Introduction
The application of unlined pressure tunnels and shafts in hydropower construction started as early as 1919. The main reason was shortage of steel during and after the First World War. Four Norwegian power plants of such kind were put into operation between 1919 - 21.
Design criteria.
1. rule-of-thumb criterion introduced by BerghChristensen and Dannevig in 1971 is expressed:
2. Design chart Was first presented in english by selmer olsen in 1974. Computerized finite element models. Fundamental Concept
Conclusion