5146 - Presupuesto Mod. 70 M2 B
5146 - Presupuesto Mod. 70 M2 B
COD.
IMPORTE
RESUMEN
IMPORTE
ALBAILERIA
100,921.15
0.75105 $
93,365.80
0.75585
INST. ELECTRICA
8,105.00
0.06032 $
7,331.60
0.05935
INST. HIDRO-SANITARIA
8,430.00
0.06274 $
7,601.40
0.06154
CARPINTERIA-HERRERIA
3,525.00
0.02623 $
3,172.50
0.02568
PINTURA
9,009.00
0.06704 $
8,108.10
0.06564
CANCELERIA Y VENTANAS
4,383.00
0.03262 $
3,944.70
0.03193
SUBTOTAL (1)
134,373.15
1.00000 $
123,524.10
1.00000
INDIRECTOS/ADMINISTRACION 12.00 %
0.00000
SUBTOTAL (2)
1.00000 $
123,524.10
1.00000
10
IMSS (7.50 %)
0.00000
11
TOTAL
134,373.15
1.00000 $
123,524.10
1.00000
12
$/M2 CONSTRUCCION
1,919.62
1,764.63
$
$
$
134,373.15
-
0.00000
0.00000
A
1
2
3
4
UNIDADCANTIDAD
5 CLAVE
ESPECIFICACION ORIGINAL
6
001 TRAZO Y NIVELACIN DEL TERRENO
7
002 LIMPIEZA Y DESPALME DEL TERRENO
8
003 RELLENO Y COMPACTADO DEL TERRENO
9
10
PRECIO
UNITARIO
IMPORTE
% PRESUP.
TOTAL
VARIANTE
FACTIBLE
INFONAVIT-70
28-Feb-02
ALBAILERIA
M2
105.00 $
2.00
210.00
0.208% $
147.00
M2
105.00 $
1.25
131.25
0.130% $
91.88
M3
0.00 $
0.000% $
M3
14.20 $
15.00
213.00
0.211% $
149.10
ZAPATA
CORRIDA
DE
CONCRETO
F'C=200KG/CM2 ARMADA CON 6 KG. DE ACERO
DE REFUERZO DEL No. 3 Y 1 KG. DE
ALAMBRON DE 1/4" CON SECCION DE 70 CM
DE ANCHO Y
20 DE ALTURA , INCLUYE
ELABORACION DEL CONCRETO, ARMADO Y
005 CURADO
M3
3.10 $
1,724.00
5,344.40
5.296% $
4,542.74
22.00 $
10.40
228.80
0.227% $
205.92
9.00 $
35.00
315.00
0.312% $
283.50
17.60 $
105.00
1,848.00
1.831% $
1,663.20
II
CON
14
CONTRA
TRABE
DE
CONCRETO
F'C=200KG/CM2 ARMADA CON. 4 VARILLAS DE
ACERO DE REFUERZO DEL No. 3 Y ESTRIBOS
DE ALAMBRON DE 1/4" @ 20 CM. CON
SECCION DE 20 CM DE ANCHO Y 25 DE
ALTURA , INCLUYE ELABORACION DEL
CONCRETO, ARMADO Y CURADO SEGN
006 ESPECIFICACION QUE
ML
CASTILLO DE CONCRETO FC=150KG/CM2
AHOGADO EN MURO DE BLOCK ARMADO CON
016 4# 3
ML
RODAPIE DE BLOCK DE CONCRETO DE 15 CM
DE ESPESOR ASENTADO CON MORTERO
007 CEMENTO ARENA EN PROPORCION 1:4
M2
IMPERMEABILIZACION DE RODAPIE, A BASE
008 DE EMULSION ASFALTICA MARCA "COMEX"
M2
17.60 $
10.00
176.00
0.174% $
140.80
15
25.60 $
90.00
2,304.00
2.283% $
2,043.65
16
11.25 $
20.00
225.00
0.223% $
202.50
11
12
13
17
B
FORJADO DE REGISTRO SANITARIO Y EL
COLECTOR PRINCIPAL, ESTE DE 2X1.50X2.30
MT.INCLUYE EXCAVACION, MURETES DE
BLOC, RELLENO PERIMETRAL, TAPAS Y
047 LIMPIEZA
PZA.
5.00 $
175.00
875.00
0.867% $
831.25
7.00 $
164.10
1,148.70
1.138% $
918.96
34.00 $
70.00
2,380.00
2.358% $
2,023.00
20
5.00 $
76.00
380.00
0.377% $
342.00
21
128.00 $
105.00
13,440.00
13.317% $
12,096.00
22
75.00 $
95.00
7,125.00
7.060% $
4,987.50
22.00 $
103.00
2,266.00
2.245% $
2,266.00
73.00 $
249.00
18,177.00
18.011% $
16,904.61
19.00 $
64.00
1,216.00
1.205% $
1,216.00
18
19
23
24
25
26
27
28
197.00 $
64.00
12,608.00
12.493% $
12,608.00
M2
198.00 $
45.00
8,910.00
8.829% $
8,910.00
M2
59.00 $
45.00
2,655.00
2.631% $
2,655.00
29
1.00 $
3,500.00
3,500.00
3.468% $
3,500.00
31
M2
68.00 $
50.00
3,400.00
3.369% $
3,400.00
32
8.00 $
135.00
1,080.00
1.070% $
950.40
33
10.00 $
115.00
1,150.00
1.140% $
1,012.00
0.00 $
13.00
40.00 $
45.00
1,800.00
1.784% $
1,620.00
4.00 $
190.00
760.00
0.753% $
760.00
10.00 $
130.00
1,300.00
1.288% $
1,300.00
10.00 $
130.00
1,300.00
1.288% $
1,300.00
1.00 $
800.00
800.00
0.793% $
800.00
0.00 $
0.000% $
PZA.
0.00 $
250.00
0.000% $
PZA.
0.00 $
150.00
0.000% $
PZA.
0.00 $
450.00
0.000% $
MT.
0.00 $
250.00
0.000% $
30
34
35
36
37
38
39
40
0.00 $
42
43
44
41
M2
0.000% $
0.000% $
45
46
47
48
49
50
51
52
53
54
B
PAVIMENTOS EXTERIORES: INCLUYE TRAZO,
CIMBRA, RELLENO Y APISONADO, COLADO Y
040 TEXTURA.(BANQUETAS Y PATIO DE SEVICIO)
SOBREPISOS EN COCINA, CLOSETS,
VESTIDORES. INCLUYE CIMBRA, RELLENO Y
041 COLADO.
M2
12.00 $
95.00
1,140.00
1.130% $
1,048.80
M2
9.00 $
35.00
315.00
0.312% $
315.00
PZA.
0.00 $
150.00
0.000% $
PZA.
1.00 $
120.00
120.00
0.119% $
120.00
LOTE
1.00 $
300.00
300.00
0.297% $
300.00
12.00 $
115.00
1,380.00
1.367% $
1,311.00
LOTE
1.00 $
400.00
400.00
0.396% $
400.00
ML
0.00 $
25.00
0.000% $
100,921.15
100.000% $
93,365.80
INFONAVIT-70
28-Feb-02
INSTALACION ELECTRICA
CLAVE
ESPECIFICACION ORIGINAL
UNIDAD
CANTIDAD
PRECIO UNITARIO
21.00 $
3.00
120.00
100
IMPORTE
2,520.00
300
4.00
100
400
1.00
2500
2500
25.00
37
925
1.00
650
650
27.00
30
810
% PRESUP.
TOTAL
VARIANTE
FACTIBLE
31.092% $
2,268.00
3.701% $
287.10
4.935% $
380.00
30.845% $
2,250.00
11.413% $
832.50
8.020% $
585.00
9.994% $
729.00
1
2
3
4
5
6
7
8
9
10
CLAVE
ESPECIFICACION ORIGINAL
UNIDAD
12
13
14
15
16
17
11
CANTIDAD
PRECIO UNITARIO
IMPORTE
% PRESUP. TOTAL
VARIANTE
FACTIBLE
INFONAVIT-70
28-Feb-02
INSTALACION HIDROSANITARIA
14.00 $
100.00
1,400.00
16.607% $
1,260.00
1.00 $
1,150.00
1,150.00
13.642% $
1,035.00
2.00 $
100.00
200.00
2.372% $
191.40
2.00 $
30.00
60.00
0.712% $
57.00
42.00 $
22.00
924.00
10.961% $
831.60
30.00 $
22.00
660.00
7.829% $
594.00
65.00 $
22.00
1,430.00
16.963% $
1,287.00
0.00 $
2,500.00
0.000% $
12.00 $
22.00
264.00
3.132% $
237.60
1.00 $
67.00
67.00
0.795% $
60.30
1.00 $
75.00
75.00
0.890% $
67.50
2.00 $
650.00
1,300.00
15.421% $
1,170.00
INFONAVIT-70
28-Feb-02
CARPINTERIA-HERRERIA
CLAVE
ESPECIFICACION ORIGINAL
UNIDAD
SUMINISTRO Y COLOCACION DE PUERTA SOLIDA DE TABLERO
VALSAPANEL
EN
ACCESO
PRINCIPAL.INCLUYE
FIJOS,
001 HERRAJES Y CERRADURA.
PZA.
SUMINISTRO Y COLOCACION DE PUERTA DE TAMBOR
002 CAOBILLA INTERIORES. INCLUYE HERRAJES Y CERRADURA.
PZA.
SUMINISTRO Y COLOCACION DE CLOSET EN RECAMARAS,
003 INCLUYE DIVISIONES Y TUBO COLGADOR
PZA.
004 SUMINISTRO E INSTALACION DE COCINA INTEGRAL
PZA.
005 PUERTA METALICA SALIDA COCINA A PATIO SERV.
TOTAL
PZA.
CANTIDAD
1.00
5.00
0.00
0.00
1.00
PRECIO
UNITARIO
% PRESUP.
TOTAL
IMPORTE
VARIANTE
FACTIBLE
750.00
750.00
21.277% $
675.00
450.00
2,250.00
63.830% $
2,025.00
3,500.00
0.000% $
4,500.00
0.000% $
525.00
525.00
14.894% $
472.50
3,525.00
100.000% $
3,172.50
INFONAVIT-70
28-Feb-02
PINTURA
CLAVE
ESPECIFICACION ORIGINAL
001 SUMINISTRO Y APLICACIN DE PINTURA VINILICA EN LOSAS
UNIDAD
CANTIDAD
M2
19.00
002
M2
198.00
003
M2
0.00
004
M2
128.00
TOTAL
SOLO SE APLICA PINTURA EN LOSAS Y MUROS DE BAOS Y
COCINA EN INTERIORES. EL RESTO DE MUROS Y LOSAS,
QUEDAN CON ACABADO DE YESO.
PRECIO
UNITARIO
IMPORTE
% PRESUP.
TOTAL
VARIANTE
FACTIBLE
25.00
475.00
5.273% $
427.50
25.00
4,950.00
54.945% $
4,455.00
85.00
28.00
3,584.00
9,009.00
0.000% $
39.782% $
3,225.60
100.000% $ 8,108.10
INFONAVIT-70
28-Feb-02
CANCELERIA Y VENTANAS
CLAVE
ESPECIFICACION ORIGINAL
UNIDAD
VENTANA VA-X0DE ALUMINIO ANODIZADO
DUROVAL G-2 Y CRYSTAL FILTRASOL DE
3MM DIMENSIONES DE 1.50X1.20 M CON ,
001 PERFIL 1 1/2"".
PZA.
VENTANA VA-X0DE ALUMINIO ANODIZADO
DUROVAL G-2 Y CRYSTAL FILTRASOL DE
3MM DIMENSIONES DE 1.20X1.20 M , PERFIL
001 1 1/2"".
PZA.
VENTANA VA-X0DE ALUMINIO ANODIZADO
DUROVAL G-2 Y CRYSTAL FILTRASOL DE
3MM DIMENSIONES DE 0.90X1.20 M , PERFIL
004 1 1/2"".
PZA.
VENTANA VA-X0DE ALUMINIO ANODIZADO
DUROVAL G-2 Y CRYSTAL FILTRASOL DE
3MM DIMENSIONES DE 0.60X0.60 M , PERFIL
006 1 1/2"".
PZA.
PUERTA CANCEL DE BAO CON ALUMINIO
ANODIZADO DURANODIC Y ACRILICO
009 OPALINO DE 1.83 X 2.00 M.
PZA.
TOTAL
CANTIDAD
PRECIO UNITARIO
IMPORTE
0.00 $
532.00
5.00 $
486.00
2,430.00
3.00 $
437.00
1,311.00
2.00 $
321.00
642.00
0.00 $
900.00
4,383.00
% PRESUP. TOTAL
0.000% $
VARIANTE
FACTIBLE
55.441% $
2,187.00
29.911% $
1,179.90
14.648% $
577.80
0.000% $
100.000% $
3,944.70
PRESUPUESTO
PAGO CONTADO
ING. ENRIQUE SILVA ROMO
2139078
No.
MATERIAL
INST. ELECTRICA
CANTIDAD
UNIDAD
0.00
P.U.
TOTAL
18.50
30.00
7.50
258.75
14.00
ROLLO
360.00
5,796.00
24.00
ROLLO
172.00
4,747.20
26.00
ROLLO
112.00
3,348.80
18.00
ROLLO
86.00
1,780.20
6.00
PZA
462.00
3,187.80
1.00
LOTE
1,025.00
1,178.75
6.00
PZA
850.00
5,865.00
100.00
PZA
18.50
2,127.50
66.00
PZA
18.60
1,411.74
6.00
PZA
24.00
165.60
200.00
PZA
5.00
1,150.00
16.00
ROLLO
96.00
1,766.40
8.00
ROLLO
150.00
1,380.00
10.00
PZA
28.00
322.00
20.00
PZA
37.00
851.00
24.00
PZA
124.00
3,422.40
156.40
1.00
PZA
136.00
4.00
PZA
11.00
50.60
4.00
PZA
33.00
151.80
6.00
LOTE
172.00
1,186.80
3.00
TRAMO
13.00
44.85
40,349.59
TOTAL