Buildup test
Fall off test Interference test
Pulso test
Drawdown Test
Conveniente para los lmites del yacimiento. Mtodos de anlisis tradicionales se han desarrollado para pruebas drawdown.
Dificultad para producir un pozo a rate constant. Las condiciones de pozo no podrian ser estaicas ni estables.
* Buildup Test
In a buildup test, a well that is flowing (ideally at a constant rate) is shut in and downhole pressure measured as the pressure builds up.
Buildup Test
Constant flow rate condition is easily achieved as the flow rate is zero. Only slight modification of analysis techniques used for drawdown analysis is required
Difficult to achieve constant rate production prior to shut in. Production loss while the well is shut in.
* Injection Test
Similar to drawdown test except that the flow is into the well rather than out of it.
Injection rates Multiphase are easier to effects make control. analysis difficult Production loss is small as compared to buildup test
* Interference Test
In an interference test, one well is produced (or shut in) and the pressure response is measured at another well (or wells). Interference tests helps to characterize the reservoir over a larger scale than the single well test. Interference test is possible with any type of pressure disturbance (drawdown, buildup, injection, fall off)