Está en la página 1de 7

HOJA DE METRADOS

04.00.00 OBRAS DE ARTE Y DRENAJE


04.07.00 BADENES
04.07.05 CONCRETO f'c = 245 Kg / cm2
PAOS DE 5.00x6.00
LOSA (M3/PAO)
ALTO

ANCHO

LONGITUD

VOLUMEN

No. VECES

VOLUMEN (m3)

0.25

5.00

6.00

7.50

1.00

7.50

Total

7.50

UA EN LOSA DE APROXIMACION (M3/ML)


ESPESOR

ANCHO1

ANCHO2

PROMEDIO

LONGITUD

VOLUMEN (m3)

0.750

0.50

0.25

0.38

1.00

0.28

Total

0.28

AFIRMADO (M3/PAO)
ESPESOR

ANCHO

LONGITUD

VOLUMEN

No. VECES

VOLUMEN (m3)

0.150

4.53

6.00

4.07

1.00

4.07

Total

4.07

ALIVIADERO DE PIEDRA EMBOQUILLADA


ESPESOR

ANCHO

LONGITUD

AREA

No. VECES

AREA (m2)

0.300

6.00

6.00

10.80

1.00

10.80

Total

10.80

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA:
PUENTE PAUCARTAMBO OXAPAMPA.

HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.04 ACERO DE REFUERZO f'y = 4200 Kg / cm 2
REFUERZO EN LA LOSA
TIPO

DESCRIPCION

B1

LONG/PIEZA BARRA/PIEZA CANTIDAD

BARRAS

LONGITUD

N de veces

.15

1/2

5.00

5/9

42

23.33

0.30

0.20

1/2

6.40

3/4

36

27

0.30

5/8

6.00

2/3

2.67

3/8

0.80

1/9

36

0.30

5/8

5.00

5/9

4.44

4.85
6
B2

6
B6

B7

0.15
0.15
5.00

B8

61.44

REFUERZO EN UA
TIPO

DESCRIPCION

LONG/PIEZA BARRA/PIEZA CANTIDAD

BARRAS

LONGITUD

N de veces

0.2

6.00
B3

1/2"

6.00

2/3

1.33

3/8"

6.00

2/3

1.33

3/8"

2.61

3/9

31

10.33

6.00
B4
0.30 0.30
B5

.90

.95
0.16

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO
OXAPAMPA.

HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.04 ACERO DE REFUERZO f'y = 4200 Kg / cm 2
BARRA LISA EN JUNTAS
TIPO

DESCRIPCION

LONG/PIEZA BARRA/PIEZA CANTIDAD

BARRAS

LONGITUD

N de veces

1.20
LONG.

3/4"

1.20

1/6

21

3.5

0.3

3/4"

1.40

1/6

17

2.83

0.3

1/2"
1

5/8"
1.55

3/4"
2.24

1"
3.97

1.40
TRANSV

ARMADURA x PAO de 5m. x 6m.


DESCRIPCION
Peso (Kg/m)

3/8"
0.56

LOSA

50 1/3

4 4/9

TOTAL VARILLAS
KG
TOTAL

4.0
20.2

50.3
453.0

4.4
62.0

0.0
0.0
0.0
0.0
535.16 KG.

3/8"
0.56

1/2"
1

5/8"
1.55

3/4"
2.24

11 2/3

1 1/3

11.7
58.8

1.3
12.0

UA x 6 ml
DESCRIPCION
Peso (Kg/m)
UA
TOTAL VARILLAS
KG
TOTAL

1"
3.97

70.80 KG.

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO
OXAPAMPA.

HOJA DE METRADOS
04.00.00 OBRAS DE ARTE
04.07.00 BADENES
04.07.03 ENCOFRADO Y DESENCOFRADO
ENCOFRADO DE BADENES
DESCRIPCION
LOSA
4x5x6

LARGO
20.00

ALTURA
0.25

No. VECES
3.00

AREA
15.00

ANCHO
10.00

ALTURA
0.25

No. VECES
5.00

AREA
12.50

4x5x4

TOTAL
27.50
27.50

LOSA
4x5x6

15.00

0.25

3.00

11.25

10.00

0.25

5.00

12.50

4x5x1.5

23.75
23.75

LOSA
4x5x6

25.00

0.25

3.00

18.75

10.00

0.25

5.00

12.50

4x5x6.5

31.25
31.25

LOSA
8x5x6

30.00

0.25

3.00

22.50

10.00

0.25

7.00

17.50

4x5x3

40.00
40.00

LOSA
12x5x6

40.00

0.25

3.00

30.00

10.00

0.25

9.00

22.50

4x5x2

52.50
52.50

UAx ML
TAPAS
LATERAL 1

0.50

0.25

0.38

0.75

1.00

0.28

1.00

0.75

1.00

0.75

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE
PAUCARTAMBO OXAPAMPA.

HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.01 EXCAVACION PARA ESTRUCTURAS
04.07.02 BASE
04.07.06 JUNTA ASFALTICA LONGITUDINAL
PROGRESIVA

2+518.00
5+589.00
5+715.00
6+184.00
7+675.00
8+386.00
10+277.00
12+232.00
13+726.00
15+710.00
20+785.00
21+050.00
22+860.00
23+304.00
23+507.00
23+738.00
26+355.00
30+845.00
38+821.00
39+388.00
39+840.00
40+965.00

DESCRIPCION

BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
TOTAL

LARGO

ANCHO

ALTO

20
15
20
30
25
15
25
30
30
20
20
40
20
20
25
25
30
20
20
15
20
15

10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

500

PAOS

EXCAVACION RELLENO
m3

16.31
13.5
16.31
21.94
19.13
13.5
19.13
21.94
21.94
16.31
16.31
27.56
16.31
16.31
19.13
19.13
21.94
16.31
16.31
13.5
16.31
13.5
392.63

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5x6

5 x Var.

4x5x6
4x5x6
4x5x6
8x5x6
4x5x6
4x5x6
4x5x6
8x5x6
8x5x6
4x5x6
4x5x6
12 x 5 x 6
4x5x6
4x5x6
4x5x6
4x5x6
8x5x6
4x5x6
4x5x6
4x5x6
4x5x6
4x5x6

4x5x4
4 x 5 x 1.5
4x5x4
4x5x3
4 x 5 x 6.5
4 x 5 x 1.5
4 x 5 x 6.5
4x5x3
4x5x3
4x5x4
4x5x4
4x5x2
4x5x4
4x5x4
4 x 5 x 6.5
4 x 5 x 6.5
4x5x3
4x5x4
4x5x4
4 x 5 x 1.5
4x5x4
4 x 5 x 1.5

ACERO (kg)
LOSA

UA

JUNTAS

AFIRMADO (M3)

UA

LOSA

UA

(ml)

e=0.15

ENCOFRADO (m2)
Barra Lisa

LOSA

CONCRETO f'c=245 (m3)

3,567.73
2,675.80
3,567.73
5,351.60
4,459.67
2,675.80
4,459.67
5,351.60
5,351.60
3,567.73
3,567.73
7,135.47
3,567.73
3,567.73
4,459.67
4,459.67
5,351.60
3,567.73
3,567.73
2,675.80
3,567.73
2,675.80

696.20
496.38
578.20
450.69
696.20
496.38
932.20
794.15
814.20
414.40
578.20
450.69
814.20
539.39
932.20
794.15
932.20
794.15
696.20
496.38
696.20
496.38
1,168.20 1,091.93
696.20
496.38
696.20
496.38
814.20
539.39
814.20
539.39
932.20
794.15
696.20
496.38
696.20
496.38
578.20
450.69
696.20
496.38
578.20
450.69

27.50
23.75
27.50
40.00
31.25
23.75
31.25
40.00
40.00
27.50
27.50
52.50
27.50
27.50
31.25
31.25
40.00
27.50
27.50
23.75
27.50
23.75

45.75
38.25
45.75
61.88
53.25
38.25
53.25
61.88
61.88
45.75
45.75
78.00
45.75
45.75
53.25
53.25
61.88
45.75
45.75
38.25
45.75
38.25

50.00
37.50
50.00
75.00
62.50
50.00
62.50
75.00
75.00
50.00
50.00
100.00
50.00
50.00
62.50
62.50
80.00
50.00
50.00
37.50
50.00
37.50

16.24
13.44
16.24
21.84
19.04
13.44
19.04
21.84
21.84
16.24
16.24
27.44
16.24
16.24
19.04
19.04
21.84
16.24
16.24
13.44
16.24
13.44

50.00
45.00
50.00
80.00
55.00
45.00
55.00
80.00
80.00
50.00
50.00
110.00
50.00
50.00
55.00
55.00
80.00
50.00
50.00
45.00
50.00
45.00

27.00
20.25
27.00
40.50
33.75
20.25
33.75
40.50
40.50
27.00
27.00
54.00
27.00
27.00
33.75
33.75
40.50
27.00
27.00
20.25
27.00
20.25

89,193.33

16,732.40

680.00

1,103.27

1,267.50

390.88

1,280.00

675.00

12,571.28

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.

RESUMEN DE METRADOS - BADENES


04.07.00 BADENES

ITEM

DESCRIPCION

UNID

CANTIDAD

MOVIMIENTO DE TIERRAS
04.07.01 Excavacin Para estructuras
04.07.02 Base (e = 0.15 m)
04.07.03 Encofrado y Desencofrado

m3
m3
m2

ACERO DE REFUERZO
04.07.04 Acero Corrugado
04.07.04 Acero Liso

kg
kg

04.07.05 Concreto f'c=245 kg/cm2

m3

04.07.06 Juntas Asfaltica Longitudinal

ml

1280

04.07.07 Aliviadero de Piedra Emboquillada

m2

612

1158.69
675
1783.27
118497.01
105925.733
12571.28
1658.38

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA


CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.

187784063.xls.ms_office

MUROS
PROGRESIVA
INICIO
FIN
2+505.00
5+705.00
8+375.00
15+700.00
22+844.00
23+294.00
23+725.00
30+830.00

2+528.00
5+718.00
8+388.00
15+710.00
22+865.00
23+307.00
23+745.00
30+853.00

DESCRIPCION

TIPO

LARGO

ANCHO

ALTO

BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES

6
4
2
2
3
4
3
6

23.00
13.00
13.00
10.00
21.00
13.00
20.00
23.00

3.60
2.4
1.3
1.3
2
2.4
2
3.6

6
4
2
2
3
4
3
6

AREA
UA MURO
0.7
12.37
0.7
5.28
1.55
1.55
3.45
0.7
5.28
3.45
0.7
12.37

TOTAL
136.00
(*) Los Muros Badenes no cuentan con Aliviaderos de piedra emboquillada se les colocar piedra acomodada

LADO 1

LADO 2

7.03
5.02
2.01
2.01
3.01
5.02
3.01
7.03

6.12
4.02
2.07
2.07
3.06
4.02
3.06
6.12

ENCOFRADO (m2)
MURO
TAPAS
TOTAL
302.45
65.35 367.80
117.52
17.94 135.46
53.04
4.65
57.69
40.80
4.65
45.45
127.47
17.25 144.72
117.52
17.94 135.46
121.40
13.80 135.20
302.45
65.35 367.80

1,389.58

m3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUNTAS
(ml)
45.45
10.64
4.78
4.78
21.81
10.64
14.54
45.45

0.00

158.09

Piedra Acomdada

También podría gustarte