Está en la página 1de 201
© Copyright 1991 Shell U.K. Limited. AU rights reserved. Aduitional registered or controlled copies can be obtained ont: Central Engineering Library. CONFIDENTIAL, Suell U.K. Exploration and Production SHELL ENGINEERING REFERENCE DOCUMENT MANUAL: GUIDELINES FOR LIFTING POINTS AND HEAVY LIFT CRITERIA Document Number : EM/039 Rev:3 UNCONTROLLED ' DOCUMENT | ad UEOE/11 _ is the appointed Custodian of this document and must always be consulted for advice on validity and currency by a user. Ref. Ind. : Signature : Date : A Wyan BEEK UEOE/I CHEZ 13/2/91 ‘Authorised Name : Ref. Ind. : Signature : Date R MUNCASTER UEOE eh. {Mveorls valle ' PrN Feat em « co gen pee Pope prey EH/039 REVISION No/DATE* REVISION DETAILS. REVISED BY NAME REF. IND. O/JUNE 1985 1/JUNE 1987 2/AUG 1989 3/DEC 1991 This Manual has been extensively revised in accordance with current ERD format procedure (see Preface). Section 3 has tucn revised to clarify design requirements for heavy lifts. Section 4.4.8 is corrected to allow a reduced safety factor for certain types of sling. Reference is made to cable laid slings for heavy lifts. Section 7.1 - Equation (2) is corrected. amendment, dated 31st July 1987, removed. Design Code References Updated, Clarification of Lifting Point Proof Test Requirements. Manual split into two parts to cover: Part 1 - Guidelines for design fabrication and inspection of lifting points (Intended for packages up to 1000 tonnes). Part 2 - Heavy Lift Criteria (Intended for packages exceeding 1000 tonnes - traditionally modules and Integrated decks). F. MOHAMAD B. IRVINE W.G. LAVER UEN/131 UENM/1 UEOB/11 * THIS DOCUMENT SHOULD BE REVIEWED WITHIN ONE YEAR OF THE LAST REVISION DATE. HOWEVER, THE USER OF THIS DOCUMENT MUST ALWAYS CONSULT THE APPOINTED CUSTODIAN FOR ADVICE ON VALIDITY AND CURRENCY. BM/039 AMENDMENT PROPOSAL FORM. To be completed by Amendment Proposer (Photocopy and leave original in binder) TO; UEOERS FROM: cory: extn: DATE: “AMENDMENT TOERD NUMBER REVISION PROPOSAL TUSTIFICATION Tobe completed by ERD Administration APE NUMBER. TARGET DATE: ‘APPROVE REJECT ‘COMMENTS OF: ‘COMMENTS FROM CONTRIBUTORS: (Only if specially equesed by Curtin) DSTRBUTE TO.

También podría gustarte