Eco- Hotel

CATALOGO DE CONCEPTOS DE OBRA CIVIL PROYECTO DE VIVIENDA | EA CLAVE CONCEPTO ADQUISICION DE TERRENO 20 x 50M EN EL CUAL SE PROYECTO PARA REALIZAR 33 C/U CON DIMENCION DE 6 X 17 M UBICADO EN SAYULITA, NAY. LOTE DE TERRENO DE 6X17 PERMISOS Y LICENCIAS PERMISO DE CONSTRUCCION EN HOTEL EN UN TERRENO DE APROXIMADAMENTE 2200 M2 PROYECTADA A 1 NIVEL INCLUYE: PERMISO Y PERITO VALUADOR UNIDAD CANTIDAD P.U. TOTAL

0.00

TERRENO

1.00

$2,745,600.00

$2,745,600.00

0.10 A

LOTE

1.00

$457,600.00 SUBTOTAL

$457,600.00 $457,600.00

A-01

LOTE

1.00

$8,400.00

$8,400.00

SUBTOTAL B B-02 C MEMORIA DE CALCULO ESTRUCTURAL CALCULO ESTRUCTURAL DE HOTEL EA PREELIMINARES LOTE 1.00 $1,500.00 SUBTOTAL

$8,400.00 $1,500.00 $1,500.00

C-03

LIMPIEZA TRAZO Y NIVELACION POR MEDIOS MANUALES PARA LOSA DE PISO INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTAS

M2

42.00

$15.20

$638.40

SUBTOTAL D CIMENTACION EXCAVACIN EN MATERIAL TIPO "B" EN CEPAS CON MEDIOS MANUALES DE 0.00 A 0.80 M DE PROFUNDIDAD. INCLUYE: HERRAMIENTA, EQUIPO, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION Z4. CIMIENTO DE CONCRETO FC= 250 KG/CM2, A BASE DE ZAPATA CORRIDA DE 80 CM DE ANCHO, POR 15 CM DE PERALTE Y 5 CM DE RECUBRIMIENTO. ARMADO CON VARILLA DE 3/8" A CADA 20 CM EN SENTIDO TRANSVERSAL Y VARILLA DE 3/8" A CADA 25 CM EN SENTIDO LONGITUDINAL. INCLUYE MATERIALES, ACARREOS, HABLITADO, MANO DE OBRA, PEGUE DE MURO DE ENRASE CON BLOCK DE JALCRETO 9 X 14 X 28 CM EN SOGA, CON MEZCLA MORTERO-ARENA 1:4. JUNTA PROMEDIO DE 1.5 CM. INCLUYE MATERIALES, RELLENO CON MATERIAL PRODUCTO DE LA EXCAVACIN COMPACTADO CON PIZN DE MANO EN CAPAS NO MAYORES A 20 CM. INCLUYE ADICIN DE AGUA MANO DE OBRA EQUIPO Y HERRAMIENTA.

$638.40

D-04

M3

16.92

$92.70

$1,568.48

D-05

ML

48.00

$311.72

$14,962.56

D-06

M2

19.20

$162.70

$3,123.84

D-07

M3

11.00

$28.24

$310.64

SUBTOTAL E ESTRUCTURA COLOCACION DE LOS CONTENEDORES O VAGONES DE TREN 6X 2.43 X 2.59, CON GRUA. MANO DE OBRA, Y HERRRAMIENTAS.

$19,965.52

E-08

M2

1.00

$4,000.00

$4,000.00

E-09

Muro TABLAROCA USG dos caras Suministro e instalacin de muro de TABLAROCA NBR 12.7 mm dos caras utilizando poste y canal 6.35 Calibre 26 cada 0.61 cms, con refuerzos de madera para puertas, esquinero perfatrim para perfilar aristas y ventanas. Terminado en Perfacinta y Redimix. Espesor del Muro 9 cms

M2

1.00

$250.00

$250.00

SUBTOTAL F F-12 FIRMES DE CONCRETO FIRME CONCRETO ACABADO COMN, FC=150 KGCM2 ESP. 8 CM. PISO ESCALERA. INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTAS. FIRME CONCRETO ACABADO ESCOBIADO, FC=150 KGCM2 ESP. 8 CM. COCHERA. INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTAS. SUMINISTRO Y COLOCACION DE RAMPA DE CONRETO COCHERA ACABADO ESCOBILLADO DE 10 CM DE ESPESOR REFORZADA CON MALLA ELECTROSOLDADA INCLUYE: MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION SUMINISTRO Y COLOCACION DE BANQUETA PEATONAL CON LOSA DE CONCRETO ACABADO ESCOBIADO DE 8 cm DE ESPESOR INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

$4,250.00

M2

42.57

$156.74

$6,672.42

F-13

M2

3.00

$179.76

$539.28

F-14

M2

6.00

$193.41

$1,160.46

F-15

M2

6.00

$324.00

$1,944.00

SUBTOTAL H H-17 ALBAILERIA ENJARRE MURO, MORTERO-ARENA 1:4 FLOTEADO PLANTA BAJA. INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA. ENJARRE PLAFN, CEMENTO-ARENA 1:4 PULIDO PLANTA BAJA, INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTAS. BOQUILLAS MORTERO-ARENA FLOTEADO 1:4, SIN CANES PLANTA BAJA. INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA. GOTERO EN PLAFN. A BASE DE MEZCLA DE MORTERO 1:4. TIPO BUA. INCLUYE, MANO DE OBRA, EQUIPO Y HERRAMIENTA. M2 129.60 $74.67

$10,316.16

$9,677.23

H-18

M2

44.00

$80.00

$3,520.00

H-19

M2

70.80

$45.73

$3,237.68

H-20

ML

7.50

$56.83 SUBTOTAL

$426.23 $16,861.14

I I-21

JARDINERIA COLOCACION Y SUMINISTRO DE PASTO PARA JARDIN INSTALACIONES INSTALACION ELECTRICA CENTRO DE CARGA INCLUYE: MANO DE OBRA Y HERRAMIENTAS ALIMENTACION Y ARMADO DE TABLERO DE PASTILLAS TERMICAS SALIDA TIMBRE INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA DE SUMBADOR DE TIMBRE INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA DE ALIMENTACION DE MEDIDOR A TABLERO INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA CONTACTO SENCILLO INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA DE APAGADOR SENCILLO INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA DE APAGADOR DE ESCALERA INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDAS CENTRO DE LUMINARIAS INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA PARA TV INCLUYE: MANO DE OBRA Y HERRAMIENTAS MATERIALES PARA LA CORRECTA ELABORACION DE LAS INSTALACIONES ELECTRICAS (CHALUPAS, CONTACTOS, APAGADORES, CINTA AISLANTE, CURVAS, MANGUERA POLIDUCTO, ETC.) CONEXIN DE CABLE DE CFE A MUFA INSTALACION HIDRAULICA SALIDAS HIDRAULICAS DE AGUA FRIA INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDAS HIDRAULICAS DE AGUA CALIENTE INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA HIDRAULICA LLLENADO DE TINACO INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA TOMA DE LA CALLE INCLUYE: MANO DE OBRA Y HERRAMIENTAS ARMADO CUADRO DE AGUA INCLUYE: MANO DE OBRA Y HERRAMIENTAS SALIDA DE VACIADO DE TINACO INCLUYE: MANO DE OBRA Y HERRAMIENTAS ALIMENTACION DE AGUA FRIA INCLUYE: MANO DE OBRA Y HERRAMIENTAS ALIMENTACION DE AGUA CALIENTE INCLUYE: MANO DE OBRA Y HERRAMIENTAS

M2

10.90

$60.00 SUBTOTAL

$654.00 $654.00

J-22 J-23 J-24 J-25

SAL. SAL. SAL. SAL.

1.00 3.00 1.00 1.00

$300.00 $240.00 $132.00 $144.00

$300.00 $720.00 $132.00 $144.00

J-26 J-27 J-28

SAL. SAL. SAL.

1.00 9.00 8.00

$144.00 $144.00 $144.00

$144.00 $1,296.00 $1,152.00

J-29

SAL.

2.00

$168.00

$336.00

J-30 J-31

SAL. SAL.

8.00 3.00

$144.00 $144.00

$1,152.00 $432.00

J-32

LOTE

1.00

$4,500.00

$4,500.00

J-33 K K-33

SAL.

1.00

$500.00 SUBTOTAL

$500.00 $10,808.00

SAL.

6.00

$168.00

$1,008.00

K-34

SAL.

5.00

$168.00

$840.00

K-35 K-36 K-37 K-38 K-39 K-40

SAL. SAL. SAL. SAL. SAL. SAL.

1.00 1.00 1.00 1.00 2.00 2.00

$180.00 $144.00 $144.00 $204.00 $180.00 $180.00

$180.00 $144.00 $144.00 $204.00 $360.00 $360.00

K-41

COLOCACION Y ARMADO DE TINACO INCLUYE: MANO DE OBRA Y HERRAMIENTAS MATERIALES PARA LA CORRECTA ELABORACION DE LAS INSTALACIONES HIDRAULICAS (TUBOS CPVC, CODOS, TEE, YEES, PEGAMENTO, TINACO, CALENTADOR SOLAR) SUMINISTRO Y COLOCACION DE CISTERNA DE 10,000 LTS PARA CONCENTRAR AGUAS PLUVIALES SUMINISTRO Y COLOCACION DE CALENTADOR SOLAR INSTALACIONES DE GAS SALIDAS DE GAS L.P INCLUYE: MANO DE OBRA Y HERRAMIENTAS ALIMENTACION GAS L.P. INCLUYE: MANO DE OBRA Y HERRAMIENTAS MATERIALES PARA LA CORRECTA ELABORACION DE LAS INSTALACIONES DE GAS (TUBOS COBRE TIPO L , CODOS, TEE, YEES, SOLDADURA)

SAL.

1.00

$180.00

$180.00

K-42

LOTE

1.00

$11,000.00

$11,000.00

K-43 K-44

PZA. PZA.

1.00 1.00

$15,000.00 $9,400.00 SUBTOTAL

$15,000.00 $9,400.00 $38,820.00

L L-45 L-46

SAL. SAL.

2.00 1.00

$144.00 $240.00

$288.00 $240.00

L-47

LOTE

1.00

$1,700.00 SUBTOTAL

$1,700.00 $2,228.00

M M-48

INSTALACIONES SANITARIAS SALIDAS SANITARIAS INCLUYE: MANO DE OBRA Y HERRAMIENTAS REGISTRO DE AGUAS NEGRAS UBICADO EN PATIO DE SERVICIO INCLUYE: MANO DE OBRA, HERRAMIENTA, MATERIALES Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION REGISTRO DE AGUAS NEGRAS UBICADO EN CALLE INCLUYE: MANO DE OBRA, HERRAMIENTA, MATERIALES Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION MATERIALES PARA LA CORRECTA ELABORACION DE LAS INSTALACIONES SANITARIAS (TEE, YEE, CODOS, COPLES, PEGAMENTO, TUBO PVC, REDUCCIONES, TEFLON)

SAL.

6.00

$156.00

$936.00

M-49

PZA

1.00

$840.00

$840.00

M-50

PZA

1.00

$840.00

$840.00

M-51

LOTE

1.00

$500.00

$500.00

SUBTOTAL N N-52 BAJANTES AGUA PLUVIAL SALIDA DE BAJANTES DE AGUA PLUVIAL, CONECTADOS A RED DE AGUA PLUVIA REGISTRO DE AGUA PLUVIAL INCLUYE: MANO DE OBRA Y HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

$3,116.00

SAL.

2.00

$168.00

$336.00

N-53

PZA

1.00

$600.00 SUBTOTAL

$600.00 $936.00

-54 -55 -56

ACABADOS ACCESORIOS Y MUEBLES PARA BAOS MUEBLES DE BAO ACCESORIOS JGO JGO 2.00 1.00 $800.00 $427.00 $1,600.00 $427.00

-57

SUMINISTRO Y COLOCACION DE VITROPISO MARCA INTERCERAMIC DE PRIMERA, MODELO VIENA BEIGE 33X33cm INCLUYE: MANO DE OBRA, MATERIALES, HERRAMIENTA PARA SU CORRECTA EJECUCION SUMINISTRO Y COLOCACION DE ZOCLO MARCA INTERCERAMIC DE PRIMERA, MODELO VIENA BEIGE 33X33cm INCLUYE: MANO DE OBRA, MATERIALES, HERRAMIENTA PARA SU CORRECTA EJECUCION SUMINISTRO Y COLOCACION PISO ANTIDERRAPANTE PARA BAO MARCA INTERCERAMIC DE PRIMERA, MODELO VENATO BEIGE 20X20CM INCLUYE: MANO DE OBRA, MATERIALES, HERRAMIENTA PARA SU CORRECTA EJECUCION SUMINISTRO Y COLOCACION AZULEJO PARA BAO MARCA INTERCERAMIC DE PRIMERA, MODELO VIENA BEIGE 20X30CM INCLUYE: MANO DE OBRA, MATERIALES, HERRAMIENTA PARA SU CORRECTA EJECUCION SUMINISTRO Y COLOCACION CENEFA PARA BAO MARCA INTERCERAMIC DE PRIMERA, MODELO NATURA CHOCOLATE 7X25CM INCLUYE: MANO DE OBRA, MATERIALES, HERRAMIENTA PARA SU CORRECTA EJECUCION SUMINISTRO Y COLOCACION DE TRAGA LUZ DE 30 X 30 CMS. CANCELERIA Y ALUMINIOS VENTANAS VENTANAS DE ALUMINIO CON VIDRIO 3MM INCLUYE: MANO DE OBRA, MATERIALES, FLETE Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION PORTON Y PROTECCION PROTECCION DE HERRERIA MODERNO INCLUYE: MATERIALES, MANO DE OBRA, FLETE Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION PUERTAS Y CARPINTERIA PUERTAS DE TAMBOR COLOR CHOCOLATE, INCLUYE: MANO DE OBRA, MATERIALES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION JARDINERIA SUMINISTRO Y COLOCACION DE TIERRA ABONADA APTA PARA LA CIEMBRA INCLUYE: REMOCION DE PASTO.

M2

43.00

$175.00

$7,525.00

-58

ML

68.00

$98.00

$6,664.00

-59

M2

1.00

$120.00

$120.00

-60

M2

8.00

$190.00

$1,520.00

-61

ML

3.00

$60.00

$180.00

-62

PZA.

8.00

$353.00 SUBTOTAL

$2,824.00 $20,860.00

O O-63

O-64

PZA

4.00

$800.00

$3,200.00

O-65 O-66

LOTE

2.00

$1,000.00 SUBTOTAL

$2,000.00 $5,200.00

P P-67

PZA

5.00

$1,200.00 SUBTOTAL

$6,000.00 $6,000.00

Q Q-68

M2

10.00

$240.00 SUBTOTAL TOTAL

$2,400.00 $2,400.00 $2,864,338.58

ESCRITURACIN PERMISOS Y LICENCIAS

$105.600,00 $3,333.33

3333.33