Está en la página 1de 4

SAMPLING SYSTEM SELECTION QUESTIO

Client: Mine:

Method of drilling? Type of Drilling? Drill Rig Make & Model Sampling System Mounting Configuration? Rig Compressor Air Volume (scfm)? Compressor Pressure? Altitude? Ambient Operating Conditions (Range?) Drill Bit Diameter? Drill Rod Diameter? Sampling Interval? Drill Hole Depth? Mineral being drilled for? Maximum Ore Moisture Content? Minimum Ore Moisture Content? Are sticky clays present? Ore Specific Gravity? Drilled ore bulk density? Maximum Particle Size? Maximum "Instantaneous" Drill Penetration Rate Primary Sample Weight Primary Sample Splitting Percentage Duplicate Sample Weight Duplicate Sample Splitting Percentage Logging Sample Weight Logging Sample Splitting Percentage RC Drill String Inner Tube Diameter RC Hammer Model RC Hammer Shroud Fitted Sampling Hose Inside Diameter Selected scfm psi m C " " m m

RC, Conventional, Other Production, Grade Control, Exploratio

On Rig, Trailer, Truck, Other

Above sea level Standard System designed for -5C to

Gold, Copper, Iron Ore, Nickel, etc % % Yes or No In ground prior to drilling After drilling

kg/m mm m/min kg % kg % kg % "

Maximum of 1m/min

If Required If Required If Required If Required

"

Electrical Supply Voltage Comments:-

VDC

12 or 24VDC

1) 2) 3) 4) 5) 6) 7) 8) 9) 10)

SELECTION QUESTIONNAIRE
Date: Enquiry Number: RC, Conventional, Other Production, Grade Control, Exploration

On Rig, Trailer, Truck, Other

Above sea level Standard System designed for -5C to +50C

Gold, Copper, Iron Ore, Nickel, etc

In ground prior to drilling After drilling

Maximum of 1m/min

If Required If Required If Required If Required

12 or 24VDC

También podría gustarte