PEKERJAAN PERSIAPAN
Rp.
#REF!
PEKERJAAN TANAH
Rp.
#REF!
PEKERJAAN STRUKTUR
Basment ke Lantai 1
Lantai 1 ke Lantai 2
Rp.
Rp.
653,710,000
454,585,000
Rp.
PEKERJAAN ARSITEKTUR
Lt 1 ke lt 2
Lt 2 ke atap
Alumunium
Pengecatan
Plafond
Rp.
Rp.
Rp.
Rp.
Rp.
352,783,300
25,408,800
#REF!
59,784,480
70,617,000
Terbilang :
#REF!
Rp.
#REF!
Rp.
#REF!
Rp.
Rp.
Rp.
1,108,295,000
34,969,500
24,932,000
10,037,500
SUB TOTAL
Rp.
#REF!
SITE MANAJEMEN
7% Rp.
#REF!
TOTAL
Rp.
#REF!
PEMBULATAN
Rp.
#REF!
I
1
2
3
4
ITEM PEKERJAAN
PEKERJAAN PERSIAPAN
Pek. Perbersihan lahan
Pengurugan, perataan dan pemadatan
Uitzet dan pasang bouplank
Pengadaan air kerja
SAT
ls
m
ls
ls
VOL
BQ
1.00
730.80
1.00
1.00
HARGA SATUAN
JUMLAH
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
II
1
2
PEKERJAAN TANAH
Galian tanah pond foote plate
Urugan pasir tb. 10 cm
m
m
274.50
14.60
#REF!
#REF!
#REF!
#REF!
#REF!
III
1
2
3
4
5
PEKERJAAN STRUKTUR
Basment ke lt 1
FOOTE Plate (150 kg)
Pas Sloff (200 kg)
Kolom struktur 40 x 40 (150 kg) bsm Ke Lt1
Balok Struktur 30 x 40 lt 1
Plat lantai t 12 cm lt 1
m
m'
m
m
m
32.87
41.69
39.24
48.62
75.64
653,710,000
2,000,000
2,500,000
3,000,000
3,250,000
2,750,000
1
2
3
Lt 1 ke lt 2
Kolom struktur 40 x 40 lt 1 ke lt 2
Balok Struktur 30 x 40 lt 2
Plat lantai t 12 cm lt 2
m
m
m
29.52
48.62
75.64
3,000,000
3,250,000
2,750,000
65,740,000
104,225,000
117,720,000
158,015,000
208,010,000
653,710,000
88,560,000
158,015,000
208,010,000
454,585,000
1
2
1
2
III
1
2
3
4
5
6
Lt 2 ke atap
Kolom struktur 25 x 25 lt 2 ke atap
Balok Struktur 30 x 40 atap
Ram
Ram dari lt 1 ke bsm
Ram dari lt 1 ke lt 2
PEKERJAAN PASANGAN
Basment ke lt 1
Lt 1 ke lt 2
Pas Batu bata
Plester pas. Batu bata
Kolom praktis 15 x 15
Pas. Lantai keramik 30 x 30 (Ruang Dalam)
Pas. Lantai keramik 20 x 20 (Teras)
Pas. Dinding keramik 20 x 25 (K. Mandi - T. 1,5M)
Pas. Dinding keramik 20 x 25 (K. Dalam - T. 1,5M)
Pas. Railing void (GIP)
m
m
Tahap 2
Tahap 2
454,585,000
Tahap 2
Tahap 2
Tahap 2
Tahap 2
m
m
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
m
m
m'
m
m
m
m
m'
1,721.70
1,449.70
182.70
715.68
165.60
482.63
302.63
23.40
705,566,600
65,000
65,000
65,000
75,000
75,000
80,000
80,000
250,000
111,910,500
94,230,500
11,875,500
53,676,000
12,420,000
38,610,400
24,210,400
5,850,000
352,783,300
1
2
3
4
5
6
7
8
9
Lt 2 ke atap
Pas Batu bata (T.1 M') bagian pinggir
Plester pas. Batu bata
Kolom praktis 15 x 15
Pas Glass Block
Pas. Batu Alam
Plester pas. Batu bata
Kolom praktis 15 x 15
Balok praktis 15 x 15
Balok latei 15 x 15
m
m
m'
m
m
m
m'
m'
m'
111.60
245.52
25.20
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
70,000
65,000
65,000
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
7,812,000
15,958,800
1,638,000
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
Tahap 2
25,408,800
IV
1
2
3
4
5
6
7
unit
unit
unit
unit
unit
unit
unit
1.00
20.00
20.00
1.00
20.00
20.00
#REF!
4,000,000
1,621,250
910,410
#REF!
#REF!
#REF!
4,000,000
32,425,000
18,208,200
#REF!
#REF!
#REF!
#REF!
V
1
2
3
4
5
6
7
8
9
10
SAT
HARGA SATUAN
VOL
BQ
m'
ls
bh
bh
bh
bh
bh
bh
m
Ls
106.20
1.00
20.00
20.00
20.00
20.00
20.00
20.00
271.80
1.00
#REF!
#REF!
2,016,000
12,000
140,000
1,080,000
100,000
75,000
18,000
37,383
300,000
unit
unit
unit
unit
ttk
unit
unit
unit
unit
unit
unit
19.00
5.00
52.00
74.00
24.00
1.00
1.00
74.00
32.00
20.00
24.00
185,000
215,000
29,538
8,514
125,000
500,000
750,000
125,000
12,000
10,000
10,000
JUMLAH
#REF!
2,016,000
240,000
2,800,000
21,600,000
2,000,000
1,500,000
360,000
10,160,640
300,000
3,515,000
1,075,000
1,536,000
630,000
3,000,000
500,000
750,000
9,250,000
384,000
200,000
240,000
#REF!
VI
1
PEKERJAAN PENGECATAN
Cat Exterior & Interior
4,270.32
14,000
59,784,480
59,784,480
m
m
820.60
151.20
75,000
60,000
61,545,000
9,072,000
70,617,000
VIII
1
2
3
4
5
6
CANOPY
Galian Tanah & Urug kembali
Pondasi beton setempat & Sloof
Kolom beton & Finish Plester - Acian
Dak beton & Finish Acian
Water proofing
Pengecatan
Ttk
m
Ttk
m
m
m
3.00
0.97
0.38
4.32
39.60
54.00
30,000
3,000,000
4,000,000
4,000,000
60,000
14,000
90,000
2,910,000
1,520,000
17,280,000
2,376,000
756,000
24,932,000
IX
IX.a
1
2
3
4
ORNAMEN
Dinding pada Jendela
Pasang bata merah
Plester & Acian
Beton pengikat
Pengecatan
Psg
Psg
Psg
Psg
5.00
5.00
5.00
5.00
325,000
137,500
275,000
110,000
1,625,000
687,500
1,375,000
550,000
Unt
Unt
2.00
2.00
2,400,000
500,000
4,800,000
1,000,000
10,037,500
JUMLAH
#REF!
Catatan :
1
2
3
4
5
6
7
8
9
Pekerjaan Air Kotor dihitung pakai pipa PVC dia 4" (Closet) & dia 3" (Buangan) dijoint ke PVC Existing terus ke IPAL
Pengurugan & perataan tanah dipadatkan pakai stamper
Pekerjaan Sparing pipa pada lantai 2 untuk persiapan K. Mandi sudah termasuk dalam hitungan
Pekerjaan Railing pada lubang Void/tangga sudah dihitung pakai Pipa GIP standard
Pekerjaan Lubang tangga pada lantai 2 ini dibuat tutupnya dengan menggunakan rangka kayu dan tutup asbes gelombang
Pada K. Mandi sudah terpasang Floor Drain & lantai diwater proofing, dalam perhitungan sebelumnya tidak ditawarkan
Pada K. Mandi terpasang pegangan dekat Closet terbuat dari pipa GIP " dan dipasang pakai dynabolt, juga tempat sabun
terbuat dari keramik dipasang pada dinding
Keramik Dinding pada penwaran awal untuk dinding bagian dalam belum ditawarkan dan sekarang dimasukan dengan T. 1,5M
Pada lantai dua dipasang dinding bata merah setinggi 1M, untuk pinggiran agar finishing pantas
ANALYSA
PENGEMBANGAN RS sebelah Utara
ITEM PEKERJAAN
NO
I
1
PEKERJAAN PERSIAPAN
Pek. Perbersihan lahan
Mandor
Tukang Batu
Kenek
Alat bantu
II
1
III
1
SAT
HARGA SATUAN
VOL
BQ
ls
1.00
Hok
Hok
Hok
ls
0.46
1.50
5.00
1.00
65,000
60,000
45,000
130,000
JUMLAH
475,000
30,000
90,000
225,000
130,000
8,120,000
Mandor
Tukang Gali
Kenek
Alat bantu
Hok
Hok
Hok
ls
9.00
45.00
63.00
1.00
65,000
60,000
45,000
2,000,000
585,000
2,700,000
2,835,000
2,000,000
ls
Lbr
Btg
Kg
Ls
Hok
Hok
Hok
1.00
12.00
6.00
1.73
1.00
0.50
1.00
2.00
28,800
25,200
12,000
50,000
65,000
60,000
45,000
750,000
345,600
151,200
20,700
50,000
32,500
60,000
90,000
ls
truk
ls
ls
Hok
1.00
12.00
1.00
1.00
15.00
65,000
75,000
220,000
45,000
1,750,000
780,000
75,000
220,000
675,000
PEKERJAAN TANAH
Galian tanah pond foote plate
305.00
Mandor
Tukang Gali
Kenek
Alat bantu
Hok
Hok
Hok
ls
8.00
35.08
55.00
1.00
16.22
Pasir Urug
Mandor
Tukang Gali
Kenek
Alat bantu
m3
Hok
Hok
Hok
ls
16.22
1.00
3.00
6.00
1.00
PEKERJAAN STRUKTUR
Basment ke lt 1
FOOTE Plate (150 kg)
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
36.52
Lbr
m
Kg
Kg
Kg
m
Ls
Hok
Hok
Hok
Hok
Hok
26.09
7.30
35.00
7,851.80
157.04
40.17
1.00
20.00
39.00
37.00
100.00
144.49
m'
46.32
Lbr
m
Kg
Kg
Kg
m
Ls
Hok
Hok
Hok
Hok
Hok
33.09
9.26
40.00
9,958.80
199.18
50.95
1.00
33.00
51.00
48.00
115.07
165.80
43.60
Lbr
m
31.14
8.72
6,100,000
65,000
60,000
45,000
1,000,000
520,000
2,105,000
2,475,000
1,000,000
1,581,450
60,000
65,000
60,000
45,000
93,250
973,200
65,000
180,000
270,000
93,250
1,982,006,842
145,294,820
165,000
2,200,000
15,000
8,400
15,000
785,000
5,994,000
65,000
65,000
60,000
60,000
45,000
4,304,143
16,068,800
525,000
65,955,120
2,355,540
31,535,020
5,994,000
1,300,000
2,535,000
2,220,000
6,000,000
6,502,197
296,762,321
165,000
2,200,000
15,000
8,400
15,000
785,000
32,425,000
551,764
1,246,000
137,500
60,000
96,502
5,459,143
20,380,800
600,000
83,653,920
2,987,640
39,997,320
32,425,000
18,208,200
63,546,000
6,600,000
6,904,298
16,000,000
173,462,600
165,000
2,200,000
5,138,571
19,184,000
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
Kg
Kg
Kg
m
Ls
Hok
Hok
Hok
Hok
Hok
40.00
9,374.00
187.48
47.96
1.00
29.00
49.00
46.00
112.00
157.50
Balok Struktur 30 x 40 lt 1
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Scafolding komplit
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
53.30
Lbr
m
Kg
Kg
Kg
m
Set
Ls
Hok
Hok
Hok
Hok
Hok
38.07
12.94
56.00
11,459.50
229.19
58.63
400.00
1.00
38.00
59.00
58.00
128.00
149.49
Plat lantai t 12 cm lt 1
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Scafolding komplit
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
80.76
Lbr
m
Kg
Kg
Kg
m
Set
Ls
Hok
Hok
Hok
Hok
Hok
57.69
17.31
52.00
17,363.40
347.27
88.84
360.00
1.00
30.00
54.00
52.00
118.00
144.70
Lt 1 ke lt 2
Kolom struktur 40 x 40 lt 1 ke lt 2
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
32.80
Lbr
Kg
Kg
Kg
Kg
Kg
Ls
Hok
Hok
Hok
Hok
Hok
23.43
6.56
38.00
7,052.00
141.04
36.08
1.00
18.00
41.00
39.00
98.00
131.04
Balok Struktur 30 x 40 lt 2
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Scafolding komplit
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
53.30
Lbr
Kg
Kg
Kg
Kg
Kg
Set
Ls
Hok
Hok
Hok
Hok
Hok
38.07
11.42
59.00
11,459.50
229.19
58.63
405.00
1.00
38.00
65.00
64.00
136.00
173.11
Plat lantai lt 12 cm
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Scafolding komplit
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
80.76
Lbr
Kg
Kg
Kg
Kg
Kg
Set
Ls
Hok
Hok
Hok
Hok
Hok
57.69
17.31
48.00
17,121.12
342.42
88.84
360.00
1.00
34.00
60.00
59.00
126.00
151.77
15,000
8,400
15,000
785,000
7,700,000
65,000
65,000
60,000
60,000
45,000
600,000
78,741,600
2,812,200
37,648,600
7,700,000
1,885,000
3,185,000
2,760,000
6,720,000
7,087,629
223,513,550
165,000
2,200,000
15,000
8,400
15,000
785,000
22,500
9,000,000
65,000
65,000
60,000
60,000
45,000
6,281,786
28,477,429
840,000
96,259,800
3,437,850
46,024,550
9,000,000
9,000,000
2,470,000
3,835,000
3,480,000
7,680,000
6,727,136
303,940,260
165,000
2,200,000
15,000
8,400
15,000
785,000
22,500
4,500,000
65,000
65,000
60,000
60,000
45,000
9,518,143
38,072,571
780,000
145,852,560
5,209,020
69,736,260
8,100,000
4,500,000
1,950,000
3,510,000
3,120,000
7,080,000
6,511,706
130,494,800
165,000
2,200,000
15,000
8,400
15,000
785,000
4,000,000
65,000
65,000
60,000
60,000
45,000
3,865,714
14,432,000
570,000
59,236,800
2,115,600
28,322,800
4,000,000
1,170,000
2,665,000
2,340,000
5,880,000
5,896,886
223,513,500
165,000
2,200,000
15,000
8,400
15,000
785,000
22,500
9,900,000
65,000
65,000
60,000
60,000
45,000
6,281,786
25,127,143
885,000
96,259,800
3,437,850
46,024,550
9,112,500
9,900,000
2,470,000
4,225,000
3,840,000
8,160,000
7,789,871
303,940,260
165,000
2,200,000
15,000
8,400
15,000
785,000
22,500
4,800,000
65,000
65,000
60,000
60,000
45,000
9,518,143
38,072,571
720,000
143,817,408
5,136,336
69,736,260
8,100,000
4,800,000
2,210,000
3,900,000
3,540,000
7,560,000
6,829,542
Lt 1 ke lt 2
Pas Batu bata
Bata merah lokal
Pasir pasang
Semen PC
Scafolding komplit
Alat bantu
Mandor
Tukang Batu
Kenek
995,529,003
m
Bh
m
Zak
1,803.00
198,330.00
54.09
270.45
Set
220.00
22,500
4,950,000
Ls
Hok
Hok
Hok
1.00
66.00
181.42
198.00
10,000,000
65,000
60,000
45,000
10,000,000
4,290,000
10,884,950
8,910,000
m
m
Zak
3,612.00
198.66
1,246.14
125,000
59,000
176,085,000
24,832,500
73,522,260
525
125,000
59,000
165,876,000
104,123,250
6,761,250
15,956,550
Set
440.00
22,500
9,900,000
Ls
Hok
Hok
Hok
1.00
128.00
409.00
332.67
20,000,000
65,000
60,000
45,000
20,000,000
8,320,000
24,540,000
14,970,240
Kolom praktis 15 x 15
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
m'
161.00
Lbr
m
Kg
Kg
Kg
m
Ls
Hok
Hok
Hok
Hok
Hok
6.00
0.30
6.00
402.18
6.11
2.50
1.00
2.00
9.00
8.50
16.00
28.00
165,000
2,200,000
15,000
8,400
15,000
785,000
250,000
65,000
65,000
60,000
60,000
45,000
990,000
660,000
90,000
3,378,295
91,705
1,962,500
250,000
130,000
585,000
510,000
960,000
1,260,000
m
Dus
m
Zak
Ls
Hok
Hok
Hok
770.00
847.00
23.10
154.00
1.00
14.22
77.00
41.07
50,000
125,000
59,000
3,739,500
65,000
60,000
45,000
65,455,000
42,350,000
2,887,500
9,086,000
3,739,500
924,000
4,620,000
1,848,000
m
Dus
m
Zak
Ls
Hok
Hok
Hok
184.00
193.20
5.52
33.12
1.00
3.40
18.40
5.76
50,000
125,000
59,000
1,200,000
65,000
60,000
45,000
15,088,000
9,660,000
690,000
1,954,080
1,200,000
220,800
1,104,000
259,120
m
Dus
m
Zak
Ls
Hok
Hok
Hok
445.00
489.50
13.35
80.10
1.00
12.00
54.17
27.00
50,000
125,000
59,000
2,600,000
65,000
60,000
45,000
38,715,000
24,475,000
1,668,750
4,725,900
2,600,000
780,000
3,250,350
1,215,000
m
Dus
m
Zak
Ls
Hok
Hok
Hok
269.00
290.52
8.07
48.42
1.00
8.00
44.00
17.81
50,000
125,000
59,000
1,050,000
65,000
60,000
45,000
23,403,000
14,526,000
1,008,750
2,856,780
1,050,000
520,000
2,640,000
801,470
m
Kg
Ls
Ls
Kg
Ls
Hok
Hok
Hok
26.00
85.00
1.00
1.00
5.00
1.00
1.00
14.00
8.89
15,000
1,000,000
175,000
59,000
500,000
65,000
60,000
45,000
4,550,000
1,275,000
1,000,000
175,000
295,000
500,000
65,000
840,000
400,000
10,867,500
V
1
140,643,400
unit
m'
set
Ls
m
Ls
Ls
Ls
Hok
Hok
Hok
1.00
12.00
2.00
1.00
6.00
1.00
1.00
1.00
1.00
8.00
5.10
unit
m'
set
Ls
m
Ls
Ls
Ls
Hok
Hok
Hok
16.00
156.00
16.00
1.00
26.00
1.00
1.00
1.00
5.00
22.00
12.00
unit
m'
set
Ls
m
Ls
Ls
Ls
Hok
Hok
Hok
16.00
96.00
16.00
1.00
5.12
1.00
1.00
1.00
4.00
10.00
8.00
unit
m'
Ls
Ls
Ls
Ls
Hok
Hok
Hok
1.00
13.80
1.00
2.40
1.00
1.00
0.48
3.00
1.00
unit
m'
Ls
m'
Ls
Ls
Hok
Hok
Hok
6.00
52.80
1.00
10.80
1.00
1.00
1.00
4.00
5.00
78,000
300,000
125,000
125,000
86,600
65,000
70,000
55,000
6,600,000
4,118,400
300,000
1,350,000
125,000
86,600
65,000
280,000
275,000
unit
m'
set
Ls
m
Ls
Ls
Ls
Hok
Hok
Hok
20.00
48.00
20.00
1.00
8.00
1.00
1.00
1.00
6.00
13.59
12.00
78,000
400,000
600,000
110,000
400,000
175,000
200,000
65,000
70,000
55,000
16,000,000
3,744,000
8,000,000
600,000
880,000
400,000
175,000
200,000
390,000
951,000
660,000
m'
Btg
Ls
Klg
Ls
Hok
Hok
Hok
96.00
24.00
1.00
6.00
1.00
1.00
11.00
6.00
22,500
150,000
22,500
81,000
65,000
65,000
55,000
2,016,000
540,000
150,000
135,000
81,000
65,000
715,000
330,000
ls
Btg
Ls
Klg
Ls
Hok
Hok
Hok
1.00
26.00
1.00
3.00
1.00
0.25
3.60
1.00
59,000
500,000
22,500
93,000
65,000
65,000
55,000
2,500,000
1,534,000
500,000
67,500
93,000
16,250
234,250
55,000
90,000
900,000
150,000
110,000
125,000
27,500
90,000
900,000
1,000,000
110,000
125,000
70,000
650,000
400,000
110,000
125,000
65,000
85,000
110,000
3,842,500
1,080,000
1,800,000
150,000
660,000
125,000
27,500
32,425,000
14,040,000
14,400,000
1,000,000
2,860,000
125,000
18,208,200
6,720,000
10,400,000
400,000
563,200
125,000
1,246,000
897,000
85,000
264,000
-
114,061,283
V
1
bh
bh
Ls
Hok
Hok
Hok
16.00
16.00
1.00
0.10
0.50
0.50
10,000
13,500
65,000
65,000
55,000
240,000
160,000
13,500
6,500
32,500
27,500
Pas. Wastafel
Wastapel INA/setara
Alat bantu
Mandor
Tukang Plumbing
Kenek
bh
bh
Ls
Hok
Hok
Hok
16.00
16.00
1.00
1.00
7.00
2.00
125,000
170,000
65,000
65,000
55,000
2,800,000
2,000,000
170,000
65,000
455,000
110,000
bh
bh
Ls
Hok
Hok
Hok
16.00
16.00
1.00
4.00
22.77
12.00
1,100,000
1,600,000
65,000
65,000
55,000
21,600,000
17,600,000
1,600,000
260,000
1,480,000
660,000
bh
bh
Ls
Hok
Hok
Hok
16.00
16.00
1.00
0.10
1.70
0.38
12,000
30,000
65,000
65,000
55,000
360,000
192,000
30,000
6,500
110,500
21,000
Water Proofing
Aquaproof
Alat bantu
Mandor
Tukang Batu
Kenek
bh
Gln
Ls
Hok
Hok
Hok
282.24
6.00
1.00
2.00
10.93
4.00
1,350,000
1,000,000
65,000
65,000
55,000
10,160,640
8,100,000
1,000,000
130,000
710,640
220,000
bh
Btg
Ls
Hok
Hok
Hok
1.00
3.00
1.00
0.10
1.00
0.38
54,000
45,500
65,000
65,000
55,000
300,000
162,000
45,500
6,500
65,000
21,000
unit
Bh
Ls
Hok
Hok
Hok
19.00
19.00
1.00
1.00
8.00
2.00
130,000
310,000
65,000
70,000
55,000
3,515,000
2,470,000
310,000
65,000
560,000
110,000
unit
Bh
Ls
Hok
Hok
Hok
5.00
5.00
1.00
0.50
3.00
1.00
130,000
127,500
65,000
70,000
55,000
1,075,000
650,000
127,500
32,500
210,000
55,000
unit
Bh
Ls
Hok
Hok
Hok
48.00
48.00
1.00
0.10
2.00
0.50
27,000
66,000
65,000
70,000
55,000
1,536,000
1,296,000
66,000
6,500
140,000
27,500
Fitting
Fitting
Alat bantu
Mandor
Tukang Listrik
Kenek
unit
Bh
Ls
Hok
Hok
Hok
70.00
70.00
1.00
0.10
1.70
0.40
6,500
27,500
65,000
70,000
55,000
630,000
455,000
27,500
6,500
119,000
22,000
ttk
m'
Ls
Hok
Hok
Hok
20.00
160.00
1.00
1.00
6.00
3.00
6,500
210,000
65,000
70,000
55,000
1,900,000
1,040,000
210,000
65,000
420,000
165,000
unit
Unit
Ls
Hok
Hok
Hok
Hok
1.00
1.00
1.00
0.10
0.30
1.00
0.50
335,000
16,500
65,000
65,000
70,000
55,000
475,000
335,000
16,500
6,500
19,500
70,000
27,500
unit
Unit
Ls
Hok
Hok
Hok
1.00
1.00
1.00
0.10
1.00
0.50
500,000
21,000
65,000
70,000
55,000
625,000
500,000
21,000
6,500
70,000
27,500
unit
m'
Ls
Hok
Hok
Hok
70.00
600.00
1.00
2.00
22.00
16.00
6,500
200,000
65,000
70,000
55,000
6,650,000
3,900,000
200,000
130,000
1,540,000
880,000
unit
Bh
Ls
Hok
Hok
Hok
28.00
28.00
1.00
0.10
1.00
0.40
7,500
27,500
65,000
70,000
55,000
336,000
210,000
27,500
6,500
70,000
22,000
unit
Bh
Ls
Hok
Hok
Hok
16.00
16.00
1.00
0.10
0.55
0.20
7,500
16,000
65,000
70,000
55,000
192,000
120,000
16,000
6,500
38,500
11,000
unit
Bh
Ls
Hok
Hok
Hok
20.00
20.00
1.00
0.10
0.80
0.20
7,500
16,500
65,000
70,000
55,000
240,000
150,000
16,500
6,500
56,000
11,000
PEKERJAAN PENGECATAN
Cat Exterior & Interior
Cat Vinylex
Plamur
Alat bantu
Mandor
Tukang Cat
Kenek
m
Pail
Gln
Ls
Hok
Hok
Hok
3,884.80
47.00
56.00
1.00
14.00
90.00
53.00
1,350,000
55,000
9,260,600
65,000
65,000
55,000
85,465,600
63,450,000
3,080,000
9,260,600
910,000
5,850,000
2,915,000
m
Btg
Lbr
Zak
Ls
Hok
Hok
Hok
883.00
700.00
353.20
18.00
1.00
15.00
95.00
58.00
95,000
55,000
65,000
60,000
10,532,000
65,000
70,000
55,000
83,885,000
38,500,000
22,958,000
1,080,000
10,532,000
975,000
6,650,000
3,190,000
m
Lbr
m
Ls
Hok
Hok
Hok
168.00
67.00
0.20
1.00
1.00
9.00
6.00
115,000
2,200,000
343,000
65,000
65,000
45,000
9,408,000
7,705,000
440,000
343,000
65,000
585,000
270,000
VI
1
VIII CANOPY
1 Galian Tanah & Urug kembali
Ttk
3.00
150,000
450,000
Mandor
Tukang Gali
Kenek
Alat bantu
Hok
Hok
Hok
ls
0.50
3.00
3.00
1.00
65,000
60,000
45,000
102,500
32,500
180,000
135,000
102,500
1.07
Lbr
m
Kg
Kg
Kg
m
Ls
Hok
Hok
0.77
0.21
3.00
214.80
4.30
1.18
1.00
0.50
1.00
4,473,210
165,000
2,200,000
15,000
8,400
15,000
785,000
305,412
65,000
65,000
126,579
472,560
45,000
1,804,320
64,440
927,399
305,412
32,500
65,000
Tukang Batu
Tukang Besi
Kenek
3
2.00
4.00
6.00
60,000
60,000
45,000
120,000
240,000
270,000
Ttk
0.42
Lbr
m
Kg
Kg
Kg
m
Ls
0.30
0.07
3.00
83.58
1.67
0.46
1.00
165,000
2,200,000
15,000
8,400
15,000
785,000
59,019
1,901,235
49,500
158,400
45,000
702,072
25,074
362,670
59,019
m
Zak
0.10
0.50
125,000
59,000
12,500
29,500
Hok
Hok
Hok
Hok
Hok
0.50
1.00
2.00
1.00
4.00
65,000
65,000
60,000
60,000
45,000
32,500
65,000
120,000
60,000
180,000
4.80
Lbr
m
Kg
Kg
Kg
m
Ls
3.43
0.82
8.00
1,008.00
20.16
5.28
1.00
165,000
2,200,000
15,000
8,400
15,000
785,000
1,725,500
565,714
1,810,286
120,000
8,467,200
302,400
4,144,800
1,725,500
m
Zak
0.50
4.00
125,000
59,000
62,500
236,000
Hok
Hok
Hok
Hok
Hok
2.00
6.00
8.00
14.00
20.00
65,000
65,000
60,000
60,000
45,000
130,000
390,000
480,000
840,000
900,000
Water proofing
Aquaproof
Alat bantu
Mandor
Tukang Batu
Kenek
m
Gln
Ls
Hok
Hok
Hok
44.00
1.00
1.00
1.00
7.00
8.00
1,350,000
660,000
65,000
65,000
55,000
2,970,000
1,350,000
660,000
65,000
455,000
440,000
Pengecatan
Cat Vinylex
Plamur
Alat bantu
Mandor
Tukang Cat
Kenek
m
Pail
Gln
Ls
Hok
Hok
Hok
60.00
0.60
1.00
1.00
1.00
2.00
3.00
1,350,000
55,000
95,000
65,000
65,000
55,000
1,320,000
810,000
55,000
95,000
65,000
130,000
165,000
Psg
Bh
m
Zak
5.00
1,320.00
0.45
3.75
525
125,000
59,000
1,625,000
693,000
56,250
221,250
IX ORNAMEN
IX.a Dinding pada Jendela
1 Pasang bata merah
Bata merah lokal
Pasir pasang
Semen PC
Scafolding komplit
Alat bantu
Mandor
Tukang Batu
Kenek
2
Hok
Hok
Hok
20,174,400
Set
6.00
22,500
135,000
Ls
Hok
Hok
Hok
1.00
1.00
4.00
4.00
34,500
65,000
60,000
45,000
34,500
65,000
240,000
180,000
Psg
m
Zak
5.00
0.70
3.08
125,000
59,000
687,500
87,500
181,720
Set
6.00
22,500
135,000
Ls
Hok
Hok
Hok
1.00
0.50
3.00
1.00
25,780
65,000
60,000
45,000
25,780
32,500
180,000
45,000
Beton pengikat
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Alat bantu
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
Psg
5.00
Lbr
Ls
Kg
Kg
Kg
m
Ls
Hok
Hok
Hok
Hok
Hok
1.00
0.12
1.00
38.00
0.76
0.23
1.00
1.00
1.00
1.00
1.50
2.00
165,000
2,200,000
15,000
8,400
15,000
785,000
49,536
65,000
65,000
60,000
60,000
45,000
165,000
264,000
15,000
319,200
11,400
180,864
49,536
65,000
65,000
60,000
90,000
90,000
Pengecatan
Cat Vinylex
Psg
Pail
5.00
0.30
1,350,000
550,000
405,000
1,375,000
Plamur
Alat bantu
Mandor
Tukang Cat
Kenek
IX.b Dinding berdiri (Sirip)
1 Beton bertulang & Finish Plester - Acian
Multiplex 12 mm
Balok 6/12 & kaso 5/7
Paku campur
Besi beton campur sesuai gambar
Kawat Ikat
Readymix K 250
Alat bantu
Pasir pasang
Semen PC
Mandor
Tukang Kayu
Tukang Batu
Tukang Besi
Kenek
Pengecatan
Cat Vinylex
Plamur
Alat bantu
Mandor
Tukang Cat
Kenek
Gln
Ls
Hok
Hok
Hok
0.50
1.00
0.10
0.50
1.00
55,000
23,500
65,000
65,000
55,000
27,500
23,500
6,500
32,500
55,000
Unt
2.00
Lbr
m
Kg
Kg
Kg
m
Ls
1.43
0.34
8.00
194.25
3.89
1.05
1.00
165,000
2,200,000
15,000
8,400
15,000
785,000
116,025
235,714
754,286
120,000
1,631,700
58,275
824,250
116,025
m
Zak
0.25
4.00
125,000
59,000
31,250
236,000
Hok
Hok
Hok
Hok
Hok
0.50
2.00
5.00
4.00
2.00
65,000
65,000
60,000
60,000
45,000
32,500
130,000
300,000
240,000
90,000
Unt
Pail
Gln
Ls
Hok
Hok
Hok
2.00
0.60
0.80
1.00
0.20
1.00
1.00
1,350,000
55,000
13,000
65,000
65,000
55,000
1,000,000
810,000
44,000
13,000
13,000
65,000
55,000
10,600,000
4,800,000