VALORIZACION MENSUAL N 01
ENTIDAD:
OBRA:
MEJORAMIENTO DE LA VIA METROPOLITANA SECTOR CERRO COLORADO - I ETAPA - CERRO COLORADO AREQUIPA
UBICACIN:
CONTRATISTA
SUPERVISOR (INSPECTOR):
L.P.
L.P. N 006-2013-MDCC
13.00%
PRESUPUESTO BASE:
3,308,299.48
PRESUPUESTO CONTRATADO:
3,308,299.48
2,803,643.63
FACTOR DE RELACION:
RESIDENTE:
1.00000
Ing XXXXXXXXXXX
FECHA DE INICIO:
9/24/2013
PLAZO CONTRACTUAL:
120
1/21/2014
FECHA DE P.B.
Jun-13
FECHA DE REAJUSTE:
Aug-13
AREA GEOGRAFICA:
MES DE VALORIZACION
SETIEMBRE - 2013
ADELANTO DIRECTO
MONTO DEL ADELANTO
661,659.89
560,728.72
9/24/2013
CONSORCIO METROPOLITANA
VALORIZACION MENSUAL N 01
SETIEMBRE - 2013
OBRA:
MEJORAMIENTO DE LA VIA METROPOLITANA SECTOR CERRO COLORADO - I ETAPA - CERRO COLORADO AREQUIPA
UBICACIN
AREQUIPA - AREQUIPA - CERRO COLORADO
ESPECIALIDAD: PRESUPUESTO GENERAL
Item
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
02.00.00
02.01.00
02.02.00
02.03.00
02.02.00
02.03.00
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.02.00
03.02.01
03.02.02
03.02.03
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
05.00.00
05.01.00
05.02.00
05.03.00
06.00.00
06.01.00
06.02.00
06.03.00
06.04.00
06.05.00
06.06.00
06.07.00
06.08.00
06.09.00
06.10.00
Descripcion
OBRAS PROVISIONALES
OBRAS PROVISIONALES
OFICINAS, ALMACENES Y TALLERES
CASETA DE GUARDIANIA
COMEDOR, VESTUARIOS Y SERVICIOS HIGIENICOS
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40M
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
CONTROL TOPOGRAFICO DURANTE EL PROCESO CONSTRUCTIVO
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
LIMPIEZA DE TERRENO
DEMOLICIONES Y REMOCIONES
DEMOLICIONES
DEMOLICION DE PAVIMENTO ASFALTICO DE 2"
DEMOLICION DE VEREDAS DE 0.10 M
DEMOLICION DE SARDINELES Y BERMAS
DEMOLICION DE CANALES
DEMOLICION DE LOSA DEPORTIVA Y CRUCE DE VIAS CON LINEA FERREA
ELIMINACION DE MATERIAL EXCEDENTE DE DEMOLICIONES
REMOCIONES
REMOCION DE AREAS VEREDES
REMOCION DE ARBOLES Y ARBUSTOS
REMOCION DE LETREROS
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL CON EQUIPO
EXCAVACION MANUAL
RELLENO CON MATERIAL PROPIO CON EQUIPO
PERFILADO, NIVELACION Y COMPACTACION CON SUBRASANTE
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO
PAVIMENTO FLEXIBLE
BASE GRANULAR E = 25 CM
IMPRIMACION ASFALTICA
CARPETA ASFALTICA EN CALIENTE DE H = 7 CM
BERMAS
BASE PARA BERMAS H = 0.15 M
ACARREO DE MATERIAL DE ADOQUIN
ACARREO DE MATERIAL DE ADOQUIN MANUAL
ADOQUIN DE CONCRETO
COLOCACION DE ADOQUIN DE CONCRETO
CORTE DE ADOQUIN
SELLADO DE JUNTAS
CONCRETO PARA BERMAS F'c = 210 kg/cm2
ENCOFRADO Y DESENCOFRADO PARA SARDINEL DE BURBUJA
CONCRETO PARA SARDINEL TIPO BURBUJA F'c = 210 kg/cm2
Und.
Metrado
Precio
Unitario
Parcial
S/.
CONTRATISTA:
SUPERVISOR:
PROCESO:
Acumulado Anterior
Metrado
S/.
Mes Actual
Metrado
S/.
Acumulado Actual
Metrado
S/.
Saldo de Obra
Metrado
S/.
M2
M2
M2
Und
100.00
15.00
70.00
2.00
63.06
32.40
55.22
911.32
6,306.00
486.00
3,865.40
1,822.64
100.00
15.00
70.00
2.00
6,306.00
486.00
3,865.40
1,822.64
100.00
15.00
70.00
2.00
6,306.00
486.00
3,865.40
1,822.64
M2
M2
Glb
Mes
M2
22,042.00
22,042.00
1.00
4.00
22,042.00
0.36
0.36
6,059.77
1,530.66
0.41
7,935.12
7,935.12
6,059.77
6,122.64
9,037.22
20,142.00
3,306.27
0.50
0.25
11,190.00
7,251.12
1,190.26
3,029.89
382.67
4,587.90
20,142.00
3,306.27
0.50
0.25
11,190.00
7,251.12
1,190.26
3,029.89
382.67
4,587.90
1,900.00
18,735.73
0.50
3.75
10,852.00
684.00
6,744.86
3,029.89
5,739.98
4,449.32
M2
M2
M2
M
M2
M3
10,040.00
2,785.97
7,178.71
2,009.92
894.50
2,599.09
1.88
5.13
2.22
5.13
8.44
15.62
18,875.20
14,292.03
15,936.74
10,310.89
7,549.58
40,597.79
7,800.00
1,740.00
7,088.29
1,740.00
2,114.44
14,664.00
8,926.20
15,736.00
8,926.20
33,027.55
7,800.00
1,740.00
7,088.29
1,740.00
2,114.44
14,664.00
8,926.20
15,736.00
8,926.20
33,027.55
2,240.00
1,045.97
90.42
269.92
894.50
484.65
4,211.20
5,365.83
200.73
1,384.69
7,549.58
7,570.23
M2
Und
Und
354.01
23.00
6.00
4.01
184.78
37.58
1,419.58
4,249.94
225.48
4.00
4.00
739.12
150.32
4.00
4.00
739.12
150.32
354.01
19.00
2.00
1,419.58
3,510.82
75.16
M3
M3
M3
M2
M3
2,736.13
732.70
179.34
22,031.20
4,111.87
3.65
14.75
21.15
1.81
15.62
9,986.87
10,807.33
3,793.04
39,876.47
64,227.41
2,736.13
732.70
179.34
22,031.20
4,111.87
9,986.87
10,807.33
3,793.04
39,876.47
64,227.41
M2
M2
M2
15,732.00
15,732.00
15,732.00
17.18
4.00
54.62
270,275.76
62,928.00
859,281.84
15,732.00
15,732.00
15,732.00
270,275.76
62,928.00
859,281.84
M2
M2
M2
M2
M2
M
M2
M3
M2
M3
1,314.00
256.00
256.00
256.00
256.00
532.50
256.00
167.70
644.80
48.00
10.93
5.09
5.90
50.00
14.23
2.93
4.15
366.08
41.78
366.08
14,362.02
1,303.04
1,510.40
12,800.00
3,642.88
1,560.23
1,062.40
61,391.62
26,939.74
17,571.84
1,314.00
256.00
256.00
256.00
256.00
532.50
256.00
167.70
644.80
48.00
14,362.02
1,303.04
1,510.40
12,800.00
3,642.88
1,560.23
1,062.40
61,391.62
26,939.74
17,571.84
CONSORCIO METROPOLITANA
Item
06.11.00
06.12.00
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
07.06.00
07.07.00
07.08.00
07.09.00
08.00.00
08.01.00
08.02.30
08.03.00
08.04.00
09.00.00
09.01.00
09.02.00
09.03.00
10.00.00
10.01.00
10.02.00
10.03.00
11.00.00
11.01.00
11.02.00
11.03.00
11.04.00
11.05.00
11.06.00
11.07.00
11.08.00
11.09.00
11.10.00
11.11.00
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
14.00.00
14.01.00
14.02.00
14.03.00
14.04.00
14.05.00
15.00.00
Descripcion
Und.
Metrado
Precio
Unitario
Parcial
S/.
Acumulado Anterior
Metrado
S/.
Mes Actual
Metrado
S/.
-
Acumulado Actual
Metrado
S/.
8,950.72
4,992.52
30,744.48
9,380.55
98,368.17
57,405.39
9,380.55
13,079.42
23,454.47
8,950.72
4,992.52
1,536.00
35.84
28.80
144.00
32.24
3.60
84.55
-
15,575.04
1,303.50
9,809.57
3,107.52
1,172.57
1,226.20
851.42
-
1,536.00
35.84
28.80
144.00
32.24
3.60
84.55
-
25,228.80
6,285.60
11,955.60
921.78
700.00
700.00
700.00
-
16,352.00
4,074.00
7,749.00
-
700.00
700.00
700.00
-
92,984.32
79,744.00
26,134.79
3,734.02
2,406.53
298.70
11,835.40
18,158.70
11,180.66
1,109.52
3,430.40
6,174.70
29,985.55
2,964.63
3,611.48
48,457.30
22,017.28
4,596.80
659.10
25,299.20
5,878.07
1,251.36
7,156.80
491.40
1,954.89
13,171.26
30,339.70
8,201.90
960.80
68,284.80
Saldo de Obra
Metrado
S/.
-
888.85
383.45
8,950.72
4,992.52
15,575.04
1,303.50
9,809.57
3,107.52
1,172.57
1,226.20
851.42
-
1,496.00
222.08
260.00
2,516.12
225.68
34.80
371.88
804.30
383.45
15,169.44
8,077.05
88,558.60
54,297.87
8,207.98
11,853.23
23,454.47
8,099.30
4,992.52
16,352.00
4,074.00
7,749.00
-
380.00
380.00
380.00
18.00
8,876.80
2,211.60
4,206.60
921.78
254.00
1,993.60
6,485.06
92,984.32
79,744.00
26,134.79
10.20
57.60
74.12
3,734.02
2,406.53
298.70
1,180.00
35.00
1,042.00
138.00
80.00
35.00
35.00
51.00
68.00
5.00
2.00
11,835.40
18,158.70
11,180.66
1,109.52
3,430.40
6,174.70
29,985.55
2,964.63
3,611.48
48,457.30
22,017.28
1,360.00
195.00
5,360.00
379.72
4,596.80
659.10
25,299.20
5,878.07
6.00
30.00
30.00
321.00
1,251.36
7,156.80
491.40
1,954.89
102.00
5.00
10.00
5.00
480.00
13,171.26
30,339.70
8,201.90
960.80
68,284.80
CONSORCIO METROPOLITANA
Descripcion
Item
Und.
M3
Und
Metrado
6,025.63
8.00
Precio
Unitario
1.31
36.70
Parcial
S/.
7,893.58
293.60
S/.
S/.
S/.
2,481,100.56
198,488.04
124,055.03
SUB-TOTAL:
FACTOR DE RELACION:
S/.
2,803,643.63
1.00000
TOTAL:
S/.
2,803,643.63
8.00%
5.00%
RESIDENTE DE OBRA
Acumulado Anterior
Metrado
S/.
-
1.00000
-
Mes Actual
Metrado
S/.
903.85
-
1,184.05
-
Acumulado Actual
Metrado
S/.
903.85
-
Saldo de Obra
Metrado
S/.
1,184.05
-
5,121.78
8.00
6,709.53
293.60
173,496.14
13,879.69
8,674.81
173,496.14
13,879.69
8,674.81
2,307,604.43
184,608.35
115,380.22
196,050.64
1.00000
196,050.64
1.00000
2,607,593.01
1.00000
196,050.64
196,050.64
2,607,593.01
SUPERVISOR DE OBRA
CONSORCIO METROPOLITANA
ORIZACION MENSUAL N 01
SETIEMBRE - 2013
%
Avance
100.00%
100.00%
100.00%
100.00%
91.38%
15.00%
50.00%
6.25%
50.77%
77.69%
62.46%
98.74%
86.57%
0.00%
81.35%
0.00%
17.39%
66.67%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
CONSORCIO METROPOLITANA
%
Avance
0.00%
0.00%
50.66%
13.90%
9.97%
5.41%
12.50%
9.38%
0.00%
9.51%
0.00%
64.81%
64.81%
64.81%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
CONSORCIO METROPOLITANA
%
Avance
15.00%
0.00%
6.99%
6.99%
OBRA:
PROCESO:
UBICACIN:
CONTRATISTA:
PERIODO:
MEJORAMIENTO DE LA VIA METROPOLITANA SECTOR CERRO COLORADO - I ETAPA - CERRO COLORADO AREQUIPA
L.P. N 006-2013-MDCC
PRESUPUESTO CONTRATADO: S/.
3,308,299.48 (incluye IGV)
AREQUIPA - AREQUIPA - CERRO COLORADO
RESIDENTE:
Ing XXXXXXXXXXX
CONSORCIO METROPOLITANA AREQUIPA
SUPERVISOR:
Ing Javier Palacios Seira
SETIEMBRE - 2013
FECHA DE INICIO:
24-Sep-13
PLAZO CONTRACTUAL (das):
120
COSTO DIRECTO
RESUMEN
PRESUPUESTO
PRESUPUESTO GENERAL
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
FACTOR DE RELACION
COSTO TOTAL
2,481,100.56
8.00%
5.00%
2,481,100.56
198,488.04
124,055.03
2,803,643.63
1.00000
2,803,643.63
AVANCE
ANTERIOR
AVANCE
ACTUAL
-
1.00000
-
AVANCE
ACUMULADO
SALDO
173,496.14
173,496.14
2,307,604.42
173,496.14
13,879.69
8,674.81
196,050.64
1.00000
173,496.14
13,879.69
8,674.81
196,050.64
1.00000
2,307,604.42
184,608.35
115,380.22
2,607,592.99
1.00000
196,050.64
196,050.64
2,607,592.99
OBRA:
PROCESO:
UBICACIN:
CONTRATISTA:
PERIODO:
MEJORAMIENTO DE LA VIA METROPOLITANA SECTOR CERRO COLORADO - I ETAPA - CERRO COLORADO AREQUIPA
L.P. N 006-2013-MDCC
PRESUPUESTO CONTRACTUAL: S/.
3,308,299.48 (incluye IGV)
AREQUIPA - AREQUIPA - CERRO COLORADO
ING. RESIDENTE:
Ing XXXXXXXXXXX
CONSORCIO METROPOLITANA AREQUIPA
ING. SUPERVISOR:
Ing Javier Palacios Seira
SETIEMBRE - 2013
FECHA DE INICIO:
24-Sep-13
PLAZO CONTRACTUAL (das):
120
COSTO DIRECTO
RESUMEN
PRESUPUESTO
AVANCE
ANTERIOR
AVANCE
ACTUAL
AVANCE
ACUMULADO
AVANCE
ACUMULADO
%
PRESUPUESTO GENERAL
2,481,100.56
173,496.14
173,496.14
6.99%
COSTO DIRECTO
2,481,100.56
173,496.14
173,496.14
6.99%
OBRA:
MEJORAMIENTO DE LA VIA METROPOLITANA SECTOR CERRO COLORADO - I ETAPA - CERRO COLORADO AREQUIPA
FORMULA POLINOMICA N:
PROPIETARIO:
PROCESO:
01
PRESUPUESTO GENERAL
MUNICIPALIDAD DISTRITAL DE CERRO COLORADO
L.P. N 006-2013-MDCC
CONTRATISTA:
FECHA DE PRESUPUESTO BASE:
FECHA REAJUSTE:
AREA GEOGRAFICA:
K = 0.127*(MOr / MOo) + 0.185*(CAr / CAo) + 0.063*(Cr / Co) + 0.192*(AGr / AGo) + 0.050*(MAr / MAo) + 0.050*(Dr / Do) + 0.201*(Mr / Mo) + 0.131*(GGr / GGo)
MONOMIO
MO
CA
C
AG
MA
D
M
GG
ELEMENTO REPRESENTATIVO
MANO DE OBRA
CEMENTO ASFALTICO
CEMENTO PORTLAND
AGREGADO GRUESO
AGREGADO FINO
MADERA PARA ENCOFRADO
ARTEFACTOS ELECTRICOS
DLAR
MAQUINARIA Y EQUIPO IMPORTADO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
IU
47
20
21
5
4
43
12
30
49
39
COEFICIENTE
INCIDENCIA
(1)
PORCENTAJE
%
(2)
0.127
0.185
0.063
0.113
0.079
0.036
0.014
0.050
0.202
0.131
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
1.000
Ir
Aug-13
Io
Jun-13
Ir/Io
(3)
(5)
6 = (5) * (2)
(7) = (4)/(6)
(1) * (7)
497.55
2,000.50
428.12
594.02
563.32
623.70
306.81
381.32
248.02
391.85
497.55
2,000.50
428.12
594.02
563.32
623.70
306.81
381.32
248.02
391.85
448.25
2,061.06
423.60
607.65
556.49
609.61
295.34
357.75
234.94
377.16
K(
448.25
2,061.06
423.60
607.65
556.49
609.61
295.34
357.75
234.94
377.16
Aug-13 )
1.110
0.971
1.011
0.978
1.012
1.023
1.039
1.066
1.056
1.039
0.141
0.180
0.064
0.110
0.080
0.037
0.015
0.053
0.213
0.136
1.029
Propietario:
Proceso:
Supervisor:
Contratista:
F.P
MES
PROGRAMADO
K
R
V(K-1)
R
acumulado
EJECUTADO
K
R
V(K-1)
R
acumulado
PRESUPUESTO GENERAL
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
137,342.30
611,912.41
793,526.29
1,104,423.29
156,439.33
1.029
3,982.93
3,982.93
196,050.64
1.029
-
5,685.47
-
TOTAL
ANTERIOR
REINTEGRO
2,803,643.62
3,982.93
196,050.64
5,685.47
TOTAL S/.
2,803,643.62
3,982.93
196,050.64
5,685.47
5,685.47
REINTEGRO
AUTORIZADO
5,685.47
5,685.47
5,685.47
5,685.47
Proceso:
L.P. N 006-2013-MDCC
Supervisor:
Ubicacin:
Contratista:
AV
-------- [ ( K - Ka ) / Ka ]
C
S/.
560,728.72
S/.
2,803,643.63
24-Sep-13
Incidencia
0.20
Frmulas Polinmicas
PRESUPUESTO GENERAL
Fecha
24-Sep-13
560,728.72
Valorizacin
N
Ka
Del Contrato
2,803,643.63
0.991
Coeficiente Reajuste
Reintegro que no
Reintegro que no
Kr
corresponde
corresponde
en el mes
acumulado
V*A/C(Kr-Ka)/Ka
PRESUPUESTO GENERAL
01
Sep-13
02
Oct-13
196,050.64
-
1,503.52
03
Nov-13
1,503.52
04
Dec-13
1,503.52
05
Jan-14
1,503.52
1.029
1,503.52
1,503.52
1,503.52
1,503.52
Obra:
MEJORAMIENTO DE LA VIA METROPOLITANA SECTOR CERRO COLORADO - I ETAPA - CERRO COLORADO AREQUIPA
Proceso:
L.P. N 006-2013-MDCC
Contratista:
Mes Valorizacin:
SETIEMBRE - 2013
Supervisor:
c/igv
Area geografica:
0-Jan-00
Amortizac. = Ci x Va (Ia/Io)
PRESUPUESTO GENERAL
Material
(I.U.)
Valorizacin Real
No.
1
Fecha
2
Monto Valorizado
Coeficiente
Va
de incidencia
196,050.64
0.051
%
5
100.000
Indices
Base
Adelanto
Jun-13
Jan-00
6
311.46
Adelanto
Valorizacin
Deflacionado
Reintegros
Utilizado
que no
Corresponden
7
313.02
Otorgado
8
313.02
10 = 9*6/7
112,486.52
111,925.92
11 = 3*4*5
9,998.58
11*(8-7)/6
Madera
Sep-13
terciada
Oct-13
para
Nov-13
encofrado
Dec-13
45
Jan-14
196,050.64
Acero de
Sep-13
construccion
Oct-13
196,050.64
-
0.065
100.000
498.41
432.33
432.33
12,743.29
-
corrugado
Nov-13
Dec-13
Jan-14
196,050.64
Agregado
Sep-13
grueso
Oct-13
196,050.64
-
0.108
100.000
608.43
610.66
610.66
238,206.75
237,336.87
21,173.47
-
Nov-13
Dec-13
Jan-14
196,050.64
Asfalto
Sep-13
13
Oct-13
196,050.64
-
0.130
100.000
1,849.17
1,697.48
1,697.48
155,574.42
169,476.84
25,486.58
-
Nov-13
Dec-13
Jan-14
196,050.64
Cemento
Sep-13
portland
Oct-13
196,050.64
-
0.205
100.000
423.60
428.12
428.12
101,458.43
100,387.25
40,190.38
-
tipo I
Nov-13
21
Dec-13
Jan-14
196,050.64
Obra:
Proceso:
Contratista:
Supervisor:
Mes Valorizacin:
MEJORAMIENTO DE LA VIA METROPOLITANA SECTOR CERRO COLORADO - I ETAPA CERRO COLORADO AREQUIPA
L.P. N 006-2013-MDCC
CONSORCIO METROPOLITANA AREQUIPA
Ing Javier Palacios Seira
SETIEMBRE - 2013
Frmula polinmica
Reintegro
Mximo
Reintegro que
no Corresponde
por el Adelanto
en Efectivo
Reintegro que
no corresponde
por el Adelanto
para Materiales
Reintegro
Neto
PRESUPUESTO GENERAL
5,685.47
1,503.52
4,181.95
TOTALES
5,685.47
1,503.52
4,181.95