PROYECTO:
MODALIDAD EJECUC.
: ADMINISTRACION DIRECTA
PLAZO DE EJECUCION
: 90 DIAS CALENDARIOS
DEL ESTABLECIMINETO DEL PUESTO DE SALUD DEL CENTRO POBLADO DE RAIN CONDOR
OBRA
ITEM
PARTIDAS
S/.S/. 586,823.36
TIEMPO 0
PARCIAL
0
ACUMULADO
30
30
30
30
60
120
***I***
01.00.
01.01.00
01.02.00
TRABAJOS PRELIMINARES
01.03.00
MOVIMIENTO DE TIERRAS
01.04.00
01.05.00
01.06.00
01.07.00
01.08.00
01.09.00
CIELORRASOS
01.10.00
01.11.00
CONTRAZOCALOS
01.12.00
ZOCALOS
01.13.00
CARPINTERIA DE MADERA
01.14.00
CERRAJERIA
01.15.00
01.16.00
PINTURA
01.17.00
INSTALACIONES SANITARIAS
01.18.00
INSTALACIONES ELECTRICAS
02.00.
TOTAL
2,003.40
24,859.80
24,859.80
2,944.26
2,944.26
3,308.24
18,375.86
.
7,064.08
3,308.24
6,616.48
18,375.86
36,751.71
21,192.25
28,256.33
355.63
8,079.70
355.63
8,079.70
16,159.40
7,629.33
2,543.11
10,172.44
7,330.10
###
14,660.19
743.41
743.41
6,508.29
6,508.29
965.23
965.23
81.13
81.13
2,073.70
4,882.43
7,130.40
5,094.94
5,094.94
2,073.70
4,882.43
7,130.40
10,189.87
02.01.00
TRABAJOS PRELIMINARES
02.02.00
MOVIMIENTO DE TIERRAS
02.03.00
02.04.00
02.05.00
02.06.00
CIELORRASOS
02.07.00
02.08.00
CONTRAZOCALOS
2,421.15
2,421.15
395.92
395.92
1,090.89
1,090.89
2,970.03
8,910.10
6,875.66
6,875.66
3,584.65
11,880.13
6,265.68
3,584.65
6,265.68
696.04
696.04
MODALIDAD EJECUC.
: ADMINISTRACION DIRECTA
PLAZO DE EJECUCION
: 90 DIAS CALENDARIOS
DEL ESTABLECIMINETO DEL PUESTO DE SALUD DEL CENTRO POBLADO DE RAIN CONDOR
OBRA
ITEM
PARTIDAS
02.09.00
ZOCALOS
02.10.00
CARPINTERIA DE MADERA
02.11.00
CERRAJERIA
S/.S/. 586,823.36
TIEMPO 0
PARCIAL
0
ACUMULADO
30
30
30
30
60
120
361.64
TOTAL
361.64
646.63
646.63
81.13
81.13
526.14
02.12.00
02.13.00
.
02.14.00
PINTURA
INSTALACIONES SANITARIAS
2,018.54
2,018.54
02.15.00
INSTALACIONES ELECTRICAS
5,388.20
5,388.20
***II***
COSTO DIRECTO
GASTOS GENERALES (11.21%)
GASTOS SUPERVISION (5.08%)
VALORIZACION PARCIAL
VALORIZACION ACUMULADA
2,573.35
44,714.27
44,714.27
526.14
2,573.35
82,975.79
2,920.75
S/. 134,645.32
S/. 15,097.02
S/. 6,846.24
S/. 156,588.58
S/. 156,588.58
###
82,975.79
165,951.57
2,920.75
5,841.50
11,683.00
S/. 182,436.77
S/. 20,455.60
S/. 9,276.26
S/. 212,168.63
S/. 125,426.61
S/. 14,063.38
S/. 6,377.50
S/. 145,867.48
S/. 514,624.69
S/. 442,508.69
S/. 49,616.00
S/. 22,500.00
S/. 514,624.69