Lnea 4-6:
Impedancia nominal = Zpu * Zb1= (0.0119+j0.0414)*9=0.1071+j0.3726 ()
Z46= 0.1071+j0.3726 (/km)
Lnea 5-7:
Impedancia nominal = Zpu * Zb1= (0.046+j0.116)*9=0.414+j1.044 ()
Z57= 0.414+j1.044 (/km)
Lnea 6-7:
Impedancia nominal = Zpu * Zb1= (0.0267+j0.0820)*9=0.2403+j0.738 ()
Z67= 0.2403+j0.738(/km)
Lnea 6-8:
Impedancia nominal = Zpu * Zb1= (0.0120+j0.0420)*9=0.108+j0.378 ()
Z68 =0.108+j0.378 (/km)
Lnea 9-10:
Z9-10= j212.96 (/km)
Lnea 12-13:
Z12-13= j271.04 (/km)
Lnea 12-14:
Z12-14 = 239.4832+ j495.4224 (/km)
Lnea 12-15:
Z12-15=128.1632+ j252.4544 (/km)
Lnea 12-16:
Z12-16=182.952+ j384.6832 (/km)
Lnea 14-15:
Z14-15 =(0.221+j 0.1997)*1936=427.856+j386.6192 (/km)
Lnea 16-17:
Z16-17=(0.0524+j0.1923)*1936=101.4464+j372.2928 (/km)
Lnea 15-18:
Z15-18=(0.1073+j0.2185)*1936=207.7328+j423.016 (/km)
Lnea 18-19:
Z18-19=(0.0639+j0.1292)*1936=123.71+j250.13 (/km)
Lnea 19-20:
Z19-20=(0.034+j0.068)*1936=65.824+j131.648(/km)
Lnea 10-20:
Z10-20=(0.0936+j0.2090)*1936=181.2096+j404.624 (/km)
Lnea 10-17:
Lnea 10-21:
Lnea 10-22:
Z10-22=(0.0727+j0.1499)*1936=140.7472+j290.2064 (/km)
Lnea 21-22:
Z21-22=(0.0116+j0.0236)*1936=22.4576+j45.6896 (/km)
Lnea 15-23:
Z15-23=(0.100+j0.2020)*1936= 193.6+j391.072(/km)
Lnea 22-24:
Z22-24=(0.115+j0.179)*1936=222.65+j346.54 (/km)
Lnea 23-24:
Z23-24=(0.1320+j0.27)*1936=255.552+522.72 (/km)
Lnea 24-25:
Z24-25=(0.1885+j0.3292)*1936=364.936+j637.3312 (/km)
Lnea 25-26:
Z25-26=(0.2544+j0.3800)*1936=492.5184+j735.68 (/km)
Lnea 25-27:
Z25-27=(0.1093+j0.2087)*1936=211.6048+j404.0432 (/km)
Lnea 28-27:
X= Vcc (100/65)*(440/440)2 , como X=0.3960 entonces Vcc = 25.74%
Lnea 27-29:
Z27-29=(0.2198+j0.4153)*1936= 425.5328+j804.0208 (/km)
Lnea 27-30:
Z27-30=(0.3202+j0.6027)*1936= 619.9072+j1166.8272(/km)
Lnea 29-30:
Z29-30=(0.2399+j0.4533)*1936= 464.4464+j877.5888(/km)
Lnea 8-28:
Lnea 6-28:
Z6-28=(0.0169+j0.0599)*1936= 32.7184+j115.9664(/km)
Barra 1 :
Barras slack:
V=1.06
Barra 2:
Barra PV ( barra de voltaje controlado y P cte)