Presupuesto
Presupuesto
Cliente
Lugar
0301013
PRESUPUESTO DE VIVIENDA TECHO PROPIO
MONNSY DE FATIMA CHONG ARRUNATEGUI
LAMBAYEQUE - CHICLAYO - CHICLAYO
Item
Descripcin
01
OBRAS PRELIMINARES
01.01
02
28/10/2013
Costo al
Und.
Metrado
Precio S/.
Parcial S/.
66.50
m2
35.00
1.90
MOVIMIENTO DE TIERRAS
02.01
m3
14.67
25.79
02.02
m2
30.91
1.81
03
CONCRETO SIMPLE
03.01
66.50
434.29
378.34
55.95
3,722.61
m3
11.74
153.66
1,803.97
03.02
m2
1.28
24.01
30.73
03.03
m2
29.62
42.95
1,272.18
m2
30.91
19.92
03.04
04
04.01
615.73
8,788.39
COLUMNAS
2,801.03
04.01.01
m3
1.63
329.51
537.10
04.01.02
m2
29.40
49.13
1,444.42
04.01.03
kg
177.00
4.63
819.51
04.02
LOSA ALIGERADA
4,089.80
04.02.01
m3
2.34
372.08
870.67
04.02.02
m2
34.81
57.29
1,994.26
04.02.03
kg
124.00
4.30
533.20
241.00
2.87
04.02.04
04.03
VIGAS
691.67
1,897.56
04.03.01
m3
1.56
362.93
566.17
04.03.02
m2
12.75
40.10
511.28
kg
177.13
4.63
04.03.03
01
01.01
02
02.01
02.02
MUROS Y TABIQUES
MURO DE SOGA LADRILLO KING-KONG 18 huecos
m2
59.23
58.05
820.11
3,438.30
3,438.30
2,520.26
m2
13.49
35.73
482.00
m2
10.26
24.18
248.09
02.03
5.48
13.55
74.25
02.04
m2
59.23
16.71
989.73
02.05
m2
30.41
23.88
726.19
03
PISOS Y CONTRAPISOS
1,863.45
03.01
m2
30.91
56.37
03.02
m2
2.65
45.68
05
05.01
05.02
REVESTIMIENTOS
IMPERMEABILIZACION DE TECHOS CON PINTURA ASFALTICA
ENCHAPADO EN ZONAS HUMEDAS (LAVADERO DE COCINA Y LAVADERO DE
ROPA)
1,742.40
121.05
7,293.95
m2
30.41
53.85
1,637.58
m2
0.90
574.47
517.02
05.03
m2
3.91
575.39
2,249.77
05.04
m2
5.03
574.47
2,889.58
4.95
11.39
04
04.01
CONTRAZOCALOS
CONTRAZOCALO EXTERIOR DE CEMENTO PULIDO H = 30 cm
06
CARPINTERIA DE MADERA
06.01
07
CARPINTERIA METALICA
07.01
56.38
56.38
322.04
u
2.00
161.02
322.04
923.73
glb
1.00
42.37
42.37
07.02
07.03
08
08.01
08.02
09
09.01
01
glb
2.00
237.29
474.58
glb
2.00
203.39
406.78
pza
2.00
27.12
130.52
54.24
pza
2.00
38.14
PINTURA
PINTURA LATEX 2 MANOS MUROS
76.28
227.00
m2
15.40
14.74
INSTALACIONES ELECTRICAS
227.00
3,854.87
01.02
4.50
13.47
60.62
01.03
68.30
11.72
800.48
01.07
2.00
5.93
11.86
01.08
1.00
5.93
5.93
01.05
pto
4.00
5.93
23.72
01.06
SALIDA DE TECHO
pto
4.00
500.00
2,000.00
01.09
WALL SOCKETE
4.00
16.61
66.44
01.01
glb
1.00
41.72
41.72
115.00
7.34
01.04
01
01.01
INSTALACIONES SANITARIAS
844.10
2,052.38
SISTEMA DE AGUA
637.60
01.01.01
pto
5.00
69.98
349.90
01.01.02
16.00
12.15
194.40
2.00
46.65
01.01.03
01.02
INSTALACIONES DE DESAGUE
93.30
1,119.23
01.02.01
pto
4.00
63.05
252.20
01.02.02
pto
4.00
71.40
285.60
01.02.03
10.90
14.82
161.54
01.02.04
3.70
13.79
51.02
01.02.05
1.00
41.88
41.88
01.02.06
1.00
29.82
29.82
01.02.07
pza
1.00
62.31
62.31
01.02.08
pza
1.00
215.05
215.05
1.00
19.81
01.02.09
01.03
19.81
295.55
01.03.01
pza
1.00
93.22
93.22
01.03.02
pza
1.00
34.32
34.32
01.03.03
pza
1.00
33.90
33.90
01.03.04
pza
1.00
46.61
46.61
01.03.05
pza
1.00
21.40
21.40
01.03.06
pza
1.00
13.22
13.22
01.03.07
pza
1.00
18.05
18.05
01.03.08
pza
1.00
19.07
19.07
01.03.09
pza
1.00
15.76
15.76
Costo Directo
Gastos Generales (10% CD)
Utilidad (5% CD)
35,694.67
3,569.47
1,784.73
------------------
Sub Total
IGV (18% ST)
41,048.87
7,388.80
============
Total Presupuesto
48,437.67