Documentos de Académico
Documentos de Profesional
Documentos de Cultura
UNIT 6
February, 2012
INTRODUCTION
Building
technology has evolved over the centuries between simple structures, through to hi-tech, state of the art buildings.
February, 2012
& MORTAR
TIMBER
CONCRETE
February, 2012
PLASTICS PREFABRICATED
COMPONENTS
February, 2012 John Fox, College of North West London 4
BUILDING USES
HOUSES
& FLATS TRADITIONALLY 1 OR 2 STOREY HIGH BUILT FROM BRICK, STONE OR TIMBER ALL HOMES BUILT TO BUILDING REGULATIONS MONITORED BY BUILDING CONTROL
February, 2012
SOUND RESISTANT TO MOISTURE THERMAL PERFORMANCE LOAD BEARING SOUND INSULATION ASTHETICALLY PLEASING
February, 2012
BUILDINGS
SPAN BUILDINGS BUILT IN STEEL FRAMES CLAD WITH ALLUMINIUM ENCLOSED BOTH ECONOMICALLY AND SAFELY
February, 2012 John Fox, College of North West London 7
RETAIL UNITS
SHOPS LARGE
PORTAL CAN
February, 2012
OFFICES
CAN
BE LOW OR MULTI STOREY BUILDINGS OPEN PLAN SUB-DIVIDED INTO SMALLER WORKING AREAS MUST INCORPORATE FIRE REGS. EG. FIRE EXITS, ALARMS, SPRINKLERS ETC.
February, 2012 John Fox, College of North West London 9
WHAT
February, 2012
BUILT IN THE UK SINCE THE 1960S TIMBER PANELS BUILT IN THE WORKSHOP RATHER THAN IN SITU DELIVERED TO SITE EASY TO ASSEMBLE PRODUCED TO QUALITY CONTROLLED STANDARDS & TOLERANCES
February, 2012 John Fox, College of North West London 11
TIMBERFRAME COMPONENTS
EXPLAIN THE PURPOSE OF EACH OF THE FOLLOWING COMPONENTS; 1. VAPOUR BARRIER 2. INSULATION QUILT 3. S/S WALL TIE 4. INSULATION MEMBRANE 5. SHEATHING BOARD
February, 2012 John Fox, College of North West London 12
February, 2012
13
PANELS ( 100X50MM ) ARE NAILED WITH PLYWOOD SHEETS TO GIVE ADDED STRENGTH THESE PANELS ARE LOAD BEARING AS THEY SUPPORT THE STRUCTURE OF THE ROOF TIMBER STRUCTURE IS ENCLOSED WITH EITHER BRICKWORK OR STONE. THIS IS ALSO KNOWN AS CLADDING
February, 2012 John Fox, College of North West London 14
STEEL FRAME BUILDINGS (SKELETAL) WERE DEVELOPED IN THE 1880S FOR AMERICAN SKYSCRAPERS USED FOR HOUSE CONSTRUCTION IN THE EARLY 1920S STEEL BECAME RELATIVELY EXPENSIVE & NOT A VIABLE ALTERNATIVE FOR HOUSING
February, 2012
15
MADE RELATIVELY EASY & QUICK TO ASSEMBLE UNAFFECTED BY MOISTURE POTENTIAL LONG ROOF SPANS COMPOSITE DESIGN
February, 2012
16
DISADVANTAGES
DEFORMS
February, 2012
17
SYSTEM WAS FIRST DEVELOPED IN THE LATE 19TH CENTURY BY WILLIAM E. WARD THE FIRST CONCRETE FRAME SKYSCRAPER WAS THE INGALLS BUILDING, BUILT IN CINNCINATTI IN1904- 210FT HIGH
February, 2012
18
IN SITU- STEEL OR WOODEN FORMWORK IS REQUIRED TO CREATE THE COLUMNS AND BEAMS. CONCRETE IS THEN POURED AND THE SHUTTERING IS REMOVED ONCE THE CONCRETE HAS GAINED ENOUGH STRENGTH. PRE-CAST- PANELS ARE DROPPED IN BY CRANE AND BOLTED TOGETHER TO FORM A RIGID STRUCTURE
February, 2012
19
ADVANTAGES- IN-BUILT FIRE PROTECTION MOULDED INTO ANY SHAPE HIGH STRENGTH IN COMPRESSION DO NOT REQUIRE A SECONDARY FINISH DISADVANTAGES-CRAINAGE REQUIRED REQUIRES INITIAL SUPPORT SKILLED WORKFORCE REQUIRED TO ASSEMBLE
February, 2012
20