPACTACION CON MATERIAL PROPIO.
REFINE,NIVELACION Y COMPACT EN ROCA SUELTA
ACARREO DE MATERIAL DISTANCIA 30 M.
ELIMINACION DE MATERIAL
CONCRETO SIMPLE
CONCRETO 1:10 +30% P.G. c/corr-falso cimiento corrido
CONCRETO 1:10 +30% P.G. c/corr-cimiento corrido
ENCOFRADO Y DESENCOFRADO NORM. - cimiento
corrido
SOLADO DE CONCRETO (C:H) 1:12 E=2"
CONCRETO 1:6+25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORM. - SOBREC.
CONCRETO ARMADO
ZAPATAS
CONCRETO F'C=210 KG/CM2 - ZAPATAS
ENCOFRADO PARA ZAPATAS
ACERO FY= 4200 KG/CM2 R- 250kg/dia
VIGAS DE CIMENTACION
CONCRETO F'C=210 KG/CM2 - VIGAS DE
CIMENTACION
ENCOFRADO PARA VIGAS DE CIMENTACION
UND
CANT.
CD (S/.)
CAP
OP
OF
PE
Ru
Rend
HH
Tu
Tp
M3
M3
116.49
2,433.81
4,148.19
10,698.68
0.16
0.10
0.97
1.55
0.97
2.50
180.00
3.5200
0.0933
410
227
47
14
30 1.55
14 0.97
M3
371.73
M3
M2
M3
M3
227.39
2,792.10
260.83
3,503.03
22,043.61
3,993.06
2,792.10
2,847.16
49,121.96
0.83
0.11
0.10
0.11
0.10
1.05
1.00
0.00
0.00
8.26
1.05
1.00
1.09
0.96
1.50
24.00
100.00
8.00
280.00
5.8667
1.0333
0.1680
1.1000
0.0314
2181 248
235
9
469 28
287 33
110 13
30
9
28
30
13
8.26
1.05
1
1.09
0.96
M3
M3
47.13
24.18
5,522.14
2,837.22
0.19
0.19
1.88
1.94
1.88
0.97
0.94
0.97
25.00
25.00
3.9040
3.5840
184
87
2
1
2
1
0.94
0.97
M2
132.14
M2
M3
M2
391.59
7.77
110.79
3,415.71
5,243.29
1,460.95
2,329.23
0.10
0.22
0.19
0.10
0.98
3.27
1.86
0.99
0.98
1.09
0.62
0.99
0.98
1.09
0.62
0.99
13.50
120.00
12.50
16.00
1.2444
0.8133
7.8720
1.0500
164
318
61
116
10
3
1
7
10
3
1
7
0.98
1.09
0.62
0.99
M3
M2
KG
165.24
277.87
4,669.86
40,629.82
8,083.56
14,364.97
0.33
0.10
0.10
0.94
0.97
0.98
1.88
1.46
0.98
0.94
0.97
0.98
25.00
22.00
250.00
2.3520
0.9455
0.0672
389
263
314
7
13
19
7 0.94
13 0.97
19 0.98
M3
14.97
M2
85.59
3,857.12
2,747.22
0.12
0.10
0.60
1.02
1.20
1.02
0.60
1.02
25.00
14.00
2.9440
1.2000
44
103
1
6
1
6
0.6
1.02
KG
1,746.70
5,372.89
0.10
1.00
1.00
1.00
250.00
0.0672
117
M3
76.45
23,126.09
0.21
2.12
2.12
1.06
12.00
8.1333
622
1.06
M2
1,006.40
KG
7,061.44
27,463.54
21,721.72
0.28
0.10
2.80
1.01
2.80
1.01
2.80
1.01
12.00
250.00
1.4000
0.0672
1409
475
84
28
30 2.8
28 1.01
M3
40.63
11,416.71
0.16
1.62
1.62
0.81
25.00
2.6240
107
M2
398.79
KG
8,672.43
12,304.15
26,677.17
0.13
0.12
1.33
1.16
1.33
1.16
1.33
1.16
10.00
250.00
1.6800
0.0672
670
583
40
35
30 1.33
30 1.16
M3
11.58
3,545.05
2.90
2.90
1.45
8.00
12.0000
139
M2
201.27
KG
1,567.98
6,210.00
4,823.34
0.10
0.11
1.01
1.05
1.01
1.05
1.01
1.05
10.00
250.00
1.6800
0.0672
338
105
20
6
20 1.01
6 1.05
M3
M2
KG
143.65
40,478.89
1,043.68 34,162.54
17,606.33 54,158.51
0.21
0.35
0.24
1.03
3.48
2.35
2.06
3.48
2.35
1.03
3.48
2.35
20.00
10.00
250.00
2.8800
1.6800
0.0672
414
7
1753 104
1183 70
7 1.03
30 3.48
30 2.35
2,913.63
0.17
1.66
1.66
0.83
12.00
8.1333
81
0.81
1.45
M3
9.91
M2
117.32
KG
599.42
3,619.96
1,843.88
0.10
0.12
0.98
1.20
0.98
1.20
0.98
1.20
10.00
250.00
1.6800
0.0672
197
40
12
2
12 0.98
2
1.2
M3
97.11
27,451.58
0.19
0.97
1.94
0.97
25.00
2.3040
224
M2
1,096.83
KG
5,268.66
26,806.61
16,207.38
0.25
0.10
2.52
1.00
2.52
1.00
2.52
1.00
14.50
250.00
1.1586
0.0672
1271
354
76
21
30 2.52
21
1
UND
9,138.00
13,733.96
0.10
0.95
0.95
0.95
1600.00
0.0555
507
0.95
M3
23.40
6,721.99
0.23
2.34
1.17
1.17
20.00
2.8800
67
1.17
0.83
0.97
M2
KG
90.24
1,781.22
3,441.54
5,479.21
0.10
0.10
1.03
1.02
1.03
1.02
1.03
1.02
8.00
250.00
2.1000
0.0672
190
120
11
7
11 1.03
7 1.02
M3
M2
KG
31.73
206.72
2,998.77
9,006.61
5,713.09
9,224.53
0.25
0.10
0.10
2.54
1.01
1.00
1.27
1.01
1.00
1.27
1.01
1.00
25.00
12.00
250.00
2.3040
1.4000
0.0672
73
289
202
1
17
12
1 1.27
17 1.01
12
1
M3
11.47
3,550.63
0.15
1.52
1.52
0.76
15.00
4.3733
50
M2
109.26
KG
907.71
3,293.10
2,792.16
0.10
0.09
0.99
0.91
0.99
0.91
0.99
0.91
10.00
250.00
1.6800
0.0672
184
61
11
4
11 0.99
4 0.91
M3
47.47
1,245.10
0.20
2.00
1.00
1.00
100.00
0.5760
27
M2
6.65
214.47
0.07
0.00
0.67
0.00
0.67
0.00
0.67
0.00
10.00
1.6800
11
0.67
M3
37.80
12,083.03
0.15
1.52
0.76
0.76
25.00
2.3040
87
0.76
M2
170.16
KG
1,350.73
4,643.59
4,154.88
0.10
0.11
1.01
1.08
1.01
1.08
1.01
1.08
12.00
250.00
1.4000
0.0672
238
91
14
5
14 1.01
5 1.08
M2
47.84
M2
656.95
2,323.44
20,149.42
0.09
0.10
0.94
0.99
0.94
0.99
7.30
10.50
2.0274
1.4095
97
926
7
63
7 0.94
63 0.99
M2
2.42
58.44
0.10
1.00
1.00
12.00
1.2333
M2
244.46
3,086.83
0.10
1.03
1.03
14.00
0.9143
224
17
17 1.03
M2
1,316.26
M2
762.27
16,930.90
12,004.29
0.31
0.21
3.13
2.12
3.13
2.12
14.00
12.00
0.9143
1.0667
1203
813
94
64
30 3.13
30 2.12
0.76
M2
ML
M2
M
1,454.16
247.25
184.05
1,144.76
31,802.65
2,032.38
3,775.85
4,828.56
0.66
0.10
0.10
0.13
6.55
1.03
1.02
1.27
6.55
1.03
1.02
1.27
7.40
20.00
10.00
30.00
1.7297
0.6400
1.2800
0.3813
2515 197
158 12
236 18
437 38
30
12
18
30
M2
M2
1,196.98
86.21
23,742.80
1,753.12
0.40
0.10
3.99
0.98
3.99
0.98
10.00
8.00
1.4800
1.6000
1772 120
138 11
30 3.99
11 0.98
M2
M2
M2
M2
M2
M2
M2
641.38
1,234.83
44.44
239.01
370.39
429.52
216.00
14,591.87
21,013.51
1,477.57
7,739.75
20,007.68
8,926.57
16,931.69
0.21
0.31
0.10
0.10
0.10
0.10
0.10
2.14
3.09
5.00
1.00
0.99
0.99
0.98
1.07
1.03
2.00
-
1.07
1.03
1.00
1.00
0.99
0.99
0.98
100.00
120.00
100.00
40.00
25.00
18.00
13.00
0.8960
0.8200
1.2080
0.3200
0.9920
0.9333
0.9846
575
1013
54
76
367
401
213
6
10
1
6
15
24
17
6
10
1
6
15
24
17
M
M
M
327.64
186.86
317.65
1,857.28
1,055.88
3,303.85
0.10
0.10
0.10
1.01
0.97
0.98
1.01
0.97
0.98
25.00
24.00
36.00
0.4576
0.4767
0.3556
150
89
113
13
8
9
13 1.01
8 0.97
9 0.98
M2
195.03
9,286.41
0.10
1.02
1.02
8.00
1.6000
312
24
24 1.02
M
M2
25.30
26.04
720.54
1,406.69
0.08
0.10
0.79
1.04
0.79
1.04
16.00
25.00
1.0500
0.9920
27
26
2
1
2
1
0.79
1.04
M2
11.94
M2
97.18
739.49
4,036.79
0.12
0.10
1.19
1.01
1.19
1.01
10.00
12.00
1.4800
1.0667
18
104
1
8
1
8
1.19
1.01
M2
745.40
16,797.13
0.12
1.24
1.24
20.00
1.2400
924
37
30 1.24
M2
M2
1,312.36
730.92
7,181.42
4,151.57
0.10
0.10
0.99
1.02
0.99
1.02
70.00
60.00
0.2400
0.2800
315
205
19
12
19 0.99
12 1.02
6.55
1.03
1.02
1.27
1.07
1.03
1
1
0.99
0.99
0.98
M2
M2
2,084.96
159.56
ML
255.85
M2
32.76
12,745.12
2,031.12
0.12
0.11
1.16
1.06
1.16
1.06
60.00
50.00
0.2800
0.3360
584
54
35
3
30 1.16
3 1.06
1,108.78
132.05
0.11
0.11
1.07
1.09
1.07
1.09
60.00
15.00
0.2800
1.1200
72
37
4
2
4
2
1.07
1.09
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
M3
M2
6.13
81.75
1,182.33
2,180.15
0.20
0.09
3.00
0.93
1.00
0.93
1.00
0.93
25.00
12.50
3.9040
1.3440
24
110
1
7
1
7
1
0.93
ML
165.00
696.06
0.09
0.92
0.92
30.00
0.3813
63
0.92
M2
24.23
551.48
0.20
2.00
1.00
1.00
100.00
0.8960
22
M2
158.24
M3
M2
M2
M2
UND
158.24
158.24
14.20
31.20
11.90
1,356.68
1,085.34
6,802.17
295.17
1,801.69
278.31
0.08
0.11
0.10
0.08
0.25
0.00
1.58
1.05
1.01
0.79
1.25
0.79
0.79
1.05
1.01
0.79
1.25
0.79
100.00
75.00
12.00
18.00
25.00
15.00
0.4080
0.4373
1.0667
0.9333
0.7040
0.5333
65
69
169
13
22
6
2
2
13
1
1
1
2
2
13
1
1
1
0.79
1.05
1.01
0.79
1.25
0.79
ML
M2
8.68
89.08
126.73
4,885.46
0.07
0.10
0.72
1.01
12.00
8.00
1.0667
2.1000
9
187
1
11
1 0.72
11 1.01
ML
ML
MES
17.80
6.60
1.00
467.96
73.82
5,475.97
0.20
-
0.89
-
1.00
-
0.72
1.01
0.00
0.89
1.00
1.00
20.00
20.00
1.00
0.8000
0.8800
96.0000
14
6
96
1
1
1
1
1
1
0.89
1
1
GLB
GLB
ML
ML
1.00
1.00
94.00
308.30
1,064.77
2,203.76
1,717.87
846.19
0.92
1.01
1.00
1.00
0.92
1.01
1.00
25.00
34.00
34.00
112.0000 112
0.3200
0
0.2353
22
0.2353
73
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
Sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
UND
UND
UND
GLB
GLB
UND
1.00
1.00
1.00
1.00
1.00
1.00
1,250.00
3,867.76
4,500.00
3,250.00
13,061.09
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
3,216.15
sub-contrato
1
1
3
9
1
1
3
9
1
1
0.92
1.01
M
M
m
M
M3
150.50
150.50
150.50
150.50
4.57
1,117.05
458.96
818.80
2,451.65
2,828.97
0.10
0.00
0.08
0.00
0.10
0.96
1.02
0.84
1.00
1.00
0.7333
0.3239
0.1467
0.3200
0.0314
110
49
22
48
0
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
UND
UND
1.00
1.00
sub-contrato
sub-contrato
sub-contrato
sub-contrato
sub-contrato
5,254.00
35,160.00
RECURSOS DIARIOS
12.00
24.70
60.00
50.00
280.00
13
6
3
3
1
13 0.96
6 1.02
3 0.84
3
1
1
1