Estimate for replacement of defective 100kva distribution transformer at north side B.B Collegiate under Electric Supply Section- Saraiyaganj I, Division- Saraiyaganj,Division-Muzaffarpur(Urban).
PARTICULARS QTY. RATE AMOUNT

11/0.4 KV 100 KVA DIST. TRANSFORMER

01 NO.

96388.27 TOTAL

96388.27 96388.27

1. COST OF MATERIALS---------------------RS. 2. CONTIGENCY @ 3%-------------------------RS. 3. TRANSPORTATION @ 4%----------------RS. 4. LABOUR COST L.S.------------------------RS. TOTAL LESS the depriciated cost of deffective Tr. @ 40% NET COST SAY RS. 67580/- ONLY.

RS. RS. RS.

96388.27 2891.64 3855.53 3000.00 106135.40 38555.30 67580.10

General And Technical Report:- The estimate has been framed for replacement of defective 100kva distribution transformer under Electric Supply Section-Saraiyaganj-I,SubDivision-Saraiyaganj,Division-Muzaffarpur(Urban). .This above transformer was being used for panipump(by MMC) at north side of B.B Collegiate. This panipump is permanently closed due to boring failure. The motijheel transformer having capacity of capacity of 200KVA is very overloaded . Fuse blown activity is very high hence just to share the load of existing transformer , estimate for LT extension has been framed and by issuing the required materials from central store MUZ work has been completed .Now defective transformer has to be replaced . the transformer is being unused Since 12 year , so due to small leakage oil level has come to bottom level. The total estimated cost comes to Rs.106135/only.The estimate may kindly be sanctioned.

JEE/SRJ-I

AEE/SRJ

APPLICATION FOR WORK ORDER


THE ELECTRICAL EXECUTIVE ENGINEER ELECTRIC SUPPLY DIVISION MUZAFFARPUR (URBAN) SIR, Please Issue work order for the undermentioned work

NAME OF WORK- Estimate for replacement of defective 100kva


distribution transformer at north side B.B Collegiate under Electric Supply Section- Saraiyaganj I, Division- Saraiyaganj,Division-Muzaffarpur(Urban).
.
1. COST OF MATERIALS---------------------RS. 2. CONTIGENCY @ 3%------------------------RS. 3. TRANSPORTATION @ 4%----------------RS. 4. LABOUR COST L.S.------------------------RS. TOTAL LESS the depriciated cost of 100KVA Tr. @ 40% GRAND TOTAL SAY RS.67580/-ONLY RS. RS. 96388.27 2891.64 3855.53 3000.00 106135.40 38555.30 67580.10

AEE/SARAIYAGANJ

JEE/SARAIYAGANJ-1

ISSUED WORK ORDER NO.

APPROVED

EEE/MUZAFFARPUR(URBAN)