METRADO

PROYECTO : CREACION DE PISTAS Y VEREDAS DE LA CALLE 10


FECHA
: 01 FEBRERO DEL 2012
ITEM

DESCRIPCION

01

OBRAS PRELIMINARES Y PROVISIONALES

01.01

OBRAS PROVISIONALES

UND

Cant.

01.01.01

CARTEL DE IDENTIFICACION

und

01.01.02

ALMACEN, CASETA DE GUARDIANIA Y OFICINA

glb

1
1
1

01.02

LARGO

MEDIDAS
ANCHO

PARCIAL
ALTO

OBRAS PRELIMINARES

01.02.01

MOVILIZACION DE EQUIPO

Est.

01.02.02

TRAZO Y REPLANTEO OBRAS DE PAVIMENTACION

m2

CDRA. 1
IZQ.
DER.

50.91
49.12

9.00
9.00

458.19
442.08
11.98
6.46

48.07
48.02

9.00
9.00

432.63
432.18
11.36
13.71

52.57
52.7

9.00
9.00

473.13
474.30
2.98
3.28
14.16
7.69

58.3
58.57

9.00
9.00

524.70
527.13
3.06
3.46
7.72
15.56

51.48
51.24

9.00
9.00

463.32
461.16
15.99
16.02

53.88
53.74

9.00
9.00

484.92
483.66
5.87
5.75
15.54
16.46

99.61
98.86

9.00
9.00

896.49
889.74
18.88
24.59
20.03
31.84

110.4
110.49

9.00
9.00

993.60
994.41
32.13
57.78

121.55
124.69

9.00
9.00

1,093.95
1,122.21
13.52
14.54
45.27
11.03

50.91
49.12

9.00
9.00

458.19
442.08
11.98
6.46

AREAS IRREGULARES (3)


CDRA 2
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 3
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 4
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 5
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 6
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 7
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 8
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 9
IZQ.
DER.
AREAS IRREGULARES (4)

01.02.03

TRAZO Y REPLANTEO OBRAS DE PAV. DURANTE EL PROCESO

m2

CDRA. 1
IZQ.
DER.
AREAS IRREGULARES (3)
CDRA 2

IZQ.
DER.

48.07
48.02

9.00
9.00

432.63
432.18
11.36
13.71

52.57
52.7

9.00
9.00

473.13
474.30
2.98
3.28
14.16
7.69

58.3
58.57

9.00
9.00

524.70
527.13
3.06
3.46
7.72
15.56

51.48
51.24

9.00
9.00

463.32
461.16
15.99
16.02

53.88
53.74

9.00
9.00

484.92
483.66
5.87
5.75
15.54
16.46

99.61
98.86

9.00
9.00

896.49
889.74
18.88
24.59
20.03
31.84

110.4
110.49

9.00
9.00

993.60
994.41
32.13
57.78

121.55
124.69

9.00
9.00

1,093.95
1,122.21
13.52
14.54
45.27
11.03

50.91
49.12

9.00
9.00
11.98
6.46

0.25
0.25
0.25
0.25

114.55
110.52
3.00
1.62

48.07
48.02

9.00
9.00
11.36
13.71

0.25
0.25
0.25
0.25

108.16
108.05
2.84
3.43

52.57
52.7

9.00
9.00
2.98
3.28
14.16
7.69

0.25
0.25
0.25
0.25
0.25
0.25

118.28
118.58
0.75
0.82
3.54
1.92

58.3
58.57

9.00
9.00
3.06
3.46

0.25
0.25
0.25
0.25

131.18
131.78
0.77
0.87

AREAS IRREGULARES (4)


CDRA 3
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 4
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 5
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 6
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 7
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 8
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 9
IZQ.
DER.
AREAS IRREGULARES (4)

01.02.04

NIVELACION DE BUZONES

02

MOVIMIENTO DE TIERRAS

02.01

CORTE DE MATERIAL SUELTO

10

m3

CDRA. 1
IZQ.
DER.
AREAS IRREGULARES (3)

CDRA 2
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 3
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 4
IZQ.
DER.
AREAS IRREGULARES (4)

7.72
15.56

0.25
0.25

1.93
3.89

51.48
51.24

9.00
9.00
15.99
16.02

0.25
0.25
0.25
0.25

115.83
115.29
4.00
4.01

53.88
53.74

9.00
9.00
5.87
5.75
15.54
16.46

0.25
0.25
0.25
0.25
0.25
0.25

121.23
120.92
1.47
1.44
3.89
4.12

99.61
98.86

9.00
9.00
18.88
24.59
20.03
31.84

0.25
0.25
0.25
0.25
0.25
0.25

224.12
222.44
4.72
6.15
5.01
7.96

110.4
110.49

9.00
9.00
32.13
57.78

0.25
0.25
0.25
0.25

248.40
248.60
8.03
14.45

121.55
124.69

9.00
9.00
13.52
14.54
45.27
11.03

0.25
0.25
0.25
0.25
0.25
0.25

273.49
280.55
3.38
3.64
11.32
2.76

50.91
49.12

9.00
9.00

458.19
442.08
11.98
6.46

48.07
48.02

9.00
9.00

432.63
432.18
11.36
13.71

52.57
52.7

9.00
9.00

473.13
474.30
2.98
3.28
14.16
7.69

58.3
58.57

9.00
9.00

524.70
527.13
3.06
3.46
7.72
15.56

51.48
51.24

9.00
9.00

463.32
461.16
15.99
16.02

53.88
53.74

9.00
9.00

484.92
483.66
5.87
5.75
15.54
16.46

99.61
98.86

9.00
9.00

896.49
889.74

CDRA 5
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 6
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 7
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 8
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 9
IZQ.
DER.
AREAS IRREGULARES (4)

02.02

PERFILADO Y COMPACTADO DE SUB-RASANTE

M2

CDRA. 1
IZQ.
DER.
AREAS IRREGULARES (3)
CDRA 2
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 3
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 4
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 5
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 6
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 7
IZQ.
DER.

18.88
24.59
20.03
31.84

AREAS IRREGULARES (4)

CDRA 8
IZQ.
DER.

110.4
110.49

9.00
9.00

993.60
994.41
32.13
57.78

121.55
124.69

9.00
9.00

1,093.95
1,122.21
13.52
14.54
45.27
11.03

AREAS IRREGULARES (4)


CDRA 9
IZQ.
DER.
AREAS IRREGULARES (4)

02.03

ELIMINACION DE MATERIAL EXCEDENTE

M3

MATERIAL DE CORTE

3,023.62

ESPONJAMIENTO 25%
03
03.01

0.25

3,023.62
755.90

PISOS Y PAVIMENTOS
BASE GRANULAR E=0.20

m2

CDRA. 1
IZQ.
DER.

50.91
49.12

9.00
9.00

458.19
442.08
11.98
6.46

48.07
48.02

9.00
9.00

432.63
432.18
11.36
13.71

52.57
52.7

9.00
9.00

473.13
474.30
2.98
3.28
14.16

AREAS IRREGULARES (3)


CDRA 2
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 3
IZQ.
DER.
AREAS IRREGULARES (4)

7.69
CDRA 4
IZQ.
DER.

58.3
58.57

9.00
9.00

524.70
527.13
3.06
3.46
7.72
15.56

51.48
51.24

9.00
9.00

463.32
461.16
15.99
16.02

53.88
53.74

9.00
9.00

484.92
483.66
5.87
5.75
15.54
16.46

99.61
98.86

9.00
9.00

896.49
889.74
18.88
24.59
20.03
31.84

110.4
110.49

9.00
9.00

993.60
994.41
32.13
57.78

121.55
124.69

9.00
9.00

1,093.95
1,122.21
13.52
14.54
45.27
11.03

50.91
49.12

9.00
9.00

458.19
442.08
11.98
6.46

48.07
48.02

9.00
9.00

432.63
432.18
11.36
13.71

52.57
52.7

9.00
9.00

473.13
474.30
2.98
3.28
14.16
7.69

58.3
58.57

9.00
9.00

524.70
527.13
3.06
3.46
7.72
15.56

51.48
51.24

9.00
9.00

463.32
461.16
15.99
16.02

53.88
53.74

9.00
9.00

484.92
483.66
5.87
5.75
15.54
16.46

99.61
98.86

9.00
9.00

896.49
889.74

AREAS IRREGULARES (4)

CDRA 5
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 6
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 7
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 8
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 9
IZQ.
DER.
AREAS IRREGULARES (4)

03.02

IMPRIMADO

M2

CDRA. 1
IZQ.
DER.
AREAS IRREGULARES (3)
CDRA 2
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 3
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 4
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 5
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 6
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 7
IZQ.
DER.

18.88
24.59
20.03
31.84

AREAS IRREGULARES (4)

CDRA 8
IZQ.
DER.

110.4
110.49

9.00
9.00

993.60
994.41
32.13
57.78

121.55
124.69

9.00
9.00

1,093.95
1,122.21
13.52
14.54
45.27
11.03

AREAS IRREGULARES (4)


CDRA 9
IZQ.
DER.
AREAS IRREGULARES (4)

03.03

PREPARACION DE MEZCLA ASFALT EN CALIENTE

M3

12,094.46

AREA POR ASFALTAR

03.04

ESPARCIDO Y COMPACTADO DE MEZCLA ASFALTICA

0.05

604.72

M2

CDRA. 1
IZQ.
DER.

50.91
49.12

9.00
9.00

458.19
442.08
11.98
6.46

48.07
48.02

9.00
9.00

432.63
432.18
11.36
13.71

52.57
52.7

9.00
9.00

473.13
474.30
2.98
3.28
14.16
7.69

58.3
58.57

9.00
9.00

524.70
527.13
3.06
3.46
7.72
15.56

51.48
51.24

9.00
9.00

463.32
461.16
15.99
16.02

53.88
53.74

9.00
9.00

484.92
483.66
5.87
5.75
15.54
16.46

99.61
98.86

9.00
9.00

896.49
889.74
18.88
24.59
20.03
31.84

110.4
110.49

9.00
9.00

993.60
994.41
32.13
57.78

121.55
124.69

9.00
9.00

1,093.95
1,122.21
13.52
14.54
45.27
11.03

AREAS IRREGULARES (3)


CDRA 2
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 3
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 4
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 5
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 6
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 7
IZQ.
DER.
AREAS IRREGULARES (4)

CDRA 8
IZQ.
DER.
AREAS IRREGULARES (4)
CDRA 9
IZQ.
DER.
AREAS IRREGULARES (4)

03.05

SEALIZACION

03.05.01

PINTADO DE PAVIMENTO (LINEA DISCONTINUA)

ml

CDRA 1 (0.39M/ML)
IZQ.
DER.

0.39
0.39

50.91
49.12

19.85
19.16

0.39
0.39

48.07
48.02

18.75
18.73

0.39
0.39

52.57
52.7

20.50
20.55

0.39
0.39

58.3
58.57

22.74
22.84

0.39
0.39

51.48
51.24

20.08
19.98

0.39
0.39

53.88
53.74

21.01
20.96

0.39
0.39

99.61
98.86

38.85
38.56

0.39
0.39

110.4
110.49

43.06
43.09

0.39
0.39

121.55
124.69

47.40
48.63

1
1

69.81
66.14

69.81
66.14

1
1

60.90
60.80

60.90
60.80

1
1

65.35
65.82

65.35
65.82

1
1

76.77
76.63

76.77
76.63

1
1

65.59
63.85

65.59
63.85

1
1

70.12
71.71

70.12
71.71

1
1

152.5
149.91

152.50
149.91

1
1

144.49
145.12

144.49
145.12

1
1

190.06
178.26

190.06
178.26

CDRA 2 (0.39M/ML)
IZQ.
DER.
CDRA 3 (0.39M/ML)
IZQ.
DER.
CDRA 4 (0.39M/ML)
IZQ.
DER.
CDRA 5 (0.39M/ML)
IZQ.
DER.
CDRA 6 (0.39M/ML)
IZQ.
DER.
CDRA 7 (0.39M/ML)
IZQ.
DER.
CDRA 8 (0.39M/ML)
IZQ.
DER.
CDRA 9 (0.39M/ML)
IZQ.
DER.

03.05.02

PINTADO DE PAVIMENTO (LINEA CONTINUA)

ml

CDRA 1
IZQ.
DER.
CDRA 2
IZQ.
DER.
CDRA 3
IZQ.
DER.
CDRA 4
IZQ.
DER.
CDRA 5
IZQ.
DER.
CDRA 6
IZQ.
DER.
CDRA 7
IZQ.
DER.
CDRA 8
IZQ.
DER.
CDRA 9
IZQ.
DER.

03.05.03

PINTADO DE PAVIMENTO (SIMBOLOS Y LETRAS)

03.05.03.01

LINEA DE PARE

m2.

CDRA 1
CDRA 2
CDRA 3
CDRA 4
CDRA 5
CDRA 6
CDRA 7
CDRA 8
CDRA 9
03.05.03.02

LINEA PEATONAL
CDRA 1
CDRA 2

2
2
2
2
2
2
2
2
2

3
3
3
3
3
3
3
3
3

6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00

12
12
12

2.41
2.49
2.49

28.92
29.88
29.88

m2

CDRA 3
CDRA 4
CDRA 5
CDRA 6
CDRA 7
CDRA 8
CDRA 9

03.05.03.03

FLECHA EN EL PAVIMENTO

04

OBRAS DE CONCRETO

04.01

VEREDAS

04.01.01

OBRAS PRELIMINARES

04.01.01.01

DEMOLICIN DE VEREDAS

2.49
2.49
2.49
2.49
2.48
2.48
2.49
2.49
2.49
2.49
2.5
2.5
2.33
2.5
2.31

29.88
29.88
29.88
29.88
29.76
29.76
29.88
29.88
29.88
29.88
30.00
30.00
27.96
30.00
27.72

18
18

1.84
1.31

33.12
23.58

m2

m2

CDRA. 1

CDRA. 2

CDRA. 3
CDRA. 4
CDRA. 5

CDRA. 6
CDRA. 7

CDRA. 8

CDRA. 9

04.01.01.02

12
12
12
12
12
12
12
12
12
12
12
12
12
12
12

22.50
4.23
36.26
41.74
10.87
21.46
7.81
42.47
25.50
7.18
18.81
13.07
6.82
16.21
5.20
7.64
15.44
8.02
9.82
11.27
8.15
15.54
29.56
3.82
0.88
2.84
17.26
6.40
18.00
7.20
6.00
6.00
19.26

TRAZO NIVELACION Y REPLANTEO MARTILLO, VEREDA Y CABECERA DE SEP. CENTRAL.


m2
CDRA. 1
IZQ.
DER.
CAB. SEP. CENTRAL

134.36
128.71
15.96
14.16

CDRA. 2
IZQ.
DER.
CAB. SEP. CENTRAL

115.09
122.62
16.41
14.21

CDRA. 3
IZQ.
DER.
CAB. SEP. CENTRAL

136.04
138.37
14.70
15.94

CDRA. 4
IZQ.
DER.
CAB. SEP. CENTRAL

145.27
155.24
15.51

14.58
CDRA. 5

120.28
139.60
14.83
14.35

IZQ.
DER.
CAB. SEP. CENTRAL

CDRA. 6

153.79
176.40
14.63
14.93

IZQ.
DER.
CAB. SEP. CENTRAL
CDRA. 7

260.81
262.82
14.48
13.70

IZQ.
DER.
CAB. SEP. CENTRAL

CDRA. 8

258.05
122.24
99.17
12.64
16.67

IZQ.
DER.
CAB. SEP. CENTRAL
CDRA. 9

373.17
113.28
123.74
17.07
17.09

IZQ.
DER.
CAB. SEP. CENTRAL

04.01.02

MOVIMIENTO DE TIERRAS

04.01.02.01

EXCAVACION MASIVA EN TERRENO NORMAL CON TRACTOR

04.01.02.02

BASE GRANULAR E=0.10 M

m3

ELIMINACIN DE MATERIAL EXCEDENTE


ESPONJAMIENTO
CONCRETO SIMPLE

04.01.03.01

VEREDA DE CONCRETO fc= 175 kg/cm2 INC. ACABADO, BRUADO Y ENCOFRADO.

3,550.91

1
1

355.09
355.09

0.10

355.09

3,550.91

m3

EXCAVACION

04.01.03

3,550.91

m2

AFIRMADO DE BASE
04.01.02.03

0.25

355.09
88.77

m2

CDRA. 1
MARTILLO IZQ.
VEREDA IZQ.

39.14

2.4

35.97

2.4

MARTILLO DER.
VEREDA DER.
CABECERA SEP CENTRAL.

23.07
16.99
93.94
23.98
15.46
86.33
13.41
11.54

CDRA. 2
MARTILLO IZQ.
VEREDA IZQ.

34.17

2.40

MARTILLO DER.
VEREDA DER.

34.1

2.4

36.29

2.4

CABECERA SEP CENTRAL.

16.30
11.50
82.01
18.07
16.39
81.84
13.79
11.59

CDRA. 3
MARTILLO IZQ.
VEREDA IZQ.
MARTILLO DER.
VEREDA DER.

36.33

2.4

CABECERA SEP CENTRAL.

15.58
27.66
87.10
17.17
30.58
87.19
12.07
13.32

CDRA. 4
MARTILLO IZQ.
VEREDA IZQ.
MARTILLO DER.

41.8

2.4

25.33
14.38
100.32
33.81
18.90

41.84

VEREDA DER.

2.4

CABECERA SEP CENTRAL.

100.42
12.89
11.96

CDRA. 5
MARTILLO IZQ.

36.58

VEREDA IZQ.

2.40

MARTILLO DER.

35.23

VEREDA DER.

2.4

CABECERA SEP CENTRAL.

14.27
12.96
87.79
28.76
21.03
84.55
12.23
11.73

CDRA. 6
MARTILLO IZQ.

37.7

VEREDA IZQ.

2.40

MARTILLO DER.

36.9

VEREDA DER.

2.4

CABECERA SEP CENTRAL.

12.68
46.32
90.48
27.60
56.23
88.56
12.00
12.29

CDRA. 7
MARTILLO IZQ.

79

VEREDA IZQ.

2.40

MARTILLO DER.

77.41

VEREDA DER.

2.4

CABECERA SEP CENTRAL.

44.49
27.43
189.60
39.40
33.98
185.78
11.86
11.06

CDRA. 8
MARTILLO IZQ.

72.07

VEREDA IZQ.

2.40

MARTILLO DER.

31.98
36.79

VEREDA DER.
CABECERA SEP CENTRAL.

2.4
2.4

30.53
42.59
172.97
32.07
8.99
11.26
76.75
88.30
11.17
14.20

CDRA. 9

40.99
18.87
308.04
19.29

MARTILLO IZQ.
VEREDA IZQ.
MARTILLO DER.

113.28
102.27
14.43

VEREDA DER.
CABECERA SEP CENTRAL.
04.01.03.02

RAMPAS DE CONCRETO fc= 175 kg/cm2 INC. ACABADO Y BRUADO

m3

RAMPAS

04.01.04

JUNTAS ASFALTICAS e= 1"

04.01.04.01

JUNTA DE DILATACION ASFALTICA A CADA 3 mts.

100

0.1

10.00
14.57

15
13

2.4
2.4

36.00
31.20

13
13

2.4
2.4

31.20
31.20

14
14

2.4
2.4

33.60
33.60

15
15

2.4
2.4

36.00
36.00

14

2.4

33.60

ml

CDRA. 01
IZQ.
DER.
CDRA. 02
IZQ.
DER.
CDRA. 03
IZQ.
DER.
CDRA. 04
IZQ.
DER.
CDRA. 05
IZQ.

DER.

13

2.4

31.20

14
14

2.4
2.4

33.60
33.60

28
27

2.4
2.4

67.20
64.80

26
12
14

2.4
2.4

62.40
28.80

33
18
15

3
3
3

99.00
54.00
45.00

1
1
1
1

38.95
36
38.24
37.56

38.95
36.00
38.24
37.56

1
1
1
1

34.18
34.02
34.11
34.07

34.18
34.02
34.11
34.07

1
1
1
1

36.27
36.34
36.49
36.51

36.27
36.34
36.49
36.51

1
1
1
1

41.79
41.9
42.06
42.11

41.79
41.90
42.06
42.11

1
1
1
1

36.56
35.23
36.2
35.97

36.56
35.23
36.20
35.97

1
1
1
1

37.66
36.91
39.85
39.76

37.66
36.91
39.85
39.76

1
1
1
1

78.79
77.48
79.65
79.3

78.79
77.48
79.65
79.30

1
1
1
1
1

72.08
31.98
36.79
79.82
81.51

72.08
31.98

1
1
1
1
1

48.92
40.52
99.31
100.55

CDRA. 06
IZQ.
DER.
CDRA. 07
IZQ.
DER.
CDRA. 08
IZQ.
DER.

CDRA. 09
IZQ.
DER.

04.02

SARDINELES

04.02.01

0BRAS PRELIMINARES

04.02.01.01

TRAZO NIVELACION Y REPLANTEO - SARDINELES

CDRA. 1

IZQ.
DER.
SEP. CENTRAL

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

CDRA. 4

IZQ.
DER.
SEP. CENTRAL

CDRA. 5

IZQ.
DER.
SEP. CENTRAL

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

CDRA. 8

IZQ.
DER.
SEP. CENTRAL

79.82
81.51

CDRA. 9

IZQ.
DER.
SEP. CENTRAL

0.00
48.92
99.31
100.55

04.02.01.02

TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO - SARDINELES

CDRA. 1

IZQ.
DER.
SEP. CENTRAL

1
1
1
1

38.95
36
38.24
37.56

38.95
36.00
38.24
37.56

1
1
1
1

34.18
34.02
34.11
34.07

34.18
34.02
34.11
34.07

1
1
1
1

36.27
36.34
36.49
36.51

36.27
36.34
36.49
36.51

1
1
1
1

41.79
41.9
42.06
42.11

41.79
41.90
42.06
42.11

1
1
1
1

36.56
35.23
36.2
35.97

36.56
35.23
36.20
35.97

1
1
1
1

37.66
36.91
39.85
39.76

37.66
36.91
39.85
39.76

1
1
1
1

78.79
77.48
79.65
79.3

78.79
77.48
79.65
79.30

IZQ.
DER.

1
1

72.08
31.98

SEP. CENTRAL

1
1

72.08
31.98
36.79
79.82
81.51

1
1
1
1
1

48.92
40.52
99.31
100.55

99.31
100.55

1
1
1
1

38.95
36
38.24
37.56

38.95
36.00
38.24
37.56

1
1
1
1

34.18
34.02
34.11
34.07

34.18
34.02
34.11
34.07

1
1
1
1

36.27
36.34
36.49
36.51

36.27
36.34
36.49
36.51

41.79

41.79

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

CDRA. 4

IZQ.
DER.
SEP. CENTRAL

CDRA. 5

IZQ.
DER.
SEP. CENTRAL

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

CDRA. 8

79.82
81.51

CDRA. 9

IZQ.
DER.
SEP. CENTRAL

04.02.02

MOVIMIENTO DE TIERRAS

04.02.02.01

EXCAVACION MANUAL DE SARDINELES

0.00
48.92

CDRA. 1

IZQ.
DER.
SEP. CENTRAL

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

CDRA. 4

IZQ.

DER.
SEP. CENTRAL

1
1
1

41.9
42.06
42.11

41.90
42.06
42.11

1
1
1
1

36.56
35.23
36.2
35.97

36.56
35.23
36.20
35.97

1
1
1
1

37.66
36.91
39.85
39.76

37.66
36.91
39.85
39.76

1
1
1
1

78.79
77.48
79.65
79.3

78.79
77.48
79.65
79.30

1
1
1
1
1

72.08
31.98
36.79
79.82
81.51

72.08
31.98

1
1
1
1
1

48.92
40.52
99.31
100.55

1
1

1,728.13
181.45

CDRA. 5

IZQ.
DER.
SEP. CENTRAL

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

CDRA. 8

IZQ.
DER.
SEP. CENTRAL

79.82
81.51

CDRA. 9

IZQ.
DER.
SEP. CENTRAL

04.02.02.02

ELIMINACION DE MATERIAL EXCEDENTE


Esponjamiento
CONCRETO ARMADO

04.02.03.01

CONCRETO PARA SARDINEL PERALTADO F'c=175 Kg/Cm2

99.31
100.55

m3

Material sacado

04.02.03

0.00
48.92

0.3

0.35
0.25

181.45
45.36

m3
54.16

04.02.03.01.01 Peralte
CDRA. 1

IZQ.
DER.
SEP. CENTRAL

1
1
1
1

38.95
36
38.24
37.56

0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2

1.17
1.08
1.15
1.13

1
1
1
1

34.18
34.02
34.11
34.07

0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2

1.03
1.02
1.02
1.02

1
1
1
1

36.27
36.34
36.49
36.51

0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2

1.09
1.09
1.09
1.10

1
1
1
1

41.79
41.9
42.06
42.11

0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2

1.25
1.26
1.26
1.26

1
1
1
1

36.56
35.23
36.2
35.97

0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2

1.10
1.06
1.09
1.08

1
1
1
1

37.66
36.91
39.85
39.76

0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2

1.13
1.11
1.20
1.19

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

CDRA. 4

IZQ.
DER.
SEP. CENTRAL

CDRA. 5

IZQ.
DER.
SEP. CENTRAL

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

1
1
1
1

78.79
77.48
79.65
79.3

0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2

2.36
2.32
2.39
2.38

1
1
1
1
1

72.08
31.98
36.79
79.82
81.51

0.15
0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2
0.2

2.16
0.96
1.10
2.39
2.45

1
1
1
1
1

48.92
40.52
99.31
100.55

0.15
0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2
0.2

0.00
1.47
1.22
2.98
3.02

CDRA. 8

IZQ.
DER.
SEP. CENTRAL

CDRA. 9

IZQ.
DER.
SEP. CENTRAL

162.49

04.02.03.01.02 Cimiento
CDRA. 1

IZQ.
DER.
SEP. CENTRAL

1
1
1
1

38.95
36
38.24
37.56

0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3

3.51
3.24
3.44
3.38

1
1
1
1

34.18
34.02
34.11
34.07

0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3

3.08
3.06
3.07
3.07

1
1
1
1

36.27
36.34
36.49
36.51

0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3

3.26
3.27
3.28
3.29

1
1
1
1

41.79
41.9
42.06
42.11

0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3

3.76
3.77
3.79
3.79

1
1
1
1

36.56
35.23
36.2
35.97

0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3

3.29
3.17
3.26
3.24

1
1
1
1

37.66
36.91
39.85
39.76

0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3

3.39
3.32
3.59
3.58

1
1
1
1

78.79
77.48
79.65
79.3

0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3

7.09
6.97
7.17
7.14

1
1
1
1
1

72.08
31.98
36.79
79.82
81.51

0.3
0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3
0.3

6.49
2.88
3.31
7.18
7.34

1
1
1
1
1

48.92
40.52
99.31
100.55

0.3
0.3
0.3
0.3
0.3

0.3
0.3
0.3
0.3
0.3

0.00
4.40
3.65
8.94
9.05

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

CDRA. 4

IZQ.
DER.
SEP. CENTRAL

CDRA. 5

IZQ.
DER.
SEP. CENTRAL

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

CDRA. 8

IZQ.
DER.
SEP. CENTRAL

CDRA. 9

IZQ.
DER.
SEP. CENTRAL

04.02.03.02

ENCOFRADO Y DESENCOFRADO DE SARDINEL

m2

CDRA. 1

IZQ.
DER.
SEP. CENTRAL

2
2
2
2

38.95
36
38.24
37.56

0.2
0.2
0.2
0.2

15.58
14.40
15.30
15.02

2
2
2
2

34.18
34.02
34.11
34.07

0.2
0.2
0.2
0.2

13.67
13.61
13.64
13.63

2
2
2
2

36.27
36.34
36.49
36.51

0.2
0.2
0.2
0.2

14.51
14.54
14.60
14.60

2
2
2
2

41.79
41.9
42.06
42.11

0.2
0.2
0.2
0.2

16.72
16.76
16.82
16.84

2
2
2
2

36.56
35.23
36.2
35.97

0.2
0.2
0.2
0.2

14.62
14.09
14.48
14.39

2
2
2
2

37.66
36.91
39.85
39.76

0.2
0.2
0.2
0.2

15.06
14.76
15.94
15.90

2
2
2
2

78.79
77.48
79.65
79.3

0.2
0.2
0.2
0.2

31.52
30.99
31.86
31.72

2
2
2
2
2

72.08
31.98
36.79
79.82
81.51

0.2
0.2
0.2
0.2
0.2

28.83
12.79
14.72
31.93
32.60

2
2
2
2
2

48.92
40.52
99.31
100.55

0.2
0.2
0.2
0.2
0.2

0.00
19.57
16.21
39.72
40.22

852.81
1423.69
1038.94

0.25
0.58
0.03

213.20
825.74
31.17

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

CDRA. 4

IZQ.
DER.
SEP. CENTRAL

CDRA. 5

IZQ.
DER.
SEP. CENTRAL

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

CDRA. 8

IZQ.
DER.
SEP. CENTRAL

CDRA. 9

IZQ.
DER.
SEP. CENTRAL

04.02.03.03

ACERO DE SARDINEL fy=4200 kg/cm2

kg

ACERO 1/4"
ACERO 3/8"
04.02.03.04

ALAMBRE N 16

kg

04.02.04

JUNTAS ASFALTICAS A CADA 3 METROS.

CDRA. 01
IZQ.
DER.
SEP. CENTRAL

15
13
14
14

0.15
0.15
0.15
0.15

2.25
1.95
2.10
2.10

13
13
13
13

0.15
0.15
0.15
0.15

1.95
1.95
1.95
1.95

14
14
14
14

0.15
0.15
0.15
0.15

2.10
2.10
2.10
2.10

CDRA. 02
IZQ.
DER.
SEP. CENTRAL

CDRA. 03
IZQ.
DER.
SEP. CENTRAL

CDRA. 04
IZQ.
DER.
SEP. CENTRAL

15
15
16
16

0.15
0.15
0.15
0.15

2.25
2.25
2.40
2.40

14
13
14
13

0.15
0.15
0.15
0.15

2.10
1.95
2.10
1.95

14
14
15
15

0.15
0.15
0.15
0.15

2.10
2.10
2.25
2.25

28
27
28
28

0.15
0.15
0.15
0.15

4.20
4.05
4.20
4.20

26
12
14
28
29

0.15
0.15
0.15
0.15
0.15

3.90
1.80
2.10
4.20
4.35

18
15
34
35

0.15
0.15
0.15
0.15

2.70
2.25
5.10
5.25

3
3
3
3

38.95
36
38.24
37.56

0.15
0.15
0.15
0.15

17.53
16.20
17.21
16.90

3
3
3
3

34.18
34.02
34.11
34.07

0.15
0.15
0.15
0.15

15.38
15.31
15.35
15.33

3
3
3
3

36.27
36.34
36.49
36.51

0.15
0.15
0.15
0.15

16.32
16.35
16.42
16.43

3
3
3
3

41.79
41.9
42.06
42.11

0.15
0.15
0.15
0.15

18.81
18.86
18.93
18.95

3
3
3
3

36.56
35.23
36.2
35.97

0.15
0.15
0.15
0.15

16.45
15.85
16.29
16.19

3
3
3
3

37.66
36.91
39.85
39.76

0.15
0.15
0.15
0.15

16.95
16.61
17.93
17.89

CDRA. 05
IZQ.
DER.
SEP. CENTRAL

CDRA. 06
IZQ.
DER.

CDRA. 07
IZQ.
DER.
SEP. CENTRAL

CDRA. 08
IZQ.
DER.
SEP. CENTRAL

CDRA. 09
IZQ.
DER.
SEP. CENTRAL

04.02.05

PINTURA DE SARDINELES

m2

CDRA. 1

IZQ.
DER.
SEP. CENTRAL

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

CDRA. 4

IZQ.
DER.
SEP. CENTRAL

CDRA. 5

IZQ.
DER.
SEP. CENTRAL

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

3
3
3
3

78.79
77.48
79.65
79.3

0.15
0.15
0.15
0.15

35.46
34.87
35.84
35.69

3
3
3
3
3

72.08
31.98
36.79
79.82
81.51

0.15
0.15
0.15
0.15
0.15

32.44
14.39
16.56
35.92
36.68

3
3
3
3

48.92
40.52
99.31
100.55

0.15
0.15
0.15
0.15

0.00
22.01
18.23
44.69
45.25

CDRA. 8

IZQ.
DER.
SEP. CENTRAL

CDRA. 9

IZQ.
DER.
SEP. CENTRAL

04.02.06

PINTURA DE MARTILLOS, SEPARDOR CENTRAL

04.02.06.01

MARTILLOS, SEPARADOR CENTRAL

m2
m2

143.27

CDRA. 1
IZQ.
DER.
SEP. CENTRAL

2
2
2
2
2
2

8.56
6.77
7.72
5.57
6.29
11.54

0.15
0.15
0.15
0.15
0.15
0.15

2.57
2.03
2.32
1.67
1.89
3.46

2
2
2
2
2
2

6.40
4.35
5.77
5.81
12.70
11.58

0.15
0.15
0.15
0.15
0.15
0.15

1.92
1.31
1.73
1.74
3.81
3.47

2
2
2
2
2
2

5.58
7.77
5.70
8.64
11.81
12.43

0.15
0.15
0.15
0.15
0.15
0.15

1.67
2.33
1.71
2.59
3.54
3.73

2
2
2
2
2
2

7.87
5.08
8.67
6.18
12.22
11.77

0.15
0.15
0.15
0.15
0.15
0.15

2.36
1.52
2.60
1.85
3.67
3.53

2
2
2
2
2
2

5.32
4.72
6.91
7.10
11.91
11.64

0.15
0.15
0.15
0.15
0.15
0.15

1.60
1.42
2.07
2.13
3.57
3.49

2
2
2
2
2
2

4.96
11.65
7.97
13.40
11.78
11.92

0.15
0.15
0.15
0.15
0.15
0.15

1.49
3.50
2.39
4.02
3.53
3.58

2
2
2
2
2
2

11.72
7.76
10.40
8.93
11.71
11.29

0.15
0.15
0.15
0.15
0.15
0.15

3.52
2.33
3.12
2.68
3.51
3.39

2
2

8.24
14.15

0.15
0.15

2.47
4.25

CDRA. 2
IZQ.
DER.
SEP. CENTRAL

CDRA. 3
IZQ.
DER.
SEP. CENTRAL

CDRA. 4
IZQ.
DER.
SEP. CENTRAL

CDRA. 5
IZQ.
DER.
SEP. CENTRAL

CDRA. 6
IZQ.
DER.
SEP. CENTRAL

CDRA. 7
IZQ.
DER.
SEP. CENTRAL

CDRA. 8
IZQ.

DER.

SEP. CENTRAL

2
2
2
2
2

8.54
4.75
5.34
11.35
13.05

0.15
0.15
0.15
0.15
0.15

2.56

2
2
2
2
2

10.01
10.67
7.77
12.97
12.93

0.15
0.15
0.15
0.15
0.15

3.00
3.20
2.33
3.89
3.88

100

3.41

3.41
3.92

CDRA. 9
IZQ.
DER.
SEP. CENTRAL

04.02.06.02

RAMPA EN MARTILLOS

05

INSTALACIONES SANITARIAS

05.01

REPOSICION DE CONEXIONES DOMICILIARIAS

06

AREAS VERDES

06.01

TRAZO Y REPLANTEO

m2

0.15

51.12

59.00

m2

CDRA. 1

IZQ.
DER.
SEP. CENTRAL

45.60
56.05
140.23

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

39.73
74.22
126.15

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

70.77
83.61
135.06

CDRA. 4

IZQ.
DER.
SEP. CENTRAL

67.58
92.64
155.70

CDRA. 5

IZQ.
DER.
SEP. CENTRAL

45.97
76.13
133.52

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

34.28
83.84
147.29

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

169.55
118.35
294.07

CDRA. 8

IZQ.
DER.

141.63
40.77
74.77
297.37

SEP. CENTRAL
CDRA. 9

IZQ.
DER.

76.32
48.92
369.27

SEP. CENTRAL

06.02

SEMBRADO DE GRASS

m2

CDRA. 1

IZQ.
DER.
SEP. CENTRAL

45.60
56.05
140.23

CDRA. 2

IZQ.
DER.
SEP. CENTRAL

39.73
74.22
126.15

CDRA. 3

IZQ.
DER.
SEP. CENTRAL

70.77
83.61
135.06

CDRA. 4

IZQ.
DER.
SEP. CENTRAL
CDRA. 5

67.58
92.64
155.70

IZQ.
DER.
SEP. CENTRAL

45.97
76.13
133.52

CDRA. 6

IZQ.
DER.
SEP. CENTRAL

34.28
83.84
147.29

CDRA. 7

IZQ.
DER.
SEP. CENTRAL

169.55
118.35
294.07

CDRA. 8

IZQ.
DER.

141.63
40.77
74.77
297.37

SEP. CENTRAL
CDRA. 9

IZQ.
DER.

76.32
48.92
369.27

SEP. CENTRAL
07

VARIOS

7.01

TACHO DE BASURA

38.00

TOTAL

1.00
1.00
1.00
12,094.46

12,094.46

10.00

3,023.62

12,094.46

3,779.52

12,094.46

12,094.46

604.72

12,094.46

504.74

1,773.83

643.62

473.23

3,550.91

355.09

3,550.91
443.86

3,438.53

10.00

822.00

1,728.13

1,728.13

1,728.13

226.82

216.65

722.18

1,038.94

31.17

99.00

812.45

194.39

59.00

3,239.39

3,239.39

38.00

ACERO
PARTIDA

ARMADURA

DESCRIPCION

N PIEZAS

LONGITUD EN METROS
LONG.

CONCRETO ARMADO
ACERO DE SARDINEL fy = 4200kg/cm2

1/4''

3411.24

3/8''

2454.63

CUADRA 1
Acero longitudinal @ .30 (Jardin Izq.)

39.95
1/4"

1.00

2.00

39.95

3/8"

1.00

113.00

0.51

1/4"

1.00

2.00

36.80

3/8"

1.00

104.00

0.51

79.90

Acero transversal @ .35 (Jardin Izq.)

0.40

0.10

57.63

1800

150

0.01

Acero longitudinal @ .30 (Jardin Der.)


36.8

73.60

Acero transversal @ .35 (Jardin Der.)

150

0.01

0.40

1800

04.02.03
04.02.03.03

CANTIDAD

0.10

53.04

1/2''

0.00

PESO EN KILOGRAMOS
5/8"

0.00

3/4"

1/4''

3/8''

1/2''

5/8"

3/4"

0.00

0.25
852.81

0.58
1423.69

1.02
0.00

1.60
0.00

2.26
0.00