URAIAN PEKERJAAN
UNIT
QTY
I 1 2 3 4 5 6 7 8 9 10 11
Ground Floor Taman Ruang Periksa Khusus Toilet Ramp Dentist Clinic General Clinic Apotik Koridor Teras Reception / Ruang Tunggu Parkir Mobil / Paving Stone Sub Total I
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
18.00 18.83 8.12 30.80 9.63 19.25 9.63 59.13 4.14 15.59 246.39 439.50
II 1 2 3 4 5 6 7 8 9 10 11
First Floor Laboratorium Toilet Lantai keramik Ramp Gudang Ruang X-Ray (1) Ruang X-Ray (2) Ruang Mesin X-Ray Ruang Periksa Ruang Tunggu Atap Policarbonate Sub Total II
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
34.00 5.00 16.00 24.16 10.00 10.00 10.00 10.00 25.62 61.00 40.58 246.36
III
Roof Floor 1 Atap Beton 2 Atap Zincalume Sub Total III SUB TOTAL PROFIT & OVERHEAD 7.5% TOTAL PPN 10% GRAND TOTAL
m2 m2