PRESUPUESTO CANCHA ANDRES AVELINO

LIMPIEZA Y REPLANTEO
Replanteo

1.00 p.a.

RD$

10,000.00

RD$

10,000.00
Subtotal

RD$
RD$
RD$
RD$
RD$
RD$
RD$
RD$

18,900.00
10,935.00
1,458.00
4,009.50
720.00
3,348.40
55,036.54
56,925.00
Subtotal

RD$ 151,332.44

RD$
RD$
RD$
RD$
RD$
RD$
RD$
RD$
RD$

63,465.36
5,112.00
8,462.05
23,270.63
62,353.80
22,462.94
687,690.00
14,708.22
12,289.14
Subtotal

RD$ 899,814.15

RD$
RD$
RD$
RD$
RD$

57,034.80
5,069.76
19,537.50
13,941.84
83,427.63
Subtotal

RD$ 179,011.53

23,600.00
295.30
295.30
324.83
150.00
97.20
350.00

RD$
RD$
RD$
RD$
RD$
RD$
RD$

47,200.00
10,748.92
26,960.89
11,693.88
3,000.00
19,023.98
12,600.00
Subtotal

RD$ 131,227.67

905.60
1,186.30

RD$
RD$

21,734.40
126,459.58
Subtotal

RD$ 148,193.98

############ ################

MOVIMIENTO DE TIERRA
Extraccin de capa vegetal (h=20cm)
Excavacion Zapata Cancha
Excavacion Zapata Gradas
Excavacion Zapata Baos y Vestidores
Excavacion Zapata Soporte Tablero
Relleno de reposicion
Bote de Material
Relleno Compactado Caliche (interior de cancha)

140.00
24.30
3.24
8.91
1.60
15.22
211.68
90.00

m3
m3
m3
m3
m3
m3
m3
m3

RD$
RD$
RD$
RD$
RD$
RD$
RD$
RD$

135.00
450.00
450.00
450.00
450.00
220.00
260.00
632.50

HORMIGON ARMADO EN:


Zapata Perimetro Cancha
Zapata Soporte Tablero
Zapata Gradas
Zapata Baos y vestidores
Losa de Techo en Baos y Vestidores
Vigas de Amarre en Baos
Piso de H.A para Cancha (Pulido)
Columnas soporte (0.50*0.30)
Vigas soporte (0.20*0.30)

8.10
0.60
1.08
2.97
36.00
0.94
450.00
0.92
0.60

m3
m3
m3
m3
m2
m3
m2
m3
m3

54.00
4.80
15.00
13.20
85.80

m2
m2
m2
m2
m2

RD$
RD$
RD$
RD$
RD$
RD$
RD$
RD$
RD$

7,835.23
8,520.00
7,835.23
7,835.23
1,732.05
23,960.47
1,528.20
15,987.20
20,481.90

MUROS DE BLOQUES 6"


Colocacion BNP Cancha
Colocacion BNP Gradas
Colocacion SNP Gradas Violinados
Colocacion BNP Baos y Vestidores
Colocacion SNP Baos y Vestidores

RD$
RD$
RD$
RD$
RD$

1,056.20
1,056.20
1,302.50
1,056.20
972.35

TERMINACION DE SUPERFICIES
Tablero fiber-glass ( Completo ; Inc. Ba
Paete Soporte Tablero
Paete Exterior de Baos
Paete de Techo en Baos
Mochetas
Cantos en general
Impermeabilizante de Techo en Baos y Vestidores

2.00
36.40
91.30
36.00
20.00
195.72
36.00

und
m2
m2
m2
ml
ml
m2

RD$
RD$
RD$
RD$
RD$
RD$
RD$
PISOS

Piso de Ceramica para Baos


Revestimiento de Ceramica en Pared de Bao

24.00 m2
106.60 m2

RD$
RD$
PINTURA

Pintura Exterior Baos y Vestidores


Pintura en Cancha y Soporte de Tablero
Pintura de Gradas

1.00 p.a.
1.00 p.a.
1.00 p.a.

RD$
RD$
RD$

15,000.00
38,000.00
25,000.00

RD$
RD$
RD$

15,000.00
38,000.00
25,000.00
Subtotal

############ ################

INSTALACIONES SANITARIAS
Red de A.P y Drenaje
Aparatos Sanitarios

1.00 p.a.
1.00 p.a.

RD$
RD$

25,000.00
73,250.00

RD$
RD$

25,000.00
73,250.00
Subtotal

141,272.00
18,000.00

RD$
RD$

141,272.00
18,000.00
Subtotal

RD$ 159,272.00

RD$
RD$
RD$
RD$
RD$

15,000.00
7,000.00
20,000.00
56,000.00
12,000.00
Subtotal

RD$ 110,000.00

RD$

98,250.00

ILUMINACION
Iluminacion Cancha Poste de H.A (2 Torr)
Instalacion Electrica en Baos y Vestidores

1.00 p.a.
1.00 p.a.

RD$
RD$

MISCELANEOS
Puerta en Baos y Vestidores
Ventanas de Baos y Vestidores
Jardinerias
Viguetas Prefabricadas para asientos de Gradas
Limpieza Final

2.00
2.00
1.00
8.00
1.00

ud
ud
p.a.
ud
p.a.

RD$
RD$
RD$
RD$
RD$

TOTAL GENERAL

7,500.00
3,500.00
20,000.00
7,000.00
12,000.00

############### #######################
C.I.

RD$ 569,879.51 pesos


60 dias

0
0
0 ml

########### ################# /dia


24.5 ml
24.5

No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

Actividad
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE BAOS Y VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MURO PERIMETRO CANCHA
ARMADO ACERO ZAPATA MUROS DE GRADA
ARMADO ACERO ZAPATA MUROS DE BAOS Y
VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO
COLOCACION DE HORMIGON ZAPATA MURO
PERIMETRO CANCHA
COLOCACION DE HORMIGON ZAPATA MUROS DE
GRADA
COLOCACION DE HORMIGON ZAPATA MUROS DE
BAOS Y VESTIDORES
COLOCACION DE HORMIGON ZAPATA SOPORTE
TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP MUROS DE GRADA
COLOCACION BLOCK BNP MUROS DE BAOS Y
VESTIDORES
RELLENO DE REPOSICION Y COMPACTACION ZAPATA
MURO PERIMETRO CANCHA
RELLENO DE REPOSICION Y COMPACTACION ZAPATA
MUROS DE GRADA
RELLENO DE REPOSICION Y COMPACTACION ZAPATA
MUROS DE BAOS Y VESTIDORES
RELLENO DE REPOSICION Y COMPACTACION SOPORTE
TABLERO
RELLENO COMPACTADO INTERIOR DE CANCHA
COLOCACION BLOCK SNP VIOLINADOS MUROS DE
GRADA
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS ) EN
GRADAS
COLOCACION BLOCK SNP MUROS DE BAOS Y
VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA DE
CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES
INSTALACION ELECTRICA EN TECHO
DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES
ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS
Y VESTIDORES
COLOCACION DE HORMIGON DE VIGAS DE AMARRE Y
LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO
CONFECCION DE MOCHETAS Y CANTOS SOPORTE
TABLERO
CONFECCION DE MOCHETAS Y CANTOS BAOS Y
VESTIDORES
COLOCACION DE TORTA Y CERAMICA DE PISO BAOS Y
VESTIDORES
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS Y
VESTIDORES
INSTALACION DE APARATOS SANITARIOS Y ACCESORIOS
ELECTRICOS
INSTALACION DE PUERTAS Y VENTANAS
IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES
PINTURA EXTERIOR BAOS Y VESTIDORES
PINTURA Y SEALIZACION CANCHA Y SOPORTE DE
TABLERO
PINTURA MUROS DE GRADAS
EXCAVACION E INSTALACION DE POSTE DE LUZ
PREFABRICADO
INSTALACION DE LAMPARAS DE ILUMINACION
INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

MATRIZ DE ANTECEDENTES
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

51
52
53
54
55
56
57
58
59

MATRIZ DE ANTECEDENTES
Actividad
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE BAOS Y
VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MURO PERIMETRO
CANCHA
ARMADO
ARMADO ACERO
ACERO ZAPATA
ZAPATA MUROS
MUROS DE
DE GRADA
BAOS Y
VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

Antecedente
1
2
2
2
2
52,57
3
4
5
6
11
18

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

10

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP MUROS DE GRADA
COLOCACION BLOCK BNP MUROS DE BAOS Y
RELLENO DE REPOSICION Y COMPACTACION
ZAPATA MURO PERIMETRO CANCHA
RELLENO DE REPOSICION Y COMPACTACION
ZAPATA MUROS DE GRADA
RELLENO DE REPOSICION Y COMPACTACION
ZAPATA MUROS DE BAOS Y VESTIDORES

12
17
20
13
14
15
16
21
22
23

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO
RELLENO COMPACTADO INTERIOR DE CANCHA
COLOCACION BLOCK SNP VIOLINADOS MUROS DE
GRADA
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )
EN GRADAS
COLOCACION BLOCK SNP MUROS DE BAOS Y
VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA
DE CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES
INSTALACION ELECTRICA EN TECHO

19
21
22
25,29
23
24,28
35
24,28
32, 34
26,31
36

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

40

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

37

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y
SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

39
26,31
38,41
38,41
27

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

44

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

42

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS
Y VESTIDORES
INSTALACION DE APARATOS SANITARIOS Y
ACCESORIOS ELECTRICOS
INSTALACION DE PUERTAS Y VENTANAS

43,46
47
48
48

IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES


PINTURA
BAOS CANCHA
Y VESTIDORES
PINTURA EXTERIOR
Y SEALIZACION
Y SOPORTE DE
TABLERO
PINTURA MUROS DE GRADAS
EXCAVACION E INSTALACION DE POSTE DE LUZ
PREFABRICADO
INSTALACION DE LAMPARAS DE ILUMINACION
INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

42
50,51
33,45
30
2
55
53
7,56
49, 54, 58

MATRIZ DE SECUENCIA
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

49
50
51
52
53
54
55
56
57
58
59

MATRIZ DE SECUENCIA
Actividad
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE BAOS Y
VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MURO PERIMETRO
CANCHA
ARMADO ACERO ZAPATA MUROS DE GRADA
ARMADO ACERO ZAPATA MUROS DE BAOS Y
VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

Secuencia
2
3,4,5,6,55
8
9
10
11
58
14
15
16
12
17
20

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

21

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

22

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

23

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP MUROS DE GRADA

18
13
27
19
24,28
25,29

COLOCACION BLOCK BNP MUROS DE BAOS Y


VESTIDORES

26,31

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

32,34

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE GRADA

30

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE BAOS Y VESTIDORES

36,41

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

44

RELLENO COMPACTADO INTERIOR DE CANCHA

32,34

COLOCACION BLOCK SNP VIOLINADOS MUROS DE


GRADA

30

COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )


EN GRADAS

54

COLOCACION BLOCK SNP MUROS DE BAOS Y


VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA
DE CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES
INSTALACION ELECTRICA EN TECHO

36,41
35
53
35
33
37
39

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

42,43

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

40

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y
SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

38
42,43
46,51
47
45

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

53

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

47

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES

48

REVESTIMIENTO DE CERAMICA EN PARED DE BAOS


Y VESTIDORES

49,50

INSTALACION DE APARATOS SANITARIOS Y


ACCESORIOS ELECTRICOS
INSTALACION DE PUERTAS Y VENTANAS
IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES
PINTURA EXTERIOR BAOS Y VESTIDORES
PINTURA Y SEALIZACION CANCHA Y SOPORTE DE
TABLERO
PINTURA MUROS DE GRADAS
EXCAVACION E INSTALACION DE POSTE DE LUZ
PREFABRICADO
INSTALACION DE LAMPARAS DE ILUMINACION
INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

59
52
52
7
57
59
56
58
7
59
-

M
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

49
50
51
52
53
54
55
56
57
58
59

MATRIZ TIEMPOS ESTANDAR


T. ptimo
Actividad
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
5
REPLANTEO
1

T. Medio
7
2

T. Psimo
14
2

1
2

1
3

1
4

1
1
1

1
2
1

1
3
1

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

2
1

2
1

3
1

COLOCACION BLOCK BNP MUROS DE BAOS Y


VESTIDORES

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE GRADA

EXCAVACION ZAPATA MURO PERIMETRO CANCHA


EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE BAOS Y
VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MURO PERIMETRO
CANCHA
ARMADO ACERO ZAPATA MUROS DE GRADA
ARMADO ACERO ZAPATA MUROS DE BAOS Y
VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP MUROS DE GRADA

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE BAOS Y VESTIDORES

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

COLOCACION BLOCK SNP VIOLINADOS MUROS DE


GRADA

COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )


EN GRADAS

1
1

1
1

1
1

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

1
2
2

2
2
2

4
4
3

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES

REVESTIMIENTO DE CERAMICA EN PARED DE BAOS


Y VESTIDORES

RELLENO COMPACTADO INTERIOR DE CANCHA

COLOCACION BLOCK SNP MUROS DE BAOS Y


VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA
DE CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES
INSTALACION ELECTRICA EN TECHO

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y
SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

INSTALACION DE APARATOS SANITARIOS Y


ACCESORIOS ELECTRICOS
INSTALACION DE PUERTAS Y VENTANAS
IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES
PINTURA EXTERIOR BAOS Y VESTIDORES
PINTURA Y SEALIZACION CANCHA Y SOPORTE DE
TABLERO
PINTURA MUROS DE GRADAS
EXCAVACION E INSTALACION DE POSTE DE LUZ
PREFABRICADO
INSTALACION DE LAMPARAS DE ILUMINACION
INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

1
2
2

1
4
3

1
7
5

T. Estndar
8
2
4
4
4
1
3
2
1
2
1
2
1
1
1
1
1
3
1
1
2
2
2
2
2

2
2
3
2
4
5
1
1
2
2
5
1
1
4
1
3
3
3
3
1
2
2
5

2
1
1
2
2
2
2
1
1
5
4

MATRIZ DE COSTOS
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

49
50
51
52
53
54
55
56
57
58
59

MATRIZ DE COSTOS
Actividad
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO

COSTOS
RD$18,900.00
RD$10,000.00

EXCAVACION ZAPATA MURO PERIMETRO CANCHA

RD$10,935.00

EXCAVACION ZAPATA MUROS DE GRADA

RD$1,458.00

EXCAVACION ZAPATA MUROS DE BAOS Y


VESTIDORES

RD$4,009.50

EXCAVACION ZAPATA SOPORTE TABLERO


BOTE DE MATERIAL INSERVIBLE

RD$720.00
RD$55,036.54

ARMADO ACERO ZAPATA MURO PERIMETRO


CANCHA

RD$19,039.61

ARMADO ACERO ZAPATA MUROS DE GRADA

RD$2,538.61

ARMADO ACERO ZAPATA MUROS DE BAOS Y


VESTIDORES

RD$6,981.19

ARMADO ACERO ZAPATA SOPORTE TABLERO


ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

RD$1,533.60
RD$4,412.47
RD$3,686.74

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

RD$44,425.75

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

RD$5,923.43

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

RD$16,289.44

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO

RD$3,578.40

ENCOFRADO SOPORTE DE TABLERO


DESENCOFRADO SOPORTE TABLERO

RD$4,049.60
RD$0.00

COLOCACION DE HORMIGON SOPORTE TABLERO

RD$14,848.55

COLOCACION BLOCK BNP PERIMETRO CANCHA

RD$57,034.80

COLOCACION BLOCK BNP MUROS DE GRADA

RD$5,069.76

COLOCACION BLOCK BNP MUROS DE BAOS Y


VESTIDORES

RD$13,941.84

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

RD$837.10

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE GRADA

RD$837.10

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE BAOS Y VESTIDORES

RD$837.10

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

RD$837.10

RELLENO COMPACTADO INTERIOR DE CANCHA

RD$56,925.00

COLOCACION BLOCK SNP VIOLINADOS MUROS DE


GRADA

RD$19,537.50

COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )


EN GRADAS

RD$56,000.00

COLOCACION BLOCK SNP MUROS DE BAOS Y


VESTIDORES

RD$83,427.63

ENCOFRADO PERIMETRO CANCHA


DESENCOFRADO PERIMETRO CANCHA

RD$48,138.30
RD$0.00

ARMADO DE MALLA ELECTROSOLDADA PARA LOSA


DE CANCHA

RD$206,307.00

COLOCACION DE HORMIGON SEMI-PULIDO CANCHA

RD$433,244.70

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

RD$10,178.01

INSTALACION ELECTRICA EN TECHO

RD$2,700.00

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

RD$0.00

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

RD$25,445.02

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES

RD$49,193.71

COLOCACION DE TUBERIAS ELECTRICAS Y


SANITARIAS

RD$37,600.00

PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

RD$26,960.89
RD$11,693.88
RD$10,748.92

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

RD$4,404.80

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

RD$17,619.19

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES

RD$21,734.40

REVESTIMIENTO DE CERAMICA EN PARED DE BAOS


Y VESTIDORES

RD$126,459.58

INSTALACION DE APARATOS SANITARIOS Y


ACCESORIOS ELECTRICOS

RD$75,950.00

INSTALACION DE PUERTAS Y VENTANAS

RD$22,000.00

IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES

RD$12,600.00

PINTURA EXTERIOR BAOS Y VESTIDORES

RD$15,000.00

PINTURA Y SEALIZACION CANCHA Y SOPORTE DE


TABLERO

RD$38,000.00

PINTURA MUROS DE GRADAS

RD$25,000.00

EXCAVACION E INSTALACION DE POSTE DE LUZ


PREFABRICADO

RD$113,017.60

INSTALACION DE LAMPARAS DE ILUMINACION

RD$28,254.40

INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA
TOTAL

RD$47,200.00
RD$20,000.00
RD$12,000.00
RD$1,965,101.77

MATRIZ DE INFORMACION
Tiempos
T. Medio T. Psimo
7
14
2
2

T. Estndar
8
2

Costos
$N
RD$18,900.00
RD$10,000.00

6
5

4
4

RD$10,935.00
RD$1,458.00

3
1
3

5
1
4

4
1
3

RD$4,009.50
RD$720.00
RD$55,036.54

1
1

1
1

2
1

2
1

RD$19,039.61
RD$2,538.61

5
6
11
18

1
1
1
1

1
1
2
1

2
1
3
1

2
1
2
1

RD$6,981.19
RD$1,533.60
RD$4,412.47
RD$3,686.74

21

RD$44,425.75

22

RD$5,923.43

16

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

23

10

RD$16,289.44

17
18
19

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO

18
13
27

12
17
20

1
2
1

1
2
1

1
3
1

1
3
1

RD$3,578.40
RD$4,049.60
RD$0.00

20

COLOCACION DE HORMIGON SOPORTE TABLERO

19

13

RD$14,848.55

21
22

COLOCACION BLOCK BNP PERIMETRO CANCHA


COLOCACION BLOCK BNP MUROS DE GRADA

24,28
25,29

14
15

1
1

2
2

3
3

2
2

RD$57,034.80
RD$5,069.76

23

COLOCACION BLOCK BNP MUROS DE BAOS Y


VESTIDORES

26,31

16

RD$13,941.84

24

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

32,34

21

RD$837.10

25

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE GRADA

30

22

RD$837.10

26

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE BAOS Y VESTIDORES

36,41

23

RD$837.10

27

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

44

19

RD$837.10

28

RELLENO COMPACTADO INTERIOR DE CANCHA

32,34

21

RD$56,925.00

29

COLOCACION BLOCK SNP VIOLINADOS MUROS DE


GRADA

30

22

RD$19,537.50

30

COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )


EN GRADAS

54

25,29

RD$56,000.00

31
32
33

COLOCACION BLOCK SNP MUROS DE BAOS Y


VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA

36,41
35
53

23
24,28
35

2
1
1

4
1
1

8
1
1

5
1
1

RD$83,427.63
RD$48,138.30
RD$0.00

34

ARMADO DE MALLA ELECTROSOLDADA PARA LOSA


DE CANCHA

35

24,28

RD$206,307.00

35

COLOCACION DE HORMIGON SEMI-PULIDO CANCHA

33

32, 34

RD$433,244.70

36
37

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES
INSTALACION ELECTRICA EN TECHO

37
39

26,31
36

3
1

4
1

7
1

5
1

RD$10,178.01
RD$2,700.00

38

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

42,43

40

RD$0.00

39

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

40

37

RD$25,445.02

40

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES

38

39

RD$49,193.71

41
42
43
44

COLOCACION DE TUBERIAS ELECTRICAS Y


SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

42,43
46,51
47
45

26,31
38,41
38,41
27

2
1
2
2

3
2
2
2

4
4
4
3

3
3
3
3

RD$37,600.00
RD$26,960.89
RD$11,693.88
RD$10,748.92

45

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

53

44

RD$4,404.80

46

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

47

42

RD$17,619.19

47

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES

48

43,46

RD$21,734.40

48

REVESTIMIENTO DE CERAMICA EN PARED DE BAOS


Y VESTIDORES

49,50

47

RD$126,459.58

49
50

INSTALACION DE APARATOS SANITARIOS Y


ACCESORIOS ELECTRICOS
INSTALACION DE PUERTAS Y VENTANAS

59
52

48
48

1
1

1
1

2
1

2
1

RD$75,950.00
RD$22,000.00

51
52

IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES


PINTURA EXTERIOR BAOS Y VESTIDORES

52
7

42
50,51

1
1

1
1

1
2

1
2

RD$12,600.00
RD$15,000.00

53
54

PINTURA Y SEALIZACION CANCHA Y SOPORTE DE


TABLERO
PINTURA MUROS DE GRADAS

57
59

33,45
30

1
1

1
1

2
2

2
2

RD$38,000.00
RD$25,000.00

55

EXCAVACION E INSTALACION DE POSTE DE LUZ


PREFABRICADO

56

RD$113,017.60

58
7
59
-

55
53
7,56
49, 54, 58

1
1
2
2

1
1
4
3

1
1
7
5

1
1
5
4

RD$28,254.40
RD$47,200.00
RD$20,000.00
RD$12,000.00
RD$1,965,101.77

No.

Actividad

Secuencia

Antecedente

1
2

LIMPIEZA Y EXTRACCION DE CAPA VEGETAL


REPLANTEO

2
3,4,5,6,55

T. ptimo
5
1

3
4

EXCAVACION ZAPATA MURO PERIMETRO CANCHA


EXCAVACION ZAPATA MUROS DE GRADA

8
9

2
2

2
2

4
3

5
6
7

EXCAVACION ZAPATA MUROS DE BAOS Y


VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE

10
11
58

2
2
52,57

2
1
2

8
9

ARMADO ACERO ZAPATA MURO PERIMETRO


CANCHA
ARMADO ACERO ZAPATA MUROS DE GRADA

14
15

3
4

10
11
12
13

ARMADO ACERO ZAPATA MUROS DE BAOS Y


VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

16
12
17
20

14

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

15

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

56
57
58
59

INSTALACION DE LAMPARAS DE ILUMINACION


INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA
TOTAL

No.
1
2

MATRIZ DE PENDIENTE
Actividad
Top
5
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
1
REPLANTEO

EXCAVACION ZAPATA MURO PERIMETRO CANCHA

EXCAVACION ZAPATA MUROS DE GRADA

EXCAVACION ZAPATA MUROS DE BAOS Y


VESTIDORES

6
7

EXCAVACION ZAPATA SOPORTE TABLERO


BOTE DE MATERIAL INSERVIBLE

ARMADO ACERO ZAPATA MURO PERIMETRO


CANCHA

ARMADO ACERO ZAPATA MUROS DE GRADA

10

ARMADO ACERO ZAPATA MUROS DE BAOS Y


VESTIDORES

11
12
13

ARMADO ACERO ZAPATA SOPORTE TABLERO


ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

1
1
1
1

14

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

15

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

16

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

17

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO

18
19

ENCOFRADO SOPORTE DE TABLERO


DESENCOFRADO SOPORTE TABLERO

20

COLOCACION DE HORMIGON SOPORTE TABLERO

21

COLOCACION BLOCK BNP PERIMETRO CANCHA

22

COLOCACION BLOCK BNP MUROS DE GRADA

1
1

23

COLOCACION BLOCK BNP MUROS DE BAOS Y


VESTIDORES

24

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

25

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE GRADA

2
2
2
1
2
1
1

1
2
1
1

26

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE BAOS Y VESTIDORES

27

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

28

RELLENO COMPACTADO INTERIOR DE CANCHA

29

COLOCACION BLOCK SNP VIOLINADOS MUROS DE


GRADA

30

COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )


EN GRADAS

31

COLOCACION BLOCK SNP MUROS DE BAOS Y


VESTIDORES

32
33

ENCOFRADO PERIMETRO CANCHA


DESENCOFRADO PERIMETRO CANCHA

2
1
1

34

ARMADO DE MALLA ELECTROSOLDADA PARA LOSA


DE CANCHA

35

COLOCACION DE HORMIGON SEMI-PULIDO CANCHA

36

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

37

INSTALACION ELECTRICA EN TECHO

3
1

38

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

39

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

40

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES

41

COLOCACION DE TUBERIAS ELECTRICAS Y


SANITARIAS

42
43
44

PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

2
1
2
2

45

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

46

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

47

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES

48

REVESTIMIENTO DE CERAMICA EN PARED DE BAOS


Y VESTIDORES

49

INSTALACION DE APARATOS SANITARIOS Y


ACCESORIOS ELECTRICOS

50

INSTALACION DE PUERTAS Y VENTANAS

51

IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES

52

PINTURA EXTERIOR BAOS Y VESTIDORES

53

PINTURA Y SEALIZACION CANCHA Y SOPORTE DE


TABLERO

54

PINTURA MUROS DE GRADAS

1
1

55

EXCAVACION E INSTALACION DE POSTE DE LUZ


PREFABRICADO

56

INSTALACION DE LAMPARAS DE ILUMINACION

57
58
59

INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

1
1
1
1

1
1
2
2

RIZ DE PENDIENTE
Ts
$N
8
RD$18,900.00
2
RD$10,000.00

RD$
RD$

$L
25,515.00
13,500.00

RD$10,935.00

RD$

14,762.25

RD$

1,913.63

RD$1,458.00

RD$

1,968.30

RD$

255.15

RD$4,009.50

RD$

5,412.83

RD$

701.66
19,262.79

4
4
4
1
3
2
1
2
1
2
1
1
1
1
1
3
1
1
2
2
2
2
2

PENDIENTE
RD$
2,205.00
RD$
3,500.00

RD$720.00
RD$55,036.54

RD$

74,299.33

RD$
RD$

RD$19,039.61

RD$

25,703.47

RD$

6,663.86

RD$6,981.19

RD$

9,424.61

RD$

2,443.42

RD$1,533.60
RD$4,412.47
RD$3,686.74

RD$
RD$

5,956.83
3,686.74

RD$

1,544.36

RD$44,425.75

RD$

44,425.75

RD$5,923.43

RD$

5,923.43

RD$16,289.44

RD$

16,289.44

RD$3,578.40

RD$

3,578.40

RD$4,049.60
RD$0.00

RD$
RD$

5,466.97
-

RD$14,848.55

RD$

14,848.55

RD$57,034.80

RD$

76,996.98

RD$

19,962.18

RD$5,069.76

RD$

6,844.18

RD$

1,774.42

RD$13,941.84

RD$

18,821.48

RD$

4,879.64

RD$837.10

RD$

1,130.09

RD$

292.99

RD$837.10

RD$

1,130.09

RD$

292.99

RD$2,538.61

NODO
1-2
2-3
3-11
3-8
3-9
3-4
56-57
11-16
8-12
9-15
4-5
5-10
19-21
16-18
12-14
15-17

RD$

1,417.36

10-13
13-19
25-27
21-25
18-22
14-19
17-20
22-28
19-23

2
2
3
2
4
5
1
1
2
2
5
1
1
4

RD$837.10

RD$

1,130.09

RD$

292.99

RD$837.10

RD$

1,130.09

RD$

292.99

RD$56,925.00

RD$

76,848.75

RD$

19,923.75

RD$19,537.50

RD$

26,375.63

RD$

6,838.13

RD$56,000.00

RD$

75,600.00

RD$

9,800.00

RD$83,427.63

RD$

112,627.30

RD$

9,733.22

RD$48,138.30
RD$0.00

RD$

48,138.30
RD$0.00

RD$206,307.00

RD$

278,514.45

RD$

72,207.45

RD$433,244.70

RD$

584,880.35

RD$

151,635.65

RD$10,178.01

RD$

13,740.31

RD$

1,781.15

RD$2,700.00

RD$

2,700.00

RD$0.00

RD$

RD$25,445.02

RD$

34,350.78

RD$49,193.71

RD$

49,193.71

1
2
2
5

27-30
22-29
19-24
24-32
20-33
29-31
37-40
29-34
34-37
33-41
41-43
46-47

RD$

4,452.88

1
3
3
3
3

20-26

43-45

45-46
RD$37,600.00

RD$

50,760.00

RD$

13,160.00

RD$26,960.89
RD$11,693.88
RD$10,748.92

RD$
RD$
RD$

36,397.20
15,786.74
14,511.04

RD$
RD$
RD$

4,718.16
4,092.86
3,762.12

RD$4,404.80

RD$

5,946.48

RD$17,619.19

RD$

23,785.90

RD$

6,166.72

RD$21,734.40

RD$

29,341.44

RD$

7,607.04

RD$126,459.58

RD$

170,720.43

RD$

22,130.43

33-38
47-49
47-48
30-36
36-39
49-51
51-52
52-53

2
1
1
2
2
2
2
1
1
5
4

RD$75,950.00

RD$

102,532.50

RD$

RD$22,000.00

RD$

22,000.00

RD$12,600.00

RD$

12,600.00

RD$15,000.00

RD$

20,250.00

RD$

5,250.00

RD$38,000.00

RD$

51,300.00

RD$

13,300.00

RD$25,000.00

RD$

33,750.00

RD$

8,750.00

RD$113,017.60

RD$

152,573.76

RD$

39,556.16

RD$28,254.40

RD$

28,254.40

RD$47,200.00
RD$20,000.00
RD$12,000.00

RD$
RD$
RD$

47,200.00
27,000.00
16,200.00

RD$
RD$

26,582.50

2,333.33
2,100.00

53-55
53-54
49-50
54-56
39-42
32-35
3-6
6-7
42-44
57-58
58-59

RD$

ACT.

Compresion

1,965,101.77

Operacion

3-9
33-41
58-59

2 da
2 da
2 da

$1,965,101.77 + 2($701.66) - 2($9,497.99)


$1,947,509.11 + 2($1,781.15) - 2($9,497.99)
$1,932,075.43 + 2($2,100.00) - 2($9,497.99)

1-2
57-58

3 da
3 da

$1,917,279.45 + 3($2,205.00) - 3($9,497.99)


$1,895,400.47 + 3($2,333.33) - 3($9,497.99)

9-15
2-3
43-45

1 da
1 da
2 da

$1,873,906.50 + 1($2,443.42)-1($9,497.99)
$1,866,851.92 + 1($3,500.00) - 1($9,497.99)
$1,860,853.93 + 2($4,452.88) - 2($9,497.99)

47-49
17-20

2 da
1 da

$1,850,763.71 + 2(4,718.16) - 2($9,497.99)


$1,841,204.03 + 1($4,879.64) - 1($9,497.99)

54-56
51-52
20-33

1 da
1 da
3 da

$1,863,585.68 + 1($5,250.00) - 1($9,497.99)


$1,832,337.69 + 1($7,607.04) - 1($9,497.99)
$1,830,681.97 + 1($9,733.22) - 1($9,497.99)

RD$

9,497.99

Costo

60

Reducida

Duracion

1,947,509.11
1,932,075.43
1,917,279.45

2 da
2 da
2 da

58 da
56 da
54 da

1,895,400.47
1,873,906.50

3 da
3 da

51 da
48 da

1,866,851.92
1,860,853.93
1,850,763.71

1 da
1 da
2 da

47 da
46 da
44 da

1,841,204.03
1,836,585.68

2 da
1 da

42 da
41 da

1,832,337.69
1,830,446.74
1,831,152.44

1 da
1 da
3 da

40 da
39 da
36 da

Tabla de informacin de Compresin

ACT. Compresion
3-9
33-41
58-59
1-2
57-58
9-15
2-3
43-45
47-49
17-20
54-56
51-52
20-33

2 da
2 da
2 da
3 da
3 da
1 da
1 da
2 da
2 da
1 da
1 da
1 da
3 da

Operacion
$1,965,101.77 + 2($701.66) - 2($9,497.99)
$1,947,509.11 + 2($1,781.15) - 2($9,497.99)
$1,932,075.43 + 2($2,100.00) - 2($9,497.99)
$1,917,279.45 + 3($2,205.00) - 3($9,497.99)
$1,895,400.47 + 3($2,333.33) - 3($9,497.99)
$1,873,906.50 + 1($2,443.42)-1($9,497.99)
$1,866,851.92 + 1($3,500.00) - 1($9,497.99)
$1,860,853.93 + 2($4,452.88) - 2($9,497.99)
$1,850,763.71 + 2(4,718.16) - 2($9,497.99)
$1,841,204.03 + 1($4,879.64) - 1($9,497.99)
$1,863,585.68 + 1($5,250.00) - 1($9,497.99)
$1,832,337.69 + 1($7,607.04) - 1($9,497.99)
$1,830,681.97 + 1($9,733.22) - 1($9,497.99)

Costo
1,947,509.11
1,932,075.43
1,917,279.45
1,895,400.47
1,873,906.50
1,866,851.92
1,860,853.93
1,850,763.71
1,841,204.03
1,836,585.68
1,832,337.69
1,830,446.74
1,831,152.44

Reducida Duracion
2 da
2 da
2 da
3 da
3 da
1 da
1 da
2 da
2 da
1 da
1 da
1 da
3 da

58 da
56 da
54 da
51 da
48 da
47 da
46 da
44 da
42 da
41 da
40 da
39 da
36 da

MATRIZ DE ANTECEDENTES Y SUCESORAS CON LIMITACIO


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

51
52
53
54
55
56
57
58
59

MATRIZ DE ANTECEDENTES Y SUCESORAS CON LIMITACIONES DE RECURSOS


Actividad
Antecedente Secuencia
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
2
REPLANTEO
1
3,4,5,6,55
6

10

2
52,57

11
58

14

15

16

6
11
18

12
17
20

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

21

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

22

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

10

23

12

18

17
20

13
27

13

19

14

24,28

15
16

25,29
26,31

21

32,34

22

30

23

36,41

EXCAVACION ZAPATA MURO PERIMETRO CANCHA


EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE BAOS Y
VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MURO PERIMETRO
CANCHA
ARMADO
ARMADO ACERO
ACERO ZAPATA
ZAPATA MUROS
MUROS DE
DE GRADA
BAOS Y
VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP MUROS DE GRADA
COLOCACION BLOCK BNP MUROS DE BAOS Y
RELLENO DE REPOSICION Y COMPACTACION
ZAPATA MURO PERIMETRO CANCHA
RELLENO DE REPOSICION Y COMPACTACION
ZAPATA MUROS DE GRADA
RELLENO DE REPOSICION Y COMPACTACION
ZAPATA MUROS DE BAOS Y VESTIDORES

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

19

44

21

32,34

22

30

25,29

54,55

23

36,41

24,28
35

35
57

24,28

35

32, 34

33

26,31

37

36

39

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

40

42,43

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

37

40

39

38

26,31

42,43

38,41
38,41
27

46,51
47
45

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

44

53

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

42

47

43,46

48

47

49,50

48

59

48

52

RELLENO COMPACTADO INTERIOR DE CANCHA


COLOCACION BLOCK SNP VIOLINADOS MUROS DE
GRADA
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )
EN GRADAS
COLOCACION BLOCK SNP MUROS DE BAOS Y
VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA
DE CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES
INSTALACION ELECTRICA EN TECHO

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y
SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS
Y VESTIDORES
INSTALACION DE APARATOS SANITARIOS Y
ACCESORIOS ELECTRICOS
INSTALACION DE PUERTAS Y VENTANAS

IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES


PINTURA EXTERIOR BAOS Y VESTIDORES
PINTURA Y SEALIZACION CANCHA Y SOPORTE DE
TABLERO
PINTURA MUROS DE GRADAS
EXCAVACION E INSTALACION DE POSTE DE LUZ
PREFABRICADO
INSTALACION DE LAMPARAS DE ILUMINACION
INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

42

52

50,51

45

57

30

59

30

56

55

59

33,53
7,56
49, 54, 58

7
59
-

No.
1
2

MATRIZ DE COSTO COMPRIMIDO


Actividad
T comp
5
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
1
REPLANTEO

EXCAVACION ZAPATA MURO PERIMETRO CANCHA

EXCAVACION ZAPATA MUROS DE GRADA

EXCAVACION ZAPATA MUROS DE BAOS Y


VESTIDORES

6
7

EXCAVACION ZAPATA SOPORTE TABLERO


BOTE DE MATERIAL INSERVIBLE

ARMADO ACERO ZAPATA MURO PERIMETRO


CANCHA

ARMADO ACERO ZAPATA MUROS DE GRADA

10

ARMADO ACERO ZAPATA MUROS DE BAOS Y


VESTIDORES

11
12
13

ARMADO ACERO ZAPATA SOPORTE TABLERO


ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

1
1
2
1

14

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

15

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

16

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

17

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO

18
19

ENCOFRADO SOPORTE DE TABLERO


DESENCOFRADO SOPORTE TABLERO

20

COLOCACION DE HORMIGON SOPORTE TABLERO

21

COLOCACION BLOCK BNP PERIMETRO CANCHA

22

COLOCACION BLOCK BNP MUROS DE GRADA

2
2

23

COLOCACION BLOCK BNP MUROS DE BAOS Y


VESTIDORES

24

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

25

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE GRADA

4
4
2
1
3
2
1

1
3
1
1

26

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE BAOS Y VESTIDORES

27

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

28

RELLENO COMPACTADO INTERIOR DE CANCHA

29

COLOCACION BLOCK SNP VIOLINADOS MUROS DE


GRADA

30

COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )


EN GRADAS

31

COLOCACION BLOCK SNP MUROS DE BAOS Y


VESTIDORES

32
33

ENCOFRADO PERIMETRO CANCHA


DESENCOFRADO PERIMETRO CANCHA

5
1
1

34

ARMADO DE MALLA ELECTROSOLDADA PARA LOSA


DE CANCHA

35

COLOCACION DE HORMIGON SEMI-PULIDO CANCHA

36

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

37

INSTALACION ELECTRICA EN TECHO

3
1

38

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

39

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

40

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES

41

COLOCACION DE TUBERIAS ELECTRICAS Y


SANITARIAS

42
43
44

PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

3
1
3
3

45

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

46

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

47

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES

48

REVESTIMIENTO DE CERAMICA EN PARED DE BAOS


Y VESTIDORES

49

INSTALACION DE APARATOS SANITARIOS Y


ACCESORIOS ELECTRICOS

50

INSTALACION DE PUERTAS Y VENTANAS

51

IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES

52

PINTURA EXTERIOR BAOS Y VESTIDORES

53

PINTURA Y SEALIZACION CANCHA Y SOPORTE DE


TABLERO

54

PINTURA MUROS DE GRADAS

2
2

55

EXCAVACION E INSTALACION DE POSTE DE LUZ


PREFABRICADO

56

INSTALACION DE LAMPARAS DE ILUMINACION

57
58
59

INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA
TOTAL DEL PROYECTO Comprimido
Dias Reducidos
Costo Indirecto Reducido

TOTAL DEL PROYECTO REDUCIDO


Tiempo de Ejecucion

2
1
1
1

1
1
2
2

DO
Costo. Comp.
RD$25,515.00
RD$13,500.00
RD$10,935.00
RD$1,458.00
RD$5,412.83
RD$720.00
RD$55,036.54
RD$19,039.61
RD$2,538.61
RD$9,424.61
RD$1,533.60
RD$4,412.47
RD$3,686.74
RD$44,425.75
RD$5,923.43
RD$16,289.44
RD$3,578.40
RD$4,049.60
RD$0.00
RD$14,848.55
RD$57,034.80
RD$5,069.76
RD$18,821.48
RD$837.10
RD$837.10

RD$837.10
RD$837.10
RD$56,925.00
RD$19,537.50
RD$56,000.00
RD$83,427.63
RD$48,138.30
RD$0.00
RD$206,307.00
RD$433,244.70
RD$13,740.31
RD$2,700.00
RD$0.00
RD$34,350.78
RD$49,193.71
RD$37,600.00
RD$36,397.20
RD$11,693.88
RD$10,748.92
RD$4,404.80
RD$17,619.19
RD$29,341.44
RD$126,459.58

RD$75,950.00
RD$22,000.00
RD$12,600.00
RD$20,250.00
RD$38,000.00
RD$25,000.00
RD$113,017.60
RD$28,254.40
RD$47,200.00
RD$27,000.00
RD$16,200.00
RD$2,029,904.57
21
RD$199,457.79

RD$1,830,446.78
39 dias

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

Tabla de Elasticidad
Actividad
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE BAOS Y VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MURO PERIMETRO CANCHA
ARMADO ACERO ZAPATA MUROS DE GRADA
ARMADO ACERO ZAPATA MUROS DE BAOS Y VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO
COLOCACION DE HORMIGON ZAPATA MURO PERIMETRO CANCHA
COLOCACION DE HORMIGON ZAPATA MUROS DE GRADA
COLOCACION DE HORMIGON ZAPATA MUROS DE BAOS Y VESTIDORES
COLOCACION DE HORMIGON ZAPATA SOPORTE TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP MUROS DE GRADA
COLOCACION BLOCK BNP MUROS DE BAOS Y VESTIDORES
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MURO PERIMETRO CANCHA
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MUROS DE GRADA
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MUROS DE BAOS Y VESTIDORES
RELLENO DE REPOSICION Y COMPACTACION SOPORTE TABLERO
RELLENO COMPACTADO INTERIOR DE CANCHA
COLOCACION BLOCK SNP VIOLINADOS MUROS DE GRADA
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS ) EN GRADAS
COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA DE CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES


INSTALACION ELECTRICA EN TECHO
DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE HORMIGON DE VIGAS DE AMARRE Y LOSA DE TECHO BAOS Y
VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO
CONFECCION DE MOCHETAS Y CANTOS SOPORTE TABLERO
CONFECCION DE MOCHETAS Y CANTOS BAOS Y VESTIDORES
COLOCACION DE TORTA Y CERAMICA DE PISO BAOS Y VESTIDORES
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS Y VESTIDORES
INSTALACION DE APARATOS SANITARIOS Y ACCESORIOS ELECTRICOS
INSTALACION DE PUERTAS Y VENTANAS
IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES
PINTURA EXTERIOR BAOS Y VESTIDORES
PINTURA Y SEALIZACION CANCHA Y SOPORTE DE TABLERO
PINTURA MUROS DE GRADAS
EXCAVACION E INSTALACION DE POSTE DE LUZ PREFABRICADO
INSTALACION DE LAMPARAS DE ILUMINACION
INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

14.00
2.00
6.00
5.00
5.00
1.00
4.00
2.00
1.00
2.00

Tiempos
Te*
(Da)
8.00
2.00
4.00
4.00
4.00
1.00
3.00
2.00
1.00
2.00

1.00

1.00

1.00

RD$1,533.60

0.00

3.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
3.00
3.00
3.00
2.00
2.00

2.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00

1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

RD$4,412.47
RD$3,686.74
RD$44,425.75
RD$5,923.43
RD$16,289.44
RD$3,578.40
RD$4,049.60
RD$0.00
RD$14,848.55
RD$57,034.80
RD$5,069.76
RD$13,941.84
RD$837.10
RD$837.10

5,956.83
3,686.74
44,425.75
5,923.43
16,289.44
3,578.40
5,466.97
0.00
14,848.55
76,996.98
6,844.18
18,821.48
1,130.09
1,130.09

2.00

2.00

1.00

RD$837.10

1,130.09

2.00
4.00
3.00
5.00
8.00
1.00
1.00
2.00
2.00

2.00
3.00
2.00
4.00
5.00
1.00
1.00
2.00
2.00

1.00
2.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00

RD$837.10
RD$56,925.00
RD$19,537.50
RD$56,000.00
RD$83,427.63
RD$48,138.30
RD$0.00
RD$206,307.00
RD$433,244.70

1,130.09
76,848.75
26,375.63
75,600.00
112,627.30
48,138.30
0.00
278,514.45
584,880.35

Tp
(Da)

To
(Da)

Costo Nominal
(RD$)

5.00
1.00
2.00
2.00
2.00
1.00
2.00
1.00
1.00
1.00

RD$18,900.00
RD$10,000.00
RD$10,935.00
RD$1,458.00
RD$4,009.50
RD$720.00
RD$55,036.54
RD$19,039.61
RD$2,538.61
RD$6,981.19

Costos
Costo Limite
(RD$)
25,515.00
13,500.00
14,762.25
1,968.30
5,412.83
0.00
74,299.33
25,703.47
0.00
9,424.61

7.00
1.00
1.00
5.00

5.00
1.00
1.00
4.00

3.00
1.00
1.00
2.00

RD$10,178.01
RD$2,700.00
RD$0.00
RD$25,445.02

13,740.31
2,700.00
0.00
34,350.78

1.00

1.00

1.00

RD$49,193.71

49,193.71

4.00
4.00
4.00
3.00
1.00
2.00
3.00
7.00
2.00
1.00
1.00
2.00
2.00
2.00
3.00
1.00
1.00
7.00
5.00

3.00
3.00
3.00
3.00
1.00
2.00
2.00
5.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
5.00
4.00

2.00
1.00
2.00
2.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00

RD$37,600.00
RD$26,960.89
RD$11,693.88
RD$10,748.92
RD$4,404.80
RD$17,619.19
RD$21,734.40
RD$126,459.58
RD$75,950.00
RD$22,000.00
RD$12,600.00
RD$15,000.00
RD$38,000.00
RD$25,000.00
RD$113,017.60
RD$28,254.40
RD$47,200.00
RD$20,000.00
RD$12,000.00

50,760.00
36,397.20
15,786.74
14,511.04
5,946.48
23,785.90
29,341.44
170,720.43
102,532.50
22,000.00
12,600.00
20,250.00
51,300.00
33,750.00
152,573.76
28,254.40
47,200.00
27,000.00
16,200.00

Lecturas
Pendiente
(RD$/da)
2,205.00
3,500.00
1,913.63
255.15
701.66
19,262.79
6,663.86
2,443.42

HT

HL

IR

IP

TR

TP

Das

%E

Cl

Das

0
5
13
6
6
6
32
18
24
8

0
5
7
6
6
6
32
11
10
8

5
6
18
24
8
13
35
20
25
9

5
6
11
10
8
7
35
13
11
9

-3.00
-1.00
7.00
14.00
-2.00
6.00
0.00
7.00
14.00
-1.00

-0.38
-0.50
1.75
3.50
-0.50
6.00
0.00
3.50
14.00
-0.50

C
C
0
0
C
0
C
0
0
C

-3.00
-1.00
0.00
0.00
-2.00
0.00
0.00
0.00
0.00
-1.00

13

14

6.00

6.00

0.00

1,544.36
1,417.36
19,962.18
1,774.42
4,879.64
292.99
292.99

14
20
20
25
9
16
17
22
21
21
26
10
23
28

8
14
13
11
9
10
11
16
15
14
12
10
16
14

16
21
21
26
10
17
20
23
22
23
28
11
26
30

10
15
14
12
10
11
14
17
16
16
14
11
18
16

6.00
6.00
7.00
14.00
0.00
6.00
6.00
6.00
6.00
7.00
14.00
-1.00
8.00
14.00

3.00
6.00
7.00
14.00
0.00
6.00
2.00
6.00
6.00
3.50
7.00
-0.50
4.00
7.00

0
0
0
0
C
0
0
0
0
0
0
C
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1.00
0.00
0.00

292.99

11

11

16

13

3.00

1.50

0.00

292.99
19,923.75
6,838.13
9,800.00
9,733.22
72,207.45
151,635.65

23
23
28
30
11
26
30
26
28

17
16
14
16
11
19
23
19
21

25
26
30
34
16
28
31
28
30

19
19
16
20
16
20
24
21
23

6.00
7.00
14.00
14.00
0.00
8.00
7.00
7.00
7.00

3.00
2.33
7.00
3.50
0.00
8.00
7.00
3.50
3.50

0
0
0
0
C
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1,781.15
4,452.88

16
19
23
20

16
19
23
20

19
20
24
22

19
20
24
22

-2.00
0.00
0.00
-2.00

-0.40
0.00
0.00
-0.50

C
C
C
C

-2.00
0.00
0.00
-2.00

22

22

23

23

0.00

0.00

0.00

13,160.00
4,718.16
4,092.86
3,762.12
1,541.68
6,166.72
7,607.04
22,130.43
26,582.50
5,250.00
13,300.00
8,750.00
39,556.16
2,333.33
2,100.00

16
24
24
25
28
25
27
28
30
30
25
31
29
34
34
36
31
35
37

16
24
24
19
22
25
27
28
30
30
25
31
23
20
20
22
25
35
37

24
25
27
28
29
27
28
30
37
31
31
32
31
37
36
37
32
37
39

19
25
27
22
23
27
28
30
32
31
26
32
25
22
22
23
26
37
39

5.00
-2.00
0.00
6.00
6.00
0.00
-1.00
-3.00
5.00
0.00
5.00
-1.00
6.00
15.00
14.00
14.00
6.00
-3.00
-2.00

1.67
-0.67
0.00
2.00
6.00
0.00
-0.50
-0.60
2.50
0.00
5.00
-0.50
3.00
7.50
7.00
14.00
6.00
-0.60
-0.50

0
C
C
0
0
C
C
C
0
C
0
C
0
0
0
0
0
C
C

0.00
-2.00
0.00
0.00
0.00
0.00
-1.00
-3.00
0.00
0.00
0.00
-1.00
0.00
0.00
0.00
0.00
0.00
-3.00
-2.00

Compresion
Probabilidad de Retraso

Das

%C

3.00
1.00
2.00
2.00
2.00
0.00
1.00
1.00
0.00
1.00

0.38
0.50
0.50
0.50
0.50
0.00
0.33
0.50
0.00
0.50

1.5
0.2
0.7
0.5
0.5
0.0
0.3
0.2
0.0
0.2

13.36%
84.14%
48.40%
61.70%
61.70%
0.00%
76.42%
84.14%
0.00%
84.14%

0.00

0.00

0.0

0.00%

1.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00

0.50
0.00
0.00
0.00
0.00
0.00
0.33
0.00
0.00
0.50
0.50
0.50
0.50
0.50

0.3
0.0
0.0
0.0
0.0
0.0
0.2
0.0
0.0
0.3
0.3
0.3
0.2
0.2

76.42%
0.00%
0.00%
0.00%
0.00%
0.00%
84.14%
0.00%
0.00%
76.42%
76.42%
76.42%
84.14%
84.14%

1.00

0.50

0.2

84.14%

1.00
1.00
1.00
2.00
3.00
0.00
0.00
1.00
1.00

0.50
0.33
0.50
0.50
0.60
0.00
0.00
0.50
0.50

0.2
0.3
0.3
0.5
1.0
0.0
0.0
0.2
0.2

84.14%
76.42%
76.42%
61.70%
31.74%
0.00%
0.00%
84.14%
84.14%

2.00
0.00
0.00
2.00

0.40
0.00
0.00
0.50

0.7
0.0
0.0
0.5

48.40%
0.00%
0.00%
61.70%

0.00

0.00

0.0

0.00%

1.00
2.00
1.00
1.00
0.00
1.00
1.00
2.00
1.00
0.00
0.00
1.00
1.00
1.00
1.00
0.00
0.00
3.00
2.00

0.33
0.67
0.33
0.33
0.00
0.50
0.50
0.40
0.50
0.00
0.00
0.50
0.50
0.50
0.50
0.00
0.00
0.60
0.50

0.3
0.5
0.3
0.2
0.0
0.2
0.3
0.7
0.2
0.0
0.0
0.2
0.2
0.2
0.3
0.0
0.0
0.8
0.5

76.42%
61.70%
76.42%
84.14%
0.00%
84.14%
76.42%
48.40%
84.14%
0.00%
0.00%
84.14%
84.14%
84.14%
76.42%
0.00%
0.00%
42.38%
61.70%

Actividades Criticas
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO
EXCAVACION ZAPATA MUROS DE BAOS Y VESTIDORES
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MUROS DE BAOS Y VESTIDORES
COLOCACION DE HORMIGON ZAPATA MUROS DE BAOS Y VESTIDORES
COLOCACION BLOCK BNP MUROS DE BAOS Y VESTIDORES
COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
INSTALACION ELECTRICA EN TECHO
DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE HORMIGON DE VIGAS DE AMARRE Y LOSA DE TECHO BAOS Y
VESTIDORES
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
CONFECCION DE MOCHETAS Y CANTOS BAOS Y VESTIDORES
COLOCACION DE TORTA Y CERAMICA DE PISO BAOS Y VESTIDORES
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS Y VESTIDORES
INSTALACION DE PUERTAS Y VENTANAS
PINTURA EXTERIOR BAOS Y VESTIDORES
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

t
8.00
2.00
4.00
3.00
2.00
1.00
2.00
5.00
5.00
1.00
1.00
4.00
1.00
3.00
3.00
2.00
2.00
5.00
1.00
2.00
5.00
4.00

8.00
10.00
14.00
17.00
19.00
20.00
22.00
27.00
32.00
33.00
34.00
38.00
39.00
42.00
45.00
47.00
49.00
54.00
55.00
57.00
62.00
66.00

t+ (t+)
1.5 9.5
9.5
0.2 2.2
11.7
16.2
0.5 4.5
19.5
0.3 3.3
21.7
0.2 2.2
22.7
0.0 1.0
25.0
0.3 2.3
31.0
1.0 6.0
36.7
0.7 5.7
37.7
0.0 1.0
38.7
0.0 1.0
43.2
0.5 4.5
0.0
0.5
0.3
0.2
0.3
0.7
0.0
0.2
0.8
0.5

1.0
3.5
3.3
2.2
2.3
5.7
1.0
2.2
5.8
4.5

44.2
47.7
51.0
53.2
55.5
61.2
62.2
64.3
70.2
74.7

80.00

70.00

60.00

50.00
Dias Programados

40.00

30.00

20.00

10.00

0.00
8.00

10.00

10.00

14.00

17.00

19.00

20.00

22.00

27.00

32.00

Retraso Previsto

32.00

33.00

34.00

38.00

Dias Tolerados

39.00

42.00

45.00

47.00

47.00

49.00

54.00

55.00

57.00

62.00

66.00

t
(t+)

No.
1
2

Actividad
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO

T comp
5
1

EXCAVACION ZAPATA MURO PERIMETRO CANCHA

EXCAVACION ZAPATA MUROS DE GRADA

EXCAVACION ZAPATA MUROS DE BAOS Y


VESTIDORES

6
7

EXCAVACION ZAPATA SOPORTE TABLERO


BOTE DE MATERIAL INSERVIBLE

ARMADO ACERO ZAPATA MURO PERIMETRO


CANCHA

ARMADO ACERO ZAPATA MUROS DE GRADA

10

ARMADO ACERO ZAPATA MUROS DE BAOS Y


VESTIDORES

11
12
13

ARMADO ACERO ZAPATA SOPORTE TABLERO


ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO

1
1
2
1

14

COLOCACION DE HORMIGON ZAPATA MURO


PERIMETRO CANCHA

15

COLOCACION DE HORMIGON ZAPATA MUROS DE


GRADA

16

COLOCACION DE HORMIGON ZAPATA MUROS DE


BAOS Y VESTIDORES

17

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO

18
19

ENCOFRADO SOPORTE DE TABLERO


DESENCOFRADO SOPORTE TABLERO

20

COLOCACION DE HORMIGON SOPORTE TABLERO

21

COLOCACION BLOCK BNP PERIMETRO CANCHA

22

COLOCACION BLOCK BNP MUROS DE GRADA

2
2

23

COLOCACION BLOCK BNP MUROS DE BAOS Y


VESTIDORES

24

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

25

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE GRADA

4
4
2
1
3
2
1

1
3
1
1

26

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MUROS DE BAOS Y VESTIDORES

27

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

28

RELLENO COMPACTADO INTERIOR DE CANCHA

29

COLOCACION BLOCK SNP VIOLINADOS MUROS DE


GRADA

30

COLOCACION VIGAS PREFABRICADAS ( ACIENTOS )


EN GRADAS

31

COLOCACION BLOCK SNP MUROS DE BAOS Y


VESTIDORES

32
33

ENCOFRADO PERIMETRO CANCHA


DESENCOFRADO PERIMETRO CANCHA

5
1
1

34

ARMADO DE MALLA ELECTROSOLDADA PARA LOSA


DE CANCHA

35

COLOCACION DE HORMIGON SEMI-PULIDO CANCHA

36

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

37

INSTALACION ELECTRICA EN TECHO

3
1

38

DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

39

ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO


BAOS Y VESTIDORES

40

COLOCACION DE HORMIGON DE VIGAS DE AMARRE


Y LOSA DE TECHO BAOS Y VESTIDORES

41

COLOCACION DE TUBERIAS ELECTRICAS Y


SANITARIAS

42
43
44

PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

3
1
3
3

45

CONFECCION DE MOCHETAS Y CANTOS SOPORTE


TABLERO

46

CONFECCION DE MOCHETAS Y CANTOS BAOS Y


VESTIDORES

47

COLOCACION DE TORTA Y CERAMICA DE PISO


BAOS Y VESTIDORES

48

REVESTIMIENTO DE CERAMICA EN PARED DE BAOS


Y VESTIDORES

49

INSTALACION DE APARATOS SANITARIOS Y


ACCESORIOS ELECTRICOS

50

INSTALACION DE PUERTAS Y VENTANAS

51

IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES

52

PINTURA EXTERIOR BAOS Y VESTIDORES

53

PINTURA Y SEALIZACION CANCHA Y SOPORTE DE


TABLERO

54

PINTURA MUROS DE GRADAS

2
2

55

EXCAVACION E INSTALACION DE POSTE DE LUZ


PREFABRICADO

56

INSTALACION DE LAMPARAS DE ILUMINACION

57
58
59

INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

2
1
1
1

1
1
2
2

RD

Costo. Comp.
RD$25,515.00
RD$13,500.00

Semana #0
RD$25,515.00
RD$13,500.00

Semana #1

RD$10,935.00

RD$10,935.00

RD$1,458.00

RD$1,458.00

RD$5,412.83

RD$5,412.83

RD$720.00
RD$55,036.54

RD$720.00

RD$19,039.61

Semana #2

RD$19,039.61

RD$2,538.61

RD$2,538.61

RD$9,424.61

RD$9,424.61

RD$1,533.60
RD$4,412.47
RD$3,686.74

RD$1,533.60
RD$4,412.47
RD$3,686.74

RD$44,425.75

RD$44,425.75

RD$5,923.43

RD$5,923.43

RD$16,289.44

RD$16,289.44

RD$3,578.40

RD$3,578.40

RD$4,049.60
RD$0.00

RD$4,049.60
RD$0.00

RD$14,848.55

RD$14,848.55

RD$57,034.80

RD$57,034.80

RD$5,069.76

RD$5,069.76

RD$18,821.48

Semana #3

RD$18,821.48

RD$837.10

RD$418.55

RD$837.10

RD$837.10

RD$418.55

RD$837.10

RD$837.10

RD$837.10

RD$837.10

RD$56,925.00

RD$18,975.00

RD$19,537.50

RD$19,537.50

RD$56,000.00

RD$14,000.00

RD$83,427.63

RD$83,427.63

RD$37,950.00

RD$42,000.00

RD$48,138.30
RD$0.00

RD$48,138.30

RD$206,307.00

RD$206,307.00

RD$433,244.70

RD$433,244.70

RD$13,740.31

RD$4,580.10

RD$2,700.00

RD$9,160.21
RD$2,700.00

RD$0.00
RD$34,350.78

RD$34,350.78

RD$49,193.71

RD$49,193.71

RD$37,600.00

RD$12,533.33

RD$25,066.67

RD$36,397.20
RD$11,693.88
RD$10,748.92

RD$10,748.92

RD$4,404.80

RD$4,404.80

RD$17,619.19
RD$29,341.44
RD$126,459.58

RD$75,950.00
RD$22,000.00
RD$12,600.00
RD$20,250.00
RD$38,000.00
RD$25,000.00

RD$25,000.00

RD$113,017.60

RD$113,017.60

RD$28,254.40

RD$28,254.40

RD$47,200.00
RD$27,000.00
RD$16,200.00
RD$2,029,904.57

RD$39,015.00

RD$75,124.44

RD$309,224.57

RD$1,070,792.73

Semana #4

Semana #5

Semana #6

RD$55,036.54

Semana #7

RD$0.00

RD$0.00

RD$36,397.20
RD$11,693.88

RD$17,619.19
RD$5,868.29

RD$23,473.15
RD$126,459.58

RD$75,950.00
RD$22,000.00
RD$12,600.00
RD$20,250.00
RD$38,000.00

RD$47,200.00

RD$199,028.56

RD$238,482.73

RD$27,000.00
RD$8,100.00
RD$90,136.54

RD$8,100.00
RD$8,100.00

ORDEN DE TRABAJO

PROYECTO

PROCESO

ACTIVIDAD

RESP.
INIC.

TEMP.
TARDIA

TERM.

TEMP.
TARDIA

TIEMPO DE DURACION
HOLGURAS

% AVANCE POR DIA

TOTAL
%

LIBRE
%

COMPRESION: DIAS

INSTRUCCIONES:

PRESUPUESTO
MANO DE OBRA
P

MATERIALES

LUGAR
FECHA
PREPARADO

REVISADO

AUTORIZADO

ORDEN DE TRABAJO

ORDEN DE TRABAJO

ORDEN DE TRABAJO

f(D-a)

0.0090

Dia

Actividades
Por Dia

Actividades
Acumuladas

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

1
1
1
1
1
1
3
4
4
4
4
5
5
4
5
5
6
6
5
5
5
5
4
3
3
4
2
1
1
1
2
2
1
1
1
1
1
1

1
2
3
4
5
6
9
13
17
21
25
30
35
39
44
49
55
61
66
71
76
81
85
88
91
95
97
98
99
100
102
104
105
106
107
108
109
110

Avance
Programado
Por Dia
0.0090
0.0180
0.0270
0.0360
0.0450
0.0541
0.0811
0.1171
0.1532
0.1892
0.2252
0.2703
0.3153
0.3514
0.3964
0.4414
0.4955
0.5495
0.5946
0.6396
0.6847
0.7297
0.7658
0.7928
0.8198
0.8559
0.8739
0.8829
0.8919
0.9009
0.9189
0.9369
0.9459
0.9550
0.9640
0.9730
0.9820
0.9910

39

111

1.0000

Dia

1/e

Dias
Transcurridos

LIMPIEZA Y EXTRACCION DE
CAPA VEGETAL

0.20

LIMPIEZA Y EXTRACCION DE
CAPA VEGETAL

0.20

LIMPIEZA Y EXTRACCION DE
CAPA VEGETAL

0.20

LIMPIEZA Y EXTRACCION DE
CAPA VEGETAL

0.20

LIMPIEZA Y EXTRACCION DE
CAPA VEGETAL

0.20

REPLANTEO

1.00

EXCAVACION ZAPATA MUROS


DE GRADA

0.25

EXCAVACION ZAPATA MUROS


DE BAOS Y VESTIDORES

0.50

EXCAVACION ZAPATA
SOPORTE TABLERO

1.00

EXCAVACION ZAPATA MUROS


DE GRADA

0.25

EXCAVACION ZAPATA MUROS


DE BAOS Y VESTIDORES

0.50

ARMADO ACERO ZAPATA


SOPORTE TABLERO

1.00

EXCAVACION ZAPATA MURO


PERIMETRO CANCHA

0.25

EXCAVACION ZAPATA MUROS


DE GRADA

0.25

EXCAVACION ZAPATA MURO


PERIMETRO CANCHA

0.25

ARMADO ACERO ZAPATA


MUROS DE BAOS Y
VESTIDORES

1.00

ARMADO COLUMNA SOPORTE


DE TABLERO

0.50

EXCAVACION ZAPATA MUROS


DE GRADA

0.25

EXCAVACION ZAPATA MURO


PERIMETRO CANCHA

0.25

10 ARMADO COLUMNA SOPORTE


DE TABLERO

0.50

COLOCACION DE HORMIGON
ZAPATA MUROS DE BAOS Y
VESTIDORES

1.00

EXCAVACION ZAPATA MURO


PERIMETRO CANCHA

0.25

COLOCACION DE HORMIGON
ZAPATA SOPORTE TABLERO

1.00

COLOCACION BLOCK BNP


MUROS DE BAOS Y
VESTIDORES

1.00

ARMADO ACERO ZAPATA


MUROS DE GRADA

1.00

COLOCACION DE HORMIGON
ZAPATA MUROS DE GRADA

1.00

RELLENO DE REPOSICION Y
COMPACTACION ZAPATA
MUROS DE BAOS Y
VESTIDORES

0.50

COLOCACION BLOCK SNP


MUROS DE BAOS Y
VESTIDORES

0.20

ENCOFRADO SOPORTE DE
TABLERO

0.33

ARMADO ACERO ZAPATA


MURO PERIMETRO CANCHA

0.50

RELLENO DE REPOSICION Y
COMPACTACION ZAPATA
MUROS DE BAOS Y
VESTIDORES

0.50

11

12

13

13

14

15

16

COLOCACION BLOCK SNP


MUROS DE BAOS Y
VESTIDORES

0.20

ENCOFRADO SOPORTE DE
TABLERO

0.33

ARMADO ACERO ZAPATA


MURO PERIMETRO CANCHA

0.50

COLOCACION BLOCK BNP


MUROS DE GRADA

0.50

COLOCACION BLOCK SNP


MUROS DE BAOS Y
VESTIDORES

0.20

COLOCACION BLOCK BNP


MUROS DE GRADA

0.50

ENCOFRADO SOPORTE DE
TABLERO

0.33

COLOCACION DE HORMIGON
ZAPATA MURO PERIMETRO
CANCHA

1.00

COLOCACION BLOCK SNP


MUROS DE BAOS Y
VESTIDORES

0.20

RELLENO DE REPOSICION Y
COMPACTACION ZAPATA
MUROS DE GRADA

0.50

COLOCACION BLOCK SNP


VIOLINADOS MUROS DE
GRADA

0.50

ARMADO VIGA SOPORTE DE


TABLERO

1.00

COLOCACION BLOCK BNP


PERIMETRO CANCHA

0.50

COLOCACION BLOCK SNP


MUROS DE BAOS Y
VESTIDORES

0.20

RELLENO DE REPOSICION Y
COMPACTACION ZAPATA
MUROS DE GRADA

0.50

COLOCACION BLOCK SNP


VIOLINADOS MUROS DE
GRADA

0.50

16

17

18

19

COLOCACION BLOCK BNP


PERIMETRO CANCHA

0.50

COLOCACION DE HORMIGON
SOPORTE TABLERO

1.00

RELLENO COMPACTADO
INTERIOR DE CANCHA

0.33

RELLENO DE REPOSICION Y
COMPACTACION ZAPATA
MURO PERIMETRO CANCHA

0.50

DESENCOFRADO SOPORTE
TABLERO

1.00

ENCOFRADO DE VIGA DE
AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES

0.33

COLOCACION DE TUBERIAS
ELECTRICAS Y SANITARIAS

0.33

COLOCACION VIGAS
PREFABRICADAS ( ACIENTOS )
EN GRADAS

0.25

RELLENO COMPACTADO
INTERIOR DE CANCHA

0.33

RELLENO DE REPOSICION Y
COMPACTACION ZAPATA
MURO PERIMETRO CANCHA

0.50

ENCOFRADO DE VIGA DE
AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES

0.33

COLOCACION DE TUBERIAS
ELECTRICAS Y SANITARIAS

0.33

COLOCACION VIGAS
PREFABRICADAS ( ACIENTOS )
EN GRADAS

0.25

RELLENO DE REPOSICION Y
COMPACTACION SOPORTE
TABLERO

0.50

RELLENO COMPACTADO
INTERIOR DE CANCHA

0.33

ENCOFRADO DE VIGA DE
AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES

0.33

COLOCACION DE TUBERIAS
ELECTRICAS Y SANITARIAS

0.33

COLOCACION VIGAS
PREFABRICADAS ( ASIENTOS )
EN GRADAS

0.25

RELLENO DE REPOSICION Y
COMPACTACION SOPORTE
TABLERO

0.50

COLOCACION VIGAS
PREFABRICADAS ( ASIENTOS )
EN GRADAS

0.25

INSTALACION ELECTRICA EN
TECHO

1.00

PAETE SOPORTE TABLERO

0.33

ENCOFRADO PERIMETRO
CANCHA

1.00

ARMADO DE MALLA
ELECTROSOLDADA PARA LOSA
DE CANCHA

0.50

PAETE SOPORTE TABLERO

0.33

ARMADO DE MALLA
ELECTROSOLDADA PARA LOSA
DE CANCHA

0.50

ARMADO DE VIGA DE AMARRE


Y LOSA DE TECHO BAOS Y
21
VESTIDORES

0.50

PINTURA MUROS DE GRADAS

0.50

EXCAVACION E INSTALACION
DE POSTE DE LUZ
PREFABRICADO

0.50

PAETE SOPORTE TABLERO

0.33

ARMADO DE VIGA DE AMARRE


Y LOSA DE TECHO BAOS Y
VESTIDORES

0.50

PINTURA MUROS DE GRADAS

0.50

19

20

22

22

23

24

25

26

EXCAVACION E INSTALACION
DE POSTE DE LUZ
PREFABRICADO

0.50

COLOCACION DE HORMIGON
SEMI-PULIDO CANCHA

0.50

COLOCACION DE HORMIGON
SEMI-PULIDO CANCHA

0.50

CONFECCION DE MOCHETAS Y
CANTOS SOPORTE TABLERO

1.00

COLOCACION DE HORMIGON
DE VIGAS DE AMARRE Y LOSA
DE TECHO BAOS Y
VESTIDORES

1.00

INSTALACION DE LAMPARAS
DE ILUMINACION

1.00

DESENCOFRADO DE VIGA DE
AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES

1.00

PINTURA Y SEALIZACION
CANCHA Y SOPORTE DE
TABLERO

0.50

DESENCOFRADO PERIMETRO
CANCHA

1.00

PINTURA Y SEALIZACION
CANCHA Y SOPORTE DE
TABLERO

0.50

PAETE EXTERIOR

1.00

PAETE DE TECHO INTERIOR

0.33

PAETE DE TECHO INTERIOR

0.33

INSTALACION DE TABLEROS

1.00

IMPERMEABILIZANTE TECHO
BAOS Y VESTIDORES

1.00

26

CONFECCION DE MOCHETAS Y
CANTOS BAOS Y VESTIDORES

0.50

PAETE DE TECHO INTERIOR

0.33

CONFECCION DE MOCHETAS Y
CANTOS BAOS Y VESTIDORES

0.50

COLOCACION DE TORTA Y
CERAMICA DE PISO BAOS Y
VESTIDORES

1.00

REVESTIMIENTO DE CERAMICA
EN PARED DE BAOS Y
29
VESTIDORES

0.50

REVESTIMIENTO DE CERAMICA
EN PARED DE BAOS Y
30
VESTIDORES

0.50

INSTALACION DE PUERTAS Y
VENTANAS

1.00

INSTALACION DE APARATOS
SANITARIOS Y ACCESORIOS
ELECTRICOS

0.50

INSTALACION DE APARATOS
SANITARIOS Y ACCESORIOS
ELECTRICOS

0.50

PINTURA EXTERIOR BAOS Y


VESTIDORES

1.00

33 BOTE DE MATERIAL INSERVIBLE

0.33

34 BOTE DE MATERIAL INSERVIBLE

0.33

35 BOTE DE MATERIAL INSERVIBLE

0.33

27

28

31

32

36

CONFECCION DE JARDINERIA

0.50

37

CONFECCION DE JARDINERIA

0.50

38

LIMPIEZA FINAL Y ENTREGA

0.50

39

LIMPIEZA FINAL Y ENTREGA

0.50

Porcentaje Poercentaje
Programado
Real

fa

Avande de a

Porcentaje
Acumulado

Avance del Proyecto

20%

10%

0.0450

0.0045

0.000%

0.450%

40%

40%

0.0450

0.0180

0.000%

1.802%

60%

55%

0.0450

0.0248

0.000%

2.477%

80%

95%

0.0450

0.0428

0.000%

4.279%

100%

100%

0.0450

0.0450

0.000%

4.505%

100%

100%

0.0090

0.0090

4.505%

5.405%

25%

35%

0.0360

0.0126

50%

40%

0.0180

0.0072

5.405%

8.288%

100%

100%

0.0090

0.0090

50%

60%

0.0360

0.0216

100%

100%

0.0180

0.0180
6.306%

12.252%

9.009%

16.306%

100%

100%

0.0090

0.0090

25%

30%

0.0360

0.0108

75%

80%

0.0360

0.0288

50%

60%

0.0360

0.0216

100%

100%

0.0090

0.0090

50%

75%

0.0180

0.0135

100%

100%

0.0360

0.0360

75%

80%

0.0360

0.0288

100%

100%

0.0180

0.0180

100%

100%

0.0090

0.0090

100%

100%

0.0360

0.0360

100%

100%

0.0090

0.0090

100%

100%

0.0090

0.0090

100%

100%

0.0090

0.0090

100%

100%

0.0090

0.0090

50%

80%

0.0180

0.0144

20%

15%

0.0450

0.0068

33%

40%

0.0270

0.0108

50%

50%

0.0180

0.0090

100%

100%

0.0180

0.0180

9.910%

19.099%

16.216%

22.523%

22.523%

27.523%

23.423%

30.721%

40%

25%

0.0450

0.0113

67%

55%

0.0270

0.0149

100%

100%

0.0180

0.0180

50%

60%

0.0180

0.0108

60%

40%

0.0450

0.0180

100%

100%

0.0180

0.0180

100%

100%

0.0270

0.0270

100%

100%

0.0090

0.0090

80%

85%

0.0450

0.0383

50%

80%

0.0180

0.0144

50%

55%

0.0180

0.0099

100%

100%

0.0090

0.0090

50%

55%

0.0180

0.0099

100%

100%

0.0450

0.0450

100%

100%

0.0180

0.0180

100%

100%

0.0180

0.0180

23.423%

30.721%

27.027%

34.234%

32.432%

40.586%

33.333%

44.144%

100%

100%

0.0180

0.0180

100%

100%

0.0090

0.0090

33%

35%

0.0270

0.0095

50%

40%

0.0180

0.0072

100%

100%

0.0090

0.0090

33%

45%

0.0270

0.0122

35%

55%

0.0270

0.0149

25%

30%

0.0360

0.0108

67%

90%

0.0270

0.0243

100%

100%

0.0180

0.0180

67%

75%

0.0270

0.0203

67%

70%

0.0270

0.0189

50%

65%

0.0360

0.0234

50%

60%

0.0180

0.0108

100%

100%

0.0270

0.0270

33.333%

44.144%

44.144%

50.495%

45.045%

56.622%

46.847%

59.820%

100%

100%

0.0270

0.0270

100%

100%

0.0270

0.0270

75%

85%

0.0360

0.0306

100%

100%

0.0180

0.0180

100%

100%

0.0360

0.0360

100%

100%

0.0090

0.0090

33%

60%

0.0270

0.0162

100%

100%

0.0090

0.0090

50%

65%

0.0180

0.0117

67%

70%

0.0270

0.0189

100%

100%

0.0180

0.0180

50%

35%

0.0180

0.0063

50%

50%

0.0180

0.0090

50%

65%

0.0180

0.0117

100%

100%

0.0270

0.0270

100%

100%

0.0180

0.0180

100%

100%

0.0180

0.0180

46.847%

59.820%

56.757%

64.955%

62.162%

68.559%

63.964%

72.973%

100%

100%

0.0180

0.0180

50%

50%

0.0180

0.0090

100%

100%

0.0180

0.0180

100%

100%

0.0090

0.0090

100%

100%

0.0090

0.0090

100%

100%

0.0090

0.0090

100%

100%

0.0090

0.0090

50%

45%

0.0180

0.0081

100%

100%

0.0090

0.0090

100%

100%

0.0180

0.0180

100%

100%

0.0090

0.0090

33%

35%

0.0270

0.0095

67%

70%

0.0270

0.0189

100%

100%

0.0090

0.0090

100%

100%

0.0090

0.0090

63.964%

72.973%

72.072%

76.577%

76.577%

79.189%

78.378%

82.027%

81.081%

85.856%

50%

60%

0.0180

0.0108

100%

100%

0.0270

0.0270

81.081%

85.856%

82.883%

87.387%

100%

100%

0.0180

0.0180

100%

100%

0.0090

0.0090

87.387%

88.288%

50%

80%

0.0180

0.0144

88.288%

89.730%

100%

100%

0.0180

0.0180

88.288%

90.090%

100%

100%

0.0090

0.0090
90.090%

91.622%

90.991%

93.694%

50%

35%

0.0180

0.0063

100%

100%

0.0180

0.0180

100%

100%

0.0090

0.0090

33%

45%

0.0270

0.0122

93.694%

94.910%

67%

70%

0.0270

0.0189

93.694%

95.586%

100%

100%

0.0270

0.0270

93.694%

96.396%

50%

60%

0.0180

0.0108

96.396%

97.477%

100%

100%

0.0180

0.0180

96.396%

98.198%

50%

90%

0.0180

0.0162

98.198%

99.820%

100%

100%

0.0180

0.0180

98.198%

100.000%

100.000%

Avance
Programado

E(P)

0.901%

0.5000

1.802%

1.0000

2.703%

0.9167

3.604%

1.1875

4.505%

1.0000

5.405%

1.0000

1 AVANCE PROGRAMADO
1 AVANCE REAL
1 EFICIENCIA
1 EFICIENCIA PROGRAMADA
1
1
1

8.108%

1.0222
1
1.40

1
1

11.712%

1.0462

1
1
1.20

1
1

15.315%

1.0647

1
1

1.00

0.01

0.02

0.00

0.02

0.50

1.00

1
18.919%

1.0095
1

Axis Title

0.80

22.523%

1.0000

0.60

1
1

1
0.40

1
27.027%

1.0183
1
1
0.20

31.532%

0.9743

31.532%

0.9743

1
0.00

1
1

35.135%

0.9744

1
1

1
39.640%

1.0239
1
1
1

1
44.144%

1.0000
1

44.144%

1.0000

1
1

49.550%

1.0191

1
1

1
1

54.955%

1.0303

1
1

1
1

59.459%

1.0061

1
59.459%

1.0061

63.964%

1.0155

1
1
1

1
1

68.468%

1.0013

1
1

1
1

72.973%

1.0000

72.973%

1.0000

1
76.577%

1.0000

1
79.279%

0.9989
1
1

81.982%

1.0005

1
1
1
1
1

85.586%

1.0032
1

85.586%

1.0032

1
1
87.387%

1.0000
1

88.288%

1.0000
1

89.189%

1.0061
1

90.090%

1.0000
1
1

91.892%

0.9971
1

93.694%

1.0000

1
1

94.595%

1.0033

95.495%

1.0009

96.396%

1.0000

97.297%

1.0019

98.198%

1.0000

99.099%

1.0073

100.000%

1.0000

1
1
1
1
1
1
1

10

0.03

0.04

0.05

0.05

0.08

0.12

0.15

0.19

0.02

0.04

0.05

0.05

0.08

0.12

0.16

0.19

0.92

1.19

1.00

1.00

1.02

1.05

1.06

1.01

10

11

12

13

11

12

13

14

15

16

17

18

0.23

0.27

0.32

0.35

0.40

0.44

0.50

0.55

0.23

0.28

0.31

0.34

0.41

0.44

0.50

0.57

1.00

1.02

0.97

0.97

1.02

1.00

1.02

1.03

Chart Title

14

15

16

17

18

19

20

21

22

23

24

19

20

21

22

23

24

25

26

0.59

0.64

0.68

0.73

0.77

0.79

0.82

0.86

0.60

0.65

0.69

0.73

0.77

0.79

0.82

0.86

1.01

1.02

1.00

1.00

1.00

1.00

1.00

1.00

24

25

26

27

28

29

30

31

32

33

34

27

28

29

30

31

32

33

34

0.87

0.88

0.89

0.90

0.92

0.94

0.95

0.95

0.87

0.88

0.90

0.90

0.92

0.94

0.95

0.96

1.00

1.00

1.01

1.00

1.00

1.00

1.00

1.00

AVANCE
EFICIENCIA
PROGRAMADO,
AVANCE
PROGRAMADA,
EFICIENCIA,
REAL, 1.001

34

35

36

37

38

39

35

36

37

38

39

0.96

0.97

0.98

0.99

1.00

0.96

0.97

0.98

1.00

1.00

1.00

1.00

1.00

1.01

1.00

fa
Dia
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

fa

Dia
1
2
3
4
5
6
7
8
9
10
11
12
13
14

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

fa
Dia
7
8
9
10
11
12
13

14
15
16
17
18
19
20
21
22
23
24
25
26

fa
Dia
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

6.1667
a
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE GRADA
ARMADO ACERO ZAPATA MUROS DE GRADA
COLOCACION DE HORMIGON ZAPATA MUROS DE GRADA
COLOCACION BLOCK BNP MUROS DE GRADA
COLOCACION BLOCK BNP MUROS DE GRADA
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MUROS DE GRADA
COLOCACION BLOCK SNP VIOLINADOS MUROS DE GRADA
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MUROS DE GRADA
COLOCACION BLOCK SNP VIOLINADOS MUROS DE GRADA
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS ) EN GRADAS
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS ) EN GRADAS
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS ) EN GRADAS
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS ) EN GRADAS
PINTURA MUROS DE GRADAS
PINTURA MUROS DE GRADAS

2.2200

a
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO
EXCAVACION ZAPATA MUROS DE BAOS Y VESTIDORES
EXCAVACION ZAPATA MUROS DE BAOS Y VESTIDORES
ARMADO ACERO ZAPATA MUROS DE BAOS Y VESTIDORES
COLOCACION DE HORMIGON ZAPATA MUROS DE BAOS Y VESTIDORES
COLOCACION BLOCK BNP MUROS DE BAOS Y VESTIDORES
COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MUROS DE BAOS Y VESTIDORES
COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MUROS DE BAOS Y VESTIDORES
COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES

COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES


COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y SANITARIAS
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y SANITARIAS
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y SANITARIAS
INSTALACION ELECTRICA EN TECHO
ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
COLOCACION DE HORMIGON DE VIGAS DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y VESTIDORES
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE DE TECHO INTERIOR
IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES
CONFECCION DE MOCHETAS Y CANTOS BAOS Y VESTIDORES
PAETE DE TECHO INTERIOR
CONFECCION DE MOCHETAS Y CANTOS BAOS Y VESTIDORES
COLOCACION DE TORTA Y CERAMICA DE PISO BAOS Y VESTIDORES
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS Y VESTIDORES
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS Y VESTIDORES
INSTALACION DE PUERTAS Y VENTANAS
INSTALACION DE APARATOS SANITARIOS Y ACCESORIOS ELECTRICOS
INSTALACION DE APARATOS SANITARIOS Y ACCESORIOS ELECTRICOS
PINTURA EXTERIOR BAOS Y VESTIDORES
BOTE DE MATERIAL INSERVIBLE
BOTE DE MATERIAL INSERVIBLE
BOTE DE MATERIAL INSERVIBLE
CONFECCION DE JARDINERIA
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA
LIMPIEZA FINAL Y ENTREGA

5.5500
a
EXCAVACION ZAPATA MUROS DE BAOS Y VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
COLOCACION DE HORMIGON ZAPATA SOPORTE TABLERO
ENCOFRADO SOPORTE DE TABLERO
ENCOFRADO SOPORTE DE TABLERO

ENCOFRADO SOPORTE DE TABLERO


ARMADO VIGA SOPORTE DE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
DESENCOFRADO SOPORTE TABLERO
RELLENO DE REPOSICION Y COMPACTACION SOPORTE TABLERO
RELLENO DE REPOSICION Y COMPACTACION SOPORTE TABLERO
PAETE SOPORTE TABLERO
PAETE SOPORTE TABLERO
PAETE SOPORTE TABLERO
CONFECCION DE MOCHETAS Y CANTOS SOPORTE TABLERO
PINTURA Y SEALIZACION CANCHA Y SOPORTE DE TABLERO
PINTURA Y SEALIZACION CANCHA Y SOPORTE DE TABLERO
INSTALACION DE TABLEROS

6.5294
a
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
ARMADO ACERO ZAPATA MURO PERIMETRO CANCHA
ARMADO ACERO ZAPATA MURO PERIMETRO CANCHA
COLOCACION DE HORMIGON ZAPATA MURO PERIMETRO CANCHA
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP PERIMETRO CANCHA
RELLENO COMPACTADO INTERIOR DE CANCHA
RELLENO COMPACTADO INTERIOR DE CANCHA
RELLENO COMPACTADO INTERIOR DE CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA DE CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA DE CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
DESENCOFRADO PERIMETRO CANCHA

Construccion de Gradas
Avance
De a
0.25
0.5
0.7
1
1
1
0.5
1
0.5
0.5
1
1
0.25
0.5
0.75
1
0.5
1

Del Proyecto
0.0126
0.0216
0.0288
0.0360
0.0090
0.0090
0.0108
0.0180
0.0144
0.0099
0.0180
0.0180
0.0108
0.0234
0.0306
0.0360
0.0090
0.0180

Del Proceso
0.0778
0.1333
0.1778
0.2222
0.0556
0.0556
0.0667
0.1111
0.0889
0.0611
0.1111
0.1111
0.0667
0.1444
0.1889
0.2222
0.0556
0.1111

Porcentaje Acumulado
0
0
0
0
0.2222
0.2778
0.3333
0.3333
0.4444
0.4444
0.6667
0.6667
0.6667
0.6667
0.8889
0.8889

Construccion de Baos y Vestidores (Ruta Critica)


Avance
De a

Del Proyecto

Del Proceso

Porcentaje Acumulado

0.2
0.4
0.6
0.8
1
1
0.5
1
1
1
1
0.2
0.5
0.4
1
0.6

0.0045
0.0180
0.0248
0.0428
0.0450
0.0090
0.0072
0.0180
0.0090
0.0090
0.0090
0.0068
0.0144
0.0113
0.0180
0.0180

0.0100
0.0400
0.0550
0.0950
0.1000
0.0200
0.0160
0.0400
0.0200
0.0200
0.0200
0.0150
0.0320
0.0250
0.0400
0.0400

0.0000
0.0000
0.0000
0.0000
0.0000
0.1000
0.1200
0.1200
0.1600
0.1800
0.2000
0.2200
0.2200
0.2600

0.8
1
0.333333333
0.333333333
0.666666667
0.666666667
1
1
1
0.5
1
1
1
1
0.333333333
0.666666667
1
0.5
1
1
1
0.5
1
1
0.5
1
1
0.333333333
0.666666667
1
0.5
1
0.5
1

0.0383
0.0450
0.0122
0.0149
0.0203
0.0189
0.0270
0.0270
0.0090
0.0063
0.0180
0.0090
0.0090
0.0090
0.0095
0.0189
0.0090
0.0108
0.0270
0.0180
0.0090
0.0144
0.0180
0.0090
0.0063
0.0180
0.0090
0.0122
0.0189
0.0270
0.0108
0.0180
0.0162
0.0180

0.0850
0.1000
0.0270
0.0330
0.0450
0.0420
0.0600
0.0600
0.0200
0.0140
0.0400
0.0200
0.0200
0.0200
0.0210
0.0420
0.0200
0.0240
0.0600
0.0400
0.0200
0.0320
0.0400
0.0200
0.0140
0.0400
0.0200
0.0270
0.0420
0.0600
0.0240
0.0400
0.0360
0.0400

0.2600
0.2600
0.3600
0.3600
0.3600
0.4800
0.5000
0.5000
0.5400
0.5600
0.5800
0.6000
0.6200
0.7200
0.7400
0.7400
0.7800
0.8000
0.8600
0.8600
0.8600
0.9200
0.9200
0.9600
0.9600

Construccion de Soporte de Tableros


Avance
De a
1
1
0.5
1
1
0.333333333
0.666666667

Del Proyecto
0.0090
0.0090
0.0135
0.0180
0.0090
0.0108
0.0149

Del Proceso
0.0500
0.0500
0.0750
0.1000
0.0500
0.0600
0.0825

Porcentaje Acumulado
0.0500
0.1000
0.1000
0.2000
0.2500
0.2500

1
1
1
1
0.5
1
0.333333333
0.666666667
1
1
0.5
1
1

0.0270
0.0090
0.0090
0.0090
0.0108
0.0180
0.0162
0.0189
0.0270
0.0090
0.0081
0.0180
0.0090

0.1500
0.0500
0.0500
0.0500
0.0600
0.1000
0.0900
0.1050
0.1500
0.0500
0.0450
0.1000
0.0500

0.2500
0.4000
0.4500
0.5000
0.5500
0.5500
0.6500
0.6500
0.6500
0.8000
0.8500
0.8500
0.9500

Costruccion de Cancha de Baloncesto


Avance
De a
0.25
0.5
0.75
1
0.5
1
1
0.5
1
0.333333333
0.666666667
1
0.5
1
0.5
1
1

Del Proyecto
0.0108
0.0216
0.0234
0.0288
0.0090
0.0180
0.0090
0.0099
0.0180
0.0095
0.0135
0.0270
0.0117
0.0180
0.0090
0.0180
0.0090

Del Proceso
0.0706
0.1412
0.1529
0.1882
0.0588
0.1176
0.0588
0.0647
0.1176
0.0618
0.0882
0.1765
0.0765
0.1176
0.0588
0.1176
0.0588

Porcentaje Acumulado
0
0
0
0
0.1882
0.1882
0.3059
0.3647
0.3647
0.4824
0.4824
0.4824
0.6588
0.6588
0.7765
0.7765
0.8941

Total del Proceso


0.0778
0.1333
0.1778
0.2222
0.2778
0.3333
0.4000
0.4444

Avance Programado
0.0625
0.1250
0.1875
0.2500
0.3125
0.3750
0.4375
0.5000

Rendimiento del Proceso


1.2444
1.0667
0.9481
0.8889
0.8889
0.8889
0.9143
0.8889

0.5944

0.5625

1.0568

0.6667

0.6250

1.0667

0.7333
0.8111
0.8556
0.8889
0.9444
1.0000

0.6875
0.7500
0.8125
0.8750
0.9375
1.0000

1.0667
1.0815
1.0530
1.0159
1.0074
1.0000

Total del Proceso

Avance Programado

Rendimiento del Proceso

0.0100
0.0400
0.0550
0.0950
0.1000
0.1200
0.1360
0.1600
0.1800
0.2000
0.2200

0.0238
0.0476
0.0714
0.0952
0.1190
0.1429
0.1667
0.1905
0.2143
0.2381
0.2619

0.4200
0.8400
0.7700
0.9975
0.8400
0.8400
0.8160
0.8400
0.8400
0.8400
0.8400

0.2670

0.2857

0.9345

0.2850

0.3095

0.9208

0.3000

0.3333

0.9000

0.3450
0.3600

0.3571
0.3810

0.9660
0.9450

0.3870

0.4048

0.9561

0.4050

0.4524

0.8953

0.4200

0.5000

0.8400

0.5000
0.5140
0.5400
0.5600
0.5800

0.5476
0.5714
0.5952
0.6190
0.6429

0.9130
0.8995
0.9072
0.9046
0.9022

0.6210

0.6667

0.9315

0.6860

0.6905

0.9935

0.7200

0.7143

1.0080

0.7400
0.7720
0.7800

0.7381
0.7619
0.7857

1.0026
1.0133
0.9927

0.8140

0.8095

1.0055

0.8600

0.8333

1.0320

0.8870
0.9020
0.9200
0.9440
0.9600
0.9960
1.0000

0.8571
0.8810
0.9048
0.9286
0.9524
0.9762
1.0000

1.0348
1.0239
1.0168
1.0166
1.0080
1.0203
1.0000

Total del Proceso


0.0500
0.1000
0.1750
0.2000
0.2500
0.3100
0.3325

Avance Programado
0.0500
0.1000
0.1500
0.2000
0.2500
0.3000
0.3500

Rendimiento del Proceso


1.0000
1.0000
1.1667
1.0000
1.0000
1.0333
0.9500

0.4000
0.4500
0.5000
0.5500
0.6100
0.6500
0.7400
0.7550
0.8000
0.8500
0.8950
0.9500
1.0000

0.4000
0.4500
0.5000
0.5500
0.6000
0.6500
0.7000
0.7500
0.8000
0.8500
0.9000
0.9500
1.0000

1.0000
1.0000
1.0000
1.0000
1.0167
1.0000
1.0571
1.0067
1.0000
1.0000
0.9944
1.0000
1.0000

Total del Proceso


0.0706
0.1412
0.1529
0.1882
0.2471
0.3059
0.3647
0.4294
0.4824
0.5441
0.5706
0.6588
0.7353
0.7765
0.8353
0.8941
0.9529

Avance Programado
0.0588
0.1176
0.1765
0.2353
0.2941
0.3529
0.4118
0.4706
0.5294
0.5882
0.6471
0.7059
0.7647
0.8235
0.8824
0.9412
1.0000

Rendimiento del Proceso


1.2000
1.2000
0.8667
0.8000
0.8400
0.8667
0.8857
0.9125
0.9111
0.9250
0.8818
0.9333
0.9615
0.9429
0.9467
0.9500
0.9529

Axis Title

DIAS
AVANCE PROGRAMADO
AVANCE REAL
EFICIENCIA
1.0000 EFICIENCIA PROGRAMADA
1.0000
1.4000
1.0000
1.0000
1.2000
1.0000
1.0000
1.0000
1.0000
1.0000
1
1
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000

7
0.0625
0.0778
1.2444
1.0000

10
0.2500
0.2222
0.8889
1.0000

11
0.3125
0.2778
0.8889
1.0000

12
0.3750
0.3333
0.8889
1.0000

13
0.4375
0.4000
0.9143
1.0000

0.6000
0.4000
0.2000
0.0000

DIAS

0.0238
AVANCE PROGRAMADO
1.0000 AVANCE REAL
0.0100
1.0000 EFICIENCIA
0.4200
1.0000 EFICIENCIA PROGRAMADA
1.0000
1.0000
1.0000
1.0000
1.2000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000

1.0000

9
0.1875
0.1778
0.9481
1.0000

0.8000

1.0000

8
0.1250
0.1333
1.0667
1.0000

1.0000

10 11 12 13 14 15 16

0.0476 0.0714

0.0952

0.1190 0.1429 0.1667

0.0400 0.0550
0.8400 0.7700
1.0000 1.0000

0.0950
0.9975
1.0000

0.1000 0.1200 0.1360


0.8400 0.8400 0.8160
1.0000 1.0000 1.0000

0.8000

Axis Title

1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000

0.6000

1.0000
0.4000

1.0000
1.0000
1.0000
1.0000
1.0000
0.2000

1.0000

DIAS
AVANCE PROGRAMADO
AVANCE REAL
EFICIENCIA
1.0000 EFICIENCIA PROGRAMADA
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000

0.0000
1

7
0.0500
0.0500
1.0000
1.0000

8
0.1000
0.1000
1.0000
1.0000

9
0.1500
0.1750
1.1667
1.0000

10
0.2000
0.2000
1.0000
1.0000

1.4000
1.2000
1.0000
Axis Title

1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000

0.8000

11
0.2500
0.2500
1.0000
1.0000

12
0.3000
0.3100
1.0333
1.0000

10

13
0.3500
0.3325
0.9500
1.0000

11

Axis Title

1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000

0.8000
0.6000
0.4000
0.2000
0.0000
7

DIAS
AVANCE PROGRAMADO
AVANCE REAL
EFICIENCIA
EFICIENCIA PROGRAMADA

8
0.0588
0.0706
1.2000
1.0000

9
0.1176
0.1412
1.2000
1.0000

10
0.1765
0.1529
0.8667
1.0000

11
0.2353
0.1882
0.8000
1.0000

12
0.2941
0.2471
0.8400
1.0000

10

13
0.3529
0.3059
0.8667
1.0000

11

12

14
0.4118
0.3647
0.8857
1.0000

1.4000

Axis Title

1.2000
1.0000
0.8000
0.6000
0.4000
0.2000
0.0000
7

10

11

12

13

14

15

16

17

18

19

14
0.5000
0.4444
0.8889
1.0000

15
16
17
18
19
0.5625 0.6250 0.6875 0.7500 0.8125
0.5944 0.6667 0.7333 0.8111 0.8556
1.0568 1.0667 1.0667 1.0815 1.0530
1
1 1.0000 1.0000 1.0000

20
0.8750
0.8889
1.0159
1.0000

21
0.9375
0.9444
1.0074
1.0000

22
1.0000
1.0000
1.0000
1.0000

14

15

16

EFICIENCIA
EFICIENCIA PROGRAMADA
AVANCE PROGRAMADO
AVANCE REAL

15 16

10

11

12

13

17

18

19

0.1905 0.2143 0.2381 0.2619

0.2857 0.3095 0.3333 0.3571 0.3810

0.4048 0.4524 0.5000

0.1600 0.1800 0.2000 0.2200


0.8400 0.8400 0.8400 0.8400
1.0000 1.0000 1.0000 1.0000

0.2670 0.2850 0.3000 0.3450 0.3600 0.3870 0.4050 0.4200


0.9345 0.9208 0.9000 0.9660 0.9450 0.9561 0.8953 0.8400
1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

11

12

14
0.4000
0.4000
1.0000
1.0000

13

15
0.4500
0.4500
1.0000
1.0000

14

15

16
0.5000
0.5000
1.0000
1.0000

16

17
0.5500
0.5500
1.0000
1.0000

17

18

18
0.6000
0.6100
1.0167
1.0000

19

19
0.6500
0.6500
1.0000
1.0000

20

21

20
0.7000
0.7400
1.0571
1.0000

22

21
0.7500
0.7550
1.0067
1.0000

23

24

22
0.8000
0.8000
1.0000
1.0000

25

26

23
0.8500
0.8500
1.0000
1.0000

27

24
0.9000
0.8950
0.9944
1.0000

EFICIENCIA

28

25
0.9500
0.9500
1.0000
1.0000

29

EFICIENCIA
EFICIENCIA PROGRAMADA
AVANCE PROGRAMADO
AVANCE REAL

12

13

14

15
0.4706
0.4294
0.9125
1.0000

15

16
0.5294
0.4824
0.9111
1.0000

16

17
0.5882
0.5441
0.9250
1.0000

17

18

18
0.6471
0.5706
0.8818
1.0000

19

20

19
0.7059
0.6588
0.9333
1.0000

21

20
0.7647
0.7353
0.9615
1.0000

22

23

21
0.8235
0.7765
0.9429
1.0000

EFICIENCIA
EFICIENCIA PROGRAMADA
AVANCE PROGRAMADO
AVANCE REAL
19

20

21

22

23

24

22
0.8824
0.8353
0.9467
1.0000

25

26

23
0.9412
0.8941
0.9500
1.0000

24
1.0000
0.9529
0.9529
1.0000

20

21

22

23

24

0.5476 0.5714 0.5952 0.6190 0.6429

25

26

27

28

29

30

0.6667 0.6905 0.7143 0.7381 0.7619 0.7857

31
0.8095

0.5000 0.5140 0.5400 0.5600 0.5800 0.6210 0.6860 0.7200 0.7400 0.7720 0.7800 0.8140
0.9130 0.8995 0.9072 0.9046 0.9022 0.9315 0.9935 1.0080 1.0026 1.0133 0.9927 1.0055
1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

EFICIENCIA
EFICIENCIA PROGRAMADA
AVANCE PROGRAMADO
AVANCE REAL

29

30

26
1.0000
1.0000
1.0000
1.0000

31

32

33

34

35

36

37

38

39

A PROGRAMADA

PROGRAMADO

32

33

34

35

36

37

38

39

0.8333 0.8571 0.8810 0.9048 0.9286 0.9524 0.9762 1.0000


0.8600 0.8870 0.9020 0.9200 0.9440 0.9600 0.9960 1.0000
1.0320 1.0348 1.0239 1.0168 1.0166 1.0080 1.0203 1.0000
1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

a
avance

10

11

17

resto

EXCAVACION ZAPATA MUROS DE GRADA

0.60

0.40

EXCAVACION ZAPATA MUROS DE BAOS Y


VESTIDORES

1.00

ARMADO ACERO ZAPATA SOPORTE TABLERO

1.00

EXCAVACION ZAPATA MURO PERIMETRO


CANCHA

0.30

0.70

EXCAVACION ZAPATA MUROS DE GRADA

0.80

0.20

EXCAVACION ZAPATA MURO PERIMETRO


CANCHA

0.60

0.40

ARMADO ACERO ZAPATA MUROS DE BAOS Y


VESTIDORES

1.00

ARMADO COLUMNA SOPORTE DE TABLERO

0.75

0.25

EXCAVACION ZAPATA MUROS DE GRADA

1.00

EXCAVACION ZAPATA MURO PERIMETRO


CANCHA

0.65

0.35

ARMADO COLUMNA SOPORTE DE TABLERO

1.00

ARMADO ACERO ZAPATA MUROS DE BAOS Y


VESTIDORES

1.00

EXCAVACION ZAPATA MURO PERIMETRO


CANCHA

0.80

0.20

COLOCACION DE HORMIGON ZAPATA SOPORTE


TABLERO

1.00

COLOCACION BLOCK BNP MUROS DE BAOS Y


VESTIDORES

1.00

ARMADO ACERO ZAPATA MUROS DE GRADA

1.00

RELLENO COMPACTADO INTERIOR DE CANCHA

0.35

0.65

17

18

19

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

0.40

0.60

DESENCOFRADO SOPORTE TABLERO

1.00

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

0.45

0.55

COLOCACION DE TUBERIAS ELECTRICAS Y


SANITARIAS

0.55

0.45

COLOCACION VIGAS PREFABRICADAS (


ACIENTOS ) EN GRADAS

0.30

0.70

RELLENO COMPACTADO INTERIOR DE CANCHA

0.50

0.50

RELLENO DE REPOSICION Y COMPACTACION


ZAPATA MURO PERIMETRO CANCHA

1.00

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

0.75

0.25

COLOCACION DE TUBERIAS ELECTRICAS Y


SANITARIAS

0.70

0.30

COLOCACION VIGAS PREFABRICADAS (


ACIENTOS ) EN GRADAS

0.65

0.35

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

0.60

0.40

RELLENO COMPACTADO INTERIOR DE CANCHA

1.00

ENCOFRADO DE VIGA DE AMARRE Y LOSA DE


TECHO BAOS Y VESTIDORES

1.00

COLOCACION DE TUBERIAS ELECTRICAS Y


SANITARIAS

1.00

COLOCACION VIGAS PREFABRICADAS (


ASIENTOS ) EN GRADAS

0.85

0.15

RELLENO DE REPOSICION Y COMPACTACION


SOPORTE TABLERO

1.00

Tiempo
e

transcurrido

necesario

Holgura Total
disponible

faltante

1.60

(0.40)

2.80

(0.20)

0.80

(0.20)

1.60

(0.40)

0.50

(0.50)

1.40

0.40

0.80

0.80

1.95

(0.05)

usada

disponible

1.20

0.20

1.65

(0.35)

1.35

(0.65)

2.80

(0.20)

1.50

0.50

0.75

(0.25)

0.90

(0.10)

1.40

(0.60)

0.80

(0.20)

0.60

(0.40)

Compresion
necesario

0.70

faltante

0 RD$

a ejecucion
m

1,913.63

a afectada
e-o

resto

0.35 RD$

costo

1,339.54

0 RD$

19,923.75

0.50 RD$

9,961.88

a afectada
compresion

costo total

ajustes

costo
-

Concluida

Concluida

Concluida

RD$

Concluida
1,339.54

Co - 2(3)

Concluida

Concluida

Concluida

Concluida

Concluida

Concluida

RD$

9,961.88

Co - 1(28)

Concluida

Concluida

Concluida

Concluida

Concluida

Relleno de Reposicin y Com


Ve
Opcin 1
Obrero 1
Obrero 2
Obrero 3
Burgess
Opcin 2
Obrero 1
Obrero 2
Obrero 3
Burgess
Opcin 3
Obrero 1
Obrero 2
Obrero 3
Burgess
Opcin 4
Obrero 1
Obrero 2
Obrero 3
Burgess

Relleno de Reposicin y Compactacin Zapata muro de Baos y


Vestidores

Encofrado Permetro Cancha

Duracin
1

Burgess

18

Opcin 1
Obrero 1
Obrero 2
Obrero 3
Obrero 4

Duracin
1

Burgess
3

Burgess

5
Opcin 2
Obrero 1
Obrero 2
Obrero 3
Obrero 4

14
Duracin

Burgess

12
Duracin

Burgess
Opcin 3
Obrero 1
Obrero 2
Obrero 3
Obrero 4
Burgess

Burgess

Encofrado Permetro Cancha


Duracin
1

Burgess

32
Duracin
1

Burgess

10
Duracin
1

Burgess

Cdigo
IR
OM
MC
OA
AA
OP
AP
OC
AC
OV
AV
TNC1
TNC2
TC
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Personal
Ingeniero Residente
Operario Maquinaria Pesada
Maestro Constructor
Operario Albailera
Ayudante Albailera
Operario Plomera
Ayudante Plomera
Operario Carpintera
Ayudante Carpinteria
Operario Varillero
Ayudante Varillero
Tcnico No Calificado
Tcnico No Calificado
Tcnico Calificado
Actividad
LIMPIEZA Y EXTRACCION DE CAPA VEGETAL
REPLANTEO
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE BAOS Y VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MURO PERIMETRO CANCHA
ARMADO ACERO ZAPATA MUROS DE GRADA
ARMADO ACERO ZAPATA MUROS DE BAOS Y VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO
COLOCACION DE HORMIGON ZAPATA MURO PERIMETRO
CANCHA
COLOCACION DE HORMIGON ZAPATA MUROS DE GRADA
COLOCACION DE HORMIGON ZAPATA MUROS DE BAOS Y
VESTIDORES
COLOCACION DE HORMIGON ZAPATA SOPORTE TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP MUROS DE GRADA

IR OM MC OA AA OP AP
X
X
X
X
X
X
X

X
X
X

X
X
X

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

COLOCACION BLOCK BNP MUROS DE BAOS Y VESTIDORES


RELLENO DE REPOSICION Y COMPACTACION ZAPATA MURO
PERIMETRO CANCHA
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MUROS
DE GRADA
RELLENO DE REPOSICION Y COMPACTACION ZAPATA MUROS
DE BAOS Y VESTIDORES
RELLENO DE REPOSICION Y COMPACTACION SOPORTE
TABLERO
RELLENO COMPACTADO INTERIOR DE CANCHA
COLOCACION BLOCK SNP VIOLINADOS MUROS DE GRADA
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS ) EN
GRADAS
COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA DE
CANCHA
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y
VESTIDORES
INSTALACION ELECTRICA EN TECHO
DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO
BAOS Y VESTIDORES
ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y
VESTIDORES
COLOCACION DE HORMIGON DE VIGAS DE AMARRE Y LOSA
DE TECHO BAOS Y VESTIDORES
COLOCACION DE TUBERIAS ELECTRICAS Y SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

CONFECCION DE MOCHETAS Y CANTOS SOPORTE TABLERO


CONFECCION DE MOCHETAS Y CANTOS BAOS Y VESTIDORES
COLOCACION DE TORTA Y CERAMICA DE PISO BAOS Y
VESTIDORES
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS Y
VESTIDORES
INSTALACION DE APARATOS SANITARIOS Y ACCESORIOS
ELECTRICOS
INSTALACION DE PUERTAS Y VENTANAS
IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES

X
X
X

X
X
X

X
X

52
53
54
55
56
57
58
59

PINTURA EXTERIOR BAOS Y VESTIDORES


PINTURA Y SEALIZACION CANCHA Y SOPORTE DE TABLERO
PINTURA MUROS DE GRADAS
EXCAVACION E INSTALACION DE POSTE DE LUZ
PREFABRICADO
INSTALACION DE LAMPARAS DE ILUMINACION
INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

OC AC OV AV TNC1 TNC2

X
X

X
X

X
X
X

X
X
X

X
X
X

X
X
X

X
X

TC

X
X

X
X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X
X
X

X
X
X
X

X
X

No.

Actividad

Secuencia

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

LIMPIEZA Y EXTRACCION DE CAPA VEGETAL


REPLANTEO
EXCAVACION ZAPATA MURO PERIMETRO CANCHA
EXCAVACION ZAPATA MUROS DE GRADA
EXCAVACION ZAPATA MUROS DE BAOS Y VESTIDORES
EXCAVACION ZAPATA SOPORTE TABLERO
BOTE DE MATERIAL INSERVIBLE
ARMADO ACERO ZAPATA MURO PERIMETRO CANCHA
ARMADO ACERO ZAPATA MUROS DE GRADA
ARMADO ACERO ZAPATA MUROS DE BAOS Y VESTIDORES
ARMADO ACERO ZAPATA SOPORTE TABLERO
ARMADO COLUMNA SOPORTE DE TABLERO
ARMADO VIGA SOPORTE DE TABLERO
HORMIGON ZAPATA MURO PERIMETRO CANCHA
COLOCACION DE HORMIGON ZAPATA MUROS DE GRADA
HORMIGON ZAPATA MUROS DE BAOS Y VESTIDORES
COLOCACION DE HORMIGON ZAPATA SOPORTE TABLERO
ENCOFRADO SOPORTE DE TABLERO
DESENCOFRADO SOPORTE TABLERO
COLOCACION DE HORMIGON SOPORTE TABLERO
COLOCACION BLOCK BNP PERIMETRO CANCHA
COLOCACION BLOCK BNP MUROS DE GRADA
COLOCACION BLOCK BNP MUROS DE BAOS Y VESTIDORES
RELLENO DE REPOSICION ZAPATA MURO PERIMETRO CANCHA
RELLENO DE REPOSICION ZAPATA MUROS DE GRADA
RELLENO DE REPOSICION ZAPATA MUROS DE BAOS Y
RELLENO DE REPOSICION SOPORTE TABLERO
RELLENO COMPACTADO INTERIOR DE CANCHA
COLOCACION BLOCK SNP VIOLINADOS MUROS DE GRADA
COLOCACION VIGAS PREFABRICADAS ( ACIENTOS ) EN
COLOCACION BLOCK SNP MUROS DE BAOS Y VESTIDORES
ENCOFRADO PERIMETRO CANCHA
DESENCOFRADO PERIMETRO CANCHA
ARMADO DE MALLA ELECTROSOLDADA PARA LOSA DE
COLOCACION DE HORMIGON SEMI-PULIDO CANCHA
ENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y
INSTALACION ELECTRICA EN TECHO
DESENCOFRADO DE VIGA DE AMARRE Y LOSA DE TECHO
ARMADO DE VIGA DE AMARRE Y LOSA DE TECHO BAOS Y
COLOCACION DE HORMIGON DE VIGAS DE AMARRE Y LOSA
COLOCACION DE TUBERIAS ELECTRICAS Y SANITARIAS
PAETE EXTERIOR
PAETE DE TECHO INTERIOR
PAETE SOPORTE TABLERO

2
3,4,5,6,55
8
9
10
11
58
14
15
16
12
17
20
21
22
23
18
13
27
19
24,28
25,29
26,31
32,34
30
36,41
44
32,34
30
54,55
36,41
35
57
35
33
37
39
42,43
40
38
42,43
46,51
47
45

45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

CONFECCION DE MOCHETAS Y CANTOS SOPORTE TABLERO


CONFECCION DE MOCHETAS Y CANTOS BAOS Y VESTIDORES
COLOCACION DE TORTA Y CERAMICA DE PISO BAOS Y
REVESTIMIENTO DE CERAMICA EN PARED DE BAOS Y
INSTALACION DE APARATOS SANITARIOS Y ACCESORIOS
INSTALACION DE PUERTAS Y VENTANAS
IMPERMEABILIZANTE TECHO BAOS Y VESTIDORES
PINTURA EXTERIOR BAOS Y VESTIDORES
PINTURA Y SEALIZACION CANCHA Y SOPORTE DE TABLERO
PINTURA MUROS DE GRADAS
EXCAVACION E INSTALACION DE POSTE DE LUZ
INSTALACION DE LAMPARAS DE ILUMINACION
INSTALACION DE TABLEROS
CONFECCION DE JARDINERIA
LIMPIEZA FINAL Y ENTREGA

53
47
48
49,50
59
52
52
7
57
59
56
59
7
59
-

Duracion
5
1
4
4
2
1
3
2
1
1
1
2
1
1
1
1
1
3
1
1
2
2
1
2
2
2
2
3
2
4
5
1
1
2
2
3
1
1
2
1
3
1
3
3

10

11

12

13

14

15

1
2
1
5
2
1
1
1
2
2
2
1
1
2
2

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

También podría gustarte