Está en la página 1de 81

ANCHOS DE ZANJA PARA ACUEDUCTO DIAMETRO BD 3 0.6 4 0.6 6 0.6 8 0.65 10 0.7 12 0.8 16 0.

9 20 1

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

Bd

RETIRO ADOQUIN

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

RETIRO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO

PAVIMENTO ASFALTICO

e=0.10 e=0.15 GRANITO MARMOL TABLON 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

e=0.15 e=0.20 e=0.25 e=0.30 e=3" e=4" e=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ADOQUIN VEHICULAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC

TEES EN HIERRO DUCTIL PARA PVC

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0-1.50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TIPO 2B 1-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

Bd

RETIRO ADOQUIN

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

RETIRO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO

PAVIMENTO ASFALTICO

e=0.10 e=0.15 GRANITO MARMOL TABLON 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

e=0.15 e=0.20 e=0.25 e=0.30 e=3" e=4" e=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ADOQUIN VEHICULAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC

TEES EN HIERRO DUCTIL PARA PVC

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0-1.50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TIPO 2B 1-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

Bd

RETIRO ADOQUIN

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

RETIRO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO

PAVIMENTO ASFALTICO

e=0.10 e=0.15 GRANITO MARMOL TABLON 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

e=0.15 e=0.20 e=0.25 e=0.30 e=3" e=4" e=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ADOQUIN VEHICULAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC

TEES EN HIERRO DUCTIL PARA PVC

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0-1.50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TIPO 2B 1-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

Bd

RETIRO ADOQUIN

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

RETIRO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO

PAVIMENTO ASFALTICO

e=0.10 e=0.15 GRANITO MARMOL TABLON 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

e=0.15 e=0.20 e=0.25 e=0.30 e=3" e=4" e=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ADOQUIN VEHICULAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC

TEES EN HIERRO DUCTIL PARA PVC

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0-1.50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TIPO 2B 1-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

Bd

RETIRO ADOQUIN

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

RETIRO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO

PAVIMENTO ASFALTICO

e=0.10 e=0.15 GRANITO MARMOL TABLON 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

e=0.15 e=0.20 e=0.25 e=0.30 e=3" e=4" e=6" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ADOQUIN VEHICULAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC

TEES EN HIERRO DUCTIL PARA PVC

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3''

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0-1.50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0-1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TIPO 2B 1-1.50 1.50-2.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE

LOCALIZACIN

Bd

RETIRO ADOQUIN

RETIRO

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO e=0.15 e=0.20 e=0.25 e=0.30

PAVIMENTO ASFALTICO e=3" e=4" e=6"

e=0.10 e=0.15 GRANITO MARMOL TABLON

ADOQUIN VEHICULAR

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA E/LISO 3'' E/LISO 4'' E/LISO 6'' E/LISO 8'' E/BRIDA 3'' E/BRIDA 4'' E/BRIDA 6'' E/BRIDA 8'' E/BRIDA 10'' E/BRIDA 12''

HIDRANTES TIPO CHICAGO VIA E/LISO 3'' ANDEN E/LISO 4'' E/LISO 6''

CRUCES EN HIERRO DUCTIL PARA PVC E/LISO 3''X3'' E/LISO 4''X3'' E/LISO 4''X4'' E/LISO 6''X3'' E/LISO 6''X4'' E/LISO 6''X6'' E/LISO 8''X3'' E/LISO 8''X4'' E/LISO 8''X6'' E/LISO 8''X8'' E/LISO 10''X3'' E/LISO 10''X4'' E/LISO 10''X6'' E/LISO 10''X8'' E/LISO 10''X10'' E/LISO 12''X3'' E/LISO 12''X4'' E/LISO 12''X6'' E/LISO 12''X8'' E/LISO 12''X10'' E/LISO 12''X12'' E/BRIDA 4''X3'' E/BRIDA 4''X4'' E/BRIDA 6''X3'' E/BRIDA 6''X4'' E/BRIDA 6''X6'' E/BRIDA 8''X3'' E/BRIDA 8''X4'' E/BRIDA 8''X6'' E/BRIDA 8''X8''

TEES EN HIERRO DUCTIL PARA PVC E/LISO 3''X3'' E/LISO 4''X3'' E/LISO 4''X4'' E/LISO 6''X3'' E/LISO 6''X4'' E/LISO 6''X6'' E/LISO 8''X3'' E/LISO 8''X4'' E/LISO 8''X6'' E/LISO 8''X8'' E/LISO 10''X3'' E/LISO 10''X4'' E/LISO 10''X6'' E/LISO 10''X8'' E/LISO 10''X10'' E/LISO 12''X3'' E/LISO 12''X4'' E/LISO 12''X6'' E/LISO 12''X8'' E/LISO 12''X10'' E/LISO 12''X12'' E/BRIDA 3''X3'' E/BRIDA 4''X3'' E/BRIDA 4''X4'' E/BRIDA 6''X3'' E/BRIDA 6''X4'' E/BRIDA 6''X6'' E/BRIDA 8''X3'' E/BRIDA 8''X4'' E/BRIDA 8''X6''

REDUCCION EN HIERRO DUCTIL PARA PVC E/LISO 4''X3'' E/LISO 6''X3'' E/LISO 6''X4'' E/LISO 8''X3'' E/LISO 8''X4'' E/LISO 8''X6'' E/LISO 10''X3'' E/LISO 10''X4'' E/LISO 10''X6'' E/LISO 10''X8'' E/LISO 12''X4'' E/LISO 12''X6'' E/LISO 12''X8'' E/LISO 12''X10'' E/BRIDA 4''X3'' E/BRIDA 6''X3'' E/BRIDA 6''X4'' E/BRIDA 8''X3'' E/BRIDA 8''X4'' E/BRIDA 8''X6'' E/BRIDA 10''X3'' E/BRIDA 10''X4'' E/BRIDA 10''X6'' E/BRIDA 10''X8'' E/BRIDA 12''X4'' E/BRIDA 12''X6'' E/BRIDA 12''X8'' E/BRIDA 12''X10''

NODO

CODOS EN HIERRO DUCTIL E/LISO 90X4'' E/LISO 90X6'' E/LISO 90X8'' E/LISO 90X10'' E/LISO 90X12'' E/LISO 45X3'' E/LISO 45X4'' E/LISO 45X6'' E/LISO 45X8'' E/LISO 45X10'' E/LISO 45X12'' E/LISO 22.5X3'' E/LISO 22.5X4'' E/LISO 22.5X6'' E/LISO 22.5X8'' E/LISO 22.5X10'' E/LISO 22.5X12'' E/LISO 11.25X3'' E/LISO 11.25X4'' E/LISO 11.25X6'' E/LISO 11.25X8'' E/LISO 11.25X10'' E/LISO 11.25X12'' E/BRIDA 90X3'' E/BRIDA 90X4'' E/BRIDA 90X6'' E/BRIDA 90X8'' E/BRIDA 90X10'' E/BRIDA 90X12'' E/BRIDA 45X3''

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC
E/LISO 3'' E/LISO 4'' E/LISO 6'' E/LISO 8'' E/LISO 10'' E/LISO 12''

CANTIDAD

CANTIDAD

CANTIDAD

CANTIDAD

CANTIDAD

CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL E/LISO 90X4'' E/LISO 90X6'' E/LISO 90X8'' E/LISO 90X10'' E/LISO 90X12'' E/LISO 45X3'' E/LISO 45X4'' E/LISO 45X6'' E/LISO 45X8'' E/LISO 45X10'' E/LISO 45X12'' E/LISO 22.5X3'' E/LISO 22.5X4'' E/LISO 22.5X6'' E/LISO 22.5X8'' E/LISO 22.5X10'' E/LISO 22.5X12'' E/LISO 11.25X3'' E/LISO 11.25X4'' E/LISO 11.25X6'' E/LISO 11.25X8'' E/LISO 11.25X10'' E/LISO 11.25X12'' E/BRIDA 90X3'' E/BRIDA 90X4'' E/BRIDA 90X6'' E/BRIDA 90X8'' E/BRIDA 90X10'' E/BRIDA 90X12'' E/BRIDA 45X3''

UNION DE REPARACION
PVC 3'' PVC 4'' PVC 6'' PVC 8'' PVC 10'' PVC 12''

UNION DE REPARACION
PVC 3'' PVC 4'' PVC 6'' PVC 8'' PVC 10'' PVC 12''

UNION MECANICA
PVC 3'' PVC 4'' PVC 6'' PVC 8'' PVC 10'' PVC 12''

UNION MECANICA
PVC 3'' PVC 4'' PVC 6'' PVC 8'' PVC 10'' PVC 12''

UNION DE ACOPLE UNIVERSAL EN HD


HD 4'' HD 6'' R1 HD 6'' R2 HD 6'' R1 x R2 HD 8'' R1 HD 8'' R2 HD 8'' R1 x R2 HD 10'' R1 HD 10'' R2 HD 10'' R1 x R2 HD 12'' R1 HD 12'' R3 HD 12'' R1 x R3

CANTIDAD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD


HD 4'' HD 6'' R1 HD 6'' R2 HD 6'' R1 x R2 HD 8'' R1 HD 8'' R2 HD 8'' R1 x R2 HD 10'' R1 HD 10'' R2 HD 10'' R1 x R2 HD 12'' R1 HD 12'' R3 HD 12'' R1 x R3

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0

4'' 6'' 8'' 10'' 12''

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 1.0-1.50 0-1.0

TIPO 2B 1-1.50 1.50-2.0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE

LOCALIZACIN

Bd

RETIRO ADOQUIN

RETIRO

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO e=0.15 e=0.20 e=0.25 e=0.30

PAVIMENTO ASFALTICO e=3" e=4" e=6"

e=0.10 e=0.15 GRANITO MARMOL TABLON

ADOQUIN VEHICULAR

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC E/BRIDA 10''X3'' E/BRIDA 10''X4'' E/BRIDA 10''X6'' E/BRIDA 10''X8'' E/BRIDA 10''X10'' E/BRIDA 12''X3'' E/BRIDA 12''X4'' E/BRIDA 12''X6'' E/BRIDA 12''X8'' E/BRIDA 12''X10'' E/BRIDA 12''X12''

TEES EN HIERRO DUCTIL PARA PVC E/BRIDA 8''X8'' E/BRIDA 10''X3'' E/BRIDA 10''X4'' E/BRIDA 10''X6'' E/BRIDA 10''X8'' E/BRIDA 10''X10'' E/BRIDA 12''X3'' E/BRIDA 12''X4'' E/BRIDA 12''X6'' E/BRIDA 12''X8'' E/BRIDA 12''X10'' E/BRIDA 12''X12''

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL E/BRIDA 45X4'' E/BRIDA 45X6'' E/BRIDA 45X8'' E/BRIDA 45X10'' E/BRIDA 45X12'' E/BRIDA 22.5X3'' E/BRIDA 22.5X4'' E/BRIDA 22.5X6'' E/BRIDA 22.5X8'' E/BRIDA 22.5X10'' E/BRIDA 22.5X12'' E/BRIDA 11.25X3'' E/BRIDA 11.25X4'' E/BRIDA 11.25X6'' E/BRIDA 11.25X8'' E/BRIDA 11.25X10'' E/BRIDA 11.25X12''

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL E/BRIDA 45X4'' E/BRIDA 45X6'' E/BRIDA 45X8'' E/BRIDA 45X10'' E/BRIDA 45X12'' E/BRIDA 22.5X3'' E/BRIDA 22.5X4'' E/BRIDA 22.5X6'' E/BRIDA 22.5X8'' E/BRIDA 22.5X10'' E/BRIDA 22.5X12'' E/BRIDA 11.25X3'' E/BRIDA 11.25X4'' E/BRIDA 11.25X6'' E/BRIDA 11.25X8'' E/BRIDA 11.25X10'' E/BRIDA 11.25X12''

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 1.0-1.50 0-1.0

TIPO 2B 1-1.50 1.50-2.0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE

LOCALIZACIN

Bd

RETIRO ADOQUIN

RETIRO

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO e=0.15 e=0.20 e=0.25 e=0.30

PAVIMENTO ASFALTICO e=3" e=4" e=6"

e=0.10 e=0.15 GRANITO MARMOL TABLON

ADOQUIN VEHICULAR

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC

TEES EN HIERRO DUCTIL PARA PVC

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 1.0-1.50 0-1.0

TIPO 2B 1-1.50 1.50-2.0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE

LOCALIZACIN

Bd

RETIRO ADOQUIN

RETIRO

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO e=0.15 e=0.20 e=0.25 e=0.30

PAVIMENTO ASFALTICO e=3" e=4" e=6"

e=0.10 e=0.15 GRANITO MARMOL TABLON

ADOQUIN VEHICULAR

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC

TEES EN HIERRO DUCTIL PARA PVC

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 1.0-1.50 0-1.0

TIPO 2B 1-1.50 1.50-2.0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

3 HF 4 AC 6 8 10 12 16 20

PVC BIOR PVC UM HD

Asfalto Rigido Tierra Comun Zona Verde Gradas Adoquin

Concreto Granito Marmol Tablon Zona Verde

SI NO

ESPESOR DE VIA INICIAL

ESPESOR DE VIA FINAL

CONVENIO CON SIVM

ENFRENTADAS

PROFUNDIDAD

ANCHO DE VIA

ACOMETIDAS

% DE ANDEN

DIAMETRO

LOCALIZACIN

TIPO DE TUBO A RETIRAR

TIPO TUBO A REPONER

TIPO DE VIA INICIAL

TIPO DE VIA FINAL

TIPO DE ANDEN

ANCHO DE ANDEN

LONGITUD

CRUCESS SARDINEL

DE NODO

% DE VIA

A NODO

### ###

May. Exc. Base Anden Esp. Anden Base Via Sub-base

10.0% 10 10 30 0

0.1 0.1 0.3 0

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DEMOLICIONES DE NODO DEMOLICION DEMOLICION DE DEMOLIC. CALZADA EN CALZADA EN ANDEN CONCRETO ASFALTO 0.10<e<= 0.15<e 0.20<=e 4"<e e<=0.10 0.20 e<=0.15 <0.20 <0.25 e>=0.25 e<=4" <6" e>=6" EXCAVACION DEMOLICION SARDINEL A NODO

EXCAVACION Y RELLENOS MATERIAL DE SITIO SUB-BASE

LOCALIZACIN

Bd

RETIRO ADOQUIN

RETIRO

ARENA

BASE

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

RECTANGULAR

RECONSTRUCCION ANDENES DE NODO A NODO

SARDINEL TRAPEZOIDAL

RESTITUCION PAVIMENTOS ZONA VERDE

LOCALIZACIN

ANDENES DE CONCRETO

ACABADOS DE ANDEN

PAVIMENTO DE CONCRETO e=0.15 e=0.20 e=0.25 e=0.30

PAVIMENTO ASFALTICO e=3" e=4" e=6"

e=0.10 e=0.15 GRANITO MARMOL TABLON

ADOQUIN VEHICULAR

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS P DE NODO A NODO UBICACION VALVULA CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

VALVULAS DE COMP. ELASTICA

HIDRANTES TIPO CHICAGO

CRUCES EN HIERRO DUCTIL PARA PVC

TEES EN HIERRO DUCTIL PARA PVC

REDUCCION EN HIERRO DUCTIL PARA PVC

NODO

CODOS EN HIERRO DUCTIL

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

DESCRIPCION DE ACCESORIOS POR NODO DE NODO A NODO TAPONES EN HIERRO DUCTIL PARA PVC CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD

LOCALIZACIN

CODOS EN HIERRO DUCTIL

UNION DE REPARACION

UNION DE REPARACION

UNION MECANICA

UNION MECANICA

UNION DE ACOPLE UNIVERSAL EN HD

### ###

5% Porcentaje de Mayoracion Tuberia

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

UNIONES MECANICAS UNION MECANICA 10" UNION MECANICA 12" UNION MECANICA 3" UNION MECANICA 4" UNION MECANICA 6" UNION MECANICA 8" DE NODO A NODO CANTIDAD

ACOMETIDAS TUBERIA PE 40 1/2" TUBERIA PE 40 3/4"

TUBERIA PVC U. MECANICA

PVC BIORIENTADA

LOCALIZACIN

UNION DE ACOPLE UNIVERSAL EN HD

3"

4"

6"

8"

10"

12"

4"

6"

1/2"

3/4"

1"

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

PVC BIORIENTADA DE NODO A NODO

TUBERIA HIERRO DUCTIL

RETIRO TUBERIA HF ANCLAJES CANTIDAD EMPATES

CAMARAS PARA VALVULAS

LOCALIZACIN

8"

10"

12"

4"

6"

8"

10"

12"

14"

16"

18"

20"

4"

6"

8"

10"

TIPO 1 0-1.0 1.0-1.50 1.50-2.0

### ###

HOJA DE CALCULO DE CANTIDADES REPOSICION ACUEDUCTO

CAMARAS PARA VALVULAS DE NODO A NODO

LOCALIZACIN

TIPO 2A 0-1.0 1.0-1.50 0-1.0

TIPO 2B 1-1.50 1.50-2.0

También podría gustarte