Está en la página 1de 1

Proyecto: "MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCTURA DE LA I.E.

N82027 EL CERRILLO, DISTRITO DE LOS BAOS DEL INCA - CAJAMARCA - CAJAMARCA"


DISEO DE ZAPATAS
AULAS
Datos:
f'c=

210 kg/cm2

fy=

4200 kg/cm2

st=

1.5

f flexin= 0.90
b1 =

kg/cm2

b=

0.02125

f aplastamiento= 0.70

s/c =

0.25 Tn/m2

mx =

0.01594

f corte= 0.85

gm =

2.65 Tn/m3

mn =

0.00180

g c = 2400 kg/m3

0.85

h f = 1.50 m

D f = 1.30 m

Zapata

Dimensiones
columna
t1

Carga
Esfuerzo
factoriza
neto
da

Cargas Servicio

Dim. Calc. Zapata


Lado
zapat.

Pu

sn

Az

(Tn)

(Tn)

(Tn/m2)

(m2)

(m)

9.67

14.87

10.78

0.90

0.95

16.42

25.79

10.78

1.52

1.23

5.65

18.34

29.21

10.78

1.70

19.37

11.86

31.23

50.40

10.78

0.30

11.31

2.32

13.63

21.14

0.30

17.6

7.64

25.24

40.15

t2

PD

PL

Ubicac.

Tipo

(m)

(m)

(Tn)

(Tn)

IJ

Z1

0.35

0.30

8.44

1.23

2J

Z2

0.35

0.30

12.56

3.86

1I

Z3

0.35

0.30

12.69

2I

Z4

0.35

0.30

1H

Z5

0.35

2H

Z6

0.35

Dim. Asumidas Zapata

Reacc.
neta
terreno

Alt. Zap. por punzonamiento

hz calc.

hz asum.

ref.
asum.

d prom

Verificacin por Cortante

Lv

Vdu

Vn=Vdu/
f

Diseo por flexin lado S

Varilla

Diseo por flexin lado T

Distribucin del
acero lado S
f varilla A varilla

(cm2)

(plg)

(cm2)

7.35

0.0024

0.000118

7.35

1/2

1.267

6 f

1/2 @ 15

2.24

9.68

0.0051

0.000257

9.68

1/2

1.267

8 f

OK

2.70

10.06

0.0060

0.000299

10.06

1/2

1.267

56.14

OK

7.06

13.16

0.0120

0.000598

13.16

1/2

-0.65

36.33

OK

1.47

8.51

0.0038

0.000192

8.51

5.76

51.19

OK

4.90

12.00

0.0091

0.000455

12.00

Az

Wnu

Vc

Mu

Asmin

(m)

(m)

(m2)

(Tn/m2)

(m)

(m)

(m)

(m)

(m)

(Tn)

(Tn)

(Tn)

1.00

0.95

0.95

15.6568

0.06

0.50

0.07

0.43

0.33

-1.56

-1.84

31.37

(Tn)

(Tn-m)

(cm2)

OK

0.79

1.30

1.25

1.63

15.8695

0.10

0.50

0.07

0.43

0.48

0.89

1.05

41.28

OK

1.30

1.35

1.30

1.76

16.641

0.11

0.50

0.07

0.43

0.50

1.51

1.78

42.93

2.90

1.70

1.75

1.70

2.98

16.9422

0.18

0.50

0.07

0.43

0.70

7.78

9.15

10.78

1.26

1.12

1.15

1.10

1.27

16.7123

0.09

0.50

0.07

0.43

0.40

-0.55

10.78

2.34

1.53

1.60

1.55

2.48

16.1903

0.15

0.50

0.07

0.43

0.63

4.89

Vc > Vn

As

Varilla
Distribucin del
acero lado T

As

f varilla

Avarilla

(cm2)

(plg)

(cm2)

7.74

1/2

1.27

7 f

1/2 @ 13

0.000257

10.06

1/2

1.27

8 f

1/2 @ 16

0.0060

0.000299

10.45

1/2

1.27

9 f

1/2 @ 14

13.55

0.0120

0.000598

13.55

1/2

1.27

11 f

1/2 @ 15

1.54

8.90

0.0038

0.000192

8.90

1/2

1.27

8 f

1/2 @ 14

5.06

12.38

0.0091

0.000455

12.38

1/2

1.27

10 f

1/2 @ 15

7.74

0.0024

0.000118

2.33

10.06

0.0051

1/2 @ 16

2.81

10.45

11 f

1/2 @ 15

7.26

1.267

7 f

1/2 @ 15

1.267

10 f

1/2 @ 15

Mu

Asmin

(Tn-m)

(cm2)

0.83

1/2 @ 15

8 f

1.267

1/2
1/2

También podría gustarte