CAMPO DE MINIFUTBOL
4.01.00
OBRAS PRELIMINARES
2.01.02
Parcial (m2)
1753.44
188.26
1941.70
Parcial (m2)
1753.44
188.26
1941.70
01.02.02
5.02.00
5.02.02
5.02.03
5.02.04
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA DRENAJE
Descripcin
Long. (m)
TRAMO 1
11.60
TRAMO 2
22.30
TRAMO 3
18.90
TRAMO 4
6.90
DRENAJE LATERAL
30.80
Cantidad
2.00
10.00
2.00
2.00
1.00
Total (m3)
Parcial (m3)
2.09
23.42
3.40
1.24
3.23
33.38
Parcial (m2)
1753.44
188.26
1941.70
Long. (m)
57.00
11.60
22.30
18.90
6.90
30.80
Ancho (m)
32.00
0.30
0.30
0.30
0.30
0.30
Alto (m)
0.12
0.30
0.35
0.30
0.30
0.35
Cantidad
1.00
2.00
10.00
2.00
2.00
1.00
Total (m3)
Parcial (m3)
218.88
2.09
23.42
3.40
1.24
3.23
252.26
Long. (m)
57.00
Ancho (m)
32.00
Alto (m)
0.05
Cantidad
1.00
Total (m3)
Parcial (m3)
91.20
91.20
5.02.06
Alto (m)
0.30
0.35
0.30
0.30
0.35
5.02.05
Ancho (m)
0.30
0.30
0.30
0.30
0.30
Long. (m)
Ancho (m)
31.20
56.20
rea de Autocad
Total (m2)
Parcial (m2)
1753.44
188.26
1753.44
5.02.02
5.02.02
Alto (m)
0.30
0.35
0.30
0.30
0.35
Long. (m)
11.60
22.30
18.90
6.90
30.80
Ancho (m)
0.30
0.30
0.30
0.30
0.30
Alto (m)
0.30
0.35
0.30
0.30
0.35
Long. (m)
11.60
22.30
18.90
6.90
30.80
35.40
19.45
5.30
6.50
6.70
32.60
Cantidad
2.00
10.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total (ml)
Parcial (ml)
23.20
223.00
37.80
13.80
30.80
35.40
19.45
5.30
6.50
6.70
32.60
434.55
Long. (m)
Ancho (m)
32.00
57.00
rea de Autocad
Parcial (m2)
1824.00
188.26
Parcial (m3)
2.09
23.42
3.40
1.24
3.23
30.15
esponjamiento 15%
4.52
Total (m3)
34.67
Cantidad
2.00
10.00
2.00
2.00
1.00
Parcial (m3)
2.09
23.42
3.40
1.24
3.23
30.15
esponjamiento 15%
4.52
Total (m3)
34.67
TUBERIA DE DRENAJE
COLOCACION DE CESPED
COLOCACION DE CESPED NATURAL
Descripcin
Campo Fulbito
Zona inclinada
Total (m2)
5.03
5.02.06
Cantidad
2.00
10.00
2.00
2.00
1.00
5.03
5.02.06
Ancho (m)
0.30
0.30
0.30
0.30
0.30
5.03
5.03.01
Long. (m)
11.60
22.30
18.90
6.90
30.80
2012.26
CARPINTERIA METLICA
SUMINISTRO E INSTALACION DE ARCO DE FULBITO
Und
2.00