PROYECTO : INSTALACION DE PISTAS Y VEREDAS EN LAS CALLES DEL CERCADO DE LA PLAZA DEL CASERIO
PROYECTISTA:
FATIMA
OBRA
:
LUGAR
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
REAS (m2)
n
vol
Lt
PTO
UND
GLB KG
1.00
3.00
1.00
860.00
35.00
4.00
140.00
55.00
4.00
220.00
50.00
4.00
200.00
30.00
4.00
120.00
45.00
4.00
180.00
1.00
4,685.44
AREA DE PAVIMENTO
5,490.12
1.00
5,490.12
DESCUENTO IGLESIA
200.74
-1.00
-200.74
DESCUENTO PARQUE
623.21
-1.00
-623.21
DESCUENTO ALAMEDA
472.73
-1.00
-472.73
AREA DE VEREDAS
244.57
1.00
244.57
247.43
1.00
247.43
0.75
1,887.05
AREA DE PAVIMENTO
5,490.12
0.45
1.00
DESCUENTO IGLESIA
200.74
0.45
-1.00
-90.33
DESCUENTO PARQUE
623.21
0.45
-1.00
-280.44
DESCUENTO ALAMEDA
472.73
0.45
-1.00
-212.73
AREA ALAMEDA
472.73
0.21
1.00
99.27
AREA DE VEREDAS
244.57
0.20
1.00
48.91
247.43
0.20
1.00
49.49
2,470.55
197.67
6.63
SARDINELES PERALTADOS
AREA 1
Sardineles peraltados - PERIMETRO TOTAL DEL AREA 1 A
PAVIMENTAR INCLUIDO LOS SARDINELES
0.15
221.12
0.20
1.00
6.63
02.02.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/COMPACTADOR VIBRATORIO TIPO PLANCHA
14.79
ver planilla movim. De tierras: PERFIL LONGITUDINAL N 01 AV. PRINCIPAL UNO ENTRE CA. CINCO Y CALLE OCHO
14.79
1.00
14.79
120.41
82.23
1.00
82.23
38.18
1.00
38.18
1,059.97
1,142.20
1.00
1,142.20
82.23
-1.00
-82.23
02.02.08 CONFORMACION Y COMPACTACION DE SUB-BASE GRANULAR (AFIRMADO) EXTENDIDO, RIEGO Y COMPACTACION E= 0.15 m.
1,059.97
AREA TOTAL DE SUBRASANTE (AREA DE AUTOCAD) INC.
AREA DE SARDINELES
1,142.20
1.00
1,142.20
82.23
-1.00
-82.23
02.02.09 CONFORMACION Y COMPACTACION DE BASE GRANULAR (AFIRMADO) EXTENDIDO, RIEGO Y COMPACTACION E= 0.15 m.
1,059.97
DESCUENTO AREA 4
0.75
1,142.20
1.00
1,142.20
82.23
-1.00
-82.23
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
REAS (m2)
n
vol
AREA 4
82.23
1.00
82.23
AREA 5
38.18
1.00
38.18
AREA N 1
627.36
1.00
627.36
AREA N 2
146.10
1.00
146.10
AREA N 3
173.92
1.00
173.92
02.02.10 RELLENO CON AFIRMADO COMPACTADO C/EQUIPO LIVIANO (E= 0.10 m.)
120.41
rea
2,699.53
1,887.05
1.30
2,453.16
197.67
1.30
256.98
6.63
1.30
8.62
14.79
-1.30
-19.23
947.38
Lt
PTO
UND
GLB KG
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
REAS (m2)
n
vol
02.03.02 PAVIMENTACION CON ADOQUINES DE CONCRETO 0.10x0.20x0.06 m. (NO INC. CAMA DE ARENA GRUESA)
Lt
947.38
AREA N 1
627.36
1.00
627.36
AREA N 2
146.10
1.00
146.10
AREA N 3
173.92
1.00
173.92
427.10
AREA N 1
221.12
1.00
221.12
AREA N 2
99.99
1.00
99.99
AREA N 3
91.76
1.00
91.76
10.10
1.00
10.10
4.13
1.00
4.13
6.40
SARDINELES SUMERGIDOS
AREA 1
ENTRADA PROGRESIVA 0 + 000
0.15
6.30
0.41
1.00
0.39
0.15
6.30
0.41
1.00
0.39
0.15
14.30
0.31
1.00
0.66
0.15
16.00
0.31
1.00
0.74
0.15
12.71
0.41
1.00
0.78
0.15
23.41
0.41
1.00
1.44
0.15
4.65
0.41
1.00
0.29
0.15
10.10
0.31
1.00
0.47
0.15
4.13
0.31
1.00
0.19
0.15
6.30
0.41
1.00
0.39
0.15
14.18
0.31
1.00
0.66
AREA 2
SALIDA PROGRESIVA 0 + 029.729
AREA 3
ENTRADA PROGRESIVA 0 + 000
EN ENTRADA INTERIOR
02.04.01.02
17.76
SARDINELES SUMERGIDOS
AREA 1
ENTRADA PROGRESIVA 0 + 000
0.15
6.30
1.00
0.95
0.15
6.30
1.00
0.95
0.15
14.30
1.00
2.15
0.15
16.00
1.00
2.40
0.15
12.71
1.00
1.91
0.15
23.41
1.00
3.51
0.15
4.65
1.00
0.70
0.15
10.10
1.00
1.52
0.15
4.13
1.00
0.62
0.15
6.30
1.00
0.95
0.15
14.18
1.00
2.13
AREA 2
SALIDA PROGRESIVA 0 + 029.729
AREA 3
ENTRADA PROGRESIVA 0 + 000
EN ENTRADA INTERIOR
02.04.01.03
7.65
SARDINELES SUMERGIDOS
AREA 1
h=
0.10
0.15
3.00
0.45
0.15
3.00
0.45
0.15
6.00
0.90
0.15
6.00
0.90
0.15
5.00
0.75
0.15
9.00
1.35
0.15
3.00
0.45
0.15
4.00
0.60
0.15
3.00
0.45
0.15
3.00
0.45
0.15
6.00
0.90
AREA 2
SALIDA PROGRESIVA 0 + 029.729
AREA 3
ENTRADA PROGRESIVA 0 + 000
EN ENTRADA INTERIOR
PTO
UND
GLB KG
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
REAS (m2)
n
vol
Lt
PTO
UND
GLB KG
36.12
SARDINELES PERALTADOS
AREA 1
Sardinel peraltado H= 0.71
0.15
80.00
0.71
1.00
8.52
0.15
24.56
0.86
1.00
3.17
0.15
104.56
0.51
1.00
8.00
0.15
11.87
0.51
-1.00
-0.91
0.15
12.20
0.51
-1.00
-0.93
0.15
13.57
0.51
-1.00
-1.04
h=
0.61
AREA 2
Sardineles peraltados - PERIMETRO TOTAL DEL AREA 2 A
PAVIMENTAR INCLUIDO LOS SARDINELES
0.15
96.99
0.51
1.00
7.42
0.15
10.48
0.51
-1.00
-0.80
0.15
-1.00
-0.91
AREA 3
0.51
1.11
0.15
91.76
1.10
1.00
15.14
0.15
23.41
1.11
-1.00
-3.90
0.15
4.65
1.11
-1.00
-0.77
0.15
12.20
1.11
-1.00
-2.03
h=
0.51
0.15
9.16
0.51
1.00
0.70
0.15
7.37
0.51
1.00
0.56
0.15
3.11
0.51
1.00
0.24
ZONA DE RECREACION
02.05.01.02
11.87
h=
h=
0.61
0.15
10.00
0.61
1.00
0.92
0.15
19.92
0.61
1.00
1.82
0.15
2.30
0.61
1.00
0.21
0.15
7.76
0.61
1.00
0.71
348.99
SARDINELES PERALTADOS
AREA 1
Sardinel peraltado HL= 0.51
0.51
80.00
2.00
81.60
0.66
24.56
2.00
32.42
0.31
104.56
2.00
64.83
0.31
11.87
-2.00
-7.36
0.31
12.20
-2.00
-7.56
0.31
13.57
-2.00
-8.41
AREA 2
0.31
0.31
96.99
2.00
60.13
0.31
10.48
-2.00
-6.50
0.31
11.87
-2.00
-7.36
AREA 3
h=
0.91
0.91
91.76
2.00
167.00
0.91
23.41
-2.00
-42.61
0.91
4.65
-2.00
-8.46
0.91
12.20
-2.00
-22.20
ZONA DE RECREACION
AREA JUNTAS
02.05.01.03
h=
h=
0.31
0.31
9.16
2.00
5.68
0.31
7.37
2.00
4.57
0.31
3.11
2.00
1.93
h=
0.41
0.41
10.00
2.00
8.20
0.41
19.92
2.00
16.33
0.41
2.30
2.00
1.89
0.41
7.76
2.00
6.36
0.15
56.75
1.00
8.51
840.02
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
02.05.01.04
REAS (m2)
n
vol
Lt
396.00
SARDINELES PERALTADOS
AREA 1
Sardinel peraltado HL= 0.51
0.51
80.00
2.00
81.60
0.66
24.56
2.00
32.42
0.31
104.56
2.00
64.83
0.31
11.87
-2.00
-7.36
0.31
12.20
-2.00
-7.56
0.31
13.57
-2.00
-8.41
AREA 2
h=
0.31
0.31
0.31
96.99
2.00
60.13
0.31
10.48
-2.00
-6.50
0.31
11.87
-2.00
-7.36
AREA 3
h=
0.91
0.91
0.91
91.76
2.00
167.00
0.91
23.41
-2.00
-42.61
0.91
4.65
-2.00
-8.46
0.91
12.20
-2.00
-22.20
h=
ZONA DE RECREACION
0.31
0.31
0.31
9.16
2.00
5.68
0.31
7.37
2.00
4.57
0.31
3.11
2.00
1.93
h=
0.41
0.41
0.41
10.00
2.00
8.20
0.41
19.92
2.00
16.33
0.41
2.30
2.00
1.89
0.41
7.76
2.00
6.36
0.15
357.24
1.00
53.59
02.05.01.05
56.75
SARDINELES PERALTADOS
AREA 1
L= l*n/3*h
80.00
1.00
24.56
1.00
5.40
104.56
1.00
10.80
11.87
-1.00
-1.23
12.20
-1.00
-1.26
13.57
-1.00
-1.40
AREA 2
h=
96.99
1.00
10.02
10.48
-1.00
-1.08
11.87
-1.00
-1.23
h=
0.91
91.76
1.00
27.83
23.41
-1.00
-7.10
4.65
-1.00
-1.41
12.20
-1.00
-3.70
h=
ZONA DE RECREACION
02.05.03 GRADAS
02.05.03.02
0.31
AREA 3
02.05.03.01
13.60
9.60
LATERALES LOSA
3.00
20.00
0.10
1.00
6.00
0.19
1.00
3.00
12.00
3.42
UA
0.15
2.00
0.18
3.000
0.20
9.98
0.19
3.00
12.00
6.84
0.31
9.16
1.00
0.95
7.37
1.00
0.76
3.11
1.00
0.32
h=
0.41
10.00
1.00
1.37
19.92
1.00
2.72
2.30
1.00
0.31
7.76
1.00
1.06
PTO
UND
GLB KG
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
02.05.03.03
REAS (m2)
n
vol
LATERALES LOSA
0.10
20.00
1.00
2.00
1.00
0.19
12.00
1.14
Lt
25.05
25.05
1.00
25.05
25.05
1.00
25.05
UAS
0.15
27.04
1.50
6.08
02.06.00 VEREDAS
02.06.01 DE CONCRETO SIMPLE
02.06.01.01
02.06.01.02
02.06.01.03
31.13
2.70
27.04
1.00
0.10
25.05
1.00
AREA N 4
82.23
1.00
82.23
AREA N 5
38.18
1.00
38.18
UND
GLB KG
281.68
02.05.03.04
PTO
2.70
25.05
25.05
120.41
02.06.02.02 PAVIMENTACION CON ADOQUINES DE CONCRETO 0.10x0.20x0.04 m. (NO INC. CAMA DE ARENA GRUESA)
120.41
AREA N 4
82.23
1.00
82.23
AREA N 5
38.18
1.00
38.18
100.03
AREA N 4
52.06
1.00
52.06
AREA N 5
47.97
1.00
47.97
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
REAS (m2)
n
vol
Lt
02.07.00 PINTURA
02.07.01 PINTURA EN SARDINELES PERALTADOS CON PINT. P/TRAFICO (01 LADO)
186.03
SARDINELES PERALTADOS
AREA 1
Sardinel peraltado HL= 0.40
0.40
80.00
1.00
32.00
0.55
24.56
1.00
13.51
0.20
104.56
1.00
20.91
0.20
11.87
-1.00
-2.37
0.20
12.20
-1.00
-2.44
0.20
13.57
-1.00
-2.71
AREA 2
h=
0.20
0.20
0.20
96.99
1.00
19.40
0.20
10.48
-1.00
-2.10
0.20
11.87
-1.00
-2.37
AREA 3
h=
0.80
0.80
0.80
91.76
1.00
73.41
0.80
23.41
-1.00
-18.73
0.80
4.65
-1.00
-3.72
0.80
12.20
-1.00
-9.76
ZONA DE RECREACION
h=
0.20
0.20
0.20
9.16
1.00
1.83
0.20
7.37
1.00
1.47
0.20
3.11
1.00
0.62
h=
0.30
0.30
0.30
10.00
1.00
3.00
0.30
19.92
1.00
5.98
0.30
2.30
1.00
0.69
0.30
7.76
1.00
2.33
0.15
357.24
1.00
53.59
2.50
6.00
2.00
30.00
LATERALES
0.20
2.50
2.00
1.00
PARTE SUPERIOR
0.20
6.00
1.00
1.20
32.20
02.08.00 VARIOS
02.08.01 PROFUNDIZACION DE RED DE AGUA EXISTENTE
02.08.01.01
211.90
108.42
1.00
108.42
Lote 1
7.80
1.00
7.80
Lote 2
7.92
1.00
7.92
Lote 3
7.86
1.00
7.86
Lote 4
7.85
1.00
7.85
Lote 5
8.05
1.00
8.05
Lote 6
7.90
1.00
7.90
Lote 7
7.93
1.00
7.93
Lote 8
7.87
1.00
7.87
Lote 9 A
8.02
1.00
8.02
Lote 9 B
7.90
1.00
7.90
Lote 10
7.85
1.00
7.85
Lote 11
8.02
1.00
8.02
Lote 12
8.51
1.00
8.51
108.42
1.00
108.42
Lote 1
7.80
1.00
7.80
Lote 2
7.92
1.00
7.92
Lote 3
7.86
1.00
7.86
Lote 4
7.85
1.00
7.85
Lote 5
8.05
1.00
8.05
Lote 6
7.90
1.00
7.90
Lote 7
7.93
1.00
7.93
Lote 8
7.87
1.00
7.87
Lote 9 A
8.02
1.00
8.02
02.08.01.02
211.90
PTO
UND
GLB KG
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
02.08.01.03
REAS (m2)
n
vol
Lote 9 B
7.90
1.00
7.90
Lote 10
7.85
1.00
7.85
Lote 11
8.02
1.00
8.02
Lote 12
8.51
1.00
8.51
108.42
1.00
108.42
Lote 1
7.80
1.00
7.80
Lote 2
7.92
1.00
7.92
Lote 3
7.86
1.00
7.86
Lote 4
7.85
1.00
7.85
Lote 5
8.05
1.00
8.05
Lote 6
7.90
1.00
7.90
Lote 7
7.93
1.00
7.93
Lote 8
7.87
1.00
7.87
Lote 9 A
8.02
1.00
8.02
Lote 9 B
7.90
1.00
7.90
Lote 10
7.85
1.00
7.85
Lote 11
8.02
1.00
8.02
Lote 12
8.51
1.00
8.51
108.42
1.00
108.42
Lote 1
7.80
1.00
7.80
Lote 2
7.92
1.00
7.92
Lote 3
7.86
1.00
7.86
Lote 4
7.85
1.00
7.85
Lote 5
8.05
1.00
8.05
Lote 6
7.90
1.00
7.90
Lote 7
7.93
1.00
7.93
Lote 8
7.87
1.00
7.87
Lote 9 A
8.02
1.00
8.02
Lote 9 B
7.90
1.00
7.90
Lote 10
7.85
1.00
7.85
Lote 11
8.02
1.00
8.02
Lote 12
8.51
1.00
8.51
108.42
1.00
108.42
Lote 1
7.80
1.00
7.80
Lote 2
7.92
1.00
7.92
Lote 3
7.86
1.00
7.86
Lote 4
7.85
1.00
7.85
Lote 5
8.05
1.00
8.05
Lote 6
7.90
1.00
7.90
Lote 7
7.93
1.00
7.93
Lote 8
7.87
1.00
7.87
Lote 9 A
8.02
1.00
8.02
Lote 9 B
7.90
1.00
7.90
Lote 10
7.85
1.00
7.85
Lote 11
8.02
1.00
8.02
Lote 12
8.51
1.00
8.51
108.42
1.00
108.42
Lote 1
7.80
1.00
7.80
Lote 2
7.92
1.00
7.92
Lote 3
7.86
1.00
7.86
Lote 4
7.85
1.00
7.85
Lote 5
8.05
1.00
8.05
Lote 6
7.90
1.00
7.90
Lote 7
7.93
1.00
7.93
Lote 8
7.87
1.00
7.87
Lote 9 A
8.02
1.00
8.02
Lote 9 B
7.90
1.00
7.90
Lote 10
7.85
1.00
7.85
Lote 11
8.02
1.00
8.02
PROFUNDIZACION DE ZANJA EN TERRENO NORMAL DESDE H= 0.50 m. HASTA Hmx<= 1.00 m. A prom= 0.45 M.
Red secundaria Desde punto de inicio (en Calle Ocho) a punto final en Av. Principal Uno
Lt
211.90
02.08.01.04
RELLENO Y APISONADO MANUAL C/MAT. PROPIO HASTA 0.30 M.S/CLAVE DE TUB. A prom= 0.45 M.
Red secundaria Desde punto de inicio (en Calle Ocho) a punto final en Av. Principal Uno
211.90
02.08.01.05
RELLENO Y COMPACTACION MANUAL DE ZANJA CAPAS 0.15 M.C/MAT. PROPIO, T.N. Hprom.= 0.50 m. A prom= 0.45 m.
Red secundaria Desde punto de inicio (en Calle Ocho) a punto final en Av. Principal Uno
211.90
02.08.01.06
211.90
PTO
UND
GLB KG
Ing.
ITEM
DESCRIPCIN
VOLUMEN(m3)
a
REAS (m2)
n
vol
Lote 12
8.51
1.00
Lt
PTO
UND
GLB KG
8.51
2.00
2.00
1,197.12
1,142.20
1.00
1,142.20
54.92
1.00
54.92