Está en la página 1de 2

TPMPROGRAM KPI CENTRALDEMANTENIMIENTO NOMBREDELEQUIPO UBICACIN MES TARJETASPROGRAMADAS TARJETASREPORTADAS %DECUMPLIMIENTOOPERADOR ESTATUSDECUMPLIMIENTO ANOMALIASREPORTADAS ASIGNADOSAMATTO

COLECTORPOLVOS
FABRICACION FEBRERO2013 44 23 52.27% NOACEPTABLE 9 7

REPORTA DIRIGIDOA FECHADEELABORACION

JAIMEARREOLA GERENCIADEMANTENIMIENTO 12/23/20137:33


%DECUMPLIMIENTOOPERADOR

10 9 8 7 6 5 4

9 7 52.27 %

45 90 78 Formul a F Descrip tion Result

MTTORESUELTO ASIGNADOSAPRODUCCION PRODUCCIONRESULTO PROBLEMASRESUELTOS PROBLEMASMASREPORTADOS NUMERODESUGERENCIASREPORTADAS ACTIVIDADESDETPMREALIZADAS 0


HOJADESINGLEPOINT INSTRUCTION

2 0 0

3 2 1 0
ANOMALIAS REPORTADAS MEJORASPARAPRODUCCION ASIGNADOSA MATTO MTTORESUELTO

IF(A2>89,"A",IF(A2>79,"B", IF(A2>69,"C",IF(A

ASIGNADOSA PRODUCCION

MEJORADESEGURIDAD

MEJORAPARAREDUCCIONDE DESPERDICIO

CANTIDADDEDEMORA TOTALDEHORASDEMORA TIEMPODISPONIBLETOTAL TIEMPOOPERATIVO(60MINUTOSFIJO) %DISPONIBILIDAD

0 0 270 270

TOTALDEHORASDEMORA

%DISPONIBILIDAD

1 0.5 0 0 1

100% 100%

100%

0%
1

ID 340 376 377 378 379 380 381 382 383 384 385 503 504 13

NOMBREDELEQUIPO COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS COLECTORDEPOLVOS 13

FECHA Tuesday,January01,2013 Wednesday,January02,2013 Wednesday,January02,2013 Wednesday,January02,2013 Wednesday,January02,2013 Thursday,January03,2013 Thursday,January03,2013 Thursday,January03,2013 Friday, Friday January04, 04 2013 Friday,January04,2013 Friday,January04,2013 Friday,January04,2013 Friday,January04,2013

TIPODEPROBLEMAENCONTRADO SEREALIZASINCOMENTARIOS NOHAYCOMENTARIOS NOSEREALIZA NOSEREALIZA NOSEREALIZA NOSEREALIZA NOSEREALIZA NOSEREALIZA NOSEREALIZA NOSEREALIZA NOSEREALIZA SEREALIZASINCOMENTARIOS SEREALIZASINCOMENTARIOS 13

CONTRAMEDIDAFIJADA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 13

A2>59,"D","F"))))

También podría gustarte