Está en la página 1de 15

01/12/2013

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering

Preparation for Engineering


HOME INTERVIEW QUESTIONS MULTIPLE CHOICE QUESTIONS FRESHER JOBS
Search this website...
GO

Koyote - Free Video Converter


Convert Video to MP3 for FREE! Easy to convert any online video to MP3 music format or to a w ide range of popular video formats for free and at high speed!

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf
Labels: Electrical Engineering Questions and Answers 1. Load factor of a power station is defined as

Advertise With Us Now!


Reach The Exact Audience You Want With Relevant Targeted Ads.

(a) maximum demand/average load (b) average load x maximum demand (c) average load/maximum demand (d) (average load x maximum demand)172 Ans: c 2.
Ads By Clicksor

Load factor of a power station is generally

(a) equal to unity (b) less than unity (c) more than unity (d) equal to zero Diversity factor is always Ans: b 3. The load factor of domestic load is usually

(a) 10 to 15% (b) 30 to 40% (c) 50 to 60% (d) 60 to 70% Ans: a 4. (a) (b) (c) (d) Annual depreciation cost is calculated by sinkingfund method straight line method both (a) and (b) none of the above
FOLLOWERS PO.ST
13

Ans: c 5. Depreciation charges are high in case of

(a) thermal plant (b) diesel plant (c) hydroelectric plant Ans: a 6. (a) (b) (c) (d) Demand factor is defined as average load/maximum load maximum demand/connected load connected load/maximum demand average load x maximum load
ARCHIVE

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

1/15

01/12/2013
Ans: b 7.

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering
2013 (915) 2012 (82) December (10) November (16) October (55) Tunnel Engineering Multiple Choice Questions and A... Docks and Harbour Engineering Multiple Choice Ques... Design of Steel Structures Multiple Choice Questio... Structural Analysis Multiple Choice Questions and ... Construction Planning and Management Multiple Choi... Heating and Welding Multiple Choice Questions and ... Industrial Drives Multiple Choice Questions and An... Electric Traction Multiple Choice Questions and An... Control Systems Multiple Choice Questions and Answ... Measurement and Instrumentation Multiple Choice Qu... Electrical Machine Design Multiple Choice Question... Electrical Engineering Materials Multiple Choice Q... Cables Multiple Choice Questions and Answers Prepa... Switchgear Protections Multiple Choice Questions a... Transmission and Distribution Multiple Choice Ques... Economics of Power Generation Multiple Choice Ques... Power Plant Engineering Multiple Choice Questions ... Rectifiers and Converters Multiple Choice Question... Synchronous Motors Multiple Choice Questions and A... Single Phase Induction Motors Multiple Choice Ques... Polyphase Induction Motors Multiple Choice Questio... Transformers Multiple Choice Questions and Answers... D.C Motors Multiple Choice Questions and Answers P... D.C. Generators - Electrical engineering multiple ... A.C. Fundamentals, Circuits and Circuit Theory - E... Electrolysis and Storage of Batteries -

High load factor indicates

(a) cost of generation per unit power is increased (b) total plant capacity is utilised for most of the time (c) total plant capacity is not properly utilised for most of the time (d) none of the above Ans: b 8. A load curve indicates

(a) average power used during the period (b) average kWh (kW) energy consumption during the period (c) either of the above (d) none of the above Ans: b 9. Approximate estimation of power demand can be made by

(a) load survey method (b) statistical methods (c) mathematical method (d) economic parameters (e) all of the above Ans: e 10. (a) (b) (c) (d) Annual depreciation as per straight line method, is calculated by the capital cost divided by number of year of life the capital cost minus the salvage value, is divided by the number of years of life increasing a uniform sum of money per annum at stipulated rate of interest none of the above

Ans: b 11. (a) (b) (c) (d) A consumer has to pay lesser fixed charges in flat rate tariff two part tariff maximum demand tariff any of the above

Ans: c 12. (a) (b) (c) (d) In two part tariff, variation in load factor will affect fixed charges operating or running charges both (a) and (b) either (a) or (b)

Ans: b 13. (a) (b) (c) (d) In Hopknison demand rate or two parttariff the demand rate or fixed charges are dependent upon the energy consumed dependent upon the maximum demand of the consumer both (a) and (b) neither (a) nor (b)

Ans: b 14. (a) (b) (c) (d) Which plant can never have 100 percent load factor ? Peak load plant Base load plant Nuclear power plant Hydro electric plant

Ans: a

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

2/15

01/12/2013
15. (a) (b) (c) (d)

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering
Electrical... The area under a load curve gives average demand energy consumed maximum demand none of the above Electromagnetic Induction - Electrical engineering... Design of Masonry Structures Multiple Choice Quest... Airport Engineering Multiple Choice Questions and ... Concrete Technology and Design of Concrete Structu... Engineering Mechanics Multiple Choice Questions An... Hydraulic and Fluid Machines Multiple Choice Quest... Magnetic Circuit - electrical multiple choice ques... Magnetism and Electromagnetism electrical multip... Electrostatics - electrical multiple choice questi... Network Theorems - electrical multiple choice ques... Current Electricity - electrical multiple choice q... Electrical Engineering Multiple choice questions w... Engineering Materials - Mechanical Engineering Mul... Machine Design - Mechanical Engineering Multiple C... Steam Boilers, Engines, Nozzles and Turbines - Mec... Nuclear Power Plants - Mechanical Engineering Mult... Thermodynamics - Mechanical Engineering Multiple C... Applied Mechanics and Graphic Statics Civil Engi... Strength of Materials - Civil Engineering Question... Building Materials and Construction - Civil Engine... Soil Mechanics and Foundation Engineering - Civil ... Environmental Engineering - Civil Engineering Ques... Railway Engineering - Civil Engineering Questions ... Highway Engineering Multiple Choice Questions and ... Civil Engineering Quiz questions and answers Downl... irrigation water resources engineering and hydrolo... Civil Engineering - Surveying Multiple Choice Ques... Fluid Mechanics Problems Quiz multiple choice ques...

Ans: b 16. Different generating stations use following prime movers (a) diesel engine (b) hydraulic turbine (c) gas turbine (d) steam turbine (e) any of the above Ans: e 17. Diversity factor has direct effect on the

(a) fixed cost of unit generated (b) running cost of unit generated (c) both (a) and (b) (d) neither (a) nor (b) Ans: a 18. (a) (b) (c) (d) (e) Following power plant has instant starting nuclear power plant hydro power plant diesel power plant both (b) and (c) none of the above

Ans: d 19. Which of the following generating station has minimum ruining cost ?

(a) Nuclear (b) Hydro (c) Thermal (d) Diesel Ans: b 20. Power plant having maximum demand more than the installed rated capacity will have

utilisation factor (a) equal to unity (b) less than unity (c) more than unity (d) none of the above Ans: c 21. (a) (b) (c) (d) Load curve is useful in deciding the operating schedule of generating units sizes of generating units total installed capacity of the plant all of the above

Ans: d 22. (a) (b) (c) (d) Load curve of a power plant has always zero slope positive slope negative slope any combination of (a), (b) and (c)

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

3/15

01/12/2013
Ans: e 23. (a) (b) (c) (d)

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering
Mechanical Engineering Multiple Choice Questions a... September (1)

Annual operating expenditure of a power plant consists of fixed charges semi-fixed charges running charges all of the above

Ans: d 24. Maximum demand on a power plant is

(a) the greatest of all "short time interval averaged" demand during a period (b) instantaneous maximum value of kVA supplied during a period (e) both (a) or (b) (d) none of the above Ans: a 25. (a) (b) (c) (d) Annual instalment towards depreciation reduces as rate of interest increases with sinking fund depreciation straight line depreciation reducing balances depreciation none of the above

Ans: a 26. (a) (b) (c) (d) Annual depreciation of the plant it proportional to the earning capacity of the plant vide sinking fund depreciation straight line depreciation reducing balances depreciation none of the above

Ans: c 27. For high value of diversity factor, a power station of given installed capacity will be in a

position to supply (a) less number of consumers (b) more number of consumers (c) neither (a) nor (b) (d) either (a) or (b) Ans: b 28. Salvage value of the plant is always

(a) positive (b) negative (c) zero (d) any of the above Ans: d 29. (a) (b) (c) (d) Load curve helps in deciding total installed capacity of the plant sizes of the generating units operating schedule of generating units all of the above

Ans: d 30 (a) (b) (c) (d) can generate power at unpredictable or uncontrolled times, Solar power plant Tidal power plant Wind power plant Any of the above

Ans: d

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

4/15

01/12/2013
31.

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering
Direct conversion of heat into electric power is possible through

(a) fuel cell (b) batteries (c) thermionic converter (d) all of the above Ans: c 32. A low utilization factor for a plant indicates that

(a) plant is used for stand by purpose only (b) plant is under maintenance (c) plant is used for base load only (d) plant is used for peak load as well as base load Ans: a 33. Which of the following is not a source of power ?

(a) Thermocouple (b) Photovoltaic cell (c) Solar cell (d) Photoelectric cell Ans: a 34. (a) (b) (c) (d) Which of the following should be used for extinguishing electrical fires ? Water Carbon tetrachloride fire extinguisher Foam type fire extinguisher CO2 fire extinguisher

Ans: b 35. Low power factor is usually not due to (a) (b) (c) (d) arc lamps induction motors fluorescent tubes incandescent lamp

Ans: d 36. Ships are generally jpowered by (a) (b) (e) (d) (e) nuclear power plants hydraulic turbines diesel engines steam accumulators none of the above

Ans: c 37. Direct conversion of heat into electrical energy is possible through (a) (b) (c) (d) fuel cells solar cells MHD generators none of the above

Ans: c 38. Which of the following place is not associated with nuclear power plants in India ? (a) Narora (b) Tarapur (c) Kota (d) Benglore Ans: d

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

5/15

01/12/2013

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering

39. During load shedding (a) system power factor is changed (b) some loads are switched off (c) system voltage is reduced (d) system frequency is reduced Efficiency is the secondary consideration in Ans: b 40. which of the following plants ? (a) (b) (c) (d) Base load plants Peak load plants Both (a) and (b) none of the above

Ans: b 41. Air will not be the working substance in which of the following ? (a) (b) (c) (d) Closed cycle gas turbine Open cycle gas turbine Diesel engine Petrol engine

Ans: a 42. A nuclear power plant is invariably used as a (a) (b) (c) (d) (e) peak load plant base load plant stand-by plant spinning reserve plant any of the above

Ans: b 43. power plant is expected to have the longest life. (a) Steam (b) Diesel (c) Hydroelectric (d) Any of the above Ans: c 44. power plant cannot have single unit of 100 MW.

(a) Hydroelectric (b) Nuclear (c) Steam (d) Diesel (e) Any of the above Ans: d 45. Which of the following, in a thermal power plant, is not a fixed cost ? (a) Fuel cost (b) Interest on capital (c) Depreciation (d) Insurance charges Ans: a 46. _______ will offer the least load. (a) Vacuum cleaner (b) Television (c) Hair dryer (d) Electric shaver Ans: d

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

6/15

01/12/2013
47. (a) (b) (c)

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering
In ______ fuel transportation cost is least. nuclear power plants diesel generating plants steam power stations

Ans: a 48. (a) (b) (c) (d) Which of the following equipment provides fluctuating load ? Exhaust fan Lathe machine Welding transformer All of the above

Ans: c 49. (a) (b) (c) (d) The increased load during summer months is due to increased business activity increased water supply increased use of fans and air conditioners none of the above

Ans: c 50 (a) (b) (c) (d) is the reserved generating capacity available for service under emergency conditions Hot reserve Cold reserve Spinning reserve Firm power

which is not kept in operation but in working order,

Ans: b 51. Generating capacity connected to the bus bars and ready to take load when switched on is known as (a) firm power (b) cold reserve (c) hot reserve (d) spinning reserve Ans: d 52. offers the highest electric load.

(a) Television set (b) Toaster (c) Vacuum cleaner (d) Washing machine Ans: b 53. _______ industry has the least power consumption per tonne of product. (a) Soap (b) Sugar (c) Vegetable oil (d) Caustic soda Ans: c 54. With reference to a power station which of the following is not a fixed cost ? (a) Fuel cost (b) Interest on capital (c) Insurance charges (d) Depreciation Ans: a 55. _______ is invariably used as base load plant.

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

7/15

01/12/2013
(a) (b) (c) (d)

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering
Diesel engine plant Nuclear power plant Gas turbine plant Pumped storage plant

Ans: b 56. (a) (b) (c) (d) In a power plant if the maximum demand on the plant is equal to the plant capacity, then plant reserve capacity will be zero diversity factor will be unity load factor will be unity load factor will be nearly 60%

Ans: a 57. (a) (b) (c) (d) Incase of ______ fuel transportation is the major problem. diesel power plants nuclear power plants hydro-electric power plants thermal power plants

Ans: d 58. (a) (b) (c) (d) Which of the following power plants need the least period for installation ? Thermal power plant Diesel power plant Nuclear power plant Hydro-electric power plant

Ans: b 59. (a) (b) (c) (d) For which of the following power plants highly skilled engineers are required for running Nuclear power plants Gas turbine power plants Solar power plants Hydro-electric power plants

the plants ?

Ans: a 60. (a) (b) (c) (d) In which of the following power plants the maintenance cost is usually high ? Nuclear power plant Hydro-electric power plants Thermal power plants Diesel engine power plants

Ans: c 61. (a) (b) (c) (d) ________ is invariably used for peak load Nuclear power plant Steam turbine plant Pumped storage plant None of the above

Ans: c 62. (a) (b) (c) (d) Ans: 63. (a) Which of the following is the essential requirement of peak load plant ? It should run at high speed Which of the following is not an operating cost ? Maintenance cost Fuel cost Salaries of high officials Salaries of operating staff

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

8/15

01/12/2013
(b) (c) (d)

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering
It should produce high voltage It should be small in size It should be capable of starting quickly

Ans: d 64. (a) (b) (c) (d) Large capacity generators are invariably water cooled natural air cooled forced air cooled hydrogen cooled

Ans: d 65. By the use of which of the following power factor can be improved ?

(a) Phase advancers (b) Synchronous compensators (c) Static capacitors (d) Any of the above Ans: d 66. An induction motor has relatively high power factor at

(a) rated r.p.m. (b) no load (c) 20 percent load (d) near full load (e) none of the above Ans: d 67. (a) (b) (c) (d) Which of the following is the disadvantage due to low power factor ? Poor voltage regulation Increased transmission losses High cost of equipment for a given load All of the above

Ans: d 68. (a) (b) (c) (d) In a distribution system, in order to improve power factor, the synchronous capacitors at the receiving end at the sending end either (a) or (b) none of the above

are installed

Ans: a 69. Satic capacitors are rated in terms of

(a) kW (b) kWh (e) kVAR (d) none of the above Ans: c 70. (a) (b) (c) (d) Which of the following is the disadvantage of a synchronous condenser ? High maintenance cost Continuous losses in motor Noise All of the above

Ans: d 71. For a consumer the most economical power factor is generally

(a) 0.5 lagging

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

9/15

01/12/2013

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering

(b) 0.5 leading (c) 0.95 lagging (d) 0.95 leading Ans: c 72. (a) (b) (c) (d) (e) A synchronous condenser is virtually which of the following ? Induction motor Under excited synchronous motor Over excited synchronous motor D.C. generator None of the above

Ans: c 73. (a) (b) (c) (d) For a power plant which of the following constitutes running cost ? Cost of wages Cost of fuel Cost of lubricants All of the above

Ans: d 74. (a) (b) (c) (d) In an interconnected system, the diversity factor of the whole system remains unchanged decreases increases none of the above

Ans: c 75. (a) (b) (c) (d) Generators for peak load plants are usually designed for maximum efficiency at 25 to 50 percent full load 50 to 75 percent full load full load 25 percent overload

Ans: b 76. ________ will be least affected due to charge in supply voltage frequency.

(a) Electric clock (b) Mixer grinder (c) Ceiling fan (d) Room heater Ans: d 77. The connected load of a IVMIM uir consumer is around

(a) 5 kW (b) 40 k\V (c) 80 kW (d) 120 kW Ans: a 78. (a) (b) (c) (d) Which of the following is not necessarily an advantage of interconnecting various power Improved frequency of power supplied Reduction in total installed capacity Increased reliability Economy in operation of plants

stations ?

Ans: a 79. A power transformer is usually rated in

(a) kW

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

10/15

01/12/2013
(b) kVAR (c) kWh (d) kVA Ans: d 80.

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering

public sector undertaking is associated with erection and sometimes running of thermal

power plants (a) NTPC (b) SAIL (c) BEL (d) BHEL Ans: a 81. Most efficient plants are normally used as

(a) peak load plants (b) base load plants (c) either (a) or (b) (d) none of the above Ans: 82. For a diesel generating station the useful life is expected to be around

(a) 15 to 20 years (b) 20 to 50 years (c) 50 to 75 years (d) 75 to 100 years Ans: a 83. Which of the following is not a method for estimating depreciation charges ?

(a) Sinking fund method (b) Straight line method (c) Diminishing value method (d) Halsey's 5050 formula Ans: d 84. The expected useful life of an hydroelectric power station is around

(a) 15 years (b) 30 years (c) 60 years (d) 100 years Ans: d 85. In a load curve the highest point represents

(a) peak demand (b) average demand (c) diversified demand (d) none of the above Ans: a 86. Which of the following source of power is least reliable ?

(a) Solar energy (b) Geothermal power (c) Wind power (d) iMHD Ans: 87. (a) (b) In India production and distribution of electrical energy is confined to private sector public sector

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

11/15

01/12/2013
(c) (d) (e)

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering
government sectors joint sector none of the above

Ans: b 88. (a) (b) (c) (d) A pilot exciter is provided on generators for which of the following reasons ? To excite the poles of main exciter To provide requisite starting torque to main exciter To provide requisite starting torque to generator None of the above

Ans: a 89. (a) (b) (c) (d) The primary reason for low power factor is supply system is due to installation of induction motors synchronous motors single phase motors d.c. motors

Ans: a 90. (a) (b) (c) (d) An over excited synchronous motor on noload is known as synchronous condenser generator induction motor alternator

Ans: a 91. ? (a) (b) (c) (d) Little maintenance cost Ease in installation Low losses All of the above Which of the following is an advantage of static capacitor for power factor improvement

Ans: d 92. For any type of consumer the ideal tariff is

(a) two part tariff (b) three part tariff (c) block rate tariff (d) any of the above Ans: b 93. The efficiency of a plant is of least concern when it is selected as

(a) peak load plant (b) casual run plant (c) either (a) or (b) (d) base load plant Ans: c 94. (a) (b) (c) (d) Which of the following plants is almost inevitably used as base load plant ? Diesel engine plant Gas turbine plant Nuclear power plant Pumped storage plant

Ans: c 95. Which of the following component, in a steam power plant, needs maximum

maintenance attention ? (a) Steam turbine

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

12/15

01/12/2013

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering

(b) Condenser (c) Water treatment plant (d) Boiler Ans: d 96. (a) (b) (c) (d) For the same cylinder dimensions and speed, which of the following engine will produce Supercharged engine Diesel engine Petrol engine All of the above engines will equal power

least power ?

Ans: c 97. (a) (b) (c) (d) The least share of power is provided in India, by which of the following power plants ? Diesel power plants Thermal power plants Hydro-electric power plants Nuclear power plants

Ans: a 98. Submarines for under water movement, are powered by which of the following ?

(a) Steam accumulators (b) Air motors (c) Diesel engines (d) Batteries Ans: d 99. An alternator coupled to a _____ runs at slow speed, as compared to as compared to others. (a) diesel engine (6) hydraulic turbine (c) steam turbine (d) gas turbine Ans: b 100. The effect of electric shock on human body depends on which of the following (a) current (b) voltage (c) duration of contact (d) all of the above Ans: d 101. Which lightening stroke is most dangerous ? (a) Direct stroke on line conductor (b) Indirect stroke on conductor (c) Direct stroke on tower top (d) Direct stroke on ground wire Ans: a 102. Which of the following devices may be used to provide protection against lightening

over voltages ? (a) Horn gaps (b) Rod gaps (c) Surge absorbers (d) All of the above Ans: d 103. When the demand of consumers is not met by a power plant, it will resort to which of

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

13/15

01/12/2013

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering

the following ? (a) Load shedding (b) Power factor improvement at the , generators (c) Penalising high load consumers by increasing the charges for electricity (d) Efficient plant operation Ans: a 104. (a) (b) (c) (d) Load shedding is possible through which of the following ? Switching of the loads Frequency reduction Voltage reduction Any of the above

Ans: d 105. (a) (b) (c) (d) In power plants insurance cover is provided for which of the following ? Unskilled workers only Skilled workers only Equipment only All of the above

Ans: d 106 A company can raise funds through

(a) fixed deposits (b) shares (c) bonds (d) any of the above Ans: d 107. Which of the following are not repayable after a stipulated period ?

(a) Shares (b) Fixed deposits (c) Cash certificates (d) Bonds Ans: a 108. The knowledge of diversity factor helps in determining

(a) plant capacity (b) average load (c) peak load (d) kWh generated (e) none of the above Ans: a 109. Which of the following is the disadvantage of static capacitor for power factor improvement ? (a) Easily damaged by high voltage (b) Cannot be repaired (c) Short service life (d) All of the above Ans: d

2 comments:
Anil Saxena on 9 August 2013 20:31 said... Please send my email ID for PDF file . Economics of power generation multiple choice question and answer prepartion for competative exaim pdf. file

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

14/15

01/12/2013

Economics of Power Generation Multiple Choice Questions and Answers Preparation for Competition exams pdf - Preparation for Engineering

A.K.Saxena, Email ID saxena.anil91@gmail.com

Anonymous said... very good MCQ'S for exam

Post a Comment
Enter your comment...

Comment as:

Google Account

Publish

Preview

Infolinks In Text Ads

Preparation for Engineering . Copyright 2012 All Rights Reserved

www.engineeringkings.com/2012/10/economics-of-power-generation-multiple.html

15/15

También podría gustarte