METRADOS

CAMPO DE MINIFUTBOL

4.01.00

OBRAS PRELIMINARES

2.01.02

TRAZO Y REPLANTEO PRELIMINAR


Descripcion
Long. (m)
Ancho (m)
Campo Fulbito
31.20
56.20
Zona inclinada
rea de Autocad
Total (m2)

Parcial (m2)
1753.44
188.26
1941.70

DESBROCE, E ILIMINACION DE MALEZA


Descripcion
Long. (m)
Ancho (m)
Campo Fulbito
31.20
56.20
Zona inclinada
rea de Autocad
Total (m2)

Parcial (m2)
1753.44
188.26
1941.70

01.02.02

5.02.00
5.02.02

5.02.03

5.02.04

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA DRENAJE
Descripcin
Long. (m)
TRAMO 1
11.60
TRAMO 2
22.30
TRAMO 3
18.90
TRAMO 4
6.90
DRENAJE LATERAL
30.80

NIVELACION Y COMPACTACION C/MAQ. SUB RASANTE


Descripcin
Long. (m)
Ancho (m)
Campo Fulbito
31.20
56.20
Zona inclinada
rea de Autocad
Total (m2)

Cantidad
2.00
10.00
2.00
2.00
1.00
Total (m3)

Parcial (m3)
2.09
23.42
3.40
1.24
3.23
33.38

Parcial (m2)
1753.44
188.26
1941.70

Long. (m)
57.00
11.60
22.30
18.90
6.90
30.80

Ancho (m)
32.00
0.30
0.30
0.30
0.30
0.30

Alto (m)
0.12
0.30
0.35
0.30
0.30
0.35

Cantidad
1.00
2.00
10.00
2.00
2.00
1.00
Total (m3)

Parcial (m3)
218.88
2.09
23.42
3.40
1.24
3.23
252.26

Long. (m)
57.00

Ancho (m)
32.00

Alto (m)
0.05

Cantidad
1.00
Total (m3)

Parcial (m3)
91.20
91.20

RELLENO CON ARENA GRUESA


Descripcin
CAMPO

5.02.06

Alto (m)
0.30
0.35
0.30
0.30
0.35

RELLENO CON MATERIAL GRAVA - MANTO DRENANTE


Descripcin
CAMPO
CANAL DRENAJE TRAMO 1
CANAL DRENAJE TRAMO 2
CANAL DRENAJE TRAMO 3
CANAL DRENAJE TRAMO 4
DRENAJE LATERAL

5.02.05

Ancho (m)
0.30
0.30
0.30
0.30
0.30

RELLENO CON MAT. PRSTAMO H=0.15M MANTO PORTANTE


Descripcin
Campo Fulbito
Zona inclinada

Long. (m)
Ancho (m)
31.20
56.20
rea de Autocad
Total (m2)

Parcial (m2)
1753.44
188.26
1753.44

5.02.02

ACARREO DE MATERIAL EXCEDENTE


Descripcin
CANAL DRENAJE TRAMO 1
CANAL DRENAJE TRAMO 2
CANAL DRENAJE TRAMO 3
CANAL DRENAJE TRAMO 4
DRENAJE LATERAL

5.02.02

Alto (m)
0.30
0.35
0.30
0.30
0.35

Long. (m)
11.60
22.30
18.90
6.90
30.80

Ancho (m)
0.30
0.30
0.30
0.30
0.30

Alto (m)
0.30
0.35
0.30
0.30
0.35

Long. (m)
11.60
22.30
18.90
6.90
30.80
35.40
19.45
5.30
6.50
6.70
32.60

Cantidad
2.00
10.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total (ml)

Parcial (ml)
23.20
223.00
37.80
13.80
30.80
35.40
19.45
5.30
6.50
6.70
32.60
434.55

Long. (m)
Ancho (m)
32.00
57.00
rea de Autocad

Parcial (m2)
1824.00
188.26

Parcial (m3)
2.09
23.42
3.40
1.24
3.23
30.15
esponjamiento 15%
4.52
Total (m3)
34.67

Cantidad
2.00
10.00
2.00
2.00
1.00

Parcial (m3)
2.09
23.42
3.40
1.24
3.23
30.15
esponjamiento 15%
4.52
Total (m3)
34.67

TUBERIA DE DRENAJE

COLOCACION DE CESPED
COLOCACION DE CESPED NATURAL
Descripcin
Campo Fulbito
Zona inclinada

Total (m2)
5.03
5.02.06

Cantidad
2.00
10.00
2.00
2.00
1.00

TUBERIA PVC PARA DRENAJE 6"


Descripcion
CANAL DRENAJE TRAMO 1
CANAL DRENAJE TRAMO 2
CANAL DRENAJE TRAMO 3
CANAL DRENAJE TRAMO 4
DRENAJE LATERAL
Tuberia de drenaje losa deportiva
Tuberia de drenaje losa deportiva
Tuberia de drenaje losa deportiva
Tuberia de drenaje losa deportiva
Tuberia de drenaje losa deportiva
Tuberia de drenaje losa deportiva

5.03
5.02.06

Ancho (m)
0.30
0.30
0.30
0.30
0.30

ELIMINACION DE MATERIAL EXCEDENTE


Descripcin
CANAL DRENAJE TRAMO 1
CANAL DRENAJE TRAMO 2
CANAL DRENAJE TRAMO 3
CANAL DRENAJE TRAMO 4
DRENAJE LATERAL

5.03
5.03.01

Long. (m)
11.60
22.30
18.90
6.90
30.80

2012.26

CARPINTERIA METLICA
SUMINISTRO E INSTALACION DE ARCO DE FULBITO
Und

2.00