PT. Ina Hasta Mandiri Mr. Wazir Rusli Mr. Lee Kwee Kang Prihandiyono (General. Mgr) Inquiry
In connection with our IFC-2 and RC Work at SAMSUNG C & T, Jakarta project, we hereby request a price quote for the following work: No 1 Description Lay Out Specification B5 Floor ~ Semi Basement Floor 3rd Floor ~ 49th Floor Excavation top-down method Total height Excavation Concrete Rebar Form
th th
Unit
Quantity
m m3 m3 ton m2
First Work- Basement ( 28 Weeks / RF, BS US, UG ) Excavation Formwork Concrete Rebar Second Work Tower Core ( PL, SG ) Formwork Concrete Rebar Second Work Tower Core ( PL, SG ) Formwork Concrete Rebar Third Work Slab ( OL, LM, FT ) Formwork Concrete Rebar
m3 m2 m3 kg
m2 m3 kg
m2 m3 kg
m2 m3 kg
We look forward to received confirmation of your quotation as quickly as possible, and later than the date August 30, 2013 before 13.00. Thanks for your attention and cooperation. Sincerelly, PT Tekniko Indonesia