To. Attn. Cc.

From Subject Dear Sir,

: : : : :

PT. Ina Hasta Mandiri Mr. Wazir Rusli Mr. Lee Kwee Kang Prihandiyono (General. Mgr) Inquiry

Date Fax No Ref. No Page

: 20 September, 2013 : : 001/Q-1249/IV/2013 : 1 of 2

In connection with our IFC-2 and RC Work at SAMSUNG C & T, Jakarta project, we hereby request a price quote for the following work: No 1 Description Lay Out Specification B5 Floor ~ Semi Basement Floor 3rd Floor ~ 49th Floor Excavation top-down method Total height Excavation Concrete Rebar Form
th th

Unit

Quantity

m m3 m3 ton m2

211.5 45,027 50,190 11,028 211,160

Preparing B5 Floor ~ Semi Basement Floor

First Work- Basement ( 28 Weeks / RF, BS US, UG ) Excavation Formwork Concrete Rebar Second Work Tower Core ( PL, SG ) Formwork Concrete Rebar Second Work Tower Core ( PL, SG ) Formwork Concrete Rebar Third Work Slab ( OL, LM, FT ) Formwork Concrete Rebar

m3 m2 m3 kg

45,027 31,310 13,503 3,093,651

Second Work Tower Core

m2 m3 kg

38,297 8,184 1,984,987

Second Work Tower Core ( continue )

m2 m3 kg

38,297 8,184 1,984,987

Third Work Slab

m2 m3 kg

132,566 27,036 5,949,366

We look forward to received confirmation of your quotation as quickly as possible, and later than the date August 30, 2013 before 13.00. Thanks for your attention and cooperation. Sincerelly, PT Tekniko Indonesia

Prihandiyono (General Manager)