1

These rates are applicable to all MJP works in the KONKAN REGION with effect from
24-12-2012 .

Rates for all items are inclusive of all taxes, levied by Central, state govt. and local bodies (excluding
ocrtoi). Labour rates are inclusive of VAT & EPF 12.5 %.

For all completed items, initial lead of 5 kms. including loading, unloading is considered for
materials like sand, bricks, metal, stone, reinforcement. Following quantities shall be considered for
additional lead charges beyond 5 Km for material required for concrete and reinforcement for structures.
(A) ESR
Capacity (Lit)

Staging (M)

Concrete
Qty (Cum)

Reinforcement
Qty. (MT)

20,000

12

27.40

2.14

30,000

12

32.70

2.55

40,000

12

37.80

2.95

50,000

12

41.90

3.27

60,000

12

46.40

3.62

70,000

12

51.20

3.99

75,000

12

53.00

4.13

80,000

12

56.00

4.37

90,000

12

62.40

4.87

1,25,000

25

107.40

8.38

1,50,000

12

89.80

7.00

1,60,000

12

94.30

7.36

1,75,000

16

117.60

9.17

2,00,000

20

143.60

11.20

2,00,000

25

157.00

12.25

2,50,000

25

177.00

13.81

3,00,000

25

206.00

16.07

Note : Spiral staircase not considerd, SBC-5 MT / Sqm. Seismic Zone-IV is Considered

GENERAL NOTES

(B) GSR

Concrete

Reinforcement

Capacity (Ltr)

Qty. (Cum)

Qty. (MT)

25000

13.58

0.9448

50000

18.45

1.5856

75000

30.45

2.0952

100000

39.31

2.7072

150000

54.699

3.7780

200000

73.313

11.9000

300000

95.092

6.5770

500000

143.277

9.8740

1000000

222.441

15.4180

(For WTP/STP works, quanities of cempleted/ongoing works shall be considerd)

These rates are applicable to water supply and sewerage schemes and
its allied works only. Items required for general construction, buildings, roads,
Irrigation Works etc. shall be adopted from the current schedule of rates of
P.W.D.

For works in Brihanmumbai Municipal Council Limit, the CSR of B. M. C. shall be


used.

For mechanical and electrical items related to water supply and sewerage
schemes, CSR for 2011-2012 prepared by Superintending Engineer (Mechanical
), Maharashtra Jeevan Pradhikaran shall be adopted.

GENERAL NOTES

Following increase in % over normal schedule of rates of M.J.P. for 2011-2012


will be applicable. (Ref. PWD GR. No. DSR/1091/CR-6577/Planning-3,dated 08/
07/2003)
Catagaries

% Increase

Works in Corporation area.

5%

Works in Municipal areas.

2%

Works in tribal area / hilly and inaccesible areas / MMRDA

10%

Prison / Jail area.

15%

Defence area.

20%

Raj Bhavan / Malbar Hill (Mumbai)

20%

Excavation for pipeline work along National Highway.

10%

Excavation for Dist.system pipe lines,Sewerage system in towns.

10%

8.

In case the area of work, lies under, the categories more than one mentioned at
Sr. No. 7, the higher percentage increase shall be made applicable. This additional
percentage is only on completed item of work and not applicable to items of
providing. If material to be supplied by departmentaly, then basic rate of such
material shall be incresed by above percentage accordingly.

9.

The hilly inaccessible areas and Tribal areas shall be got confirmed from the
circular Nos.(1)1089/CR-66/Plan-19,DT.23/11/1990 and (2) 1094/P-36/K-1455
dt.02/09/1994,of Planning department of Govt. Of Mahatrashtra. ( and
ammendment thereof ).

GENERAL NOTES

This schedule of rates is based on following basic rates for important


materials.
Material

Rate in Rs. Per MT.

Cement

63,000/-

Mild Steel

46,000/-

Tor Steel

45,712/-

Structural Steel

48,875/-

M. S. Plate

49,000/-

10. Details of standard cement consumption and standard weight of various


pipes are incorporated in this CSR .
11. 10 % of cost of items of water retaining structures, such as GSR/ESR/
MBR shall be retained till satisfactory hydraulic testing as per IS code.

12. 10 % of cost of total sub-work of pipeline work shall be retained till


satisfactory hydraulic testing is given as per IS code.
13. In case of supply of pipes / valves etc. by contractor, only 85%
payment shall be released after supply and 15% after satisfactory
hydraulic testing.

GENERAL NOTES

14. AC / PVC pipes shall not to be used in Urban Areas.


15. Provision for octroi charges for pipes,specials and valves is not considered in
the CSR 2010-2011. Provision of 4 % of cost of pipes ,specials and valves to
be used in corporation area shall be made while framing the estimate.

16. For use of ready mix cement concrete, prior permission of the Chief
Engineer must be obtained.
17. Provision for insurance of work is considered in Rate analysisn of CSR 2011-2012.
18. Rates given in this CSR are for estimation purpose only
19. The Sluice valves / Butterfly valves / Air valves and reflux valves (NRV) should be
of approved makes of M.J.P. only.
20. Excise duty is exempted for equipments (Gears, Motors, Tube Settles) used for W.
T. P.
21. As per notification no. 26/2009- central excisc dated 4/12/09
a) Pipes needed for delivery of water from its source to the plant (including the clear
treated water reservoir if any thereof) and from there to the first storage point.
b) Pipes of outer diameter exceeding 10 cm when such pipes are internal part of the
water supply projects.
c) All the items of machinery, including instruments, apparatus and appliances, auxiliary
equipment and their components / parts required for setting up of water treatment
plants.

GENERAL NOTES

22. The detailed rate analysis shall be prepared for the work of Matheran Hill station,
Raigad Fort and Gharapuri Island the same shall be got approved form the concerned
superintending Engineer.
23. As per Govt. Circular No. DSR-1090/CR-6453/PLN-3 dated 14.7.1993 1% for
labour amenities is not considerd in the DSR except concrete item while arriving the
rates.
24. As per Govt. in industries & power G. R. No. BCA-2009/CR-108/Labour 7-A
dated 17.6.10 1% cess on labour welfare is not considered in the DSR while arriveing
the rates.
25. All rates are inclusive of Royalty charges as per circular No ieewKeefve 10/1009/ He. ke. 309/
Ke / dt. 11.2.2010.
26. As per Government Notification No. 25/2012 Service tax dated 20 june 2012 point
no 12E Service tax exempted for pipeline, conduit or plant for i) Water supply. ii)
Water treatment or iii) Sewerage treatment or disposal. Hence service tax is not
considerd in rate analysis.
27. The rates of excavation for O & M works where limited working space is available
and work is required to be carried out on emergency basis, the rate should be
adopted as per the actual rate analysis which shall be approved by concerned S. E.
for that particular work only.

GENERAL NOTES

SECTION - A: MATERIALS
Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

1.

Alum Grade I Ex-factory

M.T.

8200.00

2.

Binding Wire

Kg.

64.00

3.

Black enemal paint Anti corrosive

Ltr

189.00

4.

Bricks

No

4.60

5.

Bullies, Struts (125 mm dia 1.5 M long)

rmt

164.00

6.

CCTW planks (3 x 6)

rmt

71500.00

7.

Cement (Bags)

Bag

315.00

8.

Cement (M.T.)

M.T.

6300.00

9.

Cement Sulphar Resistant

M.T.

6840.00

10.

Charcoal

11.

Corrosion Resistant steel

12.

Diesel

Lit

51.00

13.

Epoxy paint

Kg

450.00

14.

Fuse

No

22.00

15.

Gun Powder

Kg

135.00

16.

Liquid chlorine 100 kg Deptt Container .

No.

2300.00

17.

Liquid chlorine 100 kg supplier Container

No.

2500.00

SECTION - A: MATERIALS

Kg
M.T.

33.00
51000.00

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

18.

Liquid chlorine 900 kg Deptt Container at site

No.

16000.00

19.

LubricantOil

lit

249.55

20.

M.S.angle(50x50x6mm)

Kg

50.60

21.

M.S.Bars

M.T.

22.

M.S.Bars

Kg

46.00

23.

M.S.Flats (40 mm x 3 mm)

Kg

48.30

24.

M.S.plate

Kg

49.00

25.

Maganafloc coagulant aid

26.

Mild steelGrill ready

Kg

70.00

27.

Mildsteel grill railing

Kg

70.00

28.

Mobile oil

Lit

217.00

29.

Murum

Cum

260.00

30.

Nails

Kg

74.00

31.

Nutbolts

Kg

100.00

32.

Oxygen Gas (Refill)

Cylinder

375.00

33.

Polling board

Cum

20500.00

34.

R.S.Joist channel etc

M.T.

48875.00

35.

Rapid sand Gravity filter sand At Source

Cum

1500.00

SECTION - A: MATERIALS

M.T.

46000.00

110000.00

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

36.

(Godhara, Gokak, Kanhan, Yesagi sand)

37.

Rapid sand Gravity filter media At Source

38.

Rate
(in Rs.)
2012-2013
4

Cum

1500.00

Ready mixed Alluminium paint

Ltr

231.00

39.

Ready mixed lead/zinc paint

Ltr

231.00

40.

Ready mix oil paint

Ltr

226.00

41.

Ready mix primer

Ltr

154.00

42.

Ready mix primer for steel

Ltr

154.00

43.

Rubber Gasket (8 mm thick)

Kg

99.00

44.

Sand at source

cum

1552.00

45.

Kasarde sand (for mortar lining work) @ source

Cum.

1400.00

46.

Spun Yarn

Kg

110.00

47.

Stone Aggregate 10 mm

Cum

931.00

48.

Stone Aggregate 20 mm

Cum

908.00

49.

Stone Aggregate 40 mm

Cum

874.00

50.

Structural Steel

M.T.

48875.00

51.

T.C.L.(bleaching poweder Gr.I) (25kg pack)

52.

Teak wood

Cum

74800.00

53.

Tor Steel

M.T.

45712.00

SECTION - A: MATERIALS

Kg

16.00

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

54.

Walling ( 100x100mm)

Cum

20350.00

55.

Welding Rod Having weight 5.25kg

Box

1370.00

56.

White cement

Kg

33.00

57.

White lead

Kg

150.00

58

Wire

Kg

77.00

59.

Plywood Commercial 12 mm thick Waterproof for


centering (Taken in analysis for RCC items only)

Sqm

730.00

60.

Coarse Sand

Cum

800.00

61.

Rubble

Cum

402.00

SECTION -A: MATERIALS

10

Rate
(in Rs.)
2013-2014
5

SECTION - B - LABOUR AND MACHINERY


Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

1.

Assistant fitter

No.

333.00

2.

Bandhani

No.

333.00

3.

Bhisti (with pakhal)

No.

273.00

4.

Black smith (II) Class

No.

333.00

5.

Breaker

No.

333.00

6.

Carpenter (1st class)

No.

433.00

7.

Carpenter (IInd class)

No.

333.00

8.

Chiseller

No.

333.00

9.

Excavator

No.

333.00

10.

Fitter (1st class)

No.

399.00

11.

Glazier

No.

333.00

12.

Helper

No.

290.00

13.

Hole driller

No.

333.00

14.

Mason (I st class)

No.

433.00

15.

Mason (II nd class)

No.

363.00

16.

Mazdoor (female)

No.

290.00

SECTION - B: LABOUR AND MACHINERY

11

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

17.

Mazdoor (heavy)

No.

315.00

18.

Mazdoor (light)

No.

290.00

19.

Mazdoor (male)

No.

290.00

20.

Maistry

No.

333.00

21.

Mukadam

No.

333.00

22.

Painter (for colouring)

No.

333.00

23.

Painter

No.

399.00

24.

Polisher

No.

333.00

25.

Pump driver

No.

363.00

26.

Stone cutter or dresser

No.

333.00

27.

Tile layer

No.

433.00

28.

Welder

No.

433.00

29.

Welder for Pipe-line

No.

433.00

30.

White washer

No.

333.00

31.

Tile turner

No.

333.00

32.

Vehicle Driver ( Light )

No.

333.00

33.

Electrcian

No.

399.00

SECTION - B: LABOUR AND MACHINERY

12

Rate
(in Rs.)
2013-2014
5

MACHINERY
Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

1.

Rent for polishing machine with crew

Day

1017.00

2.

Rent charges for Chain pulley block with tripod.

Day

510.00

3.

Rent charges for pump excluding operator & fuel.

BHP/Day

190.00

4.

Rent charges for Mechanical Mixer with fuel & Crew.

Day

2750.00

5.

Rent charges for Vibrator with fuel & Crew.

Day

1000.00

6.

Plate Bender.

Day

1000.00

7.

Rent charges for welding set with electrical set.

Day

1100.00

8.

Rent charges for welding set with generator.

Day

2400.00

9.

Rent for Compressor with fuel

Day

2550.00

10.

Rent for Concrete breaker & Compressor

Day

2750.00

11.

Rent for poclain

Hour

2500.00

12.

Rent for Crane

Hour

1650.00

13.

Rent for JCB

Hour

1100.00

14.

Truck hire charges upto 20 km

Day

2750.00

15.

Truck hire charges for 20 km to 50 km

Day

2500.00

16.

Truck hire charges for 50 km & above

Day

2150.00

17.

Jeep hire charges with driver (upto 300km)

Day

3000.00

18.

Pipe cutter with operator

Day

1250.00

19.

De sludging/De silting pump

Day

2400.00

SECTION - B: LABOUR AND MACHINERY

13

Rate
(in Rs.)
2013-2014
5

SECTION - C - TRANSPORTATION

STATEMENT I
Sr.
No.

Item of work.

Unit

Collecting
the railway
receipt etc. &
unloading the
consignment
from railway
wagon &
keeping on
railway
platform
consignment
booked in.

M.T.

213.00
234.00

257.00
283.00

66.00
73.00

66.00
73.00

M.T.

214.00
235.00

277.00
305.00

66.00
73.00

66.00
73.00

M.T.
M.T.
M.T.

110.00
121.00
110.00
121.00
214.00
235.00

169.00
154.00
154.00
169.00
277.00
304.00

44.00
40.00
40.00
44.00
66.00
72.00

44.00
40.00
40.00
44.00
66.00
72.00

6
7
(B)

Mild steel / tor steel / R.S.J.


M.T.
Cement / bleaching powder/ Alum. M.T.

137.00
151.00
64.00
70.00

178.00
196.00
100.00
110.00

101.00
111.00
53.00
58.00

101.00
111.00
53.00
58.00

C.I./D.I./B.W.S.C./M.S./R.C.C.
M.T.
pipes of all classes having
than300
300
individual weight more
more than
kg. & also other heavy materials,
valves, machinery having
individual weight more than 300 kg

147.00
162.00

211.00
232.00

155.00
170.00

155.00
170.00

(A)

MANUAL HANDLING
(Weight upto & including 300 kg.)

C.I./D.I.M.S./H.D.P.E. pipes of all


classes upto & including 200 mm
dia. Pipes of any length.
R.C.C.pipes of all classes upto &
including 350 mm dia.
ll classes
A.C.pipes of all
classes & dia.
P.V.C. pipes of all classes & dia.

2.
3
4
5

All other material such as


C.I.Specials of individual weight
upto 300 kg.

Lifting the Loading Unloading


the material
material
the
from
material from truck
railway
into
including
platform,
truck
stacking in
loading
from
departmental
Unloading depart- stores or site
into truck. mental
of work.
store or
site of
work.

CRANE HANDLING
(Materials having individual weight
above 300 kg.)

1) The above rates in col. 1 to 5 are applicable only for Railway clearance purpose and not for other carting.
2) The rates given in col.6 to 7 shall be adopted for estimate purpose only, however actual quotations/D-tender will
prevail.
3) Irrespective of supply of C.I./D.I. Pipes as per rate contract when pipes are directly supplied by the firms by road
railway freight up to destination station and carting as per schedule from Railway Station to work site is allowed.
In such cases rate of Mathadi Kamgar shall not be applicable for carting and normal loading, unloading carting
shall be allowed.

SECTION - C: TRANSPORTATION

14

SECTION D - CEMENT CONSUMPTION


STANDARD CEMENT CONSUMPTION TO BE FOLLOWED FOR VARIOUS ITEMS OF WORKS

Sr. No.

Unit

Item of Works

Standard Cement
Consumption

A.

P.C.C./R.C.C. Works

1.

1 : 1/2 : 1 (M-300) with finishing in CM 1:3 proportion

Cum

9.20 bags

2.

1:1:2 (M-250) with finishing in CM 1:3 proportion

Cum

8.50 bags

3.

1:11/2:3 (M-200) with finishing in CM 1:3 proportion

Cum

6.90 bags

4.

1:11/2:3 (M-200) without finishing

Cum

6.80 bags

5.

1:2:4 (M-150) with finishing in CM 1:3 proportion

Cum

5.90 bags

6.

1:2:4 (M-150) without finishing

Cum

5.80 bags

B.

Brick Masonry Works

1.

B.B. Masonry - IInd sort in CM 1:6 proportion

Cum

1.44 bags

2.

B.B. Masonry - IInd sort in CM 1:5 proportion

Cum

1.62 bags

3.

B.B. Masonry - IInd sort in CM 1:4 proportion

Cum

2.30 bags

4.

Half brick walls in CM 1:4 proportion

Cum

0.22 bags

C.

Stone Masonry Works

1.

U. C. R. Masonry - IInd sort in CM 1:6 proportion

Cum

1.77 bags

2.

U. C. R. Masonry - IInd sort in CM 1:4 proportion

Cum

2.65 bags

3.

Random Rubble Masonry - IInd sort in CM 1:6 proportion

Cum

1.77 bags

4.

Random Rubble Masonry - IInd sort in CM 1:4 proportion

Cum

2.65 bags

5.

C. R. Masonry - IInd sort in CM 1:4 proportion

Cum

2.65 bags

6.

C. R. Masonry - IInd sort in CM 1:6 proportion

Cum

1.50 bags

SECTION - D : CEMENT CONSUMPTION

26

Sr. No.

Item of Works

Unit

Standard Cement
Consumption

D.

Water proofing Works

1.

Damp-proof course 50mm thick in 1:2:4 proportion with bitumen layer


W.P. compound.

Sqm

0.35 bags

2.

Integral finishing to newly laid slab in CM 1:3 proportion with


W.P. compound.

Sqm

0.06 bags

3.

Water proofing treatment over old slab with W.P. cement slurry as tack coat
12 mm thick, W. P. plaster in CM 1:3 proportion, brick bat coba average 9.50
cm thick in CM 1:6 proportion and 20 mm thick W.P. cement plaster over it
in CM 1:3 proportion and finishing with cement slurry with novelling.

Sqm

0.37 bags

a) CM 1:2 proportion

Sqm

0.16 bags

b) CM 1:3 proportion

Sqm

0.12 bags

c) CM 1:4 proportion

Sqm

0.10 bags

a) CM 1:2 proportion

Sqm

0.27 bags

b) CM 1:3 proportion

Sqm

0.19 bags

c) CM 1:4 proportion

Sqm

0.15 bags

a) CM 1:2 proportion

Sqm

0.34 bags

b) CM 1:3 proportion

Sqm

0.25 bags

c) CM 1:4 proportion

Sqm

0.19 bags

iv) Cement pointing in CM 1:3 proprotion

Sqm

0.03 bags

v) Tuck cement pointing in CM 1:3 proportion

Sqm

0.05 bags

vi) Sand faced plaster in CM 1:4 proportion including base coat 15


mm thick in CM 1:4 proportion with W.P. compound.

Sqm

E.

Plastering and Pointing Works


i) 12mm thick plaster

ii) 20 mm thick plaster

iii) 25 mm thick plaster

vii) Rough cast cement plaster in CM 1:4 proportion in two coats.


F.

Sqm

0.22 bags
0.22 bags

Flooring Works
Sqm

i) I.P.S. flooring - 40 mm thick


ii) I.P.S. flooring - 50 mm thick
iii) Rough Shahabad - any other similar flooring in CM 1:4 proportion
bedding.
iv) All types of cement / kadappa / polished / mosaic tiles flooring or
skirting / dado set on CM 1:4 proporition bedding.
v) Glazed / ceramic tiles flooring or skirting / dado fixed with plain
cement slurry.
SECTION - D : CEMENT CONSUMPTION

27

0.30 bags

Sqm

0.37 bags

Sqm

0.15 bags

Sqm
Sqm

0.18 bags
0.22 bags

STATEMENT SHOWING STANDARD WEIGHTS OF PIPES TO BE FOLLOWED FOR CARTING OF


VARIOUS DIAMETERS AND TYPES OF PIPES
(I)

C. I. Pipes (IS : 1536-1989)


Class of pipes and its weight in Kg. per meter length

Diameter of Pipe
in mm

LA

80

16.00

17.38

18.46

100

19.82

21.82

23.27

125

25.82

28.18

30.36

150

32.10

35.27

38.00

200

47.09

51.09

55.27

63.45

69.09

74.73

300

81.82

89.45

96.91

350

103.09

111.82

121.27

400

125.45

137.09

140.00

450

151.27

166.10

179.27

500

177.09

192.91

208.73

236.00

257.64

275.00

700

304.55

335.73

359.45

750

341.09

372.91

404.55

381.00

416.00

450.00

900

465.09

507.45

549.80

1000

558.73

610.36

659.64

250

600

800

SECTION - D : CEMENT CONSUMPTION

28

STATEMENT SHOWING THE TOTALWEIGHTS OF VARIOUS DIA D. I. K-9 PIPES INCLUDING WEIGHT OF
MORTAR LINING PER M LENGTH.

II) D. I. PIPES
1)
2)
3)

Barrel Mass as per IS : 8329 - 1994


Socket Mass as per IS : 8329 - 1994
Cement Motar Lining Weight as per ISO : 4179 -1985.

WEIGHT / M LENGTH OF D. I. K-9 PIPES OF

Nominal dia meter

4M

5M

5.50 M

6M

80 mm wt. of DI Pipe / M
weight morter/m

13.00
1.56

13.00
1.56

12.91
1.56

12.67
1.56

Total wt./M.
100 mm wt. of DI Pipe /
M weight of morter/m
Total wt./M.
125 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
150 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
200 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
250 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
300 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
350 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.

14.56

14.56

14.47

14.23

16.25
1.93

16.00
1.93

16.00
1.93

15.86
1.93

18.18

17.93

17.93

17.79

20.50
2.42

20.00
2.42

20.00
2.42

19.83
2.42

22.92

22.42

22.42

22.25

24.75
2.90

24.20
2.90

24.18
2.90

24.00
2.90

27.65

27.10

27.08

26.90

33.25
3.88

32.60
3.88

32.54
3.88

32.33
3.88

37.13

36.48

36.42

36.21

43.75
4.84
88.59

43.00
4.84
47.84

42.73
4.84

42.50
4.84

47.57

47.34

55.50
5.80

54.60
5.80

54.18
5.80

53.83
5.80

61.30

60.40

59.98

59.63

69.25
12.12
81.37

68.00
12.12
80.12

67.45
12.12
79.57

67.17
12.12
79.29

400 mm wt. of DI Pipe /


M weight morter/m
Total wt./M.
450 mm wt. of DI Pipe /
M weight morter/m

82.75
13.82

81.40
13.82

80.91
13.82

80.33
13.82

96.57

95.22

94.73

94.15

98.75
15.53

97.00
15.53

96.36
15.53

95.83
15.53

Total wt./M.

114.28

112.53

111.89

111.36

500 mm wt. of DI Pipe /


M weight morter/m
Total wt./M.
600 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.

115.00
17.26

112.80
17.26

112.00
17.26

111.50
17.26

132.26

130.06

129.26

128.76

152.00
20.75

149.00
20.75

147.82
20.75

147.00
20.75

172.75

169.75

168.57

167.75

700 mm wt. of DI Pipe /


M weight morter/m
Total wt./M.
750 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
800 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
900 mm wt. of DI Pipe /
M weight morter/m
Total wt./M.
1000 mm wt. of DI Pipe /
M weight morter/m

193.75
29.45

189.80
29.45

188.36

181.70
29.45

223.20

219.25

29.45
217.81

217.50
31.56

213.00
31.56

211.45
31.56

210.00
31.56

249.06

244.56

243.01

241.56

240.75
33.69

235.80
33.69

233.82
33.69

232.33
33.69

274.44

269.49

267.51

266.02

292.75
37.89

286.20
37.89

283.82
37.89

281.83
37.89

330.64

324.09

321.71

319.72

349.75
42.08

341.60
42.08

338.55
42.08

336.17
42.08

Total wt./M.

391.83

383.68

380.63

378.25

211.15

Note : These weights are as per the Circular issued by Superintending Engineer (HQ) vide lt.No. MJP/10-2000 / SE (H/Q) / DI/
15/AMDT/Stores/255 Dt. 26-6-2000.
SECTION - D : CEMENT CONSUMPTION

29

STATEMENT SHOWING STANDARD WEIGHTS TO BE FOLLOWED FOR CARTING OF


VARIOUS DIAMETERS AND TYPES OF PIPES
(III) M. S. Pipes
Note : Weight of M. S. Pipes is to be computed by considering density of steel as 7850 Kg./Cum considering
the diameter and thickness of plate used for manufacturing of M. S. Pipes.
(IV)

A. C. Pressure Pipes (ISO-160)

Diameter of
Pipe in mm

Class of pipes and its weight in Kg. per meter length


Class 5

Class - 10

Class - 15

Class - 20

80

6.00

6.20

6.40

6.80

100

7.60

7.70

8.20

10.30

125

9.57

9.80

11.00

13.30

150

11.87

12.20

15.30

19.00

200

15.57

19.30

25.60

32.70

250

19.25

25.20

32.70

41.50

300

24.97

32.30

45.10

58.10

350

39.77

47.52

55.27

71.42

400

49.20

60.20

71.36

93.10

450

56.92

70.27

83.63

111.37.

500

72.84

89.54

104.25

136.52

600

102.50

137.32

148.35

193.16

SECTION - D : CEMENT CONSUMPTION

30

(V)

P.V.C. Pipes (IS :4985-1988)

Diameter of Pipe in
mm

Class of pipes and its weight in Kg. per meter length


6.00 Kg/Sq.cm

10.00 Kg/Sq.cm

4.00 Kg/Sq.cm
2

63
75
90
110
140
160
180
200
225
250
280
315

0.47
0.67
0.92
1.32
2.13
2.78
3.56
4.26
5.48
6.63
8.34
10.55

0.67
0.93
1.33
1.89
3.10
3.92
5.07
7.00
7.84
10.19
12.16
15.37

1.01
1.44
2.05
3.08
4.99
6.56
8.10
10.20
12.56
15.31
19.80
25.00

(VI)

R. C. C. Pipes

Diameter
of Pipe in
mm

Class of pipes and its weight in Kg. per meter length


P-2
3

P-3
4

NP-2
5

NP-3
6

23.56

23.56

23.56

21.20

21.20

21.20

150

33.00

33.00

33.00

29.40

29.40

29.40

200

42.10

42.10

42.10

37.90

37.90

37.90

250

51.84

63.40

75.18

57.10

67.60

77.20

300

74..64

102.50

117.10

92.25

105.40

119.10

350

92.28

134.30

168.10

120.80

151.30

170.20

400

104.16

169.60

208.10

152.60

187.30

212.40

450

127.92

188.70

235.23

169.90

211.70

240.80

500

141.36

229.90

261.37

206.90

235.23

270.50

600

192.96

305.70

313.64

275.10

282.27

320.20

700

225.59

325.80

365.92

293.20

329.32

370.90

800

257.82

345.19

418.19

310.60

376.30

425.40

900

290.00

389.58

470.47

350.60

423.00

482.30

1000

322.28

443.98

510.00

399.80

459.00

531.40

P-1
2

100

SECTION - D : CEMENT CONSUMPTION

31

NP-4
7

(VII) P.S.C. Pipes of all classes and B. W. S. C. pipes of all classes


Diameter of Pipes in mm

Weight of pipe per meter length for all classes.

350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800

197.50 Kg/m
240.00 Kg/m
257.50 Kg/m
292.50 Kg/m
375.00 Kg/m
432.50 Kg/m
582.50 Kg/m
705.00 Kg/m
825.00 Kg/m
947.50 Kg/m
1115.00 Kg/m
1190.00Kg/m
1370.00 Kg/m
1560.00Kg/m
1767.50 Kg/m
1987.50 Kg/m
2205.50 Kg/m

(VIII) Stoneware Pipes


Diameter of Pipes in mm

(IX)

Weight of 0.60 M long pipe in Kg per pipe

100

8.70 Kg/Each

150

15.00 Kg/Each

200

20.85 Kg/Each

225

23.70 Kg/Each

250

27.57 Kg/Each

300

43.60 Kg/Each

G. I. Pipes
Class of Pipes and its weight in Kg. per meter length

Diameter of Pipes in mm

Light (Blue)
15
20
25
32
40
50
65
80
100
125
150

Medium (Yellow)

0.96
1.42
2.03
2.61
3.29
4.18
5.92
6.98
10.20
------

SECTION - D : CEMENT CONSUMPTION

1.23
1.59
2.40
3.17
3.65
5.16
6.63
8.64
12.40
16.70
19.70

32

Heavy (Red)
1.46
1.91
2.99
3.97
4.47
6.24
8.02
10.30
14.70
18.30
21.80

SECTION - E : EXCAVATION
Sr. No.

Description

Unit

1.

2.

3.

4.

5.

Excavation for foundation / pipe trenches in earth, soils of all types,


sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and
spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.
Lift 0 to 1.5 M
(Bd-A-1/259)
Excavation for foundation / pipe trenches by all means in hard
murum including removing the excavated material upto a distance of
50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation
and excluding backfilling, etc. complete.

Cum

134.00

Lift 0 to 1.5 M
(Bd-A-2/259)
Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a
distance of 50 M beyond the area and lifts as below, stacking and
spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.

Cum

156.00

Lift 0 to 1.5 M
(Bd-A-3/259)
Add for every additional lift of 1.5 M beyond initial lift of 1.50 M for
Item Nos. 1 to 3

Cum

175.00

Cum

13.00

Cum

443.00

Cum

---

Excavation for foundation / pipe trenches by all means in soft rock


and old cement and lime masonry foundation asphalt road including
removing the excavated material upto a distance of 50 M beyond area
and lifts as below, stacking as directed by Engineer-in-charge, normal
dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.
Lift 0 to 1.5 M

6.

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
4
5

(Bd-A-4/259)

Excacation for foundation / pipe trenches in by blasting in soft rock


and old masonry including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by
Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.

SECTION - E : EXCAVATION

33

Sr. No.

Description

Unit

7.

Excavation for foundation / pipe trenches in hard rock by controlled


blasting, including trimming and levelling the bed by chiselling where
necessary and removing the excavated material and stacking it
in measurable heaps within a distance of 50 metres from the area and
lifts as below, normal dewatering, excluding backfilling, etc. complete.
Lift 0 to 1.5 M

8.

9.

Cum

599.00

Cum

815.00

Cum

1019.00

Cum

301.00

(Bd-A-5/259)

Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling, by mechanical
means or by all means other than blasting including trimming and
levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as
directed by Engineer-in-charge, normal dewatering, excluding
backfilling, etc.complete by all means.
Lift 0 to 1.5 M

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
4
5

(Bd-A-6/259)

Excavation in laterite rock masses mechanically including lift


upto 1.5 M including trimming and levelling the bed, removing
the excavated material upto a distance of 50 M beyond the area
and lift as below, stacking as directed by Engineer-in charge, normal dewatering, excluding backfilling, etc. complete.

Lift 0 to 1.5 M.
10.

Excavation for foundation /pipe trenches in slush Muddy/ Marshy /


Slushy /Soil including use of poclain, labour for dewatering during
execution including removing the excavated material upto a distance
of 50 metres and lifts as below, stacking and spreading as directed,
preparing the bed by cleaning the mud, labour required for execution
for shutterng item but excluding backfilling etc. complete. Providing
and fixing shuttering shall be paid separately.
Lift 0 to 1.5 M

SECTION - E : EXCAVATION

34

Sr. No.

Description

Unit

11.

12.

Add for every additional lift beyond initial lift of 1.5 M


for item No. 5 to 10
Cum

20.00

Cum

408.00

b) For Head Works on nalla or any other site of GSDA for initial
lift of 0 to 1.5 M

Cum

228.00

c) Add for each additional lift of 1.5 M beyond initial lift of 1.5 M

Cum

20.00

Cum

806.00

HEAD WORKS
Excavation in general in soft material comprising of soft soil, soft
murum, sand, hard murum with boulders in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack
Well, Pump House, Supply Well, etc. for lift 0 to 1.5 M and lead of
150 M including baricading, guarding, disposing off surplus excavated
stuff within a radius of 0.5 km. as directed by Engineer-in- charge, etc.
complete excluding refilling.

a) For Head Works on river or dam submergence for initial lift of


0 to 1.5 M

13.

Rate
(in Rs.)
2012-2013
4

Excavation in general in hard material comprising of soft rock,


hard rock, Manjara rock, etc, by blasting / controlled blasting
/ chiselling as required in wet or dry condition for Head Works
i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply
Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricading,
guarding, disposing off surplus excavated stuff within a radius of 0.5
km. as directed by Engineer-in-charge, excluding refilling.
a) For Head Works on river or dam submergence for initial lift of
0 to 1.5 M

SECTION - E : EXCAVATION

35

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

14.

b)

For Head Works on nalla or any other site of GSDA for


initial lift of 0 to 1.5 M

Cum

556.00

c)

Add for each additional lift of 1.5 M beyond initial lift of


1.5 M

Cum

20.00

Cum

756.00

Cum

613.00

Desilting the Supply Well, Intake Well / Head Works, sump of water supply/ sewerage works etc. in wet or dry condition including
lifts upto 9 M and lead upto 150 M as required beyond the work
site, stacking, spreading, including necessary guarding, etc. complete,
as directed by Engineer-in-charge.

Cum

587.00

Add for every additional lift of 1.5 M. beyond initial lift of 9.0 M

Cum

20.00

Excavation in general in soft material comprising of soft soil, soft


murum, sand, hard murum with boulders in wet or dry condition
for Head Works and allied works by well sinking process for average depth of 12 M and lead of 150 M including shoring, baricading,
guarding, refilling, disposing of surplus excavated stuff as directed by
Engineer-in-charge, etc. complete.
a) Diameter upto and including 3 M
b) Diameter more tham 3 M

15.

16.

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
5
4

Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other
devices including disposing off water to safe distance as directed by
Engineer-in-charge (including cost of machinery, labour, fuel), etc. BHP/Hr.
complete. (Bd-A-9/261)
(i) The Contractor at his request may allowed to start construction of
masonry steining so as not to allow silting of well in oncoming monsoon and while paying masonry, 25% amount shall be withheld
and released only when excavation to the full depth is completed.
(ii) Dewatering : Total dewatering charges are to be proposed in
tender as lumpsum amount and 75% is payable for excavation
and 25 % is payable for construction of well / gallery. Out of 75%
excavation, break-up shall be as under :

SECTION - E : EXCAVATION

36

60.00

Sr. No.

Description

Unit

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
4
5

25% for last 1M depth.


20% for 2 M depth which just above last 1 M depth.
15% for 2 M depth which just above last 3 M depth.
15% for the rest of depth from water table level.

The above conditions will restrict the tendencies of agencies to avoid


deepening of wells, etc. to the required depth.

17.

18.

19.

20.

21.

22.

Refilling the trenches with available excavated stuff with soft


material first over pipeline and then hard material in 15 cm layers
with all leads and lifts including consolidation, surcharging, etc.
complete.
Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm
to 20cm layers including watering and compaction etc.complete.
(Bd-A-10/263)

Filling in plinth and floors / trenches with contractors murum


for bedding in 15cm to 20cm layers including watering and compaction royalty charges etc.complete.
(Bd-A-11/263)

Providing dry trap/granite/quartzite/gneiss, rubble stone soling


in 15cm to 20 cm thick layers including hand packing and compacting, royalty charges etc. complete.
(Bd-A-12/264)
Providing and filling in sand boxing in pipeline or for foundation
with sand of approved quality including watering compaction, initial lead upto 5.0 km. etc. complete.
(Bd-A-13/264)
Open timbering in trenches of depth more than 1.5 m for shoring and strutting including use of and waste of all necessary timber works including walling, strutts, open polling boards/ horizontal sheeting, runners, etc. as may be necessary and fixing and
removal complete. (Measurements to be taken of the face/area
timbered) (N.B.O. Item No. 4.15, P. No. 59)

SECTION - E : EXCAVATION

37

Cum

60.00

Cum

60.00

Cum

641.00

Cum

899.00

Cum

887.00

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

A) Lift 0 to 1.5 M [for non-water logged area]

Sqm.

218.00

Additional per Sqm. for further lifts of 1.5M each.

Sqm.

20.00

B) Lift 0 to 1.5 M for water logged area.

Sqm.

246.00

Additional per Sqm. for further lifts of 1.5M each.

Sqm.

20.00

Note: For the Trenches with more than 1.5M depth shoring if required from GL is to be done and is payable from G.L.

SECTION - E : EXCAVATION

38

Rate
(in Rs.)
2013-2014
5

SECTION -F : IRON AND STRUCTURAL STEEL WORK

Sr. No.

Description

Unit

1.

2.

3.

4.

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
4
5

Providing and fixing mild steel grill work for windows/ventilators of 20 Kg./Sqm. as per drawings including necessary
welding and painting with one coat of anticorrosive paint and
two coats of oil painting, etc. complete.
(Bd-U-1/537)

Sqm

1761.00

Providing and fixing mild steel grill railing of 20 Kg./Sqm.


with teak wood hand railing, still and newel posts for staircase
and including fabricating, fixtures, erecting, painting the grill
work with approved oil paint and polishing the hand rail and
newel posts with French polish two coats, etc. complete.
(Bd-U-2/537)

Sqm

2596.00

Providing structural steel work in rolled stanchions


fixed with connecting plates or angle cleats as in main and
cross beams, hip and jack rafters, purlins connecting to truss
members and like as per detailed designs and drawings or as
directed by Engineer-in-charge including cutting, fabricating,
hoisting, erecting, fixing in position, making riveted / bolted /
welded connections and one coat of anticorrosive paints
and over it two coats of oil painting, etc. complete.
(Bd-C-3/275)

MT

61494.00

MT

60351.00

Providing stuctural steel work in single stanchions composed


of RSJ, channel, etc, with caps, bases, mild steel plates, angles,
brackets, cleats, gusset plates, anchor bolts, etc. as per detailed
design and drawing or as directed by Engineer-in-charge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted/ bolted / welded connections and one coats
of anticorrosive paint and over it two coats of oil painting, etc.
complete.
(Bd-C-6/277)

SECTION -F: IRON AND STRUCTURAL


STEEL WORK

39

Sr. No.

Description

Unit

5.

6.

Providing structural steel work in rolled sections like joists,


channels, angles, tees, etc. as per detailed designs and drawings including fixing in position without connecting plates,
braces, etc. and one coat of anticorrosive paint and over it two
coats of oil painting, of approved quality and shade, etc. complete.
(Bd-C-2/275)
Providing structural steel work in trusses, other similar trussed
purlins and members with all bracing, gusset plates, etc. as
per detailed design and drawing or as directed by Engineer-incharge including cutting, fabricating, hoisting, erecting and fixing in
position, making riveted / bolted / welded connections and one coat
of anticorrosive paint and over it two coat of oil painting, etc. complete.
(Bd-C-8/278)

SECTION -F: IRONAND STRUCTURAL


STEEL WORK

40

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
4
5

MT

63141.00

MT

75473.00

SECTION G - PLAIN CEMENT CONCRETE


Sr. No.

Description

Unit

1.

Providing and laying in situ, following grades of C.C. of


trap /granite / quartzite / gneiss metal for foundation and
bedding including dewatering, formwork, compacting
and curing, finishing, etc. complete.

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
4
5

a)

M-100

Cum

4014.00

b)

M-150

Cum

4505.00

SECTION -G : PLAIN CEMENT CONCRETE, REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

41

SECTION -G : REINFORCED CEMENT CONCRETE, READY MIX CONCRETE


Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

2.

3.

Providing and laying in situ Cement concrete of trap/granite/


quartzite/ gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, 'plywood form work, bully/
steel propups, compaction, finishing and curing, etc, complete. (By
weigh batching and mix design for M-250 and M-300 only. Use of
L & T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc.
cement is permitted.) (excluding M.S. or Tor reinforcement)
a)

In RCC M-150

Cum

5475.00

b)

In RCC M-200

Cum

5533.00

c)

In RCC M- 250

Cum

6063.00

d)

In RCC M- 300

Cum

6357.00

Providing and casting in situ Cement Concrete of trap/granite/quartzite/ gneiss metal of approved quality for RCC work
as per detailed drawings and designs or as directed by Engineerin-charge including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction, finishing the formed
surfaces with CM 1:3 of sufficient minimum thickness if special
finish is to be provided and curing, etc. complete. (By weigh batching
and mix design for M-250 and M-300 only. Use of L&T, A.C. C.,
Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted) (excluding M.S, or Tor reinforcement)
a)

For RCC M-200 grade - all types of columns

Cum

7299.00

b)

For RCC M-250 grade - all types of columns

Cum

7887.00

c)

For RCC M-300 grade - all types of columns

Cum

8123.00

SECTION -G : PLAIN CEMENT CONCRETE, REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

42

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

4.

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
4
5

Providing and casting in situ C. C. of trap / granite / quartzite/


gneiss metal of approved quality for RCC works as per detailed
drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, 'plywood formwork, bully/steel
propups, compaction, finishing the formed surfaces with C.
M. 1:3 of sufficient minimum thickness to give a smooth and even
surface wherever nesessary or roughening if special finish is to be
provided and curing, etc. complete. (By weigh batching and mix
design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja,
Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (excluding M.S. or Tor reinforcement)

a)

For RCC M-200 grade

Cum

7240.00

Cum

7829.00

Cum

8111.00

Beams /Braces / Lintels


b)

For RCC M-250grade


Beams /Braces / Lintels

c)

For RCC M-300 grade


Beams /Braces / Lintels

5.

Providing and casting in situ C. C. of trap/granite/quartzite/ gneiss


metal of approved quality for RCC work as per detailed drawings
and designs or as directed by Engineer-in-charge including normal
dewatering, centering, 'plywood formwork, bully/steel prop-ups,
compaction, finishing the formed surfaces with CM 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and
curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted) (excluding M.S,
or Tor reinforcement)

SECTION -G : PLAIN CEMENT CONCRETE, REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

43

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

Cum

7770.00

Cum

8358.00

Cum

8711.00

Cum

7887.00

a)

b)

c)

6.

For RCC M-200 grade


Slabs / Landings / Vertical Walls / Waist Slabs /
Steps for Staircase
For RCC M-250 grade
Slabs / Landings / Vertical Walls / Waist Slabs /
Steps for Staircase
For RCC M-300 grade
Slabs / Landings / Vertical Walls / Waist Slabs /
Steps for Staircase

Providing and casting in situ C. C. of trap/granite/quartzite/ gneiss


metal of approved quality for RCC work as per detailed drawings
and designs or as directed by Engineer-in-charge including normal
dewatering, centering, 'plywood formwork, bully/steel propups,
compaction, finishing the formed surfaces with CM 1:3 of sufficient minimum thickness to give a smooth and even surface
wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use fo L&T, A.C. C., Ambuja,
Birla Gold, Manikgad, Rajashree, etc. cement is permitted) (excluding M.S, or Tor reinforcement)
a)

For RCC M-200 grade


Chajjas / Parapets / Curtain Walls / Partition Walls
/ Pardies

SECTION -G : PLAIN CEMENT CONCRETE, REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

44

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

For RCC M-250 grade


Chajjas/Parapets/Curtain walls/ Partition walls/
Pardies.

Cum

8418.00

For RCC M-300 grade


Chajjas/Parapets/Curtain walls/ Partition walls/
Pardies.

Cum

8653.00

c)

d)

7.

8.

Providing and laying in situ R. C. C. of trap/granite/quartzite/ gneiss metal of approved quality for RCC works of
domes as per detailed drawings and designs approved by
Engineer-in-charge including centering finishing, roughening
the surfaces with special finish or plaster to be provided separately, curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C. C., Ambuja,
Birla Gold, Manikgad, Rajashree, etc. cement is permitted) (excluding M.S. or Tor reinforcement)
a)

For RCC M-200 grade - Domes

Cum

8240.00

b)

For RCC M-250 grade - Bottom Domes only

Cum

8771.00

c)

For RCC M-300 grade - Bottom Domes only

Cum

9064.00

Providing and fixing in position steel bar reinforcement of


various diameters for RCC piles, caps, footings, foundations,
slabs, beams, columns, canopies, staircases. newels, chajjas,
lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting
as required, etc. complete.
(including cost of binding wire).
(Bd-F-17/306)

SECTION -G : PLAIN CEMENT CONCRETE, REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

45

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

9.

a)

Mild Steel

M. T.

58806.00

b)

Tor Steel

M. T.

58806.00

c)

Only fabrication (Labour) for all types of steel

M. T.

7960.00

1) 8 mm dia.

M. T.

16932.00

2) 10 mm dia.

M. T.

15372.00

3) 12 mm dia.

M. T.

14332.00

4) 16 mm dia.

M. T.

13916.00

5) 20 mm dia.

M. T.

12980.00

6) 25 mm dia.

M. T.

12015.00

7) 28 mm dia.

M. T.

11469.00

8) 32 mm dia.

M. T.

10651.00

Providing fusion bonded epoxy coating to reinforcement


bars as per IS-13620-993 specificaion for a thickness of 175
(+50) microns including extra cost on account of careful handling,
extra cost on account of using PVC coated binding wire instead of
G. I. wire, extra cost on account of touch-up material supplied by
coating agency and repair work extra cost on account of transportation to and fro from steel yard at Kalamboli to plant at Daman
and Plant at Daman to work site by trailer, loading, unloading, including all taxes (Central and Local), etc. complete.
a)

For Reinforcement Diameterwise Rates

SECTION -G : PLAIN CEMENT CONCRETE, REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

46

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

1) For 8 mm to 20 mm dia.

M. T.

14706.00

2) For above 20 mm dia.

M. T.

11379.00

b)

Average Rates (FOR ESTIMATION ONLY)

Notes for Estimation :


1)

All the rates of Reinforced Cement Concrete Items From


1 to 6 shall be increased by 10% for each brace height
above 1st brace for R.C.C. E. S. R.s.e.g. For a R.C.C.
E.S. R. with 7 M staging and first brace at 3.50 M
above ground, the concrete in columns above first
brace, concrete of ring beam and bottom slab is entitled
for 10% increase, concrete of vertical wall, roof slab
and roof beams, columns in container are entitled for
20% increase.

2)

All the rates of Reinforced Cement Concete Items


from 1 to 6 shall be increased by 2% for every floor
height above ground floor for building works.

3)

These rates are applicable for R. C. C. well works


also.These rates shall be increased by 10% for every
5 M depth below initial 5 M depth.

4)

Rates for Item Nos. 7 and 8 shall be increased by 5%


for each brace height above first brace for
R.C.C.E.S.Rs. By 5% for every ring beam below first
ring beam for R. C. C. wells. By 1% building works
for every floor height.

5)

Volumetric mix as per 1: 11/2 :3 shall be adopted with


56.5 kg. of cement for RCC-250 and 59.5 kg. of
cement for RCC- 300, per load of mixer of 1bag capacity.

6)

Fusion bonded epoxy coating to be proposed only


in Coastal Area with prior approval of the
Chief Engineer.

7)

For estimation purpose, average rates as per Item No.9b


shall be considered wherever necessary.

SECTION -G : PLAIN CEMENT CONCRETE, REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

47

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

READY MIX CONCRETE


10.

11.

Providing and laying in situ Ready Mix Cement Concrete grade


of trap/granite/quartzite/ gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC
column and steel stanchions including normal dewatering, form
work, compaction, finishing and curing including transporting from
mixing plant upto distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below G. L., etc.
complete. (Excluding reinforcement and structural steel)
a)

In RCC M-200

Cum

6248.00

b)

In RCC M-250

Cum

6540.00

c)

In RCC M-300

Cum

6643.00

Providing and casting in situ Ready Mix Cement Concrete grade


of trap/granite/quartzite/ gneiss metal of approved quality for RCC
work as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering centering, form
work, compaction, finishing the formed surfaces with CM 1:3
of sufficient minimum thickness to give a smooth and even surface
wherever necessary or roughening if special finish is to be
provided and curing including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work site for 1.5 M lift
above G. L. and 5.0 M lift below G. L., etc. complete.
(Excluding reinforcement and structural steel)

b)

In RCC M-200 - all types of columns

Cum

7760.00

c)

In RCC M-250 - all types of columns

Cum

8037.00

d)

In RCC M-300 - all types of columns

Cum

8141.00

SECTION -G : PLAIN CEMENT CONCRETE , REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

48

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

12.

13.

Rate
(in Rs.)
2012-2013
4

Providing and casting in situ Ready Mix Cement Concrete


grade of trap/granite/quartzite/ gneiss metal of approved quality
for RCC work as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering,
centering, form work compaction, finishing the formed surfaces with CM 1:3 of sufficient minimum thickness to give a
smooth and even surface wherever nesessary or roughening if
special finish is to be provided and curing including transporting from mixing plant upto distance of 25 km., pouring the concrete at work site for 1.5 M lift above G. L. and 5.0 M lift below G.
L., etc. complete.
(Excluding reinforcement and structural steel)

b)

In RCC M-200 - Beams / Braces / Lintels

Cum

7731.00

c)

In RCC M-250 - Beams / Braces / Lintels

Cum

8008.00

d)

In RCC M-300 - Beams / Braces / Lintels

Cum

8112.00

Cum

8135.00

Providing and casting in situ Ready Mix Cement Concrete grade


of trap/granite/quartzite/ gneiss metal of approved quality for
RCC work as per detailed drawings and designs or as directed
by Engineer-in-charge including normal dewatering centering,
form work, compaction, finishing the formed surfaces with
CM 1:3 of sufficient minimum thickness to give a smooth and
even surface wherever necessary or roughening if special finish is to be provided and curing including transporting from
mixing plant upto distance of 30 km., pouring the concrete at
work site for 1.5 M lift above G. L. and 5.0 M lift below G. L.,
etc. complete.
(Excluding reinforcement and structural steel)

b)

In RCC M-200
Slabs / Landings / Vertical Walls / Waist Slabs /
Steps for Staircase

SECTION -G : PLAIN CEMENT CONCRETE REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

49

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

In RCC M-250
Slabs / Landings / Vertical Walls / Waist Slabs /
Steps for Staircase

Cum

8408.00

In RCC M-300
Slabs / Landings / Vertical Walls / Waist Slabs /
Steps for Staircase

Cum

8505.00

For RCC M-200 Chajjas / Parapets / Curtain Walls /


Partition Walls / Pardies

Cum

8370.00

For RCC M-250 Chajjas / Parapets / Curtain Walls /


Partition Walls / Pardies

Cum

8642.00

For RCC M-300 Chajjas / Parapets / Curtain Walls /


Partition Walls / Pardies

Cum

8739.00

c)

d)

14.

Providing and casting in situ Ready Mix Cement Concrete grade


of trap/granite/quartzite/ gneiss metal of approved quality for RCC
work as per detailed drawings and designs or as directed
by Engineer-in-charge including normal dewatering, centering, form
work compaction, finishing the formed surfaces with CM 1:3
of sufficient minimum thickness to give a smooth and even surface
wherever nesessary or roughening if special finish is to be
provided and curing including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work site for 1.5 M lift
above G. L. and 5.0 M lift below G. L., etc. complete.
(Excluding reinforcement and structural steel)

b)

c)

d)

SECTION -G : PLAIN CEMENT CONCRETE REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

50

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

15.

Providing and casting in situ Ready Mix Cement Concrete grade


of trap/granite/quartzite/ gneiss metal of approved quality for RCC
work as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering, form
work compaction, finishing the formed surfaces with CM 1:3
of sufficient minimum thickness to give a smooth and even surface
wherever nesessary or roughening if special finish is to be
provided and curing including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work site for 1.5 M lift
above G. L. and 5.0 M lift below G. L., etc. complete.
(Excluding reinforcement and structural steel)

b)

For RCC M-200 - Domes

Cum

8678.00

c)

For RCC M-250 - Domes

Cum

8946.00

d)

For RCC M-300 - Domes

Cum

9049.00

Note : 1) Add Rs.10/- per Cum for transportation beyond


25 km. for every additional lead of 1 km.
2) Beyond 1.5 M above G.L. and 5.0 M below G. L.,
concreting is to be done by pumping by the Company.
3) Additional rate of pumping
a) Static pump
Rs. 175/- per Cum
b) Mobile pump
Rs. 250/- per Cum
4) For Ready Mix Concrete, prior permission
from Chief Engineer shall be obtained.

SECTION -G : PLAIN CEMENT CONCRETE REINFORCED


CEMENT CONCRETE, READY MIX CONCRETE,

51

Rate
(in Rs.)
2013-2014
5

SECTION - H : MISCELLANEOUS
Sr. No.

Description

Unit

2.

Rate
(in Rs.)
2012-2013
4

Providing and fixing G.I. pipe railing having 1.0 M height


consisting 50 x 50 x 6 mm thick M. S. angles as verticals at 1.5
M c/c, and additional posts at every corner bends to curved shape
with 3 rows of 25 mm dia G.I. pipes of medium class variety as
horizontal and painting 3 coats of oil paint over 1 coat of anticorrosive paint of approved colour and shade including cost of all labour,
transporting bends to curved shape, etc. complete.

RM

927.00

A)

RM

737.00

Litre
Litre

2.00
1.00

Litre
Litre

1.61
1.00

Providing and fixing M.S. gate 2.5 M wide for compound with
40 mm dia G.I. pipe, approved grill work, RCC M - 150 side
pillars of 25 cm x 40 cm x 2.5 M height, with foundation, finishing,
painting etc. complete.

No.

27324.00

Proividing and fixing Wicket gate 1.0 M wide for compound


with 40 mm dia G. I. pipe, approved grill work, RCC M-150
side pillars of 25 cm x 40 cm x 2.5 M height, its foundation, finishing painting, etc. complete.

No.

16106.00

As above but with only 2 rows.

Dismantling of ESRs of various capacities and heights using crane


(10 MT capacity) and handling over M.S./ C.I./ G.I. pipes, valves,
bends, etc. to the Department. However taking steel reinforcement by the dismantling agency including removing dismantled
materials from site and disposing them at suitable place as directed,
etc.complete.
A)
Capacity of E.S.R. upto 2 lakh litres and staging
upto 12.00 M height.
i) Conjusted Area
ii) Open Area
B)

Capacity of E.S.R. above 2 lakh litres and


staging upto 12.00 M height. i) Conjusted Area
ii) Open Area

Note :- Above 12 M staging height add 5% per Metres staging of


E.S. R. of any capacity.
3.

4.

5.

Taking Trial Bore (Core Bore Sampling) by Callyx machine with


TCT/NX bits to gader undisturbed strata samples for investigation
in all types of strata soft soil, murum, hard murum with boulders,
soft rock hard rock & quartzite etc. The item includes all Hire &
running cost of Callyx Machine conveying all materials to site of
work excluding conveyance of callyx, machine and back sampling

SECTION - H : MISCELLANEOUS

52

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

RMT
RMT
RMT
RMT

1192.00
4634.00
2378.00
3136.00

Bag
Bag

848.00
858.00

RM

677.00

Litre

4.00

Sqm

292.00

all over burden strata in glass jar and core samples serially numbered at site in a wooden Core Box, Samples to be taken at 1.0
M interval and conveying to the place as directed by Engineer
- in - charge, The diameter of bore in overburden shall be 100
mm and of NX size (50mm) in other strata. The item shall also
include M. S. casing pipe of 2.5 mm thick plate in overburden
only and shall be 1.0 m above GL with cap over it.
a)
b)
c)
d)
6.

Providing pressure grouting at a pressure of 0.56 kg./sqcm


in required row/zigzag fashion as specified at 1.5 M interval as
per site conditions to stop leakages through water retaining
structures to the entire satisfaction of the Engineer-in-charge
including material compound, hardening materials, compressor
equipment including scaffolding smooth finishing, etc. complete.
i)
ii)

7.

8.

9.

In Overburden (Soft soil, murum)


In Weathered rock with boulders
In Weathered rock/soft rock
In Hard rock other than quartzite

For masonry structure


For concrete structure

Drilling 40 mm dia holes in masonry or concrete structure


with providing and fixing 0.5 M long G. I. pipe line for pressure
grouting including all Material, labour cost and machinery charges, etc.
complete.
Providing and casting ferrocrate water tank at site inculuding all
cost of labour and material, etc, complete. upto 25,000 literes
(for foundation and providing and fixing taps, etc. shall be considered spearately).
Providing and applying one coat of Gamma coating or equivalent such as Dr.Bake, Krishna conchem ,Asian Paint, Atul Limited, Burger Paint,epoxy primer 50 to 60 microns thick and covering two Coats of Gamma Coatings or equivalent such as
Dr.Bake,Krishna Conchem, Asian Paint, Atul Limited, Burger
Paints 30 microns thick each to new M.S.pipes and structural
steel or concrete surface including repainting the surface by finishing by Solvent degreasing and de-rusting by applying chemical method and scaffolding is necessary required etc.complete as
per manufacturers specifications.
SECTION - H : MISCELLANEOUS

53

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

10.

Rate
(in Rs.)
2012-2013
4

Making cross connection to existing distribution main of any


type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing
the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-in-charge for following
diameters of existing pipeline, irrespective of diameter of branch
line (the number of joints involved will be paid separately depending upon the nature of joints and required pipes, valves and specials will be supplied free of cost at stores).

i)
ii)
iii)
iv)
v)

80 mm.
100 mm.
125 mm.
150 mm.
200 mm.

No.
No.
No.
No.
No.

1756.00
2028.00
2247.00
2375.00
2431.00

vi)
vii)
viii)
ix)
x)

250 mm.
300 mm.
350 mm.
400 mm.
450 mm.

No.
No.
No.
No.
No.

2874.00
3338.00
3846.00
4756.00
5215.00

xi)
xii)
xiii)
xiv)
xv)

500 mm.
600 mm.
700 mm.
750 mm.
800 mm.

No.
No.
No.
No.
No.

6574.00
12215.00
15061.00
19102.00
24916.00

xvi)
xvii)

900 mm
1000 mm

No.
No.

32934.00
46383.00

Note : Only 85 % rate shall be payable till satisfactory


hydraulic testing is given.

SECTION - H - MESCELLANEOUS

54

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

11.

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
4
5

Dismantling dead pipeline of M.S./R.C.C./ C.I./ P.S.C. and


G.I./ A. C. / P. V. C. / S. W. / H. D. P. E. pipe including cost of
necessary excavation and refilling of trenches, breaking the joints,
lifting the pipes and stacking to the place as directed by Engineerin-charge with all leads and lifts including cleaning the surface, etc.
complete.
A)

For M.S./R. C. C./ C.I./ P. S. C.

i)

80 mm.

RMT

146.00

ii)

100 mm.

RMT

161.00

iii)

125 mm.

RMT

164.00

iv)

150 mm.

RMT

168.00

v)

200 mm.

RMT

186.00

vi)

250 mm.

RMT

205.00

vii)

300 mm.

RMT

222.00

viii)

350 mm.

RMT

251.00

ix)

400 mm.

RMT

273.00

x)

450 mm.

RMT

309.00

xi)

500 mm.

RMT

324.00

xii)

600 mm.

RMT

397.00

xiii)

700 mm.

RMT

465.00

xiv)

750 mm.

RMT

522.00

SECTION - H - MESCELLANEOUS

55

Sr. No.

Description

Unit

12.

Rate
Rate
(in Rs.)
(in Rs.)
2012-2013 2013-2014
5
4

B)

For G.I./AC/PVC/S. W. / H.D.P.E.

i)
ii)
iii)

80 mm.
100 mm.
125 mm.

RMT
RMT
RMT

87.00
96.00
99.00

iv)
v)
vi)
vii)

150 mm.
200 mm.
250 mm.
300 mm.

RMT
RMT
RMT
RMT

101.00
111.00
123.00
133.00

viii)
ix)
x)

350 mm.
400 mm.
450 mm.

RMT
RMT
RMT

150.00
164.00
186.00

xi)
xii)
xiii)
xiv)

500 mm.
600 mm.
700 mm.
750 mm.

RMT
RMT
RMT
RMT

194.00
238.00
279.00
313.00

No.

7960.00

No.

4752.00

Providing and constructing two taps standpost as per type design with excavation 15 cm thick PCC 1:3:6 bedding 20 mm thick
PCC 1:2:4 concrete for platform of 1.75 M dia. with side curb and
bucket rest, 80 mm dia, heavy duty GI pipe central post duly filled
therein with C. C. 1:2:4, 5 M long, 20 mm dia. medium G.I. pipe
from point of tapping to standpost additional 20 mm dia G.I. pipe
fixed vertically upto 15 mm dia self closing water taps, one brass
ferrule etc. complete together with all labour and material charges
as per drawing and as directed by Engineer-in-charge when good
foundation is available. Rate includes draining arrangemment by
excavating open gutters.
a)

As above but when precast RCC platform or precast


standpost is issued free of cost at departmental
stores including cost of transportation and fixing etc.
complete.

SECTION - H - MESCELLANEOUS

56

Sr. No.

Description

Unit

13.

Providing and constructing two taps standpost as per type design wih excavation 30 cm thick boulder filling 15 cm thick PCC in
1:3:6, 20 mm thick RCC 1:2:4 platform of 1.75 M dia. with side
curb and bucket rest, 80 mm dia, heavy duty GI pipe central post
duly filled therein with C. C. 1:2:4, 5 M long, 20 mm dia. medium
G.I. pipe from point of tapping to stand post additional 20 mm dia
G.I. pipe fixed horizontally and providing and fixing two 15 mm dia
self closing water taps, one brass ferrule etc. complete together with
all labour and material charges as per drawing and as directed by
Engineer-in-charge, when B.C.Soil is available. Rate includes
draining arrangement by excavating open gutters.
a)

As above but when precast RCC platform or precast


standpost is issued free of cost at departmental stores
including cost of transportation and fixing etc. complete.

SECTION - H - MESCELLANEOUS

57

Rate
(in Rs.)
2012-2013
4

No.

8197.00

No.

4871.00

Rate
(in Rs.)
2013-2014
5

SECTION - I : C. I. PIPES
Sr. No.

1.

Unit

Description

1.
C.I. PIPES
Providing and supplying ISI mark C.I. S/S pipe (push
on joints pressure pipes of D. I. of following class and diameters fonfirming to the I. S. specification inclusive cost of
jointing materials (Rubber gasket of EPDM Quality ) including all statutary duties and taxes levied by Gol and GoM in
all respect, Education Cess, VAT, Third party inspection
charges of TPI Agency approved by MJP including Transit
insurance, Railway Freight, Unloading from railway wagon,
Loading into Truck, Transportation to departmental store/
site of work, unloading, stacking etc. completed as directed
by Engineer in charges (IS 1536/2001 for pipes and IS 158/
1969 and IS 12820/1989 or latest edition/revision with
amendments for Rubber Gaskets. (IS-1536 / 2001)
(Suitable for Tyton / Pig lead joints)

Rate
(in Rs.)
2012-2013
4

With
E.D.

Without
E.D.

a)

Class LA

i)
ii)
iii)

80 mm
100 mm
125 mm

RMT 900.00
RMT 1128.00
RMT 1425.00

844.00
1058.00
1270.00

iv)
v)

150 mm
200 mm

RMT 1831.00
RMT 2636.00

1718.00
2484.00

vi)
vii)

250 mm
300 mm

RMT 3555.00
RMT 4594.00

3348.00
4317.00

viii)
ix)
x)

350 mm
400 mm
450 mm

RMT 4537.00
RMT 5522.00
RMT 6658.00

3948.00
4806.00
5794.00

xi)
xii)
xiii)

500 mm
600 mm
700 mm

RMT 7696.00 6698.00


RMT 10253.00 8921.00
RMT 13232.00 11514.00

xiv)
xv)

750 mm
800 mm

RMT 14820.00 12897.00


RMT 16589.00 14435.00

xvi)
xvii)

900 mm
1000 mm

RMT 20206.00 17582.00


RMT 24274.00 21122.00

SECTION - I : C. I. / D. I. PIPES

58

Rate
(in Rs.)
2013-2014
5

With Without
E.D.
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
ED

A Class Continued

Without
ED

1.

C.I. PIPES

B)

Class A

i)

80 mm

RMT

956.00

852.00

ii)

100 mm

RMT

1193.00

1063.00

iii)

125 mm

RMT

1552.00

1383.00

iv)

150 mm

RMT

1912.00

1703.00

v)

200 mm

RMT

2763.00

2461.00

vi)

250 mm

RMT

3735.00

3327.00

vii)

300 mm

RMT

4833.00

4306.00

viii)

350 mm

RMT

6043.00

5384.00

ix)

400 mm

RMT

7410.00

6602.00

x)

450 mm

RMT

8976.00

7998.00

xi)

500 mm

RMT

10292.00

9170.00

xii)

600 mm

RMT

13744.00

12245.00

xiii)

700 mm

RMT

17911.00

15958.00

xiv)

750 mm

RMT

19896.00

17725.00

xv)

800 mm

RMT

22241.00

19815.00

xvi)

900 mm

RMT

27072.00

24119.00

xvii)

1000 mm

RMT

32562.00

29010.00

SECTION - I : C. I. / D. I. PIPES

59

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
ED

Without
ED

c)

Class B

i)

80 mm

RMT

1016.00

905.00

ii)

100 mm

RMT

1272.00

1134.00

iii)

125 mm

RMT

1670.00

1489.00

iv)

150 mm

RMT

2058.00

1834.00

v)

200 mm

RMT

2987.00

2661.00

vi)

250 mm

RMT

4039.00

3598.00

vii)

300 mm

RMT

5237.00

4666.00

viii)

350 mm

RMT

6554.00

5840.00

xiv)

400 mm

RMT

7567.00

6742.00

x)

450 mm

RMT

9689.00

8631.00

xi)

500 mm

RMT

11136.00

9921.00

xii)

600 mm

RMT

14671.00

13070.00

xiii)

700 mm

RMT

19165.00

17085.00

xiv)

750 mm

RMT

21583.00

19229.00

xv)

800 mm

RMT

24058.00

21435.00

xvi)

900 mm

RMT

29330.00

26132.00

xvii)

1000 mm

RMT

35189.00

31352.00

SECTION - I : C. I. / D. I. PIPES

60

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.

Description
2

2.

Unit

Rate
(in Rs.)
2012-2013

Lowering laying and jointing with SBR ruber gaskets


C.I. S/S pipes of various classes with CI / MS specials of
following diameter in proper position, grade and alignment
as directed by Engineer-in-charge including conveyance of
material from stores to site of work, including cost of jointing materials and rubber rings labour, giving hydraulic testing etc. complete.
Note : Only SBR Rubber gaskets to be used as per
IS-5382 and IS-12820.
a)
C.I. L.A. Class / Mortar inlined DI K-9/K-7
i)
80 mm.
ii)
100 mm.
iii)
125 mm.
iv)
150 mm.
v)
200 mm.

RMT
RMT
RMT
RMT
RMT

vi)
vii)
viii)
ix)

250 mm.
300 mm.
350 mm.
400 mm.

RMT
RMT
RMT
RMT

123.00
133.00
166.00
199.00

135.00
152.00
186.00
230.00

x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)
B)
i)
ii)
iii)
iv)
v)
vii)
viii)

450 mm.
500 mm.
600 mm.
700 mm.
750 mm.
800 mm.
900 mm.
1000 mm.
C.I. A Class
80 mm.
100 mm.
125 mm.
150 mm.
200 mm.
250 mm.
300 mm.

RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT

199.00
230.00
303.00
390.00
437.00
535.00
639.00
756.00

243.00
280.00
373.00
525.00
574.00
674.00
846.00
1026.00

SECTION - I : C. I. / D. I. PIPES

Without With Without With


Rubber Rubber Rubber Rubber
Rings
Rings Rings Rings

44.00 50.00
53.00 59.00
66.00 73.00
70.00 79.00
94.00 104.00

RMT 46.00 56.00


RMT 56.00 66.00
RMT 71.00 79.00
RMT 78.00 86.00
RMT 102.00 110.00
RMT 133.00 146.00
RMT 145.00 163.00
61

Rate
(in Rs.)
2013-2014

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

Without
Rubber
Rings

With
Rubber
Rings

viii)
ix)
x)
xi)
xii)

350 mm.
400 mm.
450 mm.
500 mm.
600 mm

RMT
RMT
RMT
RMT
RMT

179.00
201.00
211.00
249.00
329.00

xiii)
xiv)
xv)
xvi)
xvii)

700 mm.
750 mm.
800 mm.
900 mm.
1000 mm.

RMT
RMT
RMT
RMT
RMT

423.00 556.00
475.00 610.00
561.00 698.00
676.00 882.00
789.00 1058.00

c)
i)
ii)
iii)
iv)
v)

CI B Class
80 mm.
100 mm.
125 mm.
150 mm.
200 mm.

RMT
RMT
RMT
RMT
RMT

50.00
60.00
77.00
87.00
110.00

59.00
71.00
86.00
96.00
124.00

vi)
vii)
viii)
ix)
x)

250 mm.
300 mm.
350 mm.
400 mm.
450 mm.

RMT
RMT
RMT
RMT
RMT

144.00
157.00
193.00
225.00
228.00

164.00
175.00
225.00
255.00
262.00

xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)

500 mm.
600 mm.
700 mm.
750 mm.
800 mm.
900 mm.
1000 mm.

RMT
RMT
RMT
RMT
RMT
RMT
RMT

268.00 316.00
355.00 423.00
457.00 588.00
516.00 650.00
602.00 737.00
714.00 918.00
814.00 1082.00

Note : Only 85% rate shall be payable till


satisfactory hydraulic testing is given.
SECTION - I : C. I. / D. I. PIPES

62

Rate
(in Rs.)
2013-2014

200.00
231.00
245.00
298.00
398.00

Without
Rubber
Rings

With
Rubber
Rings

Description

Sr. No.

3.

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

Providing D.I. K-9 grade pipes (push on


joints pressure pipes of D. I. of following class
and diameters fonfirming to the I. S. specification inclusive cost of jointing materials (Rubber
gasket of EPDM Quality ) including all statutary
duties and taxes levied by Gol and GoM in all
respect, Education Cess, VAT, Third party inspection charges of TPI Agency approved by
MJP including Transit insurance, Railway
Freight, Unloading from railway wagon, Loading into Truck, Transportation to departmental
store/site of work, unloading, stacking etc. completed as directed by Engineer in charges (IS
1536/2001 for pipes and IS 158/1969 and IS
12820/1989 or latest edition/revision with
amendments for Rubber Gaskets. (IS:83292000 Latest Version)

With
E.D.

Without
E.D.

i)
ii)

100 mm.
150 mm.

RMT
RMT

1145.00
1670.00

1041.00
1518.00

iii)
iv)

200 mm.
250 mm.

RMT
RMT

2076.00
2768.00

1888.00
2516.00

v)
vi)
vii)

300 mm.
350 mm.
400 mm.

RMT
RMT
RMT

3519.00
4405.00
5208.00

3200.00
4010.00
4730.00

viii)
ix)
x)

450 mm.
500 mm.
600 mm.

RMT
RMT
RMT

6288.00
7308.00
9664.00

5716.00
6644.00
8773.00

xi)
xii)

700 mm.
750 mm.

RMT
RMT

12403.00
14102.00

11276.00
12819.00

xiii)
xiv)
xv)

800 mm.
900 mm.
1000 mm.

RMT
RMT
RMT

15339.00
18933.00

13949.00
17212.00
20089.00

SECTION - I : C. I. / D. I. PIPES

63

22098.00

With
E.D.

Without
E.D.

Description

Sr. No.

Unit

Rate
(in Rs.)
2012-2013

With
E.D.

Without
E.D.

D. I. K - 7
i)

100 mm.

RMT

977.00

888.00

ii)

150 mm.

RMT

1434.00

1304.00

iii)

200 mm.

RMT

1692.00

1538.00

iv)

250 mm.

RMT

2242.00

2038.00

v)

300 mm.

RMT

2826.00

2569.00

vi)

350 mm.

RMT

3480.00

3164.00

vii)

400 mm.

RMT

4143.00

3766.00

viii)

450 mm.

RMT

5000.00

4545.00

ix)

500 mm.

RMT

5859.00

5326.00

x)

600 mm.

RMT

7717.00

7015.00

xi)

700 mm.

RMT

10409.00

9463.00

xii)

750 mm.

RMT

12097.00 10997.00

xiii)

800 mm.

RMT

13989.00 12717.00

xiv)

900 mm.

RMT

16779.00 15264.00

xv)

1000 mm.

RMT

19646.00 17860.00

SECTION - I : C. I. / D. I. PIPES

64

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

4.

Providing and making lead caulked joint with molten lead


to Cast Iron pipes and / or specials of all classes and fitting
of following dia including cost of lead and all jointing material,
labour, hydraulic testing etc. complete.
i)
80 mm.
ii)
100 mm.
iii)
125 mm.
iv)
150 mm.
v)
200 mm.
vi)
250 mm.
vii)
300 mm.
viiii)
350 mm.
ix)
400 mm.
x)
450 mm.
xi)
500 mm.
xii)
600 mm.
xiii)
700 mm.
xiv)
750 mm.
xv)
800 mm.
xvi)
900 mm.
xvii) 1000 mm.
Note : Only 85 % rate shall be payable till satisfactory
Hydraulic testing is given.

5.

Rate
(in Rs.)
2012-2013
4

Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint

657.00
812.00
968.00
1200.00
1750.00
2126.00
2564.00
2906.00
3389.00
4707.00
5060.00
6501.00

Joint
Joint
Joint
Joint
Joint

7637.00
8675.00
9316.00
9936.00
10594.00

RMT
RMT
RMT
RMT
RMT

1419.00
1753.00
2284.00
2849.00
4371.00

Providing and supplying ISI standard CI double


flanged pipes including all taxes (Central and local), railway
freight, insurance, unloading from railway wagon, loading into
truck transport to stores / site, unloading etc. complete as directed by Engneer-in-charge.
i)
ii)
iii)
iv)
v)

80 mm.
100 mm.
125 mm.
150 mm.
200 mm.

SECTION - I : C. I. / D. I. PIPES

65

Rate
(in Rs.)
2013-2014
5

Sr. No.
1

Rate
(in Rs.)
2013-2014

5890.00
7573.00
9885.00
12053.00
14473.00
16986.00
24162.00
32371.00
35221.00

KG.
KG.
KG.

73.60
78.20
83.90

KG.
KG.
KG.

71.30
75.90
80.50

KG.
KG.
KG.

69.00
75.90
80.50

a)
Machine ends suitable for PSC pipes of all diameters as per detailed drawing with 10 mm thick x 0.7 M long
barrel welded to it.

KG.

76.50

b)
Only flanges with machining and drilling holes, etc. complete more than 40 mm thick.

KG.

74.30

250 mm.
300 mm.
350 mm.
400 mm.
450 mm.
500 mm.
600 mm.
700 mm.
750 mm.

Providing and supplying ISI standard CI flanged / S& S


specials including all taxes (Central and local), railway freight,
insurance, unloading from railway wagon, loading into truck
transport to departmental store /site, unloading stacking etc.
complete.
a)
i)
ii)
iii)
b)
i)
ii)
iii)
C)
i)
ii)
iii)

7.

Rate
(in Rs.)
2012-2013

RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT

vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xix)
6.

Description

Unit

D/F Specials
80 to 300 mm dia
350 to 600 mm dia
Above 600 mm dia
S/S Specials / Socketed Branch Flanged Specials
80 to 300 mm dia
350 to 600 mm dia
Above 600 mm dia
Plain ended/ plain ended branch flanged specials
80 to 300 mm dia
350 to 600 mm dia
Above 600 mm dia

Providing and supplying ISI standard MS specials of


required thickness with 3 coats of approved make epoxy
paint (Shalimar, Ciba or Mahindra & Mahindra make) from
inside and outside including all taxes (Central and local), octroi, inspection charges, transportation to stores / site, and
stacking, etc. complete.

SECTION - I : C. I. / D. I. PIPES

66

Sr. No.
1

8.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

c)

Double flanged specials of all diameters

KG.

72.10

d)

All socketed specials or socketed branch flanged


specials of all diameters.

KG.

72.10

e)

Plain ended specials or plain ended branch flanged


specials of all diameters.

KG.

72.10

f)

MS barrels (pipe pieces) locally manufactured


(for small quantities)

KG.

70.00

Providing and making flanged joints to flanged C.I./


M.S. pipes of all classes/specials etc. including cost of all
jointing materials (rubber packing, nut bolts, etc.), labour,
hydraulic testing etc. complete.
i)
ii)
iii)
iv)
v)

80 mm.
100 mm.
125 mm.
150 mm.
200 mm.

Joint
Joint
Joint
Joint
Joint

174.00
301.00
314.00
603.00
626.00

vi)
vii)
viii)
ix)
x)

250 mm.
300 mm.
350 mm.
400 mm.
450 mm.

Joint
Joint
Joint
Joint
Joint

897.00
931.00
1213.00
1511.00
1848.00

xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)

500 mm.
600 mm.
700 mm.
750 mm.
800 mm.
900 mm
1000 mm

Joint
Joint
Joint
Joint
Joint
Joint
Joint

1912.00
2052.00
3093.00
3179.00
4398.00
4560.00
4721.00

Note : Only 85 % rate shall be payable till


satisfactory Hydraulic testing is given.

SECTION - I : C. I. / D. I. PIPES

67

Sr. No.

Description

Unit

9.

Rate
(in Rs.)
2012-2013
4

Erecting and hoisting in position and jointing, testing


M.S./ C.I. D/F pipes and specials in vertical position including cost of all jointing materials (rubber packing, nut bolts,
etc.) labour, scaffolding, hydraulic testing etc. complete.

i)

80 mm.

Joint

193.00

ii)

100 mm.

Joint

326.00

iii)

125 mm.

Joint

344.00

iv)

150 mm.

Joint

640.00

v)

200 mm.

Joint

680.00

vi)

250 mm.

Joint

970.00

vii)

300 mm.

Joint

1025.00

viii)

350 mm.

Joint

1331.00

ix)

400 mm.

Joint

1655.00

x)

450 mm.

Joint

2022.00

xi)

500 mm.

Joint

2115.00

xii)

600 mm.

Joint

2323.00

xiii)

700 mm.

Joint

3445.00

xiv)

750 mm.

Joint

3576.00

xv)

800 mm.

Joint

4843.00

xvi)

900 mm

Joint

5098.00

xvii)

1000 mm

Joint

5373.00

Note : Only 85 % rate shall be payable till satisfactory


hydraulic testing is given.

SECTION - I : C. I. / D. I. PIPES

68

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

10.

Rate
(in Rs.)
2012-2013
4

Providing and supplying ISI standard D. I. specials & fitting


with sealing rubber gasket of S.B.R,complete with cast iron
follower gland and M. S. nut bolts coated or otherwise protected from rusting and suitable for D.I.pipes including cost
of labour ,materials, and transportation to stores / site, loading and unloading including all taxes etc. complete as per IS9523.
For all types of specials, bends tees etc.

11.

a)

80 to 300 mm dia.

Kg.

107.00

b)

350 mm & above dia.

Kg.

130.00

Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.
Rmt.

1863.00
2530.00
3238.00
4394.00
5531.00
7203.00
8720.00
10419.00
12110.00
15946.00
21457.00
26228.00
32555.00
38225.00

Providing and supplying ISI standard welded DI double


flanged pipe including all taxes (central & local) railway freight,
insurance, unloading from railway wagon, loading into truck
transport to store / site, unloading, stacking etc. complete as
directed by Engineer -in- cahrge. (for 2.75 m bare pipe)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)

100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm

SECTION - I : C. I. / D. I. PIPES

69

Rate
(in Rs.)
2013-2014
5

SECTION - I : A. C. PIPES
Sr. No.

Description

Unit

With
E.D.

II. A.C. PIPE


1.

Rate
(in Rs.)
2012-2013
4

Without With Without


E.D.
E.D.
E.D.

Providing and supplying Asbestos Cement pressure pipes manufactured and tested as per ISO-160 standards of following class and diameter in standard lengths including cost of all taxes (Central and local) insurance, railway
fright, inspection charges, unloading from railway wagon,
loading into truck, transporting to departmental stores / site,
unloading, stacking, etc. complete.
a)

Class 15 (Test Pressure 1.5 MPa)

i)

80 mm.

RMT 139.00 126.00

ii)

100 mm.

RMT 179.00 162.00

iii)

125 mm.

RMT 214.00 194.00

iv)

150 mm.

RMT. 376.00 341.00

v)

200 mm.

RMT

497.00

vi)

250 mm.

RMT

719.00

vii)

300 mm.

RMT

1052.00

b)

Class 20 (Test Pressure 2.0 MPa)

i)

80 mm.

RMT 153.00 139.00

ii)

100 mm.

RMT 229.00 208.00

iii)

125 mm.

RMT 269.00 244.00

iv)

150 mm.

RMT 475.00 431.00

v)

200 mm.

RMT

612.00

vi)

250 mm.

RMT

906.00

vii)

300 mm.

RMT

1119.00

SECTION - I : A. C. PIPES

70

Rate
(in Rs.)
2013-2014
5

Sr. No.

Unit

Description
2

Rate
(in Rs.)
2012-2013
4
With
E.D.

2.

Without
E.D.

c)

Class 25 (Test Pressure 2.5 MPa)

i)

80 mm.

RMT

173.00 190.00

ii)

100 mm.

RMT

288.00 317.00

iii)

125 mm.

RMT

334.00 367.00

iv)

150 mm.

RMT

598.00 658.00

v)

200 mm.

RMT

789.00

vi)

250 mm.

RMT

1184.00

vii)

300 mm.

RMT

1298.00

Providing and supplying C.I. detachable joints


suitable for A.C. pressure pipes manufactured as
per IS-1538-1993 standards of following class and
diameter including cost of all taxes (Central and local), insurance, railway freight, inspection
charges, unloading from railway wagon, loading
into truck, transporting to departmental store / site,
unloading, stacking and cost of rubber rings, nut
bolts, etc. complete. ( IS-1538/1993)
a)

Class 10 (Test Pressure 1.0MPa)

i)

80 mm.

No.

255.00

ii)

100 mm.

No.

323.00

SECTION - I : A. C. PIPES

71

Rate
(in Rs.)
2013-2014
5
With
E.D.

Without
E.D.

Sr. No.

Description
2

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With E.D
iii)

125 mm.

No.

408.00

iv)

150 mm.

No.

518.50

v)

200 mm.

No.

790.50

vi)

250 mm.

No.

1079.50

vii)

300 mm.

No.

1360.00

vi)

350 mm.

No.

2337.50

vii)

400 mm.

No.

2677.50

vi)

450 mm.

No.

3655.00

vii)

500 mm.

No.

5185.00

vi)

600 mm.

No.

8840.00

a)

Class 15 (Test Pressure 1.5 MPa)

i)

80 mm.

No.

300.00

ii)

100 mm.

No.

380.00

iii)

125 mm.

No.

510.00

iv)

150 mm.

No.

636.00

v)

200 mm.

No.

960.00

vi)

250 mm.

No.

1204.00

vii)

300 mm.

No.

1650.00

SECTION - I : A. C. PIPES

72

Sr. No.

Description
2

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With E.D

3.

b)

Class 20 (Test Pressure 2.0 MPa)

i)

80 mm.

No.

325.00

ii)

100 mm.

No.

425.00

iii)

125 mm.

No.

550.00

iv)

150 mm.

No.

659.00

v)

200 mm.

No.

886.00

vi)

250 mm.

No.

1250.00

vii)

300 mm.

No.

1790.00

Providing and supplying A. C. pressure coupler suitable


for A.C. pressure pipes manufactured as per ISO-160 standards of following class and diameter including cost of all taxes
(Central and local) insurance, railway fright, inspection charges,
and cost of rubber rings, nuts bolts, etc. complete. (supply at
stores / site)
a)

Class 15 (Test Pressure 1.5 MPa)

i)

80 mm.

No.

39.00

ii)

100 mm.

No.

50.00

iii)

125 mm.

No.

69.00

iv)

150 mm.

No.

84.00

SECTION - I : A. C. PIPES

73

Description

Sr. No.

Unit

Rate
(in Rs.)
2012-2013

4
With E.D.

4.

b)

Class 20 (Test Pressure 2.0 MPa)

i)

80 mm.

No.

42.00

ii)

100 mm.

No.

56.00

iii)

125 mm.

No.

72.00

iv)

150 mm.

No.

98.00

Lowering, laying and jointing with C.I.D. joints, A. C.


pressure pipes and C.I. or M. S. specials of following class
and diameters including conveyance from stores to site of
works, cost of labour and material, giving satisfactory hydraulic
testing, etc. as per ISI code, etc. complete but excluding cost
of C. I. D. joints nut bolts, rubber rings.

a)

Class 15 (Test Pressure 1.5 MPa)

i)

80 mm.

RMT

31.00

ii)

100 mm.

RMT

43.00

iii)

125 mm.

RMT

46.00

iv)

150 mm.

RMT

57.00

v)

200 mm.

RMT

73.00

vi)

250 mm.

RMT

92.00

vii)

300 mm.

RMT

113.00

SECTION - I : A. C. PIPES

74

Rate
(in Rs.)
2013-2014
5

Description

Sr. No.

5.

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

b)

Class 20 (Test Pressure 2.0 MPa)

i)

80 mm.

RMT

32.00

ii)

100 mm.

RMT

46.00

iii)

125 mm.

RMT

50.00

iv)

150 mm.

RMT

63.00

v)

200 mm.

RMT

83.00

vi)

250 mm.

RMT

104.00

vii)

300 mm.

RMT

129.00

Lowering laying and jointing with C. I. D. jointing with A.


C. coupler A.C. pressure pipes and C.I. or M.S. specials of
following class and diameters including conveyance from stores
to site of works, cost of labour and material, giving satisfactory
hydraulic testing, etc. as per ISI code, etc. complete but excluding cost of A. C. couplers and rubber rings.

a)

Class 15 (Test Pressure 1.5 MPa)

i)

80 mm.

RMT

21.00

ii)

100 mm.

RMT

28.00

iii)

125 mm.

RMT

33.00

iv)

150 mm.

RMT

42.00

SECTION - I : A. C. PIPES

75

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

v)

200 mm.

RMT

58.00

vi)

250 mm.

RMT

74.00

vii)

300 mm.

RMT

96.00

b)

Class 20 (Test Pressure 2.0 MPa)

i)

80 mm.

RMT

22.00

ii)

100 mm.

RMT

33.00

iii)

125 mm.

RMT

37.00

iv)

150 mm.

RMT

48.00

v)

200 mm.

RMT

69.00

vi)

250 mm.

RMT

86.00

vii)

300 mm.

RMT

113.00

SECTION - I : A. C. PIPES

76

Sr. No.

Description

Unit

Note :
1)

85 % payment for lowering, laying, jointing shall


be made till satisfactory hydraulic testing is given.

2)

Without any extra cost every pipe in the factory shall


be hydraulically tested for one higher class i.e. when Class15 pipe is ordered, every pipe shall be tested for 20 kg/
cm2 at factory but pipe shall be branded and paid as
Class 15. This foot note shall appear in tender conditions.

3)

Whenever manufacturer is separate and contractor for


lowering, laying, jointing and testing is separate, the principal contractor shall enter into an agreement with A.C.
pipe manufacturer for satisfactory manufacturing, transporting, lowering, laying, jointing and testing of pipes. This
foot note shall appear in the tender con ditions.

SECTION - I : A. C. PIPES

77

Rate
(in Rs.)
2012-2013
4

Rate
(in Rs.)
2013-2014
5

Sr.
No.

III.
1.

Unit

Description

Rate
(in Rs.)
2012-2013
4

Rate
(in Rs.)
2013-2014
5

P. V. C. PIPES

Providing and supplying in standard lengths ISI mark


rigid unplasticised PVC pipes suitable for potable water
with solvent cement joints including cost of couplers, as per
IS specification no. 4985 / 1988 including all local and central
taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to the departmental stores / site
and stacking the same in closed shed duly protected from sun
rays and rains including cost of jointing material i.e. solvent
cement, etc. complete (selffit type to be jointed with cement
solvent).

Note : 1) 10% of cost of pipes shall be considered


for cost of PVC specials for estimate purpose only.
2) One coupler and required cement solvent shall
be provided with each full length pipe cost
of which is included in rates below.
a)

Working Pressure 4 Kg./Sq.cm

i)
ii)
iii)

63 mm.
75 mm.
90 mm.

iv)
v)
vi)

With
ED

Without
ED

RMT
RMT
RMT

46.00
65.00
91.00

41.00
58.00
81.00

110 mm.
140 mm
160 mm.

RMT
RMT
RMT

124.00
208.00
274.00

110.00
184.00
243.00

vii)
viii)
ix)

180 mm.
200 mm.
225 mm.

RMT
RMT
RMT

372.00
460.00
589.00

331.00
408.00
522.00

x)
xi)

250 mm.
280 mm.

RMT
RMT

719.00
953.00

638.00
847.00

SECTION - I : P. V. C. PIPES

78

With Without
ED
ED

Sr. No.

Unit

Description
2

Rate
(in Rs.)
2013-2014

Rate
(in Rs.)
2012-2013
4

With ED Without ED

xii)

315 mm.

RMT

1213.00

1078.00

xii)

355 mm.

RMT

1626.00

1445.00

xiv)

400 mm.

RMT

2074.00

1844.00

b)

Working Pressure 6 Kg. / Sq.cm

i)

63 mm.

RMT

66.00

58.00

ii)

75 mm.

RMT

93.00

83.00

iii)

90 mm.

RMT

133.00

119.00

iv)

110 mm.

RMT

185.00

164.00

v)

140 mm.

RMT

307.00

273.00

vi)

160 mm.

RMT

397.00

353.00

vii)

180 mm.

RMT

528.00

469.00

viii)

200 mm.

RMT

673.00

599.00

ix)

225 mm.

RMT

851.00

755.00

x)

250 mm.

RMT

1061.00

944.00

xi)

280 mm.

RMT

1401.00

1244.00

xii)

315 mm.

RMT

1786.00

1587.00

xiii)

355 mm.

RMT

2384.00

2118.00

xiv)

400 mm.

RMT

3046.00

2706.00

SECTION - I : P. V. C. PIPES

79

With ED Without ED

Sr. No.

Description
2

Unit

Rate
(in Rs.)
2012-2013

C) Working Pressure 8 Kg/Sq.cm

With ED

Rate
(in Rs.)
2013-2014
5

Without
ED

i)

63 mm.

RMT

91.00

80.00

ii)

75 mm.

RMT

129.00

114.00

iii)

90 mm.

RMT

183.00

162.00

iv)

110 mm.

RMT

257.00

229.00

v)

140 mm.

RMT

427.00

379.00

vi)

160 mm.

RMT

557.00

496.00

vii)

180 mm.

RMT

740.00

658.00

viii)

200 mm.

RMT

931.00

827.00

ix)

225 mm.

RMT

1181.00

1050.00

x)

250 mm.

RMT

1478.00

1313.00

xi)

280 mm.

RMT

1946.00

1729.00

xii)

315 mm.

RMT

2464.00

2191.00

xiii)

355 mm.

RMT

3315.00

2945.00

xiv)

400 mm.

RMT

4293.00

3814.00

SECTION - I : P. V. C. PIPES

80

With ED Without ED

Sr. No.

Description

Rate
(in Rs.)
2013-2014
5

Rate
(in Rs.)
2012-2013
4

Unit
3

With ED

Without ED

d) Working Pressure 10 Kg./Sq.cm

ii)

63 mm.

RMT

108.00

96.00

ii)

75 mm.

RMT

154.00

138.00

iii)

90 mm.

RMT

223.00

197.00

iv)

110 mm.

RMT

315.00

278.00

v)

140 mm.

RMT

508.00

452.00

vi)

160 mm.

RMT

666.00

590.00

vii)

180 mm.

RMT

915.00

813.00

viii)

200 mm.

RMT

1131.00

1005.00

ix)

225 mm.

RMT

1445.00

1283.00

x)

250 mm.

RMT

1826.00

1621.00

xi)

280 mm.

RMT

2294.00

2039.00

xii)

315 mm.

RMT

2916.00

2590.00

xiii)

355 mm.

RMT

3920.00

3484.00

xiv)

400 mm.

RMT

4999.00

4442.00

SECTION - I : P. V. C. PIPES

81

With ED Without ED

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

e)

Working Pressure 12.50 Kg./Sq.cm

ii)

63 mm.

RMT

138.00 123.00

ii)

75 mm.

RMT

195.00 173.00

iii)

90 mm.

RMT

281.00 250.00

iv)

110 mm.

RMT

399.00 354.00

v)

140 mm.

RMT

648.00 575.00

vi)

160 mm.

RMT

851.00 757.00

vii)

180 mm.

RMT 1164.00 1035.00

viii)

200 mm.

RMT 1446.00 1284.00

ix)

225 mm.

RMT 1837.00 1632.00

x)

250 mm.

RMT 2322.00 2063.00

xi)

280 mm.

RMT 2920.00 2596.00

xii)

315 mm.

RMT 3724.00 3310.00

xiii)

355 mm.

RMT 4977.00 4423.00

xiv)

400 mm.

RMT 6449.00 5730.00

SECTION - I : P. V. C. PIPES

82

With ED

Rate
(in Rs.)
2013-2014

Without
ED

Sr.
No.

Description

Unit

2. Providing and supplying in standard lengths ISI


mark rigid unplastised PVC for patable water with
rubber ring joints including cost of rubber ring as
per IS-4985-1998, all local and central taxes,
transportation, freight charges, transit insurance,
inspection charges, loading, unloading, conveyance to store/site and stacking the same in closed
shed duly protected from sun rays and rains, etc.
complete ( with third party inspection ) (socketed)
a)
Working Pressure 4 Kg/Sq.cm

Rate
(in Rs.)
2012-2013
4

With
ED

Without
ED

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm

RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT

48.00
69.00
96.00
131.00
181.00
219.00
291.00
395.00

43.00
60.00
85.00
117.00
161.00
195.00
257.00
350.00

ix)
x)
xi)
xii)
xiii)
b)

200 mm
225 mm
250 mm
280 mm
315 mm
Working Pressure 6 Kg/Sq.cm

RMT
RMT
RMT
RMT
RMT

487.00
623.00
763.00
1011.00
1287.00

434.00
554.00
678.00
899.00
1142.00

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm

RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT

69.00
98.00
142.00
197.00
271.00
325.00
421.00
560.00

61.00
88.00
126.00
173.00
239.00
290.00
373.00
498.00

ix)
x)
xi)
xii)
xiii)

200 mm
225 mm
250 mm
280 mm
315 mm

RMT
RMT
RMT
RMT
RMT

714.00
902.00
1126.00
1484.00
1892.00

634.00
800.00
1001.00
1319.00
1682.00

SECTION - I : P. V. C. PIPES

83

Rate
(in Rs.)
2013-2014
5

With
ED

Without
ED

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

WITH
ED

WITHOUT
ED

c) Working Pressure 10 Kg./Sq.cm

i)

63 mm.

RMT

95.00

84.00

ii)

75 mm.

RMT

137.00

122.00

iii)

90 mm.

RMT

193.00

171.00

iv)

110 mm.

RMT

272.00

243.00

v)

125 mm

RMT

376.00

334.00

vi)

140 mm.

RMT

454.00

402.00

vii)

160 mm.

RMT

591.00

526.00

viii)

180 mm.

RMT

785.00

697.00

ix)

200 mm.

RMT

988.00

877.00

x)

225 mm.

RMT

1252.00

1113.00

xi)

250 mm.

RMT

1565.00

1390.00

xii)

280 mm.

RMT

2063.00

1834.00

xiii)

315 mm.

RMT

2613.00

2323.00

SECTION - I : P. V. C. PIPES

84

Rate
(in Rs.)
2013-2014
5

WITH ED

WITHOUT
ED

Sr. No.

Description
2

Unit
3

d) Working Pressure 10 Kg./Sq.cm

Rate
(in Rs.)
2012-2013
4

With

Without

ED

ED

i)

63 mm.

RMT

114.00

103.00

ii)

75 mm.

RMT

165.00

146.00

iii)

90 mm.

RMT

236.00

209.00

iv) 110 mm.

RMT

333.00

296.00

v)

125 mm

RMT

460.00

406.00

vi) 140 mm.

RMT

538.00

478.00

vii) 160 mm.

RMT

705.00

626.00

viii) 180 mm.

RMT

969.00

862.00

ix) 200 mm.

RMT

1199.00

1065.00

x)

225 mm.

RMT

1531.00

1360.00

xi) 250 mm.

RMT

1935.00

1720.00

xii) 280 mm.

RMT

2432.00

2161.00

xiii) 315 mm

RMT

3090.00

2746.00

e)Working Pressure 12.5 Kg./Sq.cm


i)

63 mm.

RMT

146.00

129.00

ii)

75 mm.

RMT

207.00

183.00

iii)

90 mm.

RMT

297.00

265.00

iv) 110 mm.

RMT

424.00

376.00

v)

125 mm

RMT

584.00

518.00

vi) 140 mm.

RMT

687.00

611.00

vii) 160 mm.

RMT

903.00

801.00

viii) 180 mm.

RMT

1235.00

1097.00

ix) 200 mm.

RMT

1531.00

1361.00

x)

225 mm.

RMT

1946.00

1730.00

xi) 250 mm.

RMT

2462.00

2186.00

xii) 280 mm.

RMT

3096.00

2751.00

xiii) 315 mm

RMT

3946.00

3507.00

SECTION - I : P. V. C. PIPES

85

Rate
(in Rs.)
2013-2014
5

With ED

Without
ED

Sr. No.
1

3.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

Lowering, laying and jointing with P.V.C. pipes and


specials of following class and diameter including cost of
conveyance from stores to site of works including cost of
all labour, material, except cement solvent, rubber ring, giving satisfactory hydraulic testing as per IS code, etc. complete (with cement solvent joint / ring fit joint).
a)

Working Pressure 4 Kg./Sq.cm.

i)

63 mm.

RMT

16.00

ii)

75 mm.

RMT

21.00

iii)

90 mm.

RMT

25.00

iv)

110 mm.

RMT

29.00

v)

140 mm.

RMT

34.00

vi)

160 mm.

RMT

38.00

vii)

180 mm.

RMT

42.00

viii)

200 mm

RMT

46.00

ix)

225 mm

RMT

53.00

x)

250 mm

RMT

57.00

xi)

280 mm

RMT

63.00

xii)

315 mm

RMT

70.00

xiii)

355 mm

RMT

77.00

xiv)

400 mm

RMT

84.00

b)

Working Pressure 6 to 12.5 Kg./Sq.cm.

i)

63 mm.

RMT

22.00

ii)

75 mm.

RMT

29.00

iii)

90 mm.

RMT

33.00

iv)

110 mm.

RMT

37.00

v)

140 mm.

RMT

44.00

SECTION - I : P. V. C. PIPES

86

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

vi)

160 mm.

RMT

47.00

vii)

180 mm.

RMT

53.00

viii)

200 mm.

RMT

58.00

ix)

225 mm.

RMT

63.00

x)

250 mm.

RMT

69.00

xi)

280 mm

RMT

78.00

xii)

315 mm

RMT

87.00

xiii)

355 mm

RMT

96.00

xiv)

400 mm

RMT

106.00

1)

Only 85% rate shall be payable till satisfactory


hydraulic testing is given.

2)

Third party inspecting agency shall invariably


carry out.

I)

Specific Gravity Test.

II)

Weight / Rmt.

III) Ash Content Test and confirm in writing that


those are within prescribed limits. This condition shall appear in tender conditions.

3)

After receipt of pipes at site, concerned Deputy


Engineer shall confirm that weight of pipe for
every class and diameter is not less than the prescribed standard weight as per IS-4985/1998
(Which is given in CSR), Under weight pipes
shall be rejected. This condition shall appear
in the tender conditions.

SECTION - I : P. V. C. PIPES

87

Sr. No.
1

IV.
1.

Description

Unit

Rate
(in Rs.)
2012-2013

G. I. PIPES

Providing ISI mark G.I. pipe of following class and dia. including all local and central taxes, octroi, inspection charges, transportation to stores, etc. complete as per IS-1239/2004.
Note : One coupler shall be provided with each full length
of pipe cost of which is included in rates below.
With
ED

Without
ED

RMT
RMT
RMT
RMT
RMT

71.00
106.00
146.00
183.00
229.00

65.00
95.00
131.00
166.00
208.00

RMT
RMT
RMT
RMT

288.00
397.00
477.00
680.00

255.00
349.00
420.00
596.00

15 mm. ( 1.23 kg./m )


20 mm. ( 1.59 kg./m )
25 mm. ( 2.40 kg./m )
32 mm. ( 3.17 kg./m )
40 mm. ( 3.65 kg./m )

RMT
RMT
RMT
RMT
RMT

85.00
108.00
165.00
209.00
240.00

77.00
98.00
150.00
189.00
218.00

50 mm. ( 5.16 kg./m )


65 mm. ( 6.63 kg./m )
80 mm. ( 8.64 kg./m )
100 mm. ( 12.40 kg./m )
125 mm ( 16.70 kg/m )
150 mm.( 19.70 kg./m )

RMT 342.00 301.00


RMT 424.00 384.00
RMT 556.00 503.00
RMT 820.00 719.00
RMT 1097.00 978.00
RMT 1311.00 1151.00

a)

LIGHT

i)
ii)
iii)
iv)
v)

15 mm. ( 0.96 kg./m )


20 mm. ( 1.42 kg./m )
25 mm. ( 2.03 kg./m )
32 mm. ( 2.61 kg./m )
40 mm. ( 3.29 kg./m )

vi)
vii)
viii)
ix)

50 mm. ( 4.18 kg./m )


65 mm. ( 5.92 kg./m )
80 mm. ( 6.98 kg./m )
100 mm. ( 10.20 kg./m )

b)

MEDIUM

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
xx)
xxi)

SECTION - I : G. I. PIPES

88

Rate
(in Rs.)
2013-2014

2.

With Without
ED
ED
96.00
87.00

Unit

Description

Sr. No.

Rate
(in Rs.)
2012-2013
4

c)

HEAVY

i)

15 mm. ( 1.46 kg./m )

RMT

ii)

20 mm. ( 1.91 kg./m )

RMT 125.00

113.00

iii)

25 mm. ( 2.99 kg./m )

RMT 196.00

177.00

iv)

32 mm. ( 3.97 kg./m )

RMT 246.00

223.00

v)

40 mm. ( 4.47 kg./m )

RMT 285.00

259.00

vi)

50 mm. ( 6.24 kg./m )

RMT 395.00

359.00

vii)

65 mm. ( 8.02 kg./m )

RMT 508.00

461.00

viii)

80 mm. ( 10.30 kg./m )

RMT 649.00

589.00

ix)

100 mm. ( 14.70 kg./m )

RMT 936.00

849.00

x)

125 mm ( 18.30 kg/m )

RMT 1159.00 1052.00

xi)

150 mm ( 21.80 kg./m )

RMT 1396.00 1266.00

Lowering, laying and jointing G. I. pipes and specials of


following class and diameter including conveyance from stores
to site of works, all labour, giving satisfactory hydraulic test,
etc. complete either underground or in vertical position, as directed by Engineer-in-charge.
a)

LIGHT

i)

15 mm.

RMT

23.00

ii)

20 mm.

RMT

26.00

iii)

25 mm.

RMT

32.00

iv)

32 mm.

RMT

37.00

v)

40 mm.

RMT

46.00

vi)

50 mm.

RMT

55.00

vii)

65 mm.

RMT

80.00

viii)

80 mm.

RMT

89.00

ix)

100 mm.

RMT 106.00

SECTION - I : G. I. PIPES

89

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
ED

b)

MEDIUM

i)
ii)
iii)
iv)

15 mm.
20 mm.
25 mm.
32 mm.

RMT
RMT
RMT
RMT

25.00
28.00
34.00
39.00

v)
vi)
vii)
viii)
ix)
x)
xi)

40 mm
50 mm
65 mm
80 mm
100 mm
125 mm
150 mm

RMT
RMT
RMT
RMT
RMT
RMT
RMT

50.00
59.00
86.00
97.00
106.00
113.00
119.00

c)

HEAVY

i)
ii)
iii)
iv)
v)

15 mm.
20 mm.
25 mm.
32 mm.
40 mm.

RMT
RMT
RMT
RMT
RMT

27.00
30.00
36.00
43.00
54.00

vi)
vii)
viii)
ix)
x)
xi)

50 mm.
65 mm.
80 mm.
100 mm.
125 mm
150 mm

RMT
RMT
RMT
RMT
RMT
RMT

67.00
94.00
113.00
106.00
118.00
128.00

Note : Only85% rate shall be payable till


satisfactory hydraulic testing is given.

SECTION - I : G. I. PIPES

90

With
ED

Sr. No.

Description

Unit

V.
1.

2.

Rate
(in Rs.)
2012-2013
4

STONEWARE PIPES

Providing ISI standard Stoneware pipes including all taxes (Central and local), inspection charges, railway freight, unloading from railway wagons, loading into trucks, transport to departmental
stores, unloading, stacking etc. complete as per IS-651.
i)
ii)
iii)

100 mm
150 mm
200 mm.

RMT
RMT
RMT

122.00
167.00
223.00

iv)
v)
vi)

225 mm.
250 mm.
300 mm.

RMT
RMT
RMT

269.00
300.00
352.00

Lowering, laying and jointing in proper grade and alignment Stoneware pipes with cement joints in C. M. (1:1) proportion of following diameters including cost of conveyance from stores
to site of work jointing material, labour, giving satisfactory hydraulic testing etc. complete as per IS-1742.

i)
ii)
iii)

100 mm
150 mm
200 mm.

RMT
RMT
RMT

64.00
105.00
131.00

iv)
v)
vi)

225 mm.
250 mm.
300 mm.

RMT
RMT
RMT

143.00
156.00
183.00

Note : Only 85% rate shall be payable till satisfactory


hydrau lic testing is given.

SECTION - I : STONEWARE PIPES

91

Rate
(in Rs.)
2013-2014
5

Sr. No.
1

VI.
1.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

R.C.C. PIPES

Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter
suitable for either collar joints or rubber ring
joints, including all taxes (Central and local),
inspection charges, transport to departmental
stores/site, unloading and stacking etc. complete as per IS-458/1988.
Note : One collar should be supplied with
each full length plain ended RCC
pipe, cost including in rates below. One rubber ring should be supplied with each full length of socketed pipe, cost included in rates below.
a)
Class P-I
i)
ii)
iii)
iv)
v)

80 mm.
100 mm.
150 mm.
200 mm.
225 mm.

vi)
vii)
viii)
ix)
x)

250 mm.
300 mm.
350 mm.
400 mm.
450 mm.

xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)
xviii)

500 mm.
600 mm.
700 mm.
800 mm.
900 mm.
1000 mm.
1100 mm.
1200 mm.

SECTION - I : R.C.C. PIPES

Collar
Joints
With
E. D.

Rubber
Ring Joints

Without E. With
D.
E. D.

Without
E. D.

309.00
324.00
339.00
396.00
452.00

281.00
294.00
309.00
360.00
411.00

273.00
293.00
304.00
355.00
407.00

247.00
267.00
275.00
322.00
369.00

RMT 494.00
RMT 632.00
RMT 681.00
RMT 864.00
RMT 1064.00

449.00
575.00
619.00
785.00
966.00

443.00
567.00
613.00
782.00
962.00

403.00
514.00
556.00
710.00
873.00

1280.00
1615.00
2103.00
2428.00
3056.00
3580.00
4068.00
4887.00

1163.00
1466.00
1910.00
2205.00
2775.00
3252.00
3694.00
4438.00

1153.00
1456.00
1892.00
2184.00
2751.00
3225.00
3662.00
4402.00

1046.00
1322.00
1719.00
1983.00
2498.00
2928.00
3326.00
3998.00

RMT
RMT
RMT
RMT
RMT

RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT

92

Sr. No.

Description
2

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

Collar Joints
With
E. D.

Without
E. D.

Rubber Ring
Joints
With
E. D.

b)

Class P-II

i)
ii)
iii)

80 mm.
100 mm.
150 mm.

RMT
RMT
RMT

329.00
351.00
420.00

299.00
319.00
381.00

293.00
316.00
379.00

265.00
286.00
344.00

iv)
v)
vi)

200 mm.
225 mm.
250 mm.

RMT
RMT
RMT

566.00
670.00
725.00

513.00
608.00
659.00

513.00
604.00
658.00

465.00
547.00
598.00

vii)
viii)
ix)

300 mm.
350 mm.
400 mm.

RMT
RMT
RMT

956.00
1193.00
1332.00

869.00
1084.00
1210.00

914.00
1080.00
1213.00

829.00
981.00
1101.00

x)
xi)
xii)

450 mm.
500 mm.
600 mm.

RMT
RMT
RMT

1616.00
2256.00
2797.00

1467.00
2049.00
2541.00

1450.00
2056.00
2521.00

1317.00
1897.00
2290.00

xiii)
xiv)
xv)
xvi)

700 mm.
800 mm.
900 mm.
1000 mm.

RMT
RMT
RMT
RMT

3811.00
4583.00
5163.00
6249.00

3461.00
4163.00
4689.00
5675.00

3466.00
4177.00
5202.00
5626.00

3148.00
3794.00
4724.00
5109.00

c)

Class P-III

i)
ii)
iii)

80 mm.
100 mm.
150 mm.

RMT
RMT
RMT

355.00
383.00
437.00

322.00
348.00
397.00

351.00
379.00
438.00

318.00
343.00
397.00

iv)
v)
vi)

200 mm.
225 mm.
250 mm.

RMT
RMT
RMT

594.00
709.00
829.00

540.00
643.00
753.00

595.00
709.00
830.00

540.00
643.00
752.00

SECTION - I : R.C.C. PIPES

93

Without
E. D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2013-2014

Rate
(in Rs.)
2012-2013
4

Collar Joints

Rubber Ring
Joints

With
E. D.

Without
E. D.

E. D.

Without
E. D.

With

vii)
viii)
ix)

300 mm.
350 mm.
400 mm.

RMT
RMT
RMT

1151.00
1502.00
2067.00

1046.00
1364.00
1878.00

1151.00
1502.00
2067.00

1045.00
1364.00
1878.00

x)
xi)
xii)

450 mm.
500 mm.
600 mm.

RMT
RMT
RMT

2372.00
2895.00
3719.00

2155.00
2630.00
3378.00

2373.00
2896.00
3720.00

2156.00
2629.00
3378.00

xiii)
xiv)

700 mm.
800 mm.

RMT
RMT

5305.00
6738.00

4819.00
6119.00

5305.00
6738.00

4818.00
6119.00

d)

Class NP-II
( For 2.00 m. length )

Collar

Rubber

Joints Ring Joints

i)
ii)
iii)
iv)
v)

80 mm.
100 mm.
150 mm.
200 mm.
225 mm.

RMT
RMT
RMT
RMT
RMT

290.00
298.00
348.00
407.00
454.00

293.00
304.00
354.00
415.00
463.00

vi)
vii)

RMT
RMT

488.00
652.00

498.00
665.00

viii)
ix)
x)

250 mm.
300 mm.
( For 2.50 m. length )
350 mm.
400 mm.
450 mm.

RMT
RMT
RMT

799.00
928.00
1088.00

815.00
947.00
1110.00

xi)
xii)
xiii)
xiv)
xv)

500 mm.
600 mm.
700 mm.
800 mm.
900 mm.

RMT
RMT
RMT
RMT
RMT

1272.00
1679.00
2422.00
2767.00
3545.00

1297.00
1713.00
2470.00
2822.00
3616.00

SECTION - I : R.C.C. PIPES

94

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

Collar
Joints

Rubber Collar
Joints
Ring
Joints

xvi)

1000 mm.

RMT

4243.00

4328.00

xvii)

1100 mm.

RMT

5327.00

5434.00

xviii)

1200 mm.

RMT

5703.00

5817.00

xix)

1400 mm.

RMT

6778.00

6914.00

xx)

1600 mm.

RMT

7782.00

7938.00

xxi)

1800 mm.

RMT

e)

Class NP-III (For 2.00 m. length)

80 mm

RMT

328.00

335.00

ii)

100 mm

RMT

372.00

379.00

iii)

150 mm

RMT

410.00

418.00

iv)

200 mm

RMT

612.00

624.00

v)

225 mm

RMT

713.00

727.00

vi)

250 mm

RMT

763.00

778.00

vii)

300 mm.

RMT

868.00

885.00

viii)

350 mm.

RMT

1537.00

1568.00

ix)

400 mm.

RMT

1722.00

1756.00

x)

450 mm.

RMT

2047.00

2088.00

xi)

500 mm.

RMT

2274.00

2319.00

xii)

600 mm.

RMT

2996.00

3056.00

xiii)

700 mm.

RMT

4072.00

4153.00

xiv)

800 mm.

RMT

4851.00

4948.00

xv)

900 mm.

RMT

5603.00

5715.00

xvi)

1000 mm.

RMT

6855.00

6992.00

xvii)

1100 mm.

RMT

7930.00

8089.00

xviii)

1200 mm.

RMT

9304.00

9490.00

xix)

1400 mm

RMT

11180.00 11404.00

xx)

1600 mm

RMT

16292.00 16618.00

xxi)

1800 mm

RMT

21550.00 21981.00

SECTION - I : R.C.C. PIPES

95

Rate
(in Rs.)
2013-2014

10901.00 11119.00

Rubber
Ring
Joints

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Collar

Rubber

Joints

RingJoints

f)

Class NP-IV

i)

80 mm.

RMT

353.00

360.00

ii)

100 mm.

RMT

414.00

422.00

iii)

150 mm.

RMT

469.00

478.00

iv)

200 mm.

RMT

655.00

668.00

v)

225 mm.

RMT

774.00

789.00

vi)

250 mm.

RMT

872.00

889.00

vii)

300 mm.

RMT

1111.00

1133.00

viii)

350 mm.

RMT

1687.00

1721.00

ix)

400 mm.

RMT

1807.00

1843.00

x)

450 mm.

RMT

2131.00

2174.00

xi)

500 mm.

RMT

2604.00

2656.00

xii)

600 mm.

RMT

3185.00

3249.00

xiii)

700 mm.

RMT

4767.00

4862.00

xiv)

800 mm.

RMT

5444.00

5553.00

xv)

900 mm.

RMT

6376.00

6504.00

xvi)

1000 mm.

RMT

9026.00

9207.00

xvii)

1100 mm.

RMT

9792.00

9988.00

xviii)

1200 mm.

RMT

9836.00 10033.00

xix)

1400 mm.

RMT

15359.00 15666.00

xx)

1600 mm.

RMT

19148.00 19531.00

xxi)

1800 mm.

RMT

26249.00 26774.00

SECTION - I : R.C.C. PIPES

96

Rate
(in Rs.)
2013-2014
5

Collar
Joints

Rubber
RingJoints

Description

Unit

Rate
(in Rs.)
2012-2013

2.

Lowering, laying and jointing in proper grade


and alignment R.C.C. pipes with collar joints in
C.M.1:1 proportion or socketed R.C.C. pipes with
rubber joints (excluding cost of rubber ring or
R.C.C. collar,) including cost of conveyance from
stores to site of work, cost of jointing material,
labour, giving hydraulic testing etc. complete as
directed by Engineer-in-charge (For all class
of pipes.) as per IS-783-1985.

Sr. No.

Collar
Joints

Rubber
Ring
Joints

i)
ii)
iii)
iv)
v)

80 mm.
100 mm.
150 mm.
200 mm.
225 mm.

RMT
RMT
RMT
RMT
RMT

44.00
53.00
80.00
106.00
124.00

31.00
37.00
56.00
75.00
88.00

vi)
vii)
viii)
ix)
x)

250 mm.
300 mm.
350 mm.
400 mm.
450 mm.

RMT
RMT
RMT
RMT
RMT

140.00
168.00
173.00
220.00
266.00

98.00
118.00
121.00
155.00
185.00

xi)
xii)
xiii)
xiv)
xv)

500 mm.
600 mm.
700 mm.
800 mm.
900 mm.

RMT
RMT
RMT
RMT
RMT

290.00
367.00
416.00
482.00
530.00

203.00
254.00
289.00
334.00
369.00

xvi)
xvii)
xviii)
xix)
xx)
xxi)

1000 mm.
1100 mm.
1200 mm.
1400 mm.
1600 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT
RMT

580.00
806.00
856.00
954.00
1052.00
1150.00

404.00
547.00
582.00
652.00
722.00
792.00

Note : Only 85% rate is payable till


satisfactory hydraulic testing is given.

SECTION - I : R.C.C. PIPES

97

Rate
(in Rs.)
2013-2014
5

Collar
Joints

Rubber
Ring Joints

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

1.

VII. P. S. C. PIPES
Providing ISI standard Pre - stressed Cement concrete pipes of following class and diameter including cost of
all meterial and labour required, cost of all taxes(Central and
local) , inspection charges, transportaion to stores/ site, unloading and stacking etc. complete as per IS-784-2001.
i) Factory test pressure
a) Site test pressure + 01N/mm2, For working pressure upto 1
N/mm2
b) Site test pressure + 02N/mm2, For working pressure upto 1
N/mm2
ii) Site test pressure - 1.5 times working pressure pertaining
to the section or 1.1 times static pressure, which ever is more
(such pressure is to be control within 25% of pumphead incase
of pumping main)
iii) Working pessure - The maximum sustained internal pressure excluding surge to which each portion of pipeline my be
subjected when installed.
Note : One rubber ring should be supplied with
each pipe, cost included in rates below.
With

Without

ED

ED

3400.00
3657.00
3837.00
4225.00
5078.00

3085.00
3318.00
3481.00
3833.00
4608.00

a)

Factory Test Pressure 2 kg/Sqcm

i)
ii)
iii)
iv)
v)

350 mm.
400 mm.
450 mm.
500 mm.
600 mm.

RMT
RMT
RMT
RMT
RMT

vi)
vii)
viii)
ix)
x)

700 mm.
800 mm.
900 mm.
1000 mm.
1100 mm.

RMT 5654.00 5130.00


RMT 6983.00 6335.00
RMT 8684.00 7878.00
RMT 10121.00 9184.00
RMT 11560.00 10488.00

xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)

1200 mm.
1300 mm.
1400 mm.
1500 mm.
1600 mm.
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT
RMT
RMT

SECTION - I : P. S. C. PIPES

98

13358.00
15447.00
16996.00
19452.00
21575.00
23699.00
25823.00

Rate
(in Rs.)
2013-2014

12119.00
14014.00
15419.00
17648.00
19574.00
21501.00
23427.00

Sr. No.
2

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014
5

With

Without

ED

ED

b)

Factory Test Pressure 4 kg/Sqcm

i)
ii)
iii)
iv)
v)

350 mm.
400 mm.
450 mm.
500 mm.
600 mm.

RMT
RMT
RMT
RMT
RMT

3400.00
3658.00
3837.00
4225.00
5080.00

3085.00
3319.00
3481.00
3833.00
4609.00

vi)
vii)
viii)
ix)

700 mm.
800 mm.
900 mm.
1000 mm.

RMT
RMT
RMT
RMT

5656.00
6984.00
8685.00
10124.00

5131.00
6336.00
7879.00
9186.00

x)
xi)
xii)
xiii)

1100 mm.
1200 mm.
1300 mm.
1400 mm.

RMT
RMT
RMT
RMT

11562.00
13358.00
15451.00
16998.00

10490.00
12120.00
14017.00
15420.00

xiv)
xv)
xvi)
xvii)

1500 mm.
1600 mm.
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT

19455.00
21578.00
23703.00
25825.00

17651.00
19577.00
21504.00
23430.00

c)

Factory Test Pressure 6 kg/Sqcm

i)
ii)
iii)
iv)
v)

350 mm.
400 mm.
450 mm.
500 mm.
600 mm.

RMT
RMT
RMT
RMT
RMT

3404.00
3678.00
3847.00
4255.00
5148.00

3089.00
3338.00
3490.00
3861.00
4670.00

SECTION - I : P. S. C. PIPES

99

Rate
(in Rs.)
2012-2013
3

With

Without

ED

ED

RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT

5851.00
7242.00
9027.00
10529.00
11988.00
13888.00
16044.00
17652.00
20220.00
22456.00
24693.00
26929.00

5310.00
6570.00
8189.00
9552.00
10877.00
12599.00
14555.00
16014.00
18344.00
20373.00
22402.00
24432.00

350 mm.
400 mm.
450 mm.
500 mm.
600 mm.

RMT
RMT
RMT
RMT
RMT

3411.00
3705.00
3871.00
4315.00
5321.00

3094.00
3362.00
3513.00
3915.00
4827.00

vi)
vii)
viii)
ix)
x)

700 mm.
800 mm.
900 mm.
1000 mm.
1100 mm.

RMT 6146.00 5577.00


RMT 7548.00 6848.00
RMT 9409.00 8537.00
RMT 11004.00 9983.00
RMT 12590.00 11423.00

xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)

1200 mm.
1300 mm.
1400 mm.
1500 mm.
1600 mm.
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT
RMT
RMT

vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)

700 mm.
800 mm.
900 mm.
1000 mm.
1100 mm.
1200 mm.
1300 mm.
1400 mm.
1500 mm.
1600 mm.
1700 mm.
1800 mm.

d)

Factory Test Pressure 8 kg/Sqcm

i)
ii)
iii)
iv)
v)

SECTION - I : P. S. C. PIPES

100

14576.00
16861.00
18637.00
21355.00
24097.00
26838.00
29579.00

Rate
(in Rs.)
2013-2014

13226.00
15299.00
16909.00
19376.00
21861.00
24348.00
26836.00

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With

Without

With

Without

ED

ED

ED

ED

e)

Factory Test Pressure 10 kg/Sqcm

i)
ii)
iii)
iv)
v)

350 mm.
400 mm.
450 mm.
500 mm.
600 mm.

RMT
RMT
RMT
RMT
RMT

vi)
vii)
viii)
ix)
x)

700 mm.
800 mm.
900 mm.
1000 mm.
1100 mm.

RMT 6396.00 5802.00


RMT 7933.00 7197.00
RMT 9886.00 8969.00
RMT 11577.00 10505.00
RMT 13285.00 12053.00

xi)
xii)
xiii)
xiv)
xv)

1200 mm.
1300 mm.
1400 mm.
1500 mm.
1600 mm.

RMT
RMT
RMT
RMT
RMT

xvi)
xvii)

1700 mm.
1800 mm.

RMT 28372.00 25742.00


RMT 31012.00 28138.00

f)

Factory Test Pressure 12 kg/Sqcm

i)
ii)
iii)
iv)
v)

350 mm.
400 mm.
450 mm.
500 mm.
600 mm.

SECTION - I : P. S. C. PIPES

RMT
RMT
RMT
RMT
RMT

101

3428.00
3757.00
4007.00
4489.00
5550.00

15392.00
17821.00
20144.00
23092.00
25733.00

3512.00
3855.00
4134.00
4642.00
5771.00

3110.00
3407.00
3635.00
4071.00
5035.00

13964.00
16168.00
18275.00
20951.00
23347.00

3185.00
3498.00
3750.00
4211.00
5235.00

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With

Without

With

Without

ED

ED

ED

ED

vi)
vii)
viii)
ix)
x)

700 mm.
800 mm.
900 mm.
1000 mm.
1100 mm.

RMT 6683.00 6064.00


RMT 8309.00 7539.00
RMT 10333.00 9375.00
RMT 12105.00 10984.00
RMT 13879.00 12592.00

xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)

1200 mm.
1300 mm.
1400 mm.
1500 mm.
1600 mm.
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT
RMT
RMT

16357.00
18944.00
20960.00
24004.00
26746.00
29490.00
32232.00

14842.00
17089.00
19017.00
21777.00
24266.00
26754.00
29243.00

g)

Factory Test Pressure 14 kg./Sqcm.


RMT
RMT
RMT
RMT
RMT

3598.00
3957.00
4262.00
4792.00
5993.00

3263.00
3591.00
3866.00
4348.00
5437.00

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)

350 mm.
400 mm.
450 mm.
500 mm.
600 mm.

RMT 6972.00 6326.00


RMT 8688.00 7882.00
RMT 10827.00 9823.00
RMT 12915.00 11717.00
RMT 14840.00 13464.00

700 mm.
800 mm.
900 mm.
1000 mm.
1100 mm.

RMT 17205.00 15610.00


RMT 19860.00 18018.00
RMT 22633.00 20534.00

1200 mm.
1300 mm.
1400 mm.

SECTION - I : P. S. C. PIPES

102

Rate
(in Rs.)
2013-2014

Sr. No.

Description

Rate
(in Rs.)
2012-2013

Unit

5
With

Without

With

Without

ED

ED

ED

ED

xiv)
xv)

1500 mm.
1600 mm.

RMT 25936.00 23531.00


RMT 29004.00 26315.00

xvi)
xvii)

1700 mm.
1800 mm.

RMT 32072.00 29099.00


RMT 35141.00 31883.00

h)

Factory Test Pressure 16 kg./Sqcm.

i)
ii)

350 mm.
400 mm.

RMT
RMT

3675.00 3335.00
4064.00 3687.00

iii)
iv)
v)

450 mm.
500 mm.
600 mm.

RMT
RMT
RMT

4391.00 3985.00
4950.00 4492.00
6213.00 5637.00

vi)
vii)
viii)

700 mm.
800 mm.
900 mm.

RMT 7266.00 6592.00


RMT 9063.00 8222.00
RMT 12030.00 10915.00

ix)
x)

1000 mm.
1100 mm.

RMT 13539.00 12283.00


RMT 16249.00 14740.00

xi)
xii)
xiii)

1200 mm.
1300 mm.
1400 mm.

RMT 18754.00 17015.00


RMT 21585.00 19584.00
RMT 23826.00 21617.00

xiv)
xv)
xvi)
xvii)

1500 mm.
1600 mm.
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT

SECTION - I : P. S. C. PIPES

Rate
(in Rs.)
2013-2014

103

28302.00
31744.00
35186.00
38627.00

25677.00
28800.00
31923.00
35044.00

Sr. No.

Description

Rate
(in Rs.)
2012-2013
4

Unit

3
With

Without

With

Without

ED

ED

ED

ED

i)

Factory Test Pressure 18 kg/Sqcm

i)
ii)
iii)

350 mm.
400 mm.
450 mm.

RMT
RMT
RMT

3761.00
4176.00
4518.00

3412.00
3788.00
4099.00

iv)
v)

500 mm.
600 mm.

RMT
RMT

5105.00
6434.00

4631.00
5837.00

vi)
vii)

700 mm.
800 mm.

RMT
RMT

7946.00
9916.00

7210.00
8996.00

viii)
ix)

900 mm.
1000 mm.

RMT 12542.00 11378.00


RMT 14738.00 13371.00

x)
xi)

1100 mm.
1200 mm.

RMT 17008.00 15430.00


RMT 19658.00 17835.00

xii)
xiii)

1300 mm.
1400 mm.

RMT 22642.00 20542.00


RMT 29877.00 27107.00

xiv)
xv)

1500 mm.
1600 mm.

RMT 33689.00 30564.00


RMT 37971.00 34450.00

xvi)
xvii)

1700 mm.
1800 mm.

RMT 42252.00 38334.00


RMT 46533.00 42218.00

SECTION - I : P. S. C. PIPES

104

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Rate
(in Rs.)
2012-2013
4

Unit

Rate
(in Rs.)
2013-2014
5

With

Without

With

Without

ED

ED

ED

ED

J)

Factory Test pressure 20 kg/Sqcm.

i)
ii)

350 mm.
400 mm.

RMT
RMT

3849.00
4277.00

3491.00
3881.00

iii)
iv)

450 mm.
500 mm.

RMT
RMT

4649.00
5265.00

4219.00
4776.00

v)
vi)

600 mm.
700 mm.

RMT
RMT

6661.00
8803.00

6044.00
7986.00

vii)
viii)

800 mm.
900 mm.

RMT 11711.00 10624.00


RMT 13843.00 12559.00

ix)
x)

1000 mm.
1100 mm.

RMT 16654.00 15109.00


RMT 19796.00 17961.00

xi)
xii)

1200 mm.
1300 mm.

RMT 24895.00 22588.00


RMT 27394.00 24853.00

xiii)
xiv)

1400 mm.
1500 mm.

RMT 32000.00 29033.00


RMT 36169.00 32915.00

xv)
xvi)
xvii)

1600 mm.
1700 mm.
1800 mm.

RMT 40452.00 36812.00


RMT 44734.00 40708.00
RMT 49015.00 44605.00

SECTION - I : P. S. C. PIPES

105

Sr. No.

Description
2

2.

Unit
3

Rate
(in Rs.)
2012-2013
4

Lowering, laying and jointing in proper grade and alignment


Pre-Stressed Cement Concrete Pipes with rubber ring joints
including cost of conveyance from stores to site of works, all
labour involved, giving hydraulic testing, etc. complete but
excluding cost of rubber rings (for all class of pipes)

i)

350 mm.

RMT

105.00

ii)

400 mm.

RMT

148.00

iii)

450 mm.

RMT

179.00

iv)

500 mm.

RMT

203.00

v)

600 mm.

RMT

270.00

vi)

700 mm.

RMT

297.00

vii)

800 mm.

RMT

334.00

viii)

900 mm.

RMT

345.00

ix)

1000 mm.

RMT

445.00

x)

1100 mm

RMT

585.00

xi)

1200 mm

RMT

626.00

xii)

1300 mm

RMT

743.00

SECTION - I : P. S. C. PIPES

106

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description
2

Unit

Rate
(in Rs.)
2012-2013

xiii)

1400 mm

RMT

784.00

xiv)

1500 mm

RMT

989.00

xv)

1600 mm

RMT

1112.00

xvi)

1700 mm.

RMT

1239.00

xvii)

1800 mm.

RMT

1310.00

Note : 1) Only 85% rate is payable till satisfactory


hydraulic testing is given.

2) Whenever manufacturer is separated ant


contractor for lowering, laying, jointing and
tsting is separate, the principal contractor
shall enter into an agreement with P.S.C.
pipe manufacturer foar satisfactory manufacturing, transporting, lowering, laying
jointing and testing of pipes. This foot note
shall appear into the tender conditions.

SECTION - I : P. S. C. PIPES

107

Rate
(in Rs.)
2013-2014

Sr. No.

Description

Unit

1.

VIII. BAR WRAPPED STEEL


CYLINDER PIPES (BWSC)
Providing and supplying European Standard
EN 639/1994 and EN 641/1994 or AWWA
C-303 standard and reinforced concrete pressure pipes cylinder type or IS-15155-2002
(Bar wrapped steel cylinder pipes suitable for
overlaping steel welded joint or butt welded steel
joints) of following class and diameter including
cost of all material and labour required, cost of
all taxes (Central and State Govt.), inspection
charges, transportation to stores/ site, transit insurance, loading and unloding and stacking etc.
complete.
i) Factory test pressure
a) Site test pressure + 01N/mm2, For working
pressure upto 1 N/mm2
b) Site test pressure + 02N/mm2, For working
pressure upto 1 N/mm2
ii) Site test pressure - 1.5 times working pressure pertaining to the section or 1.1 times static
pressure, which ever is more (such pressure is to
be control within 25% of pumphead incase of
pumping main)
iii) Working pessure - The maximum sustained
internal pressure excluding surge to which each
portion of pipeline my be subjected when installed.
Note : 1) Class mentioned below represents
the working pressure of pipe.
2) For external coating at site to the
joints, necessary polythene wrap
ping for pouring cement slurry
shall also be given free with each
pipe.

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

108

Rate
(in Rs.)
2012-2013
4

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

With
E.D.

Without
E.D.

a)

Factory Test Pressure 4 kg / Sqcm

i)

350 mm.

RMT

3706.00

3366.00

ii)

400 mm.

RMT

4064.00

3691.00

ii)

450 mm.

RMT

4499.00

4086.00

iv)

500 mm.

RMT

5006.00

4546.00

v)

600 mm.

RMT

6510.00

5912.00

vi)

700 mm.

RMT

7522.00

6831.00

vii)

800 mm.

RMT

8168.00

7418.00

viii)

900 mm.

RMT 11414.00

10367.00

ix)

1000 mm.

RMT 13155.00

11947.00

x)

1100 mm.

RMT 18907.00

17171.00

xi)

1200 mm.

RMT 21085.00

19149.00

xii)

1300 mm.

RMT 24621.00

22362.00

xiii)

1400 mm.

RMT 26410.00

23986.00

xiv)

1500 mm.

RMT 28184.00

25598.00

xv)

1600 mm.

RMT 30364.00

27577.00

xvi)

1700 mm.

RMT 32213.00

29256.00

xvii)

1800 mm.

RMT 34393.00

31237.00

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

109

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

Description

Sr. No.

Unit

Rate
(in Rs.)
2012-2013
4

With
E.D.

Without
E.D.

b)

Factory Test Pressure 6 kg / Sqcm

i)

350 mm.

RMT

3710.00

3369.00

ii)

400 mm.

RMT

4068.00

3694.00

iii)

450 mm.

RMT

4501.00

4089.00

iv)

500 mm.

RMT

5013.00

4554.00

v)

600 mm.

RMT

6517.00

5920.00

vi)

700 mm.

RMT

7528.00

6838.00

vii)

800 mm.

RMT

8175.00

7425.00

viii)

900 mm.

RMT

11421.00

10373.00

ix)

1000 mm.

RMT

13160.00

11953.00

x)

1100 mm.

RMT

18913.00

17179.00

xi)

1200 mm.

RMT

21090.00

19157.00

xii)

1300 mm.

RMT

24627.00

22367.00

xiii)

1400 mm.

RMT

26416.00

23992.00

xiv)

1500 mm.

RMT

28192.00

25604.00

xv)

1600 mm.

RMT

30370.00

27584.00

xvi)

1700 mm.

RMT

32219.00

29262.00

xvii)

1800 mm.

RMT

34399.00

31243.00

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

110

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.
1

c)

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

Factory Test Pressure 8 kg / Sqcm


With
E.D.

Without
E.D.

i)

350 mm.

RMT

3713.00

3373.00

ii)

400 mm.

RMT

4071.00

3698.00

iii)

450 mm.

RMT

4506.00

4092.00

iv)

500 mm.

RMT

5025.00

4564.00

v)

600 mm.

RMT

6528.00

5928.00

vi)

700 mm.

RMT

7540.00

6847.00

vii)

800 mm.

RMT

8186.00

7434.00

vii)

900 mm.

RMT

11432.00

10383.00

ix)

1000 mm.

RMT

13172.00

11964.00

x)

1100 mm.

RMT

18925.00

17187.00

xi)

1200 mm.

RMT

21102.00

19165.00

xii)

1300 mm.

RMT

24638.00

22378.00

xiii)

1400 mm.

RMT

26427.00

24002.00

xiv)

1500 mm.

RMT

28203.00

25614.00

xv)

1600 mm.

RMT

30382.00

27594.00

xvi)

1700 mm.

RMT

32230.00

29272.00

xvii)

1800 mm.

RMT

34411.00

31253.00

d)

Factory Test Pressure 10 kg / Sqcm

i)

350 mm.

RMT

3717.00

3375.00

ii)

400 mm.

RMT

4075.00

3702.00

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

111

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4
With
E.D.

Without
E.D.

iii)

450 mm.

RMT

4509.00

4095.00

iv)

500 mm.

RMT

5040.00

4577.00

v)

600 mm.

RMT

6544.00

5943.00

vi)

700 mm.

RMT

7555.00

6862.00

vii)

800 mm.

RMT

8202.00

7449.00

viii)

900 mm.

RMT

11437.00

10398.00

ix)

1000 mm.

RMT

13187.00

11978.00

x)

1100 mm.

RMT

18941.00

17202.00

xi)

1200 mm.

RMT

21117.00 19180.00

xii)

1300 mm.

RMT

24653.00

22392.00

xiii)

1400 mm.

RMT

26443.00

24016.00

xiv)

1500 mm.

RMT

28218.00

25629.00

xv)

1600 mm.

RMT

30397.00

27608.00

xvi)

1700 mm.

RMT

32245.00

29286.00

xvii)

1800 mm.

RMT

34426.00

31268.00

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

112

Rate
(in Rs.)
2013-2014
5
With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4
With
E.D.

Without
E.D.

e)

Factory Test Pressure 12 kg / Sqcm

i)

350 mm.

RMT

3720.00

3379.00

ii)

400 mm.

RMT

4079.00

3704.00

iii)

450 mm.

RMT

4513.00

4099.00

iv)

500 mm.

RMT

5059.00

4597.00

v)

600 mm.

RMT

6564.00

5961.00

vi)

700 mm.

RMT

7575.00

6880.00

vii)

800 mm.

RMT

9368.00

8507.00

viii)

900 mm.

RMT

11448.00 10398.00

ix)

1000 mm.

RMT

14231.00 12925.00

x)

1100 mm.

RMT

18960.00 17221.00

xi)

1200 mm.

RMT

21138.00 19200.00

xii)

1300 mm.

RMT

24675.00 22411.00

xiii)

1400 mm.

RMT

26464.00 24036.00

xiv)

1500 mm.

RMT

28538.00 25921.00

xv)

1600 mm.

RMT

31570.00 28673.00

xvi)

1700 mm.

RMT

34171.00 31036.00

xvii)

1800 mm.

RMT

38004.00 34516.00

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

113

Rate
(in Rs.)
2013-2014
5
With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
E.D.

Without
E.D.

f)

Factory Test Pressure 14 kg / Sqcm

i)

350 mm.

RMT

3724.00

3383.00

ii)

400 mm.

RMT

4083.00

3707.00

iii)

450 mm.

RMT

4526.00

4110.00

iv)

500 mm.

RMT

5152.00

4679.00

v)

600 mm.

RMT

6683.00

6069.00

vi)

700 mm.

RMT

8695.00

7898.00

vii)

800 mm.

RMT

10196.00

9259.00

viii)

900 mm.

RMT

12574.00

11420.00

ix)

1000 mm.

RMT

15138.00

13750.00

x)

1100 mm.

RMT

19037.00

17291.00

xi)

1200 mm.

RMT

21130.00

19191.00

xii)

1300 mm.

RMT

25286.00

22965.00

xiii)

1400 mm.

RMT

28572.00

25951.00

xiv)

1500 mm.

RMT

31792.00

28874.00

xv)

1600 mm.

RMT

35451.00

32197.00

xvi)

1700 mm.

RMT

38923.00

35351.00

xvii)

1800 mm.

RMT

42585.00

38678.00

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

114

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

g)

Factory Test Pressure 16 kg / Sqcm

i)

350 mm.

ii)

400 mm.

iii)

450 mm.

iv)

500 mm.

v)

Rate
(in Rs.)
2012-2013
4

With
E.D.

Without
E.D.

RMT

3728.00

3386.00

RMT

4087.00

3712.00

RMT

4684.00

4255.00

RMT

5525.00

5018.00

600 mm.

RMT

7173.00

6515.00

vi)

700 mm.

RMT

9254.00

8407.00

vii)

800 mm.

RMT

11090.00

10073.00

viii)

900 mm.

RMT

13717.00

12458.00

ix)

1000 mm.

RMT

16673.00

15143.00

x)

1100 mm.

RMT

20080.00

18238.00

xi)

1200 mm.

RMT

23418.00

21269.00

xii)

1300 mm.

RMT

27896.00

25337.00

xiii)

1400 mm.

RMT

31490.00

28601.00

xiv)

1500 mm.

RMT

35119.00

31896.00

xv)

1600 mm.

RMT

39052.00

35470.00

xvi)

1700 mm.

RMT

43349.00

39371.00

xvii)

1800 mm.

RMT

48369.00

43932.00

h)

Factory Test Pressure 18 kg / Sqcm

i)

350 mm.

RMT

3732.00

3391.00

ii)

400 mm.

RMT

4148.00

3767.00

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

115

Rate
(in Rs.)
2013-2014
5

With Without
E.D.
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

iii)

450 mm.

RMT

4833.00

4389.00

iv)

500 mm.

RMT

5691.00

5168.00

v)

600 mm.

RMT

7444.00

6761.00

vi)

700 mm.

RMT

9785.00

8888.00

vii)

800 mm.

RMT

11550.00

10491.00

viii)

900 mm.

RMT

14275.00

12966.00

ix)

1000 mm.

RMT

17415.00

15817.00

x)

1100 mm.

RMT

20957.00

19033.00

xi)

1200 mm.

RMT

24417.00

22177.00

xii)

1300 mm.

RMT

28992.00

26333.00

xiii)

1400 mm.

RMT

33132.00

30092.00

xiv)

1500 mm.

RMT

36595.00

33237.00

xv)

1600 mm.

RMT

41512.00

37703.00

xvi)

1700 mm.

RMT

46039.00

41816.00

xvii)

1800 mm.

RMT

50958.00

46283.00

i)

Factory Test Pressure 20 kg / Sqcm

i)

350 mm.

RMT

3719.00

3379.00

ii)

400 mm.

RMT

4380.00

3979.00

iii)

450 mm.

RMT

5004.00

4544.00

iv)

500 mm.

RMT

6065.00

5509.00

v)

600 mm.

RMT

7935.00

7207.00

vi)

700 mm.

RMT

10317.00

9371.00

vii)

800 mm.

RMT

12595.00

11439.00

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

116

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

With
E.D.

Rate
(in Rs.)
2013-2014
5

Without
E.D.

viii)

900 mm.

RMT

15551.00 14125.00

ix)

1000 mm.

RMT

19029.00 17282.00

x)

1100 mm.

RMT

22835.00 20741.00

xi)

1200 mm.

RMT

26549.00 24114.00

xii)

1300 mm.

RMT

31538.00 28644.00

xiii)

1400 mm.

RMT

36348.00 33012.00

xiv)

1500 mm.

RMT

40934.00 37179.00

xv)

1600 mm.

RMT

45721.00 41525.00

xvi)

1700 mm.

RMT

51075.00 46389.00

xvii)

1800 mm.

RMT

56537.00 51351.00

With
E.D.

Without
E.D.

Notes :
1) For lowering, laying & pouring of cement mortar in the field on joints ( after laying and welding ), rates as
per P. S. C. pipes lowering, laying and jointing shall be adopted.
2) For field welding rates applicable for similar welding in M. S. pipes given in that section shall be abopted.
3) Whenever manufacturer is separate and contractor for lowering laying, jointing and testing is separate, the
pricipal contractor shall be enter into an agreement with B. W. S. C. pipe manufacturer for satisfactory
manufacturing transporting, lowering, laying, jointing and testing of pipes.
This footnote shall appear into the tender condition.
4) No negative tolerance shall be accepted for the M. S. Shell thickness of B. W. S. C. pipes over the
thickness mentioned in E. N. 641 of AWWA AC 303.

SECTION - I : BAR WRAPPED STEEL


CYLINDER PIPES

117

Sr. No.

Description
2

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

IX. GLASS REINPORCED PLASTIC


PIPES (GRP)
1.

Providing and supplying Glass fibre reinfor


ced polyester pipes conforming to BIS 12709 / BIS 14402 with double bell REKA
GRP coupling EPDM rubber gaskets for sealing of following pressure diameter and stiffness class including cost of all material and
labour required cost of all taxes (Central and
State Govt.), insurance, transportation to site
of work / store unloading and stacking etc.
complete.

A. Class (SN) 2500


With
E.D.

With out
E.D.

a)

3 Kg/Sq. cm :

i)

300 mm

RMT

1371.00

1229.00

ii)

350 mm

RMT

1586.00

1422.00

iii)

400 mm

RMT

1745.00

1565.00

iv)

450 mm

RMT

1965.00

1761.00

v)

500 mm

RMT

2222.00

1992.00

vi)

600 mm

RMT

2855.00

2559.00

vii)

700 mm

RMT

3548.00

3181.00

viii)

800 mm

RMT

4357.00

3906.00

ix)

900 mm

RMT

5324.00

4773.00

x)

1000 mm

RMT

6315.00

5662.00

xi)

1100 mm

RMT

7677.00

6883.00

xii)

1200 mm

RMT

8938.00

8013.00

SECTION - I : G. R. P. PIPES

118

With
E.D.

Without
E.D.

Sr. No.

Description
2

Unit

Rate
(in Rs.)
2013-2014

Rate
(in Rs.)
2012-2013

With
E.D.

Without
E.D.

xiii) 1300 mm

RMT

10121.00

9074.00

xiv) 1400 mm

RMT

11685.00

10477.00

xv)

1500 mm

RMT

13280.00

11907.00

xvi) 1600 mm

RMT

15466.00

13867.00

xiii) 1700 mm

RMT

18269.00

16573.00

xiv) 1800 mm

RMT

19935.00

18085.00

xv)

1900 mm

RMT

22284.00

20216.00

xvi) 2000 mm

RMT

24092.00

21856.00

xiii) 2100 mm

RMT

26923.00

24424.00

xiv) 2200 mm

RMT

28899.00

26217.00

xiv) 2300 mm

RMT

31232.00

28333.00

xv)

RMT

33384.00

30286.00

2400 mm

b)

6 Kg/Sq. cm :

i)

300 mm

RMT

1422.00

1275.00

ii)

350 mm

RMT

1626.00

1458.00

iii)

400 mm

RMT

1827.00

1638.00

iv)

450 mm

RMT

2029.00

1819.00

v)

500 mm

RMT

2307.00

2068.00

vi)

600 mm

RMT

2988.00

2679.00

vii)

700 mm

RMT

3715.00

3331.00

viii)

800 mm

RMT

4552.00

4081.00

SECTION - I : G. R. P. PIPES

119

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

ix)

900 mm

RMT

5545.00

4972.00

x)

1000 mm

RMT

6595.00

5913.00

xi)

1100 mm

RMT

7992.00

7166.00

xii)

1200 mm

RMT

9249.00

8293.00

xiii)

1300 mm

RMT

10583.00

9489.00

xiv)

1400 mm

RMT

12109.00 10857.00

xv)

1500 mm

RMT

13814.00 12385.00

xvi)

1600 mm

RMT

16111.00 14445.00

ix)

1700 mm

RMT

19038.00 17271.00

x)

1800 mm

RMT

20715.00 18793.00

xi)

1900 mm

RMT

23181.00 21029.00

xii)

2000 mm

RMT

25033.00 22710.00

xiii)

2100 mm

RMT

27987.00 25389.00

xiv)

2200 mm

RMT

30159.00 27360.00

xv)

2300 mm

RMT

32504.00 29488.00

xvi)

2400 mm

RMT

34710.00 31489.00

SECTION - I : G. R. P. PIPES

120

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

c)

9 Kg/Sq. cm :

i)

300 mm

RMT

1468.00

1316.00

ii)

350 mm

RMT

1706.00

1530.00

iii)

400 mm

RMT

1902.00

1705.00

iv)

450 mm

RMT

2157.00

1933.00

v)

500 mm

RMT

2445.00

2192.00

vi)

600 mm

RMT

3171.00

2843.00

vii)

700 mm

RMT

3949.00

3541.00

viii)

800 mm

RMT

4919.00

4410.00

ix)

900 mm

RMT

6009.00

5387.00

x)

1000 mm

RMT

7114.00

6378.00

SECTION - I : G. R. P. PIPES

121

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

xi)

1100 mm

RMT

8598.00

7708.00

xii)

1200 mm

RMT

9983.00

8950.00

ix)

1300 mm

RMT

11527.00

10335.00

x)

1400 mm

RMT

13245.00

11875.00

xi)

1500 mm

RMT

15044.00

13488.00

xii)

1600 mm

RMT

17564.00

15747.00

ix)

1700 mm

RMT

20797.00

18867.00

x)

1800 mm

RMT

22744.00

20633.00

xi)

1900 mm

RMT

25266.00

22921.00

xii)

2000 mm

RMT

27416.00

24872.00

ix)

2100 mm

RMT

30510.00

27678.00

x)

2200 mm

RMT

32799.00

29755.00

xi)

2300 mm

RMT

35415.00

32129.00

xii)

2400 mm

RMT

38193.00

34649.00

SECTION - I : G. R. P. PIPES

122

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

d)

12 Kg/Sq. cm :

i)

300 mm

RMT

1556.00

1395.00

ii)

350 mm

RMT

1796.00

1610.00

iii)

400 mm

RMT

2000.00

1793.00

iv)

450 mm

RMT

2613.00

2342.00

v)

500 mm

RMT

2264.00

2029.00

vi)

600 mm

RMT

3407.00

3054.00

vii)

700 mm

RMT

4225.00

3788.00

viii)

800 mm

RMT

5234.00

4693.00

ix)

900 mm

RMT

6418.00

5754.00

x)

1000 mm

RMT

7650.00

6859.00

xi)

1100 mm

RMT

9377.00

8406.00

xii)

1200 mm

RMT

10936.00

9805.00

xiii)

1300 mm

RMT

12378.00

11097.00

xiv)

1400 mm

RMT

14246.00

12772.00

xv)

1500 mm

RMT

16289.00

14604.00

xvi)

1600 mm

RMT

18892.00

16938.00

xiii)

1700 mm

RMT

22414.00

20334.00

xiv)

1800 mm

RMT

24573.00

22293.00

xv)

1900 mm

RMT

27200.00

24676.00

xvi)

2000 mm

RMT

29580.00

26835.00

xiii)

2100 mm

RMT

32976.00

29916.00

xiv)

2200 mm

RMT

35587.00

32284.00

SECTION - I : G. R. P. PIPES

123

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

With
E.D.

Without
E.D.

e)

16 Kg/Sq. cm :

i)

300 mm

RMT

1620.00

1452.00

ii)

350 mm

RMT

1871.00

1677.00

iii)

400 mm

RMT

2080.00

1865.00

iv)

450 mm

RMT

2398.00

2150.00

v)

500 mm

RMT

2756.00

2471.00

vi)

600 mm

RMT

3642.00

3265.00

vii)

700 mm

RMT

4543.00

4073.00

viii)

800 mm

RMT

5669.00

5082.00

ix)

900 mm

RMT

6987.00

6264.00

x)

1000 mm

RMT

8292.00

7434.00

xi)

1100 mm

RMT

10173.00

9121.00

xii)

1200 mm

RMT

11804.00 10583.00

xiii)

1300 mm

RMT

13549.00 12147.00

xiv)

1400 mm

RMT

15595.00 13982.00

xv)

1500 mm

RMT

17692.00 15862.00

xvi)

1600 mm

RMT

20527.00 18404.00

xiii)

1700 mm

RMT

24695.00 22403.00

xiv)

1800 mm

RMT

26988.00 24483.00

xv)

1900 mm

RMT

30134.00 27338.00

xvi)

2000 mm

RMT

32796.00 29752.00

SECTION - I : G. R. P. PIPES

124

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

B. Class (SN) 5000

Without
E.D.

a)

3 Kg/Sq. cm :

i)

300 mm

RMT

1470.00

1317.00

ii)

350 mm

RMT

1724.00

1546.00

iii)

400 mm

RMT

1965.00

1761.00

iv)

450 mm

RMT

2234.00

2004.00

v)

500 mm

RMT

2472.00

2216.00

vi)

600 mm

RMT

3222.00

2889.00

vii)

700 mm

RMT

4033.00

3616.00

viii)

800 mm

RMT

4999.00

4482.00

ix)

900 mm

RMT

6155.00

5519.00

x)

1000 mm

RMT

7321.00

6564.00

xi)

1100 mm

RMT

8874.00

7956.00

xii)

1200 mm

RMT

10401.00

9325.00

xiii)

1300 mm

RMT

11843.00 10618.00

xiv)

1400 mm

RMT

13612.00 12204.00

xv)

1500 mm

RMT

15533.00 13926.00

xvi)

1600 mm

RMT

18058.00 16190.00

xvii)

1700 mm

RMT

21385.00 19400.00

xviii)

1800 mm

RMT

23454.00 21277.00

xix)

1900 mm

RMT

26105.00 23682.00

xx)

2000 mm

RMT

28394.00 25758.00

xx)

2100 mm

RMT

31611.00 28677.00

xx)

2200 mm

RMT

34120.00 30954.00

SECTION - I : G. R. P. PIPES

125

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

RMT

1492.00

1338.00

350 mm

RMT

1753.00

1572.00

iii)

400 mm

RMT

1938.00

1737.00

iv)

450 mm

RMT

2209.00

1980.00

v)

500 mm

RMT

2545.00

2282.00

vi)

600 mm

RMT

3292.00

2952.00

vii)

700 mm

RMT

4136.00

3708.00

viii)

800 mm

RMT

5119.00

4589.00

ix)

900 mm

RMT

6305.00

5653.00

x)

1000 mm

RMT

7485.00

6711.00

xi)

1100 mm

RMT

9154.00

8208.00

xii)

1200 mm

RMT

10641.00

9540.00

xiii)

1300 mm

RMT

12160.00 10902.00

xiv)

1400 mm

RMT

13952.00 12509.00

xv)

1500 mm

RMT

15896.00 14252.00

xvi)

1600 mm

RMT

18502.00 16589.00

xvii)

1700 mm

RMT

21907.00 19874.00

xviii)

1800 mm

RMT

24020.00 21791.00

xix)

1900 mm

RMT

26757.00 24274.00

xx)

2000 mm

RMT

29152.00 26446.00

xx)

2100 mm

RMT

32429.00 29420.00

xx)

2200 mm

RMT

35057.00 31804.00

b)

6 Kg/Sq. cm :

i)

300 mm

ii)

SECTION - I : G. R. P. PIPES

126

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

c)

9 Kg/Sq. cm :

i)

300 mm

RMT

1547.00

1387.00

ii)

350 mm

RMT

1813.00

1625.00

iii)

400 mm

RMT

2040.00

1829.00

iv)

450 mm

RMT

2323.00

2082.00

v)

500 mm

RMT

2657.00

2382.00

vi)

600 mm

RMT

3650.00

3273.00

vii)

700 mm

RMT

4334.00

3886.00

viii)

800 mm

RMT

5582.00

5005.00

ix)

900 mm

RMT

6590.00

5909.00

x)

1000 mm

RMT

7861.00

7049.00

xi)

1100 mm

RMT

12694.00 11381.00

xii)

1200 mm

RMT

14442.00 12948.00

xiii)

1300 mm

RMT

16271.00 14588.00

xiv)

1400 mm

RMT

18213.00 16330.00

xv)

1500 mm

RMT

20866.00 18707.00

xvi)

1600 mm

RMT

23703.00 21252.00

xvii)

1700 mm

RMT

28204.00 25586.00

xviii)

1800 mm

RMT

30732.00 27880.00

SECTION - I : G. R. P. PIPES

127

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

d)

12 Kg/Sq. cm :

i)

300 mm

RMT

1591.00

1426.00

ii)

350 mm

RMT

1887.00

1692.00

iii)

400 mm

RMT

2086.00

1870.00

iv)

450 mm

RMT

2415.00

2165.00

v)

500 mm

RMT

2758.00

2473.00

vi)

600 mm

RMT

3642.00

3265.00

vii)

700 mm

RMT

4591.00

4116.00

viii)

800 mm

RMT

5666.00

5080.00

ix)

900 mm

RMT

7076.00

6344.00

x)

1000 mm

RMT

8322.00

7461.00

xi)

1100 mm

RMT

10229.00

9170.00

xii)

1200 mm

RMT

11886.00

10657.00

xiii)

1300 mm

RMT

13623.00

12214.00

xiv)

1400 mm

RMT

15698.00

14074.00

xv)

1500 mm

RMT

17831.00

15986.00

xvi)

1600 mm

RMT

20607.00

18476.00

xvii)

1700 mm

RMT

24516.00

22241.00

xviii)

1800 mm

RMT

26951.00

24450.00

xix)

1900 mm

RMT

29866.00

27095.00

SECTION - I : G. R. P. PIPES

128

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

e)

15 Kg/Sq. cm :

i)
ii)
iii)
iv)

300 mm
350 mm
400 mm
450 mm

RMT
RMT
RMT
RMT

1647.00
1962.00
2193.00
2533.00

1477.00
1758.00
1966.00
2271.00

v)
vi)
vii)
viii)

500 mm
600 mm
700 mm
800 mm

RMT
RMT
RMT
RMT

2890.00
3836.00
4827.00
6040.00

2591.00
3439.00
4328.00
5415.00

ix)
x)
xi)
xii)

900 mm
1000 mm
1100 mm
1200 mm

RMT
RMT
RMT
RMT

7450.00
8882.00
10802.00
12657.00

6679.00
7963.00
9685.00
11348.00

xiii)
xiv)
xv)
xvi)

1300 mm
1400 mm
1500 mm
1600 mm

RMT
RMT
RMT
RMT

14463.00
16688.00
18981.00
21975.00

12967.00
14962.00
17018.00
19703.00

xvii)
xviii)

1700 mm
1800 mm

RMT
RMT

26079.00
28722.00

23659.00
26057.00

With
E.D.

Without
E.D.

Note : 1) For lowering, laying & jointing rates of GRP pipes 50 % rates for lowering, laying &
jointing of PSC pipes of corresponding diameter shall be adopted.
2) Where manufacturer is seperate & contractor for lowering,laying jointing &testing is seperate
the principal controctor shall enter into an aggrement with G.R.P. pipe manufacture for
safisfactory manufacturing, transporting, lowering, laying, jointing & testing of pipe.
This foot Note shall appear in tender conditions.
3) Only 85 % Payment shall be payable till satisfactory hydraulic testing is given.
SECTION - I : G. R. P. PIPES

129

Sr. No.

Description

Unit

X.
1.

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014
5

H. D. P. E. PIPES

Providing and supplying in standard lengths


Polyethelene Pipes, confirming to IS 4984 /
14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e.
thread / insert joint / quick release coupler joint
/ compression fitting joint or flanged joint,
including all local & central taxes, transportation
and fright charges inspection charges, loading /
unloading charges, conveyance to the departmental stores / site & stacking the same in closed
shade duly protecting from sunrays & rains, etc.
complete.

A.)

With
E.D.

PE-100
a)

6 Kg/Sq. cm :

i)

63 mm

ii)

75 mm

iii)

90 mm

iv)

110 mm

v)

125 mm

vi)

140 mm

vii)

160 mm

viii)

180 mm

ix)

200 mm

x)

225 mm

xi)

250 mm

xii)

280 mm

xiii)

315 mm

xiv)

355 mm

xv)

400 mm

SECTION - I : H. D. P. E. PIPES

130

Without
E.D.

RMT
RMT
RMT
RMT

91.00
132.00
184.00
267.00

84.00
119.00
167.00
242.00

RMT
RMT
RMT
RMT

364.00
457.00
592.00
746.00

330.00
415.00
538.00
678.00

RMT
RMT
RMT
RMT

876.00
1129.00
1385.00
1737.00

794.00
1024.00
1257.00
1576.00

RMT
RMT
RMT

2201.00
2790.00
3654.00

1997.00
2531.00
3315.00

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

xvi)

450 mm

RMT

4814.00

4368.00

xvii)

500 mm

RMT

5953.00

5400.00

xviii)

560 mm

RMT

7451.00

6760.00

xix)

630 mm

RMT

9385.00

8509.00

xx)

710 mm

RMT

11891.00

10986.00

xxi)

800 mm

RMT

14336.00

13244.00

xxii)

900 mm

RMT

18161.00

16778.00

RMT

22394.00

20690.00

xxxiii) 1000 mm

b)

8 Kg/Sq. cm :

i)

63 mm

RMT

116.00

105.00

ii)

75 mm

RMT

172.00

156.00

iii)

90 mm

RMT

231.00

209.00

iv)

110 mm

RMT

340.00

308.00

v)

125 mm

RMT

461.00

418.00

vi)

140 mm

RMT

576.00

524.00

vii)

160 mm

RMT

750.00

680.00

viii)

180 mm

RMT

945.00

857.00

SECTION - I : H. D. P. E. PIPES

131

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

ix)

200 mm

RMT

1113.00

1010.00

x)

225 mm

RMT

1430.00

1297.00

xi)

250 mm

RMT

1762.00

1598.00

xii)

280 mm

RMT

2210.00

2004.00

xiii)

315 mm

RMT

2794.00

2536.00

xiv)

355 mm

RMT

3537.00

3209.00

xv)

400 mm

RMT

4645.00

4215.00

xvi)

450 mm

RMT

6212.00

5635.00

xvii)

500 mm

RMT

7663.00

6951.00

xviii)

560 mm

RMT

9618.00

8725.00

xix)

630 mm

RMT

12109.00

10978.00

xx)

710 mm

RMT

15344.00

14176.00

xxi)

800 mm

RMT

18509.00

17100.00

xxii)

900 mm

RMT

23430.00

21646.00

RMT

22868.00

21127.00

xxxiii) 1000 mm

SECTION - I : H. D. P. E. PIPES

132

With
E.D.

Without
E.D.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With E.D.

Without With E.D. Without


E.D.
E.D.

c)

10 Kg/Sq. cm :

i)

63 mm

RMT

145.00

131.00

ii)

75 mm

RMT

204.00

185.00

iii)

90 mm

RMT

290.00

264.00

iv)

110 mm

RMT

428.00

389.00

v)

125 mm

RMT

552.00

501.00

vi)

140 mm

RMT

690.00

625.00

vii)

160 mm

RMT

895.00

813.00

viii)

180 mm

RMT

1136.00

1031.00

ix)

200 mm

RMT

1331.00

1208.00

x)

225 mm

RMT

1704.00

1547.00

xi)

250 mm

RMT

2129.00

1931.00

xii)

280 mm

RMT

2628.00

2385.00

xiii)

315 mm

RMT

3376.00

3062.00

xiv)

355 mm

RMT

4236.00

3843.00

xv)

400 mm

RMT

5643.00

5118.00

SECTION - I : H. D. P. E. PIPES

133

Sr. No.

Description

Unit

Rate
(in Rs.)
2013-2014
5

Rate
(in Rs.)
2012-2013
4

With E.D.

With out E.D. With E.D.

xvi)

450 mm

RMT

7509.00

6811.00

xvii)

500 mm

RMT

9280.00

8418.00

xviii)

560 mm

RMT

11161.00

10124.00

xix)

630 mm

RMT

14659.00

13289.00

xx)

710 mm

RMT

18618.00

16880.00

xxi)

800 mm

RMT

22441.00

20346.00

xxii)

900 mm

RMT

22710.00

20589.00

xxiii)

1000 mm

RMT

28067.00

25445.00

d)

12.5 Kg/Sq. cm :

i)

63 mm

RMT

169.00

154.00

ii)

75 mm

RMT

239.00

217.00

iii)

90 mm

RMT

345.00

314.00

iv)

110 mm

RMT

508.00

461.00

v)

125 mm

RMT

656.00

595.00

vi)

140 mm

RMT

822.00

746.00

vii)

160 mm

RMT

1070.00

971.00

viii)

180 mm

RMT

1354.00

1228.00

ix)

200 mm

RMT

1591.00

1443.00

x)

225 mm

RMT

2053.00

1862.00

xi)

250 mm

RMT

2525.00

2290.00

xii)

280 mm

RMT

3166.00

2872.00

xiii)

315 mm

RMT

4007.00

3636.00

xiv)

355 mm

RMT

5089.00

4617.00

xv)

400 mm

RMT

6688.00

6068.00

SECTION - I : H. D. P. E. PIPES

134

With out E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2013-2014
5

Rate
(in Rs.)
2012-2013
4

With E.D.

With out E.D. With E.D.

xvi)

450 mm

RMT

8938.00

8108.00

xvii)

500 mm

RMT

11015.00

9994.00

xviii)

560 mm

RMT

13808.00

12528.00

xix)

630 mm

RMT

17623.00

15978.00

xx)

710 mm

RMT

18175.00

16478.00

xxi)

800 mm

RMT

21902.00

19857.00

xxii)

900 mm

RMT

27748.00

25156.00

xxiii)

1000 mm

RMT

33795.00

30639.00

e)

16 Kg/Sq. cm :

i)

63 mm

RMT

205.00

185.00

ii)

75 mm

RMT

288.00

262.00

iii)

90 mm

RMT

414.00

375.00

iv)

110 mm

RMT

612.00

554.00

v)

125 mm

RMT

790.00

717.00

vi)

140 mm

RMT

986.00

894.00

vii)

160 mm

RMT

1293.00

1173.00

viii)

180 mm

RMT

1627.00

1476.00

ix)

200 mm

RMT

2808.00

2549.00

x)

225 mm

RMT

3550.00

3221.00

xi)

250 mm

RMT

4379.00

3973.00

SECTION - I : H. D. P. E. PIPES

135

With out E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With E.D.

With out E.D. With E.D.

xii)

280 mm

RMT

5493.00

4983.00

xiii)

315 mm

RMT

6943.00

6300.00

xiv)

355 mm

RMT

8809.00

7990.00

xv)

400 mm

RMT

11410.00

10352.00

xvi)

450 mm

RMT

14463.00

13120.00

xvii)

500 mm

RMT

17835.00

16180.00

xviii)

560 mm

RMT

13650.00

12375.00

xix)

630 mm

RMT

17294.00

15679.00

xx)

710 mm

RMT

22006.00

19951.00

xxi)

800 mm

RMT

26511.00

24035.00

xxii)

900 mm

RMT

33558.00

30424.00

xxiii)

1000 mm

RMT

41199.00

37353.00

SECTION - I : H. D. P. E. PIPES

136

Rate
(in Rs.)
2013-2014
5

With out E.D.

Sr. No.

Description

Unit

2.

Lowering, Laying and Jointing H. D. P. E.


pipes by heating to the ends of pipes with
the help of tefflon coated electric mirror / heater
to the required temparature and then pressing
the ends together against each other, to form a
monolithic & leak proof joint by thermosetting
process. The pressing may be required to be
done with Jacks/ Hydraulic Jacks/Butt fusion
machine etc. complete with all materials labours
as directed by Engineer - in - charge, including,
given satisfactory hydraulic test.
For all classes.

Rate
(in Rs.)
2012-2013
4

With
ED

i)
ii)
iii)
iv)

63 mm
75 mm
90 mm
110 mm

Rmt.
Rmt.
Rmt.
Rmt.

37.00
40.00
55.00
58.00

v)
vi)
vii)
viii)

125 mm
140 mm
160 mm
180 mm

Rmt.
Rmt.
Rmt.
Rmt.

66.00
89.00
95.00
95.00

ix)
x)
xi)
xii)

200 mm
225 mm
250 mm
280 mm

Rmt.
Rmt.
Rmt.
Rmt.

106.00
136.00
141.00
174.00

xiii)
xiv)
xv)
xvi)

315 mm
355 mm
400 mm
450 mm

Rmt.
Rmt.
Rmt.
Rmt.

191.00
209.00
211.00
238.00

xvii)
xviii)
xix)

500 mm
560 mm
630 mm

Rmt.
Rmt.
Rmt.

308.00
345.00
388.00

SECTION - I : H. D. P. E. PIPES

137

Without
ED

Rate
(in Rs.)
2013-2014
5

Sr. No.
1

1.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

XI. M. D. P. E. PIPES
Providing and Supplying Blue MDPE pipes
conforming to ISO 4427:1996 manufactured
from virgin resin PE 80 Food grade compounded
Raw Material having Blue Colour only with
quality assurance certificate from quality
agencies like WRC / CIPET (India) / DVGM /
KIWA / SPGN etc. for usage in Drinking Water
system The cost shall include testing of all
materials, all taxes such as, Sate, Municipal,
Inspection charges, transportation up to site,
transitinsurance, loading, as specified and
directed.unloading, stacking etc. complete as
specified and directed.

With
E.D.

Without
E.D.

a)

PN 16 (SDR 9)

i)
ii)
iii)
iv)

20 mm
25 mm
32 mm
40 mm

RMT
RMT
RMT
RMT

28.00
40.00
66.00
97.00

26.00
36.00
59.00
87.00

vii)
viii)
ix)
x)

50 mm
63 mm
75 mm
90 mm

RMT
RMT
RMT
RMT

148.00
218.00
295.00
426.00

132.00
194.00
262.00
379.00

xi)
vii)
xiii)
xiv)

110 mm
125 mm
140 mm
160 mm

RMT
RMT
RMT
RMT

633.00
817.00
1027.00
1361.00

563.00
727.00
914.00
1211.00

xv)
xvi)
xvii)
xviii)

180 mm
200 mm
225 mm
250 mm

RMT
RMT
RMT
RMT

1722.00
2129.00
2697.00
3316.00

1533.00
1895.00
2400.00
2952.00

xix)
xx)

280 mm
315 mm

RMT
RMT

4169.00
5362.00

3711.00
4772.00

SECTION - I : M. D. P. E. PIPES

138

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

b)

PN 12.5 (SDR 11)

i)
iii)
iv)

25 mm
32 mm
40 mm

RMT
RMT
RMT

37.00
62.00
90.00

33.00
55.00
84.00

vii)
viii)
ix)
x)

50 mm
63 mm
75 mm
90 mm

RMT
RMT
RMT
RMT

130.00
175.00
245.00
359.00

116.00
158.00
219.00
316.00

xi)
vii)
xiii)
xiv)

110 mm
125 mm
140 mm
160 mm

RMT
RMT
RMT
RMT

526.00
684.00
854.00
1118.00

468.00
609.00
760.00
995.00

xv)
xvi)
xvii)
xviii)

180 mm
200 mm
225 mm
250 mm

RMT
RMT
RMT
RMT

1439.00
1778.00
2248.00
2770.00

1291.00
1581.00
2001.00
2479.00

xix)
xx)

280 mm
315 mm

RMT
RMT

3471.00
4400.00

3089.00
3916.00

c)

PN 10 (SDR 13.6)

viii)
ix)
x)

63 mm
75 mm
90 mm

RMT
RMT
RMT

150.00
212.00
305.00

134.00
189.00
272.00

xi)
vii)
xiii)
xiv)

110 mm
125 mm
140 mm
160 mm

RMT
RMT
RMT
RMT

450.00
579.00
727.00
951.00

401.00
516.00
647.00
846.00

xv)
xvi)
xvii)
xviii)

180 mm
200 mm
225 mm
250 mm

RMT
RMT
RMT
RMT

1205.00
1483.00
1881.00
2315.00

1072.00
1320.00
1673.00
2060.00

SECTION - I : M. D. P. E. PIPES

139

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

RMT
RMT

2900.00
3662.00

2581.00
3259.00

xix)
xx)

280 mm
315 mm

d)

PN 8 (SDR 17)

x)
ix)
x)
xi)
vii)
xiii)
xiv)

63 mm.
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm

RMT
RMT
RMT
RMT
RMT
RMT
RMT

122.00
171.00
247.00
367.00
470.00
589.00
771.00

108.00
152.00
220.00
327.00
418.00
524.00
686.00

xv)
xvi)
xvii)
xviii)

180 mm
200 mm
225 mm
250 mm

RMT
RMT
RMT
RMT

977.00
1203.00
1528.00
1875.00

870.00
1071.00
1360.00
1705.00

xix)
xx)

280 mm
315 mm

RMT
RMT

2399.00
3040.00

2135.00
2705.00

e)

PN 6 (SDR 21)

ix)
xi)
x)

63 mm.
75 mm.
90 mm

RMT
RMT
RMT

94.00
136.00
190.00

84.00
121.00
169.00

xi)
vii)
xiii)
xiv)

110 mm
125 mm
140 mm
160 mm

RMT
RMT
RMT
RMT

284.00
374.00
460.00
602.00

258.00
326.00
410.00
536.00

xv)
xvi)
xvii)
xviii)
xix)
xx)

180 mm
200 mm
225 mm
250 mm
280 mm
315 mm

RMT
RMT
RMT
RMT
RMT
RMT

756.00
939.00
1189.00
1452.00
1836.00
2309.00

672.00
836.00
1058.00
1293.00
1634.00
2055.00

SECTION - I : M. D. P. E. PIPES

140

With
E.D.

Without
E.D.

Sr. No.
1

2.

Description

Unit

Rate
(in Rs.)
2012-2013

With
E.D.

Providing & Supply of Electro Fusion Fittings


in accordance with BS EN12201: Part-3
suitable for drinking water with in black/ blue
colour manufactured from compounded PE80/
PE100 virgin polymer and compatible with
PE80/PE100 pipes, in pressure rating SDR11
with min PN12.5 rated for water application
and shall be inclusive of all cost such as testing,
all taxes related to central, state & municipal,
inspection charges, transportation up to site,
transit insurance, loading, unloading, stacking
etc. complete.

Couplers 20
Couplers 25
Couplers 32
Couplers 40

No.
No.
No.
No.

100.00
100.00
100.00
173.00

Couplers 50
Couplers 63
Couplers 75
Couplers 90

No.
No.
No.
No.

217.00
257.00
435.00
476.00

Couplers 110
Couplers 125
Couplers 140
Couplers 160

No.
No.
No.
No.

664.00
675.00
1446.00
1569.00

Couplers 180
Couplers 200
Couplers 225
Couplers 250

No.
No.
No.
No.

2254.00
2530.00
3189.00
4973.00

Couplers 280
Couplers 315

No.
No.

5600.00
6116.00

SECTION - I : M. D. P. E. PIPES

141

Without
E.D.

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.
Equal Tee 20
Equal Tee 25
Equal Tee 32
Equal Tee 40

No.
No.
No.
No.

210.00
210.00
210.00
463.00

Equal Tee 50
Equal Tee 63
Equal Tee 75
Equal Tee 90

No.
No.
No.
No.

473.00
775.00
1135.00
1620.00

Equal Tee 110


Equal Tee 125

No.
No.

2250.00
3104.00

Equal Tee 160


Equal Tee 180
Equal Tee 200
Equal Tee 225
Equal Tee 250

No.
No.
No.
No.
No.

5380.00
6758.00
10832.00
12215.00
17895.00

Elbow 90 Deg. 20
Elbow 90 Deg. 25
Elbow 90 Deg. 32
Elbow 90 Deg. 40

No.
No.
No.
No.

112.00
112.00
113.00
153.00

Elbow 90 Deg. 50
Elbow 90 Deg. 63
Elbow 90 Deg. 75
Elbow 90 Deg. 90

No.
No.
No.
No.

181.00
252.00
394.00
465.00

Elbow 90 Deg. 110


Elbow 90 Deg. 125

No.
No.

641.00
816.00

Elbow 90 Deg. 160


Elbow 90 Deg. 180
Elbow 90 Deg. 200
Elbow 90 Deg. 225
Elbow 90 Deg. 250

No.
No.
No.
No.
No.

1786.00
2070.00
2679.00
5840.00
10943.00

SECTION - I : M. D. P. E. PIPES

142

Without
E.D.

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
E.D.
Elbow 45 Deg. 32
Elbow 45 Deg. 40

No.
No.

120.00
145.00

Elbow 45 Deg. 50
Elbow 45 Deg. 63
Elbow 45 Deg. 75
Elbow 45 Deg. 90

No.
No.
No.
No.

172.00
240.00
374.00
442.00

Elbow 45 Deg. 110


Elbow 45 Deg. 125

No.
No.

641.00
816.00

Elbow 45 Deg. 160


Elbow 45 Deg. 180
Elbow 45 Deg. 200
Elbow 45 Deg. 225
Elbow 45 Deg. 250

No.
No.
No.
No.
No.

1503.00
1970.00
2070.00
2679.00
5840.00

Reducer 25 x 20
Reducer 32 x 20
Reducer 32 x 25
Reducer 40 x 32

No.
No.
No.
No.

150.00
158.00
165.00
179.00

Reducer 50 x 32
Reducer 50 x 40
Reducer 63 x 32
Reducer 63 x 40
Reducer 63 x 50
Reducer 90 x 63
Reducer 110 x 75
Reducer 110 x 90
Reducer 125 x 90
Reducer 160 x 110

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

179.00
179.00
217.00
217.00
217.00
536.00
697.00
697.00
774.00
1369.00

Reducer 180 x 125


Reducer 200 x 160
Reducer 225 x 160
Reducer 250 x 160
Reducer 250 x 200

No.
No.
No.
No.
No.

1705.00
2020.00
2955.00
4082.00
4465.00

SECTION - I : M. D. P. E. PIPES

143

Without
E.D.

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
E.D.
End Cap 20
End Cap 25
End Cap 32
End Cap 40

No.
No.
No.
No.

40.00
40.00
55.00
60.00

End Cap 50
End Cap 63
End Cap 75
End Cap 90

No.
No.
No.
No.

64.00
84.00
308.00
351.00

End Cap 110


End Cap 125
End Cap 140
End Cap 160

No.
No.
No.
No.

493.00
624.00
1021.00
1106.00

End Cap 180


End Cap 200
End Cap 225
End Cap 250
End Cap 315

No.
No.
No.
No.
No.

1286.00
2055.00
3530.00
4550.00
7527.00

Ferrule tapping tee 63 x 1/2"


Ferrule tapping tee 63 x 3/4"
Ferrule tapping tee 63 x 1"

No.
No.
No.

757.00
757.00
757.00

Ferrule tapping tee 75 x 1/2"


Ferrule tapping tee 75 x 3/4"
Ferrule tapping tee 75 x 1"

No.
No.
No.

757.00
757.00
757.00

Ferrule tapping tee 90 x 1/2"


Ferrule tapping tee 90 x 3/4"
Ferrule tapping tee 90 x 1"

No.
No.
No.

757.00
757.00
757.00

Ferrule tapping tee 90 x 1"


Ferrule tapping tee 90 x 1"
Ferrule tapping tee 90 x 2"

No.
No.
No.

982.00
982.00
982.00

SECTION - I : M. D. P. E. PIPES

144

Without
E.D.

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.
Ferrule tapping tee 110 x 1/2"
Ferrule tapping tee 110 x 3/4"
Ferrule tapping tee 110 x 1"

No.
No.
No.

757.00
757.00
757.00

Ferrule tapping tee 110 x 1"


Ferrule tapping tee 100 x 1"
Ferrule tapping tee 110 x 2"

No.
No.
No.

982.00
982.00
982.00

Ferrule tapping tee 160 x 1/2"


Ferrule tapping tee 160 x 3/4"
Ferrule tapping tee 160 x 1"

No.
No.
No.

757.00
757.00
757.00

Ferrule tapping tee 160 x 1"


Ferrule tapping tee 160 x 1"
Ferrule tapping tee 160 x 2"

No.
No.
No.

1070.00
1070.00
1070.00

Ferrule tapping tee 200 x 1/2"


Ferrule tapping tee 200 x 3/4"
Ferrule tapping tee 200 x 1"

No.
No.
No.

1068.00
1068.00
1068.00

Ferrule tapping tee 200 x 1"


Ferrule tapping tee 200 x 1"
Ferrule tapping tee 200 x 2"

No.
No.
No.

1540.00
1540.00
1540.00

Ferrule tapping tee 250 x 1/2"


Ferrule tapping tee 250 x 3/4"
Ferrule tapping tee 250 x 1"

No.
No.
No.

1068.00
1068.00
1068.00

Ferrule tapping tee 250 x 1"


Ferrule tapping tee 250 x 1"
Ferrule tapping tee 250 x 2"

No.
No.
No.

1540.00
1540.00
1540.00

Ferrule tapping tee 315 x 1/2"


Ferrule tapping tee 315 x 3/4"
Ferrule tapping tee 315 x 1"

No.
No.
No.

1271.00
1271.00
1271.00

Ferrule tapping tee 315 x 1"


Ferrule tapping tee 315 x 1"
Ferrule tapping tee 315 x 2"

No.
No.
No.

1726.00
1726.00
1726.00

SECTION - I : M. D. P. E. PIPES

145

Without
E.D.

With
E.D.

Without
E.D.

Sr. No.
1

3.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

Providing & Supply of Compression fittings,


PN16 rated in conformation to ISO:142362000 and shall be tested as per ISO:3459,
ISO:3501 & ISO:3503, suitable for drinking
water & approved by WRAS, UK/ KIWA etc,
in food grade polypropylene and shall be
inclusive of all cost such as testing, all taxes
related to central, state & unicipal, inspection
charges, transportation up to site, transit
insurance, loading, unloading, stacking etc.
complete.

With
E.D.

Male Adaptor 20 x 1/2"


Male Adaptor 25 x 3/4"
Male Adaptor 32 x 1"
Male Adaptor 40 x 1"
Male Adaptor 50 x 1"
Male Adaptor 63 x 2"

No.
No.
No.
No.
No.
No.

68.00
78.00
100.00
184.00
241.00
344.00

Female Adaptor 20 x 1/2"


Female Adaptor 25 x 3/4"
Female Adaptor 32 x 1"
Female Adaptor 40 x 1"
Female Adaptor 50 x 1"
Female Adaptor 63 x 2"

No.
No.
No.
No.
No.
No.

73.00
86.00
108.00
202.00
259.00
365.00

Coupling 20 x 20
Coupling 25 x 25
Coupling 32 x 32
Coupling 40 x 40
Coupling 50 x 50
Coupling 63 x 63

No.
No.
No.
No.
No.
No.

70.00
77.00
98.00
187.00
240.00
347.00

Reducing Coupling 25 x 20
Reducing Coupling 32 x 20
Reducing Coupling 32 x 25
Reducing Coupling 40 x 25
Reducing Coupling 40 x 32
Reducing Coupling 50 x 32
Reducing Coupling 50 x 40
Reducing Coupling 63 x 50

No.
No.
No.
No.
No.
No.
No.
No.

128.00
169.00
169.00
289.00
289.00
374.00
374.00
530.00

SECTION - I : M. D. P. E. PIPES

146

Without
E.D.

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

90 Deg. Elbow 20
90 Deg. Elbow 25
90 Deg. Elbow 32
90 Deg. Elbow 40
90 Deg. Elbow 50
90 Deg. Elbow 63

No.
No.
No.
No.
No.
No.

130.00
155.00
190.00
312.00
443.00
600.00

90 Deg. Elbow threaded male off take 20 x 1/2"


90 Deg. Elbow threaded male off take 25 x 3/4"
90 Deg. Elbow threaded male off take 32 x 1"
90 Deg. Elbow threaded male off take 40 x 1/4"
90 Deg. Elbow threaded male off take 50 x 1/2"
90 Deg. Elbow threaded male off take 63 x 2"

No.
No.
No.
No.
No.
No.

78.00
95.00
123.00
197.00
269.00
374.00

90 Deg. Elbow threaded Female male off take 20 x 1/2"


90 Deg. Elbow threaded Female male off take 25 x 3/4"
90 Deg. Elbow threaded Female male off take 32 x 1"
90 Deg. Elbow threaded Female male off take 40 x 1"
90 Deg. Elbow threaded Female male off take 50 x 1"
90 Deg. Elbow threaded Female male off take 63 x 2"

No.
No.
No.
No.
No.
No.

89.00
110.00
132.00
257.00
337.00
443.00

No.
No.
No.
No.
No.
No.

155.00
204.00
264.00
436.00
590.00
839.00

No.
No.
No.
No.
No.
No.

40.00
40.00
55.00
60.00
64.00
84.00

Equal Tee 20 x 20 x 20
Equal Tee 25 x 25 x 25
Equal Tee 32 x 32 x 32
Equal Tee 40 x 40 x 40
Equal Tee 50 x 50 x 50
Equal Tee 63 x 63 x 63
End Cap 20
End Cap 25
End Cap 32
End Cap 40
End Cap 50
End Cap 63

SECTION - I : M. D. P. E. PIPES

147

Without
E.D.

With
E.D.

Without
E.D.

Sr. No.
1

XII.
1.

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

P. C. C. PIPES

With
E.D.

Providing and Supplying Prestressed Concrete Cylinder Pipes suitable for sliding ovrelap
weld joint or confined rubber ring joint with
necessary rubber ring of following class and diameter including cost of all taxes (central & local) transportation, inspection charges to site
of work / store, transit insurance, unloading and
stacking etc. complete.

Without
E.D.

i) Factory test pressure


a) Site test pressure + 01N/mm2, For working
pressure upto 1 N/mm2
b) Site test pressure + 02N/mm2, For working
pressure upto 1 N/mm2
ii) Site test pressure - 1.5 times working pressure pertaining to the section or 1.1 times static
pressure, which ever is more (such pressure is
to be control within 25% of pumphead incase
of pumping main)
iii) Working pessure - The maximum sustained
internal pressure excluding surge to which each
portion of pipeline my be subjected when installed.
As Per 784 : 2001
a)

F T P - 4 Kg/Sq. cm

i)

350 mm

RMT

4464.00

4054.00

ii)

400 mm

RMT

4909.00

4457.00

iii)

450 mm

RMT

5390.00

4896.00

iv)

500 mm

RMT

5965.00

5417.00

SECTION - I : P. C. C. PIPES

148

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

v)

600 mm

RMT

7213.00

6551.00

vi)

700 mm

RMT

8334.00

7569.00

vii)

800 mm

RMT

9382.00

8522.00

viii)

900 mm

RMT

11499.00

10445.00

ix)

1000 mm

RMT

13280.00

12062.00

x)

1100 mm

RMT

14870.00

13505.00

xi)

1200 mm

RMT

16349.00

14849.00

xii)

1300 mm

RMT

18890.00

17156.00

xiii)

1400 mm

RMT

20511.00

18628.00

xiv)

1500 mm

RMT

21993.00

19975.00

xv)

1600 mm

RMT

23476.00

21321.00

xvi)

1700 mm.

RMT

24958.00

22668.00

xvii)

1800 mm.

RMT

26440.00

24014.00

b)

F T P - 5.5 Kg/Sq. cm

i)

350 mm

RMT

4464.00

4054.00

ii)

400 mm

RMT

4930.00

4479.00

iii)

450 mm

RMT

5417.00

4923.00

iv)

500 mm

RMT

6000.00

5449.00

SECTION - I : P. C. C. PIPES

149

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

v)

600 mm

RMT

7262.00

6596.00

vi)

700 mm

RMT

8400.00

7629.00

vii)

800 mm

RMT

9493.00

8621.00

viii)

900 mm

RMT

11606.00 10542.00

ix)

1000 mm

RMT

13412.00 12181.00

x)

1100 mm

RMT

15040.00 13661.00

xi)

1200 mm

RMT

17157.00 15584.00

xii)

1300 mm

RMT

19169.00 17409.00

xiii)

1400 mm

RMT

20866.00 18952.00

xiv)

1500 mm

RMT

22350.00 20298.00

xv)

1600 mm

RMT

23832.00 21646.00

xvi)

1700 mm.

RMT

25315.00 22992.00

xvii)

1800 mm.

RMT

26797.00 24339.00

c)

F T P - 7 Kg/Sq. cm

i)

350 mm

RMT

4475.00

4063.00

ii)

400 mm

RMT

4951.00

4496.00

SECTION - I : P. C. C. PIPES

150

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
E.D.

Without
E.D.

iii)

450 mm

RMT

5445.00

4945.00

iv)

500 mm

RMT

6032.00

5478.00

v)

600 mm

RMT

7312.00

6641.00

vi)

700 mm

RMT

8479.00

7701.00

vii)

800 mm

RMT

9629.00

8745.00

viii)

900 mm

RMT

11756.00 10677.00

ix)

1000 mm

RMT

13613.00 12366.00

x)

1100 mm

RMT

15289.00 13886.00

xi)

1200 mm

RMT

17455.00 15853.00

xii)

1300 mm

RMT

19518.00 17728.00

xiii)

1400 mm

RMT

21450.00 19483.00

xiv)

1500 mm

RMT

22384.00 20329.00

xv)

1600 mm

RMT

23867.00 21676.00

xvi)

1700 mm.

RMT

25349.00 23023.00

xvii)

1800 mm.

RMT

26831.00 24369.00

SECTION - I : P. C. C. PIPES

151

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
E.D.

Without
E.D.

d)

F T P - 8.5 Kg/Sq. cm

i)

350 mm

RMT

4492.00

4080.00

ii)

400 mm

RMT

4976.00

4520.00

iii)

450 mm

RMT

5473.00

4970.00

iv)

500 mm

RMT

6067.00

5510.00

v)

600 mm

RMT

7376.00

6700.00

vi)

700 mm

RMT

8578.00

7790.00

vii)

800 mm

RMT

9765.00

8869.00

viii)

900 mm

RMT

11923.00 10828.00

ix)

1000 mm

RMT

13819.00 12550.00

x)

1100 mm

RMT

15537.00 14112.00

xi)

1200 mm

RMT

17903.00 16261.00

xii)

1300 mm

RMT

20032.00 18194.00

xiii)

1400 mm

RMT

21859.00 19853.00

xiv)

1500 mm

RMT

22789.00 20699.00

xv)

1600 mm

RMT

24273.00 22045.00

xvi)

1700 mm.

RMT

25755.00 23392.00

xvii)

1800 mm.

RMT

27237.00 24738.00

SECTION - I : P. C. C. PIPES

152

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

e)

F T P - 10 Kg/Sq. cm

i)
ii)

350 mm
400 mm

RMT
RMT

4508.00
4995.00

4095.00
4539.00

iii)
iv)

450 mm
500 mm

RMT
RMT

5506.00
6117.00

5002.00
5555.00

v)
vi)

600 mm
700 mm

RMT
RMT

7449.00
8677.00

6764.00
7880.00

vii)
viii)

800 mm
900 mm

RMT
RMT

9913.00
12087.00

9003.00
10978.00

ix)
x)

1000 mm
1100 mm

RMT
RMT

14024.00
15926.00

12736.00
14465.00

xi)
xii)

1200 mm
1300 mm

RMT
RMT

18207.00
20390.00

16536.00
18520.00

xiii)
xiv)

1400 mm
1500 mm

RMT
RMT

22276.00
23209.00

20233.00
21079.00

xv)
xvi)
xvii)

1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT

24692.00
26175.00
27657.00

22427.00
23773.00
25120.00

f)

F T P - 11.5 Kg/Sq. cm

i)
ii)

350 mm
400 mm

RMT
RMT

4527.00
5027.00

4111.00
4567.00

iii)
iv)

450 mm
500 mm

RMT
RMT

5550.00
6169.00

5039.00
5602.00

SECTION - I : P. C. C. PIPES

153

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

With
E.D.

Without
E.D.

v)
vi)
vii)
viii)

600 mm
700 mm
800 mm
900 mm

RMT
RMT
RMT
RMT

7523.00 6833.00
8774.00 7968.00
10188.00 9254.00
12254.00 11131.00

ix)
x)
xi)
xii)

1000 mm
1100 mm
1200 mm
1300 mm

RMT
RMT
RMT
RMT

14228.00
16181.00
18513.00
20751.00

12922.00
14696.00
16814.00
18848.00

xiii)
xiv)
xv)
xvi)
xvii)

1400 mm
1500 mm
1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT

22699.00
23631.00
25113.00
26596.00
28078.00

20617.00
21462.00
22809.00
24155.00
25502.00

g)

F T P - 13 Kg/Sq. cm

i)
ii)
iii)
iv)

350 mm
400 mm
450 mm
500 mm

RMT
RMT
RMT
RMT

4562.00
5069.00
5594.00
6220.00

4143.00
4604.00
5081.00
5649.00

v)
vi)
vii)
viii)

600 mm
700 mm
800 mm
900 mm

RMT
RMT
RMT
RMT

7595.00 6898.00
8874.00 8058.00
10356.00 9407.00
12421.00 11281.00

ix)
x)
xi)
xii)

1000 mm
1100 mm
1200 mm
1300 mm

RMT
RMT
RMT
RMT

14526.00
16438.00
18823.00
21120.00

13193.00
14930.00
17095.00
19181.00

xiii)
xiv)
xv)
xvi)
xvii)

1400 mm
1500 mm
1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT

23116.00
24047.00
25530.00
27012.00
28494.00

20995.00
21841.00
23188.00
24534.00
25871.00

SECTION - I : P. C. C. PIPES

154

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
E.D.

Without
E.D.

h)

F T P - 14.5 Kg/Sq. cm

i)
ii)
iii)
iv)

350 mm
400 mm
450 mm
500 mm

RMT
RMT
RMT
RMT

4601.00
5116.00
5649.00
6279.00

4179.00
4646.00
5131.00
5703.00

v)
vi)
vii)
viii)

600 mm
700 mm
800 mm
900 mm

RMT
RMT
RMT
RMT

7672.00
9456.00
10525.00
12706.00

6968.00
8588.00
9559.00
11541.00

ix)
x)
xi)
xii)

1000 mm
1100 mm
1200 mm
1300 mm

RMT
RMT
RMT
RMT

14739.00
16696.00
19130.00
21479.00

13386.00
15163.00
17374.00
19507.00

xiii)
xiv)
xv)
xvi)
xvii)

1400 mm
1500 mm
1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT

24161.00
25092.00
26575.00
28057.00
29539.00

21944.00
22789.00
24137.00
25483.00
26830.00

i)

F T P - 17 Kg/Sq. cm

i)
ii)
iii)
iv)

350 mm
400 mm
450 mm
500 mm

RMT
RMT
RMT
RMT

4636.00
5162.00
5707.00
6347.00

4212.00
4689.00
5183.00
5765.00

v)
vi)
vii)
viii)

600 mm
700 mm
800 mm
900 mm

RMT
RMT
RMT
RMT

7771.00
9076.00
10728.00
12889.00

7057.00
8244.00
9745.00
11705.00

ix)
x)
xi)
xii)

1000 mm
1100 mm
1200 mm
1300 mm

RMT
RMT
RMT
RMT

14955.00
16964.00
19440.00
21844.00

13581.00
15408.00
17656.00
19840.00

SECTION - I : P. C. C. PIPES

155

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

With
E.D.

Without
E.D.

RMT
RMT
RMT
RMT
RMT

24628.00
25558.00
27041.00
28524.00
30006.00

22367.00
23214.00
24560.00
25907.00
27253.00

xiii)
xiv)
xv)
xvi)
xvii)

1400 mm
1500 mm
1600 mm
1700 mm.
1800 mm.

j)

F T P - 18.5 Kg/Sq. cm

i)
ii)
iii)
iv)

350 mm
400 mm
450 mm
500 mm

RMT
RMT
RMT
RMT

4674.00
5209.00
5765.00
6417.00

4245.00
4731.00
5236.00
5828.00

v)
vi)
vii)
viii)

600 mm
700 mm
800 mm
900 mm

RMT
RMT
RMT
RMT

7870.00
9189.00
11082.00
13113.00

7148.00
8347.00
10064.00
11910.00

ix)
x)
xi)
xii)

1000 mm
1100 mm
1200 mm
1300 mm

RMT
RMT
RMT
RMT

15211.00
17231.00
19752.00
22892.00

13814.00
15649.00
17940.00
20793.00

xiii)
xiv)
xv)
xvi)
xvii)

1400 mm
1500 mm
1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT

25266.00
25671.00
27153.00
28635.00
30119.00

22948.00
23314.00
24662.00
26009.00
27355.00

k)

F T P - 20 Kg/Sq. cm

i)
ii)
iii)
iv)

350 mm
400 mm
450 mm
500 mm

RMT
RMT
RMT
RMT

4711.00
5257.00
5822.00
6489.00

4278.00
4775.00
5288.00
5894.00

v)
vi)

600 mm
700 mm

RMT
RMT

7968.00 7237.00
9416.00 8552.00

SECTION - I : P. C. C. PIPES

156

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013
4

With
E.D.

Without
E.D.

vii)
viii)

800 mm
900 mm

RMT
RMT

11349.00 10306.00
13415.00 12182.00

ix)
x)
xi)
xii)

1000 mm
1100 mm
1200 mm
1300 mm

RMT
RMT
RMT
RMT

15564.00
17638.00
20785.00
23387.00

14135.00
16019.00
18878.00
21241.00

xiii)
xiv)
xv)
xvi)
xvii)

1400 mm
1500 mm
1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT

25824.00
26227.00
27710.00
29192.00
30674.00

23453.00
23821.00
25168.00
26514.00
27861.00

l)

F T P - 21.5 Kg/Sq. cm

i)
ii)
iii)
iv)

350 mm
400 mm
450 mm
500 mm

RMT
RMT
RMT
RMT

4750.00
5302.00
5880.00
6559.00

4316.00
4817.00
5340.00
5957.00

v)
vi)
vii)
viii)

600 mm
700 mm
800 mm
900 mm

RMT
RMT
RMT
RMT

8084.00 7342.00
9879.00 8973.00
11528.00 10469.00
13711.00 12453.00

ix)
x)
xi)
xii)

1000 mm
1100 mm
1200 mm
1300 mm

RMT
RMT
RMT
RMT

15918.00
18527.00
21302.00
23929.00

14457.00
16827.00
19347.00
21733.00

xiii)
xiv)
xv)
xvi)
xvii)

1400 mm
1500 mm
1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT

27241.00
27647.00
29129.00
30611.00
32094.00

24741.00
25109.00
26457.00
27803.00
29150.00

SECTION - I : P. C. C. PIPES

157

Rate
(in Rs.)
2013-2014
5

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

With
E.D.

Without
E.D.

m)

F T P - 23 Kg/Sq. cm

i)
ii)

350 mm
400 mm

RMT
RMT

4787.00
5350.00

4349.00
4859.00

ii)
iv)

450 mm
500 mm

RMT
RMT

5939.00
6628.00

5394.00
6020.00

v)
vi)

600 mm
700 mm

RMT
RMT

8254.00
10190.00

7497.00
9256.00

vii)
viii)

800 mm
900 mm

RMT
RMT

11880.00 10790.00
14008.00 12723.00

ix)
x)

1000 mm
1100 mm

RMT
RMT

16270.00 14778.00
19017.00 17272.00

xi)
xii)

1200 mm
1300 mm

RMT
RMT

21825.00 19823.00
24612.00 22353.00

xiii)
xiv)

1400 mm
1500 mm

RMT
RMT

27747.00 25200.00
28150.00 25567.00

xv)
xvi)
xvii)

1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT

29632.00 26915.00
31116.00 28261.00
32598.00 29607.00

n)

F T P - 24.5 Kg/Sq. cm

i)
ii)

350 mm
400 mm

RMT
RMT

4825.00
5398.00

4382.00
4902.00

iii)
iv)

450 mm
500 mm

RMT
RMT

5997.00
6699.00

5447.00
6084.00

SECTION - I : P. C. C. PIPES

158

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

With
E.D.

Without
E.D.

v)
vi)
vii)
viii)

600 mm
700 mm
800 mm
900 mm

RMT
RMT
RMT
RMT

8586.00
10331.00
12097.00
14244.00

7798.00
9383.00
10986.00
12938.00

ix)
x)
xi)
xii)

1000 mm
1100 mm
1200 mm
1300 mm

RMT
RMT
RMT
RMT

17036.00
19508.00
22354.00
26559.00

15472.00
17718.00
20305.00
24122.00

xiii)
xiv)
xv)
xvi)
xvii)

1400 mm
1500 mm
1600 mm
1700 mm.
1800 mm.

RMT
RMT
RMT
RMT
RMT

28276.00
28677.00
30159.00
31642.00
33124.00

25682.00
26045.00
27392.00
28738.00
30085.00

Note :
1)
For PCCP pipes lowering, laying, and
pouring of cement mortar in the field on
joints (after laying and welding), rates
as per PSC pipes lowering, laying and
jointing shall be adopted.
2)
For field welding rates applicable for
similar welding in MS pipes given in that
section shall be adopted.
3)
Whenever manufacturer is separate and
contractor for lowering, laying, jointing
and testing is separate the principal contractor shall enter into an agreement with
PCCP pipe manufacturer for satisfactory manufacturing transporting, lowering, laying, jointing and testing of pipes.
This foot notes shall appear in the tender
conditions.

SECTION - I : P. C. C. PIPES

159

With
E.D.

Without
E.D.

Sr. No.

Description

Unit

XIII.

1.

Rate
(in Rs.)
2012-2013
4

PIPES
APPURTENANCES

Providing and supplying ISI mark CI D/F reflux


valves (non-return valves ) of following dia including all
taxes (Central and Local), railway freight, inspection
charges unloding from railway wagon, loading into truck,
transportation upto departmental stroes/ site, unloading,
stacking etc. complete.
Reflux valves as per I.S.5312 Part I (1984)
a)

Without by pass
arrangement PN -1

i)
ii)
iii)
iv)
v)

50 mm.
65 mm.
80 mm.
100 mm.
125 mm.

No.
No.
No.
No.
No.

3308.00
3873.00
4078.00
5694.00
8130.00

vi)
vii)
viii)
ix)
x)

150 mm.
200 mm.
250 mm.
300 mm.
350 mm.

No.
No.
No.
No.
No.

9844.00
17694.00
30194.00
41374.00
68478.00

xi)
xii)
xiii)
xiv)
xv)

400 mm.
450 mm.
500 mm.
600 mm.
700 mm.

No.
No.
No.
No.
No.

94273.00
111059.00
181880.00
266900.00
468495.00

SECTION - I : PIPES APPURTENANCES

160

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

b)

Rate
(in Rs.)
2012-2013
4

With by pass
arrangement - PN -1

i)

80 mm.

No.

4709.00

ii)

100 mm.

No.

6708.00

iii)

125 mm.

No.

9134.00

iv)

150 mm.

No.

10848.00

v)

200 mm.

No.

20224.00

vi)

250 mm.

No.

33057.00

vii)

300 mm.

No.

44373.00

viii)

350 mm.

No.

72752.00

ix)

400 mm.

No.

97627.00

x)

450 mm.

No.

114222.00

xi)

500 mm.

No.

185408.00

xii)

600 mm.

No.

270477.00

xiii)

700 mm.

No.

709220.00

xiv)

750 mm.

No.

776307.00

xv)

800 mm.

No.

843396.00

xvi)

900 mm.

No.

920068.00

xvii)

1000 mm.

No.

1073413.00

SECTION - I : PIPES APPURTENANCES

161

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

c)

Rate
(in Rs.)
2012-2013
4

Without by pass
arrangement - PN -1.6

i)

50 mm.

No.

3227.00

ii)

65 mm

No.

3486.00

iii)

80 mm.

No.

5718.00

iv)

100 mm.

No.

7323.00

v)

125 mm.

No.

10203.00

vi)

150 mm

No.

11419.00

vii)

200 mm.

No.

24284.00

viii)

250 mm.

No.

38986.00

ix)

300 mm.

No.

54474.00

x)

350 mm.

No.

93820.00

xi)

400 mm.

No.

108424.00

xii)

450 mm.

No.

127927.00

xiii)

500 mm.

No.

207834.00

xiv)

600 mm.

No.

305384.00

xv)

700 mm.

No.

369010.00

xvi)

750 mm.

No.

423608.00

xvii)

800 mm.

No.

481972.00

xviii)

900 mm.

No.

609995.00

xix)

1000 mm.

No.

753081.00

xx)

1100 mm

No.

911227.00

xxi)

1200 mm

No.

1084436.00

SECTION - I : PIPES APPURTENANCES

162

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

d)

Rate
(in Rs.)
2012-2013
4

With by pass
arrangement - PN -1.6

i)

50 mm.

No.

3312.00

ii)

65 mm

No.

3727.00

iii)

80 mm.

No.

5484.00

iv)

100 mm.

No.

7092.00

v)

125 mm.

No.

9911.00

vi)

150 mm

No.

12030.00

vii)

200 mm.

No.

24298.00

viii)

250 mm.

No.

36715.00

ix)

300 mm.

No.

51028.00

x)

350 mm.

No.

85713.00

xi)

400 mm.

No.

112272.00

xii)

450 mm.

No.

131355.00

xiii)

500 mm.

No.

213216.00

xiv)

600 mm.

No.

311049.00

xv)

700 mm.

No.

375853.00

xvi)

750 mm.

No.

431463.00

xvii)

800 mm.

No.

490910.00

xviii)

900 mm.

No.

621308.00

xix)

1000 mm.

No.

767046.00

xx)

1100 mm

No.

928125.00

xxi)

1200 mm

No.

1104545.00

SECTION - I : PIPES APPURTENANCES

163

Rate
(in Rs.)
2013-2014
5

Description

Unit

Rate
(in Rs.)
2012-2013

Rate
(in Rs.)
2013-2014

2.

Providing double flange sluice valve confirming for IS2906/14846 including worn gear arrangements as per
test pressure stainless steel spindle, caps including all
taxes transportation etc. complete.

Sr. No.

a)

Sluice valves - PN -1 (Without by pass)

i)

50 mm.

No.

4391.00

ii)

65 mm.

No.

4985.00

iii)

80 mm.

No.

5116.00

iv)

100 mm.

No.

6812.00

v)

125 mm.

No.

8521.00

vi)

150 mm.

No.

10217.00

vii)

200 mm.

No.

19333.00

viii)

250 mm.

No.

29913.00

ix)

300 mm.

No.

37695.00

x)

350 mm.

No.

53477.00

xi)

400 mm.

No.

72101.00

xii)

450 mm.

No.

88187.00

xiii)

500 mm.

No.

113477.00

xiv)

600 mm.

No.

167606.00

xv)

700 mm.

No.

300430.00

xvi)

750 mm.

No.

342603.00

xvii)

800 mm.

No.

427239.00

xviii)

900 mm.

No.

550860.00

xix)

1000 mm.

No.

814189.00

xx)

1100 mm

No.

1078533.00

xxi)

1200 mm.

No.

1280269.00

SECTION - I : PIPES APPURTENANCES

164

Unit

Description

Sr. No.
1

Rate
(in Rs.)
2012-2013
4

b)

Sluice valves - PN -1.0 (With by pass arrangement)

i)

50 mm.

No.

4391.00

ii)

65 mm.

No.

4985.00

iii)

80 mm.

No.

5116.00

iv)

100 mm.

No.

6812.00

v)

125 mm.

No.

8521.00

vi)

150 mm.

No.

12374.00

vii)

200 mm.

No.

21854.00

viii)

250 mm.

No.

33263.00

ix)

300 mm.

No.

40982.00

x)

350 mm.

No.

58087.00

xi)

400 mm.

No.

77248.00

xii)

450 mm.

No.

93275.00

xiii)

500 mm.

No.

120104.00

xiv)

600 mm.

No.

174198.00

xv)

700 mm.

No.

310617.00

xvi)

750 mm.

No.

351996.00

xvii)

800 mm.

No.

437316.00

xviii)

900 mm.

No.

561585.00

xix)

1000 mm.

No.

826615.00

xx)

1100 mm

No.

1093680.00

xxi)

1200 mm.

No.

1293675.00

SECTION - I : PIPES APPURTENANCES

165

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

c)

Sluice valve - PN - 1.6


(Without by pass arrangement)

i)

50 mm.

No.

5803.00

ii)

65 mm.

No.

6371.00

iii)

80 mm.

No.

7265.00

iv)

100 mm.

No.

9636.00

v)

125 mm.

No.

12024.00

vi)

150 mm.

No.

11893.00

vii)

200 mm.

No.

24101.00

viii)

250 mm.

No.

37382.00

ix)

300 mm.

No.

49699.00

x)

350 mm.

No.

72811.00

xi)

400 mm.

No.

99720.00

xii)

450 mm.

No.

123737.00

xiii)

500 mm.

No.

160146.00

xiv)

600 mm.

No.

243982.00

xv)

700 mm.

No.

524772.00

xvi)

750 mm.

No.

579078.00

xvii)

800 mm.

No.

672599.00

xviii)

900 mm.

No.

813137.00

xix)

1000 mm.

No.

1183325.00

xx)

1100 mm

No.

1285723.00

xxi)

1200 mm.

No.

1721030.00

SECTION - I : PIPES APPURTENANCES

166

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

Rate
(in Rs.)
2012-2013

d)

Sluice valve - PN - 1.6


(With by pass arrangement)

i)

50 mm.

No.

5803.00

ii)

65 mm.

No.

6371.00

iii)

80 mm.

No.

7265.00

iv)

100 mm.

No.

9636.00

v)

125 mm.

No.

12024.00

vi)

150 mm.

No.

14014.00

vii)

200 mm.

No.

26755.00

viii)

250 mm.

No.

40969.00

ix)

300 mm.

No.

53299.00

x)

350 mm.

No.

77866.00

xi)

400 mm.

No.

105441.00

xii)

450 mm.

No.

129463.00

xiii)

500 mm.

No.

167602.00

xiv)

600 mm.

No.

251533.00

xv)

700 mm.

No.

538550.00

xvi)

750 mm.

No.

589319.00

xvii)

800 mm.

No.

682470.00

xviii)

900 mm.

No.

823468.00

xix)

1000 mm.

No.

1195568.00

xx)

1100 mm

No.

1297614.00

xxi)

1200 mm.

No.

1734270.00

SECTION - I : PIPES APPURTENANCES

167

Rate
(in Rs.)
2013-2014
5

Sr. No.
1

Description

Unit

Rate
(in Rs.)
2012-2013

Providing, double flanged short body pattern type manually


operated Butterfly Valve having body, disc and end cover in
graded cast iron to IS-210 Gr.CF 200 generally confirming in
to IS-13095-1991, Synthetic rubber faced ring secured on disc
by retaining ring with stainless steel screw stub shaft of stainless steel riding in teflon bearing excluding C.C. foundation /
structural steel support.
a)

Butterfly valve - PN - 1
(With by pass arrangement)

i)
ii)
iii)

80 mm.
100 mm.
125 mm.

No.
No.
No.

5808.00
7424.00
8467.00

iv)
v)
vii)
viii)
viii)

150 mm.
200 mm.
250 mm.
300 mm.
350 mm.

No.
No.
No.
No.
No.

10944.00
14586.00
18230.00
28844.00
58665.00

ix)
x)
xi)
xii)
xiii)

400 mm.
450 mm.
500 mm.
600 mm
700 mm

No.
No.
No.
No.
No.

63023.00
72811.00
79947.00
98727.00
159784.00

xiv)
xv)
xvi)
xvii)
xviii)
xix)

750 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm

No.
No.
No.
No.
No.
No.

198334.00
218214.00
301378.00
358723.00
581758.00
550499.00

xx)
xxi)

1400 mm
1500 mm

No. 839367.00
No. 1042954.00

SECTION - I : PIPES APPURTENANCES

168

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

b)

Rate
(in Rs.)
2012-2013
4

Butterfly valve - PN - 1.6


(With by pass arrangement)

i)

80 mm.

No.

6444.00

ii)

100 mm.

No.

8537.00

iii)

125 mm.

No.

9317.00

iv)

150 mm.

No.

12585.00

v)

200 mm.

No.

16776.00

vii)

250 mm.

No.

20965.00

viii)

300 mm.

No.

33171.00

viii)

350 mm.

No.

67464.00

ix)

400 mm.

No.

72476.00

x)

450 mm.

No.

83733.00

xi)

500 mm.

No.

91939.00

xii)

600 mm

No.

113537.00

xiii)

700 mm

No.

183751.00

xiv)

750 mm

No.

228084.00

xv)

800 mm

No.

249867.00

xvi)

900 mm

No.

346586.00

xvii)

1000 mm

No.

448404.00

xviii)

1100 mm

No.

727199.00

xix)

1200 mm

No.

688125.00

xx)

1400 mm

No.

1049209.00

xxi)

1500 mm

No.

1294878.00

SECTION - I : PIPES APPURTENANCES

169

Rate
(in Rs.)
2013-2014
5

Sr. No.

Unit

Description

4.

Lowering, laying and jointing in position following


C.I.D/F Reflex valves, Butterfly valves and Sluice
valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc.
complete. (Rate for all class of valves.)

Rate
(in Rs.)
2012-2013
4

i)

50 mm.

No.

689.00

ii)

65 mm.

No.

1036.00

iii)

80 mm.

No.

1440.00

iv)

100 mm.

No.

1881.00

v)

125 mm.

No.

2342.00

vi)

150 mm.

No.

2957.00

vii)

200 mm.

No.

3076.00

viii)

250 mm.

No.

4008.00

ix)

300 mm.

No.

4158.00

x)

350 mm.

No.

5124.00

xi)

400 mm.

No.

6182.00

xii)

450 mm.

No.

7354.00

xii)

500 mm.

No.

7616.00

xiv)

600 mm.

No.

8083.00

xv)

700 mm.

No.

8714.00

xvi)

750 mm.

No.

9598.00

xvii)

800 mm.

No.

11438.00

xviii)

900 mm.

No.

12136.00

xix)

1000 mm.

No.

14307.00

xx)

1100 mm.

No.

16521.00

xxi)

1200 mm.

No.

18153.00

SECTION - I : PIPES APPURTENANCES

170

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

5.

Rate
(in Rs.)
2012-2013
4

Providing and supplying Air Valves as per IS14845-2000 and MJPs standard specifications of approved make and quality of following diameters including
all taxes (Central and local), railway freight, inspection
charges, unloding from railway wagons, loading
into truck, transportation upto departmental stores / site,
unloding and stacking etc. complete.

a)

Air Valve Single


Ball Flanged / Screwed
Type - PN -1

i)
ii)
iii)
iv)
v)
vi)

12/15 mm.
20 mm.
25 mm.
32 mm.
40 mm.
50 mm.

b)

Air Valve Single


Ball Flanged / Screwed
Type - PN -1.6

i)
ii)
iii)
iv)
v)
vi)

12/15 mm.
20 mm.
25 mm.
32 mm.
40 mm.
50 mm.

SECTION - I : PIPES APPURTENANCES

171

No.
No.
No.
No.
No.
No.

615.00
741.00
1022.00
1116.00
1228.00
1349.00

No.
No.
No.
No.
No.
No.

719.00
1022.00
1228.00
1324.00
1418.00
1851.00

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

6.

Rate
(in Rs.)
2012-2013
4

Providing and supplying Air Valves as per IS10845 and MJPs standard specifications double orifice type combined with screw down isolating valve,
small orifice elastic ball resting on a gun metal orifice nipple,
large orifice vulcanite ball seating on moulded seat ring,
inlet face and drilled, including all taxes (Central and local), insurance, third party inspection charges, loading,
unloding, transportation upto departmental stores / site, etc.
complete.

a)

Air Valve Double Ball Flanged


Type - PN -1

i)

50 mm.

No.

5673.00

ii)

65 mm.

No.

6619.00

iii)

80 mm.

No.

7561.00

b)

Air Valve Double Ball Flanged


Type - PN -1.6

i)

50 mm.

No.

7515.00

ii)

65 mm.

No.

8509.00

iii)

80 mm.

No.

10530.00

SECTION - I : PIPES APPURTENANCES

172

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

7.

Rate
(in Rs.)
2012-2013
4

Providing and supplying Air Valves as per IS14845-2000 and MJPs standard specifications double
orifice type combined with isolating sluice valve, mounted in
horizontal position and operated by wheel gearing, small orifice elastic ball resting on a gun metal orifice nipple, large
orifice vulcanite ball seating on moulded seat ring, inlet face
and drilled, including all taxes (Central and local), insurance, third party inspection charges, loading, unloading, transportation upto departmental store / site, etc.
complete.

a)

Air Valve Double Ball Flanged


Type - PN -1

i)

100 mm.

No.

9561.00

ii)

150 mm.

No.

17425.00

iii)

200 mm.

No.

29304.00

b)

Air Valve Double Ball Flanged


Type - PN -1.6

i)

100 mm.

No.

14617.00

ii)

150 mm.

No.

20593.00

iii)

200 mm.

No.

34633.00

SECTION - I : PIPESAPPURTENANCES

173

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

8.

Rate
(in Rs.)
2012-2013
4

Providing and supplying Kinetic Double Orifice type


Air Valves as per MJPs standard specifications combined with screw down isolating valve, small orifice
elastic ball resting on a gun metal orifice nipple, large
orifice vulcanite ball seating on moulded seat ring, inlet face
and drilled, including all taxes (Central and local), insurance,
third party inspection charges, loading, unloading, transportation upto departmental stores / site, etc. complete.

a)

Kinetic Air Valve Flanged


Type - PN -1

i)

40 mm.

No.

9516.00

ii)

50 mm.

No.

11729.00

iii)

80 mm.

No.

15304.00

b)

Kinetic Air Valve Flanged


Type - PN -1.6

i)

40 mm.

No.

11280.00

ii)

50 mm.

No.

13903.00

iii)

80 mm.

No.

18176.00

SECTION - I : PIPES APPURTENANCES

174

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

9.

Providing and supplying Kinetic Double Orifice type


Air Valves as per MJPs standard specifications having
small orifice elastic ball resting on a gun metal orifice nipple,
large orifice vulcanite ball seating on moulded seat ring,with
built-in Kinetic features, isolating sluice valve mounted in
horizontal position and operated by wheel gearing, inlet face
and drilled, including all taxes (Central and local),
insurance, third party inspection charges, loading,
unloding, transportation upto departmental stores / site,
etc. complete.

a)

Rate
(in Rs.)
2012-2013
4

Kinetic Air Valve Flanged


Type - PN -1

i)

100 mm.

No.

20610.00

ii)

150 mm.

No.

38804.00

iii)

200 mm.

No.

56659.00

b)

Kinetic Air Valve Flanged


Type - PN -1.6

i)

100 mm.

No.

24427.00

ii)

150 mm.

No.

45993.00

iii)

200 mm.

No.

67161.00

SECTION - I : PIPES APPURTENANCES

175

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit

10.

Lowering, laying and fixing in proper alignment and position


all types of C.I. air valves as directed by Engineer-in-charge
including cost of conveyance from stores to site of work, cost of all
material and giving satisfactory hydraulic testing, etc. complete. (for
all class of valves).

Rate
(in Rs.)
2012-2013
4

a)

Air Valve Single Ball (PN-1 and PN - 1.6)

i)
ii)
iii)
iv)
v)

15 mm.
20 mm.
25 mm.
32 mm.
40 mm.

No.
No.
No.
No.
No.

110.00
140.00
180.00
199.00
213.00

vi)
vii)
viii)
ix)
x)

50 mm.
65 mm.
80 mm.
100 mm.
125 mm.

No.
No.
No.
No.
No.

231.00
243.00
255.00
285.00
345.00

xi)
xii)

150 mm.
200 mm.

No.
No.

383.00
421.00

b)

Air Valve Double Ball (PN-1 and PN - 1.6)

i)
ii)
iii)
iv)
v)

15 mm.
20 mm.
25 mm.
32 mm.
40 mm.

No.
No.
No.
No.
No.

120.00
149.00
180.00
205.00
238.00

vi)
vii)
viii)
ix)
x)

50 mm.
65 mm.
80 mm.
100 mm.
125 mm.

No.
No.
No.
No.
No.

275.00
317.00
379.00
400.00
441.00

xi)
xii)

150 mm.
200 mm.

No.
No.

603.00
664.00

SECTION -I : PIPES APPURTENANCES

176

Rate
(in Rs.)
2013-2014
5

Sr. No.

Description

Unit
3

Rate
(in Rs.)
2012-2013
4

c) Kinetic Air Valve (PN-1 and PN - 1.6)

11.

i)
ii)
iii)
iv)
v)

40 mm.
50 mm.
65 mm.
80 mm.
100 mm.

No.
No.
No.
No.
No.

273.00
315.00
345.00
379.00
417.00

vi)
vii)
viii)

125 mm.
150 mm.
200 mm.

No.
No.
No.

455.00
652.00
711.00

Providing erecting Cast Steel/ Spheroidal Graphite


(S.G) Iron D/F Sluice Valves / Butterfly Valves with
jointing to pipe work (including all hardware and packing) water works quality, having non-rising spindle with
hand wheel and without bypass arrangement, spindle of
stainless steel as per requirement, excluding C. C. foundation / structural steel support.
For Rating Class 150 (Working Pressure 20 kg/cm2
and Test Pressure 30 kg/cm2)

A)

a)

Sluice Valves

i)
ii)
iii)
iv)

80 mm dia.
100 mm dia.
150 mm dia.
200 mm dia.

No.
No.
No.
No.

14656.00
19540.00
29311.00
45713.00

v)
vi)
vii)
viii)

250 mm dia.
300 mm dia.
350 mm dia.
400 mm dia.

No.
No.
No.
No.

65786.00
84173.00
112230.00
187281.00

ix)
x)
xi)

450 mm dia.
500 mm dia.
600 mm dia.

No.
No.
No.

255524.00
300616.00
343203.00

SECTION - I : PIPES APPURTENANCES

177

Rate
(in Rs.)
2013-2014
5

También podría gustarte