ITEM
01.00.00
DESCRIPCION
UND
METRADO
PARCIAL S/.
1 MES
2 MES
3864.00
3 MES
01.01.00
OBRAS PRELIMINARES
01.01.01
01.01.02
UND
01.01.03
01.02
MOVIMIENTO DE TIERRAS
01.02.01
01.02.02
5,520.00
7,728.00
3864.00
1.00
1,012.59
1012.59
2,760.00
1,821.60
910.80
910.80
2,760.00
15,373.20
7686.60
7686.60
2,760.00
3,670.80
1835.40
1835.40
01.02.03
2,760.00
9,687.60
4843.80
4843.80
01.02.04
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL SELECCIONADO P/TUB. DN 90-160 mm HASTA 1.00 mm
2,760.00
15,345.60
4603.68
7672.80
01.02.05
ELIMINACION DE DESMONTE R= 5 Km
M3
138.00
2,351.52
01.03
01.03.01
2,760.00
33,368.40
16684.20
16684.20
01.03.02
2,760.00
3,615.60
1807.80
1807.80
01.04
01.04.01
TAPON PVC UF DN 90 mm
pza
5.00
112.25
112.25
01.04.02
TEE PVC UF DN 90 mm
pza
4.00
244.20
244.20
01.04.03
pza
3.00
96.87
96.87
02.00.00
CONEXIONES DOMICILIARIAS
02.01
584.00
2,587.12
1293.56
02.02
584.00
776.72
388.36
388.36
02.03
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL SELECCIONADO P/TUB. 1/2" HASTA 0.80 m
584.00
2,201.68
1100.84
1100.84
02.04
CONEXION DE AGUA 1/2" A RED MATRIZ DN 90 mm T. N. DE 12.00 m LONG. PROMEDIO INCLUYE LOSA 1x1x0.1
UND
m
46.00
11,490.80
5745.40
5745.40
02.05
ELIMINACION DE DESMONTE R= 5 Km
m3
11.68
199.03
03.00.00
TANQUE ELEVADO
03.01
OBRAS PRELIMINARES
03.01.01
M2
12.60
16.76
16.76
03.01.02
TRAZO Y REPLANTEO
M2
12.60
18.40
18.40
03.02
MOVIMIENTO DE TIERRAS
03.02.01
M3
70.00
1,904.00
1904.00
03.02.02
ELIMINACION DE DESMONTE R= 5 Km
M3
87.50
1,491.00
1491.00
03.03
CONCRETO SIMPLE
03.03.01
M3
2.50
638.63
638.63
03.04
CONCRETO ARMADO
03.04.01
m3
4.70
1,247.15
1247.15
03.04.02
m3
1.11
294.54
294.54
03.04.03
m3
4.54
1,585.73
1585.73
03.04.04
m3
6.37
2,121.59
2121.59
03.04.05
m3
4.26
1,487.93
1487.93
03.04.06
m3
2.74
817.45
817.45
03.04.07
kg
308.38
1,390.79
1390.79
03.04.08
kg
1,216.34
4,999.16
4999.16
03.04.09
kg
1,851.84
7,611.06
7611.06
03.04.10
kg
476.66
2,025.81
2025.81
03.04.11
kg
461.89
1,963.03
1963.03
03.04.12
m2
72.96
3,510.11
3510.11
03.04.13
m2
63.72
3,268.84
3268.84
03.04.14
m2
30.80
1,291.14
1291.14
03.04.15
m2
49.70
1,883.63
1883.63
3.05
03.05.01
m2
39.96
607.79
03.05.02
m2
34.08
553.80
03.05.03
m2
39.96
1,339.86
3069.12
2351.52
1293.56
199.03
607.79
553.80
1339.86
4 MES
5 MES
6 MES
DESCRIPCION
UND
METRADO
PARCIAL S/.
1 MES
2 MES
03.05.04
m2
29.25
1,112.09
1112.09
03.05.05
m2
34.08
655.70
655.70
03.06
03.06.01
15.00
491.70
491.70
03.06.02
UND
4.00
961.96
961.96
03.06.03
UND
4.00
375.28
375.28
03.06.04
4.00
247.28
247.28
03.06.05
UND
7.00
551.74
551.74
03.06.06
UND
1.00
127.84
127.84
03.06.07
UND
2.00
163.64
163.64
03.06.08
pza
4.00
784.60
784.60
03.06.09
40.00
483.60
483.60
03.06.10
TEE PVC UF DN 90 mm
pza
2.00
122.10
122.10
03.06.11
CODO PVC UF 45 x DN 90 mm
pza
3.00
96.87
96.87
03.06.12
CODO PVC UF 90 x DN 90 mm
pza
2.00
64.58
64.58
03.06.13
m3
20.00
507.40
507.40
03.06.14
m3
32.80
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (5%)
SUBTOTAL
IGV (18%)
PRESUPUESTO REFERENCIAL
510.37
161,008.53
16,100.85
8,050.43
185,159.81
33,328.77
218,488.58
3 MES
510.37
83,268.94
8,326.89
4,163.45
95,759.28
17,236.67
112,995.95
62,430.17
6,243.02
3,121.51
71,794.70
12,923.05
84,717.74
15,309.42
1,530.94
765.47
17,605.83
3,169.05
20,774.88
4 MES
5 MES
6 MES